CN103866660A - Small high speed ballastless track rope saw cutting device - Google Patents

Small high speed ballastless track rope saw cutting device Download PDF

Info

Publication number
CN103866660A
CN103866660A CN201210534754.6A CN201210534754A CN103866660A CN 103866660 A CN103866660 A CN 103866660A CN 201210534754 A CN201210534754 A CN 201210534754A CN 103866660 A CN103866660 A CN 103866660A
Authority
CN
China
Prior art keywords
saw cutting
installing plate
rope
rope saw
general utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201210534754.6A
Other languages
Chinese (zh)
Other versions
CN103866660B (en
Inventor
常士家
谢江生
刘学毅
杨荣山
胡斌
刘刚
赵雪玉
陈安叶
袁燕萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRCC High Tech Equipment Corp Ltd
Original Assignee
Kunming China Railway Large Maintenance Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunming China Railway Large Maintenance Machinery Co Ltd filed Critical Kunming China Railway Large Maintenance Machinery Co Ltd
Priority to CN201210534754.6A priority Critical patent/CN103866660B/en
Publication of CN103866660A publication Critical patent/CN103866660A/en
Application granted granted Critical
Publication of CN103866660B publication Critical patent/CN103866660B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)
  • Earth Drilling (AREA)

Abstract

The invention relates to a small high speed ballastless track rope saw cutting device which comprises a general tool trolley on a ballastless track and formed by supporting a steel track and a track plate through four wheels, an object storage box used for placing accessories for maintenance is arranged in the trolley, a handrail is installed at the tail end, locking mechanisms are installed at four corners of the trolley, and a lateral drilling suspension support is connected on one side or two sides of the trolley through a lateral drilling suspension support installation plate. A guide track is arranged at the front end of the trolley, and a vertical drilling installation support is installed on the guide track. Support installation plates on two sides of the trolley are connected with a rope saw cutting suspension support through a rope saw cutting installation plate. A maintaining device has generality, different maintenance operations are achieved by installing different maintenance device installation supports, one-side drilling or two-side drilling is achieved, single hole drilling or simultaneous multiple hole drilling is achieved, the drilling efficiency is effectively improved, rope saw cutting is flexible and variable, and the maintenance device installation supports are simple and convenient to assemble and disassemble.

Description

A kind of rope saw cutting equipment of miniature high-speed non-fragment orbit
Technical field
The present invention relates to ballastless track of high-speed railway maintenance field, in particular to a kind of rope saw cutting equipment of miniature high-speed non-fragment orbit.
Background technology
At present, the High-speed Railway Network of China begins to take shape, and high speed railway track pattern is taking non-fragment orbit as main.In general, non-fragment orbit has higher stability and durability, builds up rear seldom needs and safeguards.But under the long term of train load and factor of natural environment, produce destruction once the force transferring part of moderate finite deformation or track occurs on basis, the strength and stability of track structure is just difficult to ensure, and is difficult for reparation.
Although China is longer to non-fragment orbit research history, to build and putting into effect high-speed railway and the laying maximum country of non-fragment orbit at present, but major part is all built up by innovation again in recent years, to the research of ballastless track system especially CRTS series ballastless track system recovery technique also in the Primary Study stage.To the development of ballastless track of high-speed railway system repaired item, be a R&D process of growing out of nothing, fill up the blank of domestic ballastless track of high-speed railway system repaired item.
For example notice of authorization number is that the Chinese patent of CN 202208871 U discloses a kind of fine adjustment equipment for ballastless track slab of high-speed railway, comprise multiple adjusters, console, power distributing cabinet and mobile vehicle frame, multiple adjusters are all electrically connected with console, adjuster comprises elevation adjuster and horizontal adjustment device, elevation adjuster and horizontal adjustment device join with vertical screw and horizontal screw bolt respectively, mobile vehicle frame comprises support body, the bottom of support body is connected with multiple universal caster wheels that can drive support body to move forward and backward, on support body, be provided with connecting rod, this accurate-adjusting equipment easy to use and flexible, degree of regulation is high, be convenient to promote the use of, but it is whole that this accurate-adjusting equipment only carries out accurate adjustment for track plates, can not keep in repair other fault occurring on track.
The United States Patent (USP) that for example notice of authorization number is CN 1168434 A again discloses a kind of fully automatic, multiple operation rail maintenance apparatus, comprise a movable machine, its have a body frame, crosses basal plane driving mechanism for promoting this machine, one and machine be connected and be connected with machine for surveying the sensor of at least one position that is positioned the target on described basal plane and one, comprise that for obtaining the encoder component exercise data of exercise data at least machine crosses the displacement of basal plane and of speed.This maintenance of equipment is full-automatic maintenance of equipment, and the degree of accuracy is higher, but this maintenance of equipment complicated structure, floor space is larger, and operating system is comparatively complicated, and needs professional just can operate.
Summary of the invention
In order to solve the above-mentioned technological deficiency existing in prior art, the invention provides a kind of general utility tool dolly that different maintenances of equipment can be installed and supporting difference maintenance equipment mounting frame thereof, in maintenance sites, can be according to different maintenance requirements, the maintenance of equipment installing rack that can complete corresponding maintenance work is installed on general utility tool dolly and is solved the difficulty running in the maintenance of non-fragment orbit, as to the horizontal drilling deep hole of CA screed, track twist drill anchor hole, track plates cutting and whole CA screed horizontal resection etc.
To achieve these goals, technical scheme of the present invention is:
A kind of rope saw cutting equipment of miniature high-speed non-fragment orbit, comprise by four wheels and be bearing in the general utility tool dolly on the non-fragment orbit being formed by rail and track plates, in general utility tool dolly, put the storage tank of maintenance accessory, rear end is provided with handrail, and four jiaos of described general utility tool dolly are provided with locking mechanism; The bearing installing plate of general utility tool dolly both sides cuts installing plate by rope sawing and cuts suspension and link together with rope sawing.
Preferably, described general dolly is supported by structural framing, and structural framing is mainly welded by rectangular tube.
In above-mentioned arbitrary scheme, preferably, described wheel is embedded in structural framing; Respectively there is a support bar wheel both sides, and by an axle, wheel and support bar are cascaded, and support bar is welded on the side of structural framing.
In above-mentioned arbitrary scheme, preferably, the rectangular tube of described structural framing front end is removed the face with the welding of general utility tool dolly, has been screwed respectively five panels on its excess-three face.
In above-mentioned arbitrary scheme, preferably, the close one side of described bearing installing plate and storage tank is welded with three gussets.
In above-mentioned arbitrary scheme, preferably, described bearing installing plate top has two bolt fixing holes; The bottom of bearing installing plate is bolted the installation board slot of lock screw.
The front end of general utility tool dolly has a guide rail, rail length equates with the width of track plates, guide rail is for installing vertical boring installing rack, and realized vertical boring installing rack and can on guide rail, slide, therefore realizing general utility tool dolly can be in the horizontal optional position boring of whole track plates.Because vertical boring installing rack will slide on guide rail, therefore in order to reduce the contact area of vertical boring installing rack and guide rail, and it is more easily more laborsaving that vertical boring installing rack is slided on guide rail, also reduce machine area simultaneously, except the rectangular tube of structural framing front end and the face of general utility tool dolly welding, five panels on its excess-three surface, are screwed respectively for vertical boring installing rack is installed.
General utility tool dolly is each side provided with a bearing installing plate, in order to improve the strength and stability of bearing installing plate, is welded with three gussets at bearing installing plate near the one side of storage tank.Bearing installing plate top has two bolt fixing holes; The installing plate cover that lock screw is installed is fixed by bolts to the bottom of bearing installing plate, forms a groove with bearing installing plate simultaneously, and this groove is mainly used for limiting the installing rack of the maintenance of equipment coordinating with bearing installing plate.In the time that the bed plate of maintenance of equipment installing rack embeds in groove, lock screw closely fits together seamless by the bed plate of maintenance of equipment installing rack and bearing installing plate, thereby ensured, in the time of operation, maintenance of equipment installing rack can be because of vibration vibration greatly and ceaselessly.
In above-mentioned arbitrary scheme, preferably, described locking mechanism comprises rail snap close, lateral locking double-screw bolt and vertical lock stud.
In above-mentioned arbitrary scheme, preferably, described vertical lock stud is welded on the top panel of rail snap close, and perpendicular to the top panel of rail snap close; Vertical lock stud is arranged in the waist hole on the short slab of general dolly, and can slide.
In above-mentioned arbitrary scheme, preferably, the inside groove of described rail buckle structure mates with rail profile.
In above-mentioned arbitrary scheme, preferably, described lateral locking double-screw bolt is resisted against on rail shackle sides panel.
Locking mechanism regulates the position of rail snap close by waist hole on short slab, at non-job state, by regulating the position of rail snap close to make rail snap close depart from rail, thereby do not affect the quick transition operation of short distance of general utility tool dolly; Under diagram job state, utilize locking mechanism can make general utility tool dolly be locked in securely on rail in the time of operation, rail snap close in locking mechanism coordinates with rail, recycling lateral locking double-screw bolt limits the lateral displacement of general utility tool dolly, and vertical lock stud limits the vertical deviation of general utility tool dolly.
In above-mentioned arbitrary scheme, preferably, the bottom that installing plate is cut in described rope sawing is arranged in the installing plate cover of general utility tool dolly, and fits together by the lock screw bearing installing plate that sawing cuts installing plate and general utility tool dolly that makes to restrict.
In above-mentioned arbitrary scheme, preferably, the top of installing plate is cut in described rope sawing and the bearing installing plate of general utility tool dolly is removably linked together by attachment bolt.
In above-mentioned arbitrary scheme, preferably, described rope sawing is cut on installing plate and is welded a short semi girder, and the bottom of short semi girder is welded with leading block erection column, on leading block erection column, leading block is installed.
In above-mentioned arbitrary scheme, preferably, on described leading block, be wound with rope sawing and cut rope.
In above-mentioned arbitrary scheme, preferably, described rope sawing is cut to restrict and under the drive of power source, is cut the track plates of non-fragment orbit.
The bottom that rope sawing is cut to installing plate is arranged in the installing plate cover of general utility tool dolly, and cuts together with the bearing installing plate secure fit of installing plate and general utility tool dolly by the lock screw sawing that makes to restrict; The top of installing plate is cut in rope sawing and the bearing installing plate of general utility tool dolly is linked together reliably by attachment bolt, in the time of dismounting, only attachment bolt need to be turned on.After the bearing installing plate that rope sawing is cut to installing plate and general utility tool dolly links together, again leading block direction is as required arranged on leading block erection column, finally rope sawing cut rope along leading block around, like this by the sawing of power source band running rope cut rope shuttling movement realize cutting non-fragment orbit track plates.
Second aspect of the present invention provides a kind of flank hole suspension, and this flank hole suspension and described general utility tool dolly link together, and flank hole suspension is connected to the one or both sides of general utility tool dolly by flank hole suspension installing plate.
The 3rd aspect of the present invention provides a kind of vertical boring installing rack, and this vertical boring installing rack and described general dolly link together, and vertical boring installing rack is connected on the guide rail of general utility tool dolly front end.
Preferably, the bottom of the flank hole suspension installing plate of described flank hole suspension is arranged in the installing plate cover of general utility tool dolly, and makes by lock screw together with the bearing installing plate secure fit of flank hole suspension installing plate and general utility tool dolly.
In above-mentioned arbitrary scheme, preferably, the top of flank hole suspension installing plate and the bearing installing plate of general utility tool dolly of described flank hole suspension link together by attachment bolt is dismountable.
In above-mentioned arbitrary scheme, preferably, described flank hole suspension installing plate is welded on semi girder one end; Semi girder is rectangular tube, and its other end is provided with extensible canopy.
In above-mentioned arbitrary scheme, preferably, the intersection of described semi girder and flank hole suspension installing plate is welded with four gussets.
In above-mentioned arbitrary scheme, preferably, described semi girder has a waist hole near the bottom of extensible canopy one end, and is welded with eight blocks, and extensible canopy can slide in semi girder.
In above-mentioned arbitrary scheme, preferably, described extensible canopy is fixed with bolt near one end of semi girder, and snap close and spring are housed on bolt.
In above-mentioned arbitrary scheme, preferably, the other end of described extensible canopy is welded with auger supporting backboard, and auger supporting backboard is provided with auger mount pad.
In above-mentioned arbitrary scheme, preferably, described auger mount pad is provided with dovetail structure, and by trip bolt, auger mount pad is fixed on auger supporting backboard; Handle, lead screw pair and guide rail are installed on auger mount pad.
In above-mentioned arbitrary scheme, preferably, described guide rail is provided with auger, and auger can be at guide rail lateral sliding.
In above-mentioned arbitrary scheme, preferably, described extensible canopy in indentation position, is installed undersized auger in the time of limited space on auger mount pad; Be not subject in limited time extensible canopy in stretching out position in space, auger that drilling efficiency is higher be installed on flank hole suspension.
In the time of limited space, the general utility tool dolly that flank hole suspension is installed is not exceeding under the prerequisite of gauge, meets non-fragment orbit boring demand simultaneously.When the one-sided installation of flank hole suspension, can carry out one-sided boring maintenance activity to non-fragment orbit; When flank hole suspension bilateral is installed, can realize the boring maintenance activity to non-fragment orbit bilateral.
In above-mentioned arbitrary scheme, preferably, described vertical boring installing rack is arranged on guide rail by slide block and baffle plate; Vertical boring installing rack can slide on guide rail.
In above-mentioned arbitrary scheme, preferably, described slide block top and baffle plate link together by attachment bolt is dismountable, and trip bolt is installed on baffle plate.
In above-mentioned arbitrary scheme, preferably, in the vertical chute of described slide block, be provided with L-type installing plate.
In above-mentioned arbitrary scheme, preferably, the middle part of a side plate of described L-type installing plate has a waist hole, and L-type installing plate is fixed in slide block by an attachment bolt through lockplate and this edge plate waist hole.
In above-mentioned arbitrary scheme, preferably, this edge plate of described L-type installing plate is provided with four row's sulculuses.
Vertical boring installing rack is arranged on guide rail by slide block and baffle plate, and vertical boring installing rack can slide and adjust position arbitrarily on guide rail.When vertical boring installing rack slides into after correct position on guide rail, utilize trip bolt that vertical boring installing rack is fixed, vertical boring taking two vertical boring installing racks on one group of guide rail that is arranged on general utility tool dolly.Auger is arranged on two vertical boring installing racks, between two vertical boring installing racks, stays certain interval, utilizes this gap auger and vertical boring installing rack to be fixed together with screw bolt and nut, and gap should not be less than the diameter of bolt.In order to improve drilling efficiency, the in the situation that of generator or other power source power and space permission, can allow the many groups of vertical boring installing racks that auger is installed carry out vertical bore operation simultaneously.
Brief description of the drawings
Fig. 1 is according to the structural representation of a preferred embodiment of the rope saw cutting equipment of miniature high-speed non-fragment orbit of the present invention;
Fig. 2 is according to the structural framing of embodiment illustrated in fig. 1 middle general utility tool dolly and the top view of train of the rope saw cutting equipment of miniature high-speed non-fragment orbit of the present invention;
Fig. 3 is according to the structural representation of the embodiment illustrated in fig. 1 middle general utility tool dolly locking mechanism of the rope saw cutting equipment of miniature high-speed non-fragment orbit of the present invention;
Fig. 4 is according to the structural representation of rail snap close in the embodiment illustrated in fig. 3 middle locking mechanism of the rope saw cutting equipment of miniature high-speed non-fragment orbit of the present invention;
Fig. 5 is according to the structural representation of the flank hole suspension of the rope saw cutting equipment of miniature high-speed non-fragment orbit of the present invention;
Fig. 6 is the rope saw embodiment illustrated in fig. 1 middle general utility tool dolly of cutting equipment and the structural representation of flank hole suspension assembly according to miniature high-speed non-fragment orbit of the present invention;
Fig. 7 is arranged on according to a flank hole suspension in the rope saw cutting equipment of miniature high-speed non-fragment orbit of the present invention the structural representation of realizing one-sided boring on general utility tool dolly;
Fig. 8 is arranged on according to two flank hole suspensions in the rope saw cutting equipment of miniature high-speed non-fragment orbit of the present invention the structural representation of realizing bilateral boring on general utility tool dolly;
Fig. 9 is according to the structural representation of vertical boring installing rack in the rope saw cutting equipment of miniature high-speed non-fragment orbit of the present invention;
Figure 10 is the rope saw embodiment illustrated in fig. 1 middle general utility tool dolly of cutting equipment and the structural representation of vertical boring installing rack assembly according to miniature high-speed non-fragment orbit of the present invention;
Figure 11 is the structural representation that cuts suspension according to the sawing of restricting in the rope saw cutting equipment of miniature high-speed non-fragment orbit of the present invention;
Figure 12 is the structural representation that cuts suspension assembly according to the embodiment illustrated in fig. 1 middle general utility tool dolly of the rope saw cutting equipment of miniature high-speed non-fragment orbit of the present invention and rope sawing.
Attached number in the figure:
General utility tool dolly 1, wheel 2, rail 3, track plates 4, non-fragment orbit 5, storage tank 6, handrail 7, guide rail 8, panel 9, bearing installing plate 10, gusset 11, bolt fixing hole 12, lock screw 13, installing plate cover 14, structural framing 15, support bar 16, axle 17, locking mechanism 18, short slab 19, rail snap close 20, lateral locking double-screw bolt 21, vertical lock stud 22, flank hole suspension 23, flank hole suspension installing plate 24, semi girder 25, block 26, extensible canopy 27, bolt 28, snap close 29, spring 30, auger mount pad 31, auger 32, auger supporting backboard 33, handle 34, lead screw pair 35, trip bolt 36, guide rail 37, attachment bolt 38, gauge 39, vertical boring installing rack 40, slide block 41, baffle plate 42, L-type installing plate 43, lockplate 44, suspension 45 is cut in rope sawing, short semi girder 46, installing plate 47 is cut in rope sawing, leading block erection column 48, leading block 49, rope 50 is cut in rope sawing, power source 51.
Detailed description of the invention
The detailed description of the invention of the rope saw cutting equipment below in conjunction with Figure of description to a kind of miniature high-speed non-fragment orbit of the present invention is further described.
First consult shown in Fig. 1, general utility tool dolly 1 in the present invention is bearing in by four wheels 2 on the non-fragment orbit 5 being made up of rail 3 and track plates 4, dolly 1 has the storage tank 6 that can put maintenance accessory etc. by steel plate butt welding above, there is a handrail of carrying out for dolly 17 rear end of dolly 1 simultaneously, to realize short-range quick transition maintenance activity.
The front end of general utility tool dolly 1 has a guide rail 8, guide rail 8 length equate with the width of track plates 4, guide rail 8 is for installing vertical boring installing rack 40, and realized vertical boring installing rack 40 and can on guide rail 8, slide, therefore realizing general utility tool dolly 1 can be in the horizontal optional position boring of whole track plates 4.Because vertical boring installing rack 40 will slide on guide rail 8, therefore in order to reduce the contact area of vertical boring installing rack 40 and guide rail 8, and it is more easily more laborsaving that vertical boring installing rack 40 is slided on guide rail 8, also reduce machine area simultaneously, except the face welding at rectangular tube and the general utility tool dolly 1 of structural framing 15 front ends, five panels 9 on its excess-three surface, are screwed respectively.
General utility tool dolly 1 is each side provided with a bearing installing plate 10, in order to improve the strength and stability of bearing installing plate 10, is welded with three gussets 11 at bearing installing plate 10 near the one side of storage tank 6.Bearing installing plate 10 tops have two bolt fixing holes 12; The installing plate cover 14 that lock screw 13 is installed is fixed by bolts to the bottom of bearing installing plate 10, forms a groove with bearing installing plate 10 simultaneously, and this groove is mainly used for limiting the installing rack of the maintenance of equipment coordinating with bearing installing plate 10.In the time that the bed plate of maintenance of equipment installing rack embeds in groove, lock screw 13 closely fits together seamless by the bed plate of maintenance of equipment installing rack and bearing installing plate 10, thereby ensured, in the time of operation, maintenance of equipment installing rack can be because of vibration vibration greatly and ceaselessly.
Next consult shown in Fig. 2, general utility tool dolly 1 is in order to reduce whole height as far as possible, adopt the structure of wheel 2 embedded structure frameworks 15, respectively there is a support bar 16 wheel 2 both sides, and by an axle 17, wheel 2 and support bar 16 are cascaded, support bar 16 is to be welded on the side of structural framing 15.General utility tool dolly 1 is welded by rectangular tube with structural framing 15, in order to improve bulk strength and the stability of structural framing 15, is welded with eight gussets 11 in structural framing 15 inner sides.
Below in conjunction with Fig. 1, Fig. 3 is described, general utility tool dolly 1 has four locking mechanisms 18 as shown in Figure 3, lays respectively at four edges of general utility tool dolly 1 bottom.Locking mechanism 18 regulates the position of rail snap close 20 by waist hole on short slab 19, at non-job state, make rail snap close 20 depart from rail 3, thereby do not affect the quick transition operation of short distance of general utility tool dolly 1 by the position that regulates rail snap close 20; Under diagram job state, utilize locking mechanism 18 can make general utility tool dolly 1 in the time of operation, be locked in securely on rail 3, rail snap close 20 in locking mechanism 18 coordinates with rail 3, recycling lateral locking double-screw bolt 21 limits the lateral displacement of general utility tool dolly 1, and vertical lock stud 22 limits the vertical deviation of general utility tool dolly 1.
The inside groove of the snap close of rail shown in Fig. 4 20 structures and rail 3 appearance similars, the upper plane of rail snap close 20 is welded with a vertical lock stud 22.In addition, the inside groove of rail snap close 20 structures is to mate according to the rail type of rail 30.
Figure 5 shows that the structural representation of flank hole suspension 23.Flank hole suspension installing plate 24 and semi girder 25 weld together, and in order to improve flexing resistance and the stability of semi girder 25, have welded four gussets 11 on flank hole suspension installing plate 24 and semi girder 25.The end of semi girder 25 is stretching structure, i.e. extensible canopy 27.In addition, at semi girder 25(rectangular tube) have a waist hole near the bottom of extensible canopy 27 one end, and be welded with eight blocks 26, extensible canopy 27 can be at semi girder 25(rectangular tube) in slip, and on extensible canopy 27, be fixed with a bolt 28, snap close 29 and spring 30 are housed on bolt 28.Snap close 29 locks the position of snap close 29 by block 26, the effect of spring 30 is to make snap close 29 complete after flexible and relock in block 26 at extensible canopy 27.In the time of limited space, extensible canopy 27, in indentation position, is at this moment installed undersized auger 32 on auger mount pad 31; When space is not subject in limited time, extensible canopy 27 is in stretching out position, at this moment auger 32 that drilling efficiency is higher is installed on flank hole suspension 23.Auger supporting backboard 33 is welded on extensible canopy 27, in order to improve flexing resistance and the structural strength of extensible canopy 27, is welded with four gussets 11 at auger supporting backboard 33 and extensible canopy 27 intersections.
Auger mount pad 31 is arranged on auger supporting backboard 33 by dovetail structure, auger mount pad 31(is flank hole) height and position drive lead screw pair 35 to rotate by turning handle 34 to regulate, the locking of auger mount pad 31 is to make the panel of dovetail structure be pressed in tightly on the dovetail of auger mount pad 31 to realize by tightening trip bolt 36.Auger mount pad 31 is provided with auger guide rail 37, has therefore realized the height and position that regulates auger 32 flank holes by lead screw pair 35, and auger 32 can slide and realize flank hole feeding on guide rail 37.
Next consult the flank hole suspension 23 shown in Fig. 6 and be arranged on the structural representation on general utility tool dolly 1.The bottom of flank hole suspension installing plate 24 is arranged in the installing plate cover 14 of general utility tool dolly 1, and makes by lock screw 13 together with bearing installing plate 10 secure fit of flank hole suspension installing plate 24 and general utility tool dolly 1; The top of flank hole suspension installing plate 24 and the bearing installing plate 10 of general utility tool dolly 1 are linked together reliably by attachment bolt 38, in the time of dismounting, only attachment bolt 38 need to be turned on.
As shown in Figure 7, Figure 8, be respectively flank hole suspension 23 and be arranged on the one-sided installation of general utility tool dolly 1 and the structural representation of bilateral.While being limited space in Fig. 7, the general utility tool dolly 1 that flank hole suspension 23 is installed is not exceeding under the prerequisite of gauge 39, meets non-fragment orbit boring demand simultaneously.As shown in Figure 7, when the one-sided installation of flank hole suspension 23, can carry out one-sided boring maintenance activity to non-fragment orbit; As shown in Figure 8, when flank hole suspension 23 bilaterals are installed, can realize the boring maintenance activity to non-fragment orbit bilateral.
The structural representation of vertical boring installing rack 40 shown in Fig. 9.Slide block 41 tops and the baffle plate 42 of vertical boring installing rack 40 link together by attachment bolt 38 is dismountable, and trip bolt 36 is installed on baffle plate 42, utilize trip bolt 36 can make vertical boring installing rack 40 be fixed on guide rail 8.A side plate of the L-type installing plate 43 of vertical boring installing rack 40 is arranged in slide block 41, this edge board is in the vertical chute of slide block 41, and then limit the rotation of L-type installing plate 43, and the middle part of this edge plate has a waist hole, L-type installing plate 43 is fixed in slide block 41 by an attachment bolt 38 through lockplate 44 and this edge plate waist hole.On lockplate 44 both sides, respectively have a blend stop, this blend stop inserts in the sulculus of opening on slide block 41 and this edge plate simultaneously, thus the vertical deviation of restriction L-type installing plate 43.In the time that the blend stop on lockplate 44 leaves the sulculus on this edge plate, L-type installing plate 43 can slide in the chute of slide block, in the time sliding into certain position, blend stop on lockplate 44 can fix L-type installing plate 43 by inserting another sulculus on this edge plate again, this edge plate is provided with four row's sulculuses, so L-type installing plate 43 can recall four height values on slide block, we can increase the row of sulculus as required certainly, for example 5 rows, 6 rows, 7 rows etc.
Figure 10 shows that vertical boring installing rack 40 is arranged on the structural representation on general utility tool dolly 1.Vertical boring installing rack 40 is arranged on guide rail 8 by slide block 41 and baffle plate 42, and vertical boring installing rack 40 can slide and adjust position arbitrarily on guide rail 8.When vertical boring installing rack 40 slides into after correct position on guide rail 8, utilize trip bolt 36 to make vertical boring installing rack 40 fixing, vertical boring is arranged on the guide rail 8 of general utility tool dolly 1 taking 40 as one groups of two vertical boring installing racks.Auger 32 is arranged on two vertical boring installing racks 40, between two vertical boring installing racks 40, stay certain interval, utilize this gap auger 32 and vertical boring installing rack 40 to be fixed together with screw bolt and nut, gap should not be less than the diameter of bolt, with reference in Figure 10 shown in dotted line.In order to improve drilling efficiency, the in the situation that of generator or other power source power and space permission, can allow the many groups of vertical boring installing racks 40 that auger 32 is installed carry out vertical bore operation simultaneously.
Figure 11 shows that rope sawing cuts the structural representation of suspension 45.The short semi girder 46 that suspension 45 is cut in rope sawing is welded on rope sawing and cuts on installing plate 47, and leading block erection column 48 is welded on short semi girder 46 bottoms, and leading block 49 direction is as required arranged on leading block erection column 48.
Figure 12 shows that rope sawing cuts suspension 45 and be arranged on the structural representation on general utility tool dolly 1.The bottom that rope sawing is cut to installing plate 47 is arranged in the installing plate cover 14 of general utility tool dolly 1, and cuts together with bearing installing plate 10 secure fit of installing plate 47 and general utility tool dolly 1 by lock screw 13 sawing that makes to restrict; The top of installing plate 47 is cut in rope sawing and the bearing installing plate 10 of general utility tool dolly 1 is linked together reliably by attachment bolt 38, in the time of dismounting, only attachment bolt 38 need to be turned on.After rope sawing is cut to installing plate 47 and is linked together with the bearing installing plate 10 of general utility tool dolly 1, again leading block 49 direction is as required arranged on leading block erection column 48, finally rope sawing cut rope 50 along leading block 49 around, like this by power source 51 with running rope sawing cut rope 50 shuttling movements realize cutting non-fragment orbits track plates 4.
It will be apparent to those skilled in the art that the rope saw cutting equipment of a kind of miniature high-speed non-fragment orbit of the present invention comprises any combination of each several part in this manual.As space is limited and in order to be to make manual simple and clear, these combinations to be introduced one by one in detail at this, but seen after this manual, the scope of the present invention that any combination of the each several part being made up of this manual forms is self-evident.

Claims (10)

1. the rope of miniature high-speed non-fragment orbit saw cutting equipment, comprise by four wheels (2) and be bearing in the general utility tool dolly (1) on the non-fragment orbit (5) being formed by rail (3) and track plates (4), in general utility tool dolly (1), put the storage tank (6) of maintenance accessory, rear end is provided with handrail (7), it is characterized in that: four jiaos of described general utility tool dolly (1) are provided with locking mechanism (18); The bearing installing plate (10) of general utility tool dolly (1) both sides cuts installing plate (47) by rope sawing and cuts suspension (45) and link together with rope sawing.
2. rope saw cutting equipment as claimed in claim 1, is characterized in that: described general dolly (1) is supported by structural framing (15), and structural framing (15) is mainly welded by rectangular tube.
3. as the rope saw cutting equipment of claim 1 or 2, it is characterized in that: described wheel (2) is embedded in structural framing (15); Respectively there is a support bar (16) wheel (2) both sides, and by an axle (17), wheel (2) and support bar (16) are cascaded, and support bar (16) is welded on the side of structural framing (15).
4. rope saw cutting equipment as claimed in claim 2, is characterized in that: the rectangular tube of described structural framing (15) front end is removed the face with general utility tool dolly (1) welding, has been screwed respectively five panels (9) on its excess-three face.
5. rope saw cutting equipment as claimed in claim 1, is characterized in that: the close side of described bearing installing plate (10) and storage tank (6) is welded with three gussets (11).
6. as the rope saw cutting equipment of claim 1 or 5, it is characterized in that: described bearing installing plate (10) top has two bolt fixing holes (12); The bottom of bearing installing plate (10) is bolted the installation board slot (14) of lock screw (13).
7. rope saw cutting equipment as claimed in claim 1, is characterized in that: described locking mechanism (18) comprises rail snap close (20), lateral locking double-screw bolt (21) and vertical lock stud (22).
8. rope as claimed in claim 7 saw cutting equipment, is characterized in that: described vertical lock stud (22) is welded on the top panel of rail snap close (20), and perpendicular to the top panel of rail snap close (20); Vertical lock stud (22) is arranged in the waist hole on the short slab (19) of general dolly (1), and can slide.
9. as the rope saw cutting equipment of claim 7 or 8, it is characterized in that: the inside groove of described rail snap close (20) structure mates with rail (3) profile.
10. rope saw cutting equipment as claimed in claim 7, is characterized in that: described lateral locking double-screw bolt (21) is resisted against on rail snap close (20) side panel.
CN201210534754.6A 2012-12-13 2012-12-13 A kind of rope saw cutting equipment of miniature high-speed non-fragment orbit Active CN103866660B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210534754.6A CN103866660B (en) 2012-12-13 2012-12-13 A kind of rope saw cutting equipment of miniature high-speed non-fragment orbit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210534754.6A CN103866660B (en) 2012-12-13 2012-12-13 A kind of rope saw cutting equipment of miniature high-speed non-fragment orbit

Publications (2)

Publication Number Publication Date
CN103866660A true CN103866660A (en) 2014-06-18
CN103866660B CN103866660B (en) 2016-03-23

Family

ID=50905642

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210534754.6A Active CN103866660B (en) 2012-12-13 2012-12-13 A kind of rope saw cutting equipment of miniature high-speed non-fragment orbit

Country Status (1)

Country Link
CN (1) CN103866660B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103233401A (en) * 2013-04-28 2013-08-07 昆明中铁大型养路机械集团有限公司 Locking mechanism for small-sized high-speed ballastless track repairing device
CN104889480A (en) * 2015-05-28 2015-09-09 苏州市华宁机械制造有限公司 Rail cutting machine capable of automatically measuring distance
CN105798381A (en) * 2016-05-12 2016-07-27 昆明奥通达铁路机械有限公司 Electric rail sawing machine
CN109338832A (en) * 2018-11-20 2019-02-15 昆明理工大学 A kind of track machine people
CN109440553A (en) * 2018-11-27 2019-03-08 中国铁道科学研究院集团有限公司铁道建筑研究所 A kind of non-fragment orbit arch regulation method based on rope saw cut
CN110426232A (en) * 2019-07-31 2019-11-08 中冶华天工程技术有限公司 A kind of steel sheet pile (H profile steel) automatic sampling device
CN112806180A (en) * 2021-01-20 2021-05-18 湖北省烟草公司宜昌市公司 Automatic tobacco seedling pruning and strengthening device

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3488789A (en) * 1968-03-26 1970-01-13 Rock Mill Inc Machine for scraping railway rails
CN1168434A (en) * 1996-04-24 1997-12-24 诺德科公司 Fully automatic, multiple operation rail maintenance apparatus
DE60017656T2 (en) * 1999-09-14 2005-12-29 Piergiorgio Rossi Device for lubricating rail fastening devices of a track
CN2918514Y (en) * 2006-02-10 2007-07-04 李保国 Electric rail sawing machine
CN101633214A (en) * 2008-07-25 2010-01-27 日本法斯特姆株式会社 Rope saw cutting device
CN202208871U (en) * 2011-08-31 2012-05-02 西安远景智能控制有限公司 Fine adjustment equipment for ballastless track slab of high-speed railway
CN202989712U (en) * 2012-12-13 2013-06-12 昆明中铁大型养路机械集团有限公司 Small high-speed rope saw cutting device for ballastless tracks

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3488789A (en) * 1968-03-26 1970-01-13 Rock Mill Inc Machine for scraping railway rails
CN1168434A (en) * 1996-04-24 1997-12-24 诺德科公司 Fully automatic, multiple operation rail maintenance apparatus
DE60017656T2 (en) * 1999-09-14 2005-12-29 Piergiorgio Rossi Device for lubricating rail fastening devices of a track
CN2918514Y (en) * 2006-02-10 2007-07-04 李保国 Electric rail sawing machine
CN101633214A (en) * 2008-07-25 2010-01-27 日本法斯特姆株式会社 Rope saw cutting device
CN202208871U (en) * 2011-08-31 2012-05-02 西安远景智能控制有限公司 Fine adjustment equipment for ballastless track slab of high-speed railway
CN202989712U (en) * 2012-12-13 2013-06-12 昆明中铁大型养路机械集团有限公司 Small high-speed rope saw cutting device for ballastless tracks

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103233401A (en) * 2013-04-28 2013-08-07 昆明中铁大型养路机械集团有限公司 Locking mechanism for small-sized high-speed ballastless track repairing device
CN103233401B (en) * 2013-04-28 2015-06-10 昆明中铁大型养路机械集团有限公司 Locking mechanism for small-sized high-speed ballastless track repairing device
CN104889480A (en) * 2015-05-28 2015-09-09 苏州市华宁机械制造有限公司 Rail cutting machine capable of automatically measuring distance
CN105798381A (en) * 2016-05-12 2016-07-27 昆明奥通达铁路机械有限公司 Electric rail sawing machine
CN109338832A (en) * 2018-11-20 2019-02-15 昆明理工大学 A kind of track machine people
CN109338832B (en) * 2018-11-20 2023-09-22 昆明理工大学 Rail robot
CN109440553A (en) * 2018-11-27 2019-03-08 中国铁道科学研究院集团有限公司铁道建筑研究所 A kind of non-fragment orbit arch regulation method based on rope saw cut
CN110426232A (en) * 2019-07-31 2019-11-08 中冶华天工程技术有限公司 A kind of steel sheet pile (H profile steel) automatic sampling device
CN112806180A (en) * 2021-01-20 2021-05-18 湖北省烟草公司宜昌市公司 Automatic tobacco seedling pruning and strengthening device
CN112806180B (en) * 2021-01-20 2022-08-19 湖北省烟草公司宜昌市公司 Automatic tobacco seedling pruning and strengthening device

Also Published As

Publication number Publication date
CN103866660B (en) 2016-03-23

Similar Documents

Publication Publication Date Title
CN103866660A (en) Small high speed ballastless track rope saw cutting device
CN202989712U (en) Small high-speed rope saw cutting device for ballastless tracks
CN202989713U (en) Small high-speed drilling device for ballastless tracks
CN103866661A (en) Small high speed ballastless track drilling device
CN202170456U (en) Construction device of ballastless track
CA2728869C (en) Clamp assembly
CN108708557A (en) Movable inclined column installation equipment and method
JPS5948502A (en) Tool apparatus for performing ballast filling, level adjustment and left-right correction of track
CN102825410A (en) Horizontal-type fast assembling platform for H profile steel
CN112573426A (en) Partition plate hoisting device for building fabricated building
CN102513378B (en) Automatic special-shaped section discharging and collecting device
CN102191732B (en) Ballastless track plate pavement accurate adjustment trolley
CN105648854A (en) Special regulating device for construction of trench-reserved tracks of tramcars and application method of special regulating device
CN209603497U (en) A kind of multi-use architecture template
CN214164973U (en) Rail equipment for rail train experiment
CN103303789B (en) Adjustable buttress for supporting running rail of tunnel track laying gantry crane
CN108381006A (en) A kind of travel guidance mechanism for flame cutting machine
JP5260346B2 (en) Moving shelf and its underframe
CN115351399A (en) Automatic welding production line for civil air defense door leaf
CN103233401B (en) Locking mechanism for small-sized high-speed ballastless track repairing device
CN201671029U (en) Ballastless track bed turnout assembling platform
CN208067531U (en) The guiding mechanism of flame cutting machine
CN203211323U (en) Locking mechanism for small high-speed ballastless track repairing equipment
CN202925401U (en) Ultrahigh adjusting device for ballastless track construction bent frame employing frame track panel method
CN103866662A (en) Small milling device for high-speed ballastless track

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 650215 Kunming City, Yunnan sheep sheep Wang Fang No. 384

Patentee after: CHINA RAILWAY CONSTRUCTION HIGH-TECH EQUIPMENT CO., LTD.

Address before: 650215 Kunming City, Yunnan sheep sheep Wang Fang No. 384

Patentee before: Zhongtie Giant Road Maintenance Machinery Group Co., Ltd., Kunming