CN103854231A - 利用Google Earth提高输电线路运管质效的方法 - Google Patents
利用Google Earth提高输电线路运管质效的方法 Download PDFInfo
- Publication number
- CN103854231A CN103854231A CN201210552764.2A CN201210552764A CN103854231A CN 103854231 A CN103854231 A CN 103854231A CN 201210552764 A CN201210552764 A CN 201210552764A CN 103854231 A CN103854231 A CN 103854231A
- Authority
- CN
- China
- Prior art keywords
- google earth
- gps
- data
- latitude
- longitude
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Position Fixing By Use Of Radio Waves (AREA)
Abstract
本发明公开了一种利用Google Earth提高输电线路运管质效的方法,它解决了现有供电线路运行、维修工作量大、劳动强度高、管理质效低等问题,其特征在于:利用Google Earth卫星地图软件,对供电线路进行电子化管理,包括如下步骤:首先对所辖线路的杆塔进行GPS经纬度测量,并记录归档;然后把所有线路杆塔的GPS数据导入Google Earth,用专业的转换软件google earth kml tools把用GPS仪器测出的经纬度转换成Google Earth能导入的KML文件;再把GPS经纬度数据导入GoogleEarth;即可制作成大版面的线路地理图挂在墙上;从而达到每基杆塔的位置、线路的走向以及进出变电站的方式和每基杆塔周边的公路、铁路、山川、河流、树障、外破等一系列情况一目了然,从而使辖区内电网运行、维修等日常管理达到国网公司精细化管理标准。
Description
一、技术领域
本发明属于供电线路运行和维修的管理方法,尤其是涉及到一种利用Google Earth提高输电线路运管质效的方法。
二、背景技术
随着科学技术的不断发展,电力输送在国民经济发展中起着越来越大的作用,而遍布全国城乡的电力输送线路星罗棋布、错综复杂,给供电系统的线路管理带来了较大麻烦。仅就单位担负着黄冈市主网三分之一输电线路运行、维护检修工作而言,所辖输电线路就覆盖了辖区内的团风县、罗田县、英山县、浠水县、黄州区四县一区,杆塔分布地形复杂,既有平原城区又有高山大岭,线路总长约500公里,最大线路维护半径168公里。而要达到国网公司精细化管理标准的要求,就得解决我们日常对线路进行巡视、检修时遇到的一些难题,即对所辖杆塔的位置、线路的走向以及进出变电站的方式和每基杆塔周边的公路、铁路、山川、河流、树障、外破等一系列情况做到一目了然。
三、发明内容
本发明的目的是为市场提供一种使用方便、情况直观、劳动强度小、工作效率高的利用Google Earth提高输电线路运管质效的方法。
本发明的技术方案是:利用Google Earth卫星地图软件,对供电线路进行电子化管理,具体包括如下步骤:
步骤一:杆塔定位,首先对所辖线路的杆塔进行GPS经纬度测量,并记录归档;然后对测量的杆塔GPS坐标数据进行审查,发现不合格的进行复测,保证数据的准确性;
步骤二:数据转换,即把所有线路杆塔的GPS数据导入GoogleEarth,用专业的转换软件google earth kml tools把用GPS仪器测出的经纬度转换成Google Earth能导入的KML文件;
步骤三:录入数据,把GPS经纬度数据导入Google Earth,即用GoogleEarth上面的导入功能,把KML格式的杆塔坐标文件导入Google地图,或双击KML文件直接打开;
步骤四:运用地图,即把所有线路资料导入谷歌地球后,制作成大版面的线路地理图挂在墙上;对存在的外力破坏、树障、房障、山火隐患等在进行符号标记;从Google Earth上面,我们就可以很清楚的看到杆塔的位置、线路的走向以及进出变电站的方式和每基杆塔周边的公路、铁路、山川、河流、树障、外破等一系列情况。
本发明的有益效果是:不仅具有使用简单、劳动强度小、工作效率高等优点,而且加强了对线路周边外破的管理,非常清晰地了解线路的周边道路交通、河流、山川等概况,从而更好地达到国网公司精细化管理的要求标准。
四、具体实施方式
以黄冈供电公司输电中心黄州巡线班担负着黄冈市主网三分之一输电线路运行、维护检修工作。所辖输电线路覆盖了团风县、罗田县、英山县、浠水县、黄州区四县一区,杆塔分布地形复杂,既有平原城区又有高山大岭,线路总长约500公里,最大线路维护半径168公里。我们利用Google Earth卫星地图软件,对我们所辖的线路进行电子化,把线路搬上电子屏幕,这样就有利于我们处理以遇到的各种问题。具体方法是:首先是对辖区管理的杆塔进行杆塔定位。由工作人员用GPS仪器把我们每基线路杆塔经纬度从野外测量回来,并进行归档保存;然后将测 量数据进行数据转换。把所有线路杆塔的GPS数据导入Google Earth,用专业的转换软件google earth kml tools把用GPS仪器测出的经纬度转换成Google Earth能导入的KML文件。再进行录入数据。即把GPS经纬度数据导入Google Earth,用Google Earth上面的导入功能,把KML格式的杆塔坐标文件导入Google地图,或双击KML文件直接打开。最后即可运用地图进行管理。即从Google Earth上面,我们可以很清楚的看到辖区内杆塔的位置、线路的走向以及进出变电站的方式和每基杆塔周边的公路、铁路、山川、河流、树障、外破等一系列情况,使我们日常线路运行、维修等管理工作质效得到大幅度提高。具体参照见下表:
项目 | 采集重要交叉跨越(人) | 到达指定地点(时间) |
普通地理图 | 5 | 1小时 |
谷歌地图 | 1 | 1小时 |
Claims (1)
1.一种利用Google Earth提高输电线路运管质效的方法,它是利用Google Earth卫星地图软件,对供电线路进行电子化管理,包括如下步骤:
步骤一:杆塔定位,首先对所辖线路的杆塔进行GPS经纬度测量,并记录归档;然后对测量的杆塔GPS坐标数据进行审查,发现不合格的进行复测,保证数据的准确性;
步骤二:数据转换,即把所有线路杆塔的GPS数据导入GoogleEarth,用专业的转换软件google earth kml tools把用GPS仪器测出的经纬度转换成Google Earth能导入的KML文件;
步骤三:录入数据,把GPS经纬度数据导入Google Earth,即用GoogleEarth上面的导入功能,把KML格式的杆塔坐标文件导入Google地图,或双击KML文件直接打开;
步骤四:运用地图,即把所有线路资料导入谷歌地球后,制作成大版面的线路地理图挂在墙上;对存在的外力破坏、树障、房障、山火隐患等在进行符号标记;从Google Earth上面,我们就可以很清楚的看到杆塔的位置、线路的走向以及进出变电站的方式和每基杆塔周边的公路、铁路、山川、河流、树障、外破等一系列情况。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210552764.2A CN103854231A (zh) | 2012-12-04 | 2012-12-04 | 利用Google Earth提高输电线路运管质效的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210552764.2A CN103854231A (zh) | 2012-12-04 | 2012-12-04 | 利用Google Earth提高输电线路运管质效的方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103854231A true CN103854231A (zh) | 2014-06-11 |
Family
ID=50861853
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210552764.2A Pending CN103854231A (zh) | 2012-12-04 | 2012-12-04 | 利用Google Earth提高输电线路运管质效的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103854231A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105279299A (zh) * | 2014-07-25 | 2016-01-27 | 国家电网公司 | 电缆管线的线路生成方法和装置 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101778121A (zh) * | 2009-01-08 | 2010-07-14 | 北京瑞佳晨科技有限公司 | 一种虚拟地球仪系统辅助的在线定位系统 |
WO2010151311A1 (en) * | 2009-06-26 | 2010-12-29 | Flight Landata, Inc. | Dual-swath imaging system |
US20110234796A1 (en) * | 2010-03-29 | 2011-09-29 | Raytheon Company | System and Method for Automatically Merging Imagery to Provide Enhanced Situational Awareness |
CN102663215A (zh) * | 2012-05-14 | 2012-09-12 | 重庆大学 | 架空输电线路塔-线耦合体系抗冰能力的评估方法 |
-
2012
- 2012-12-04 CN CN201210552764.2A patent/CN103854231A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101778121A (zh) * | 2009-01-08 | 2010-07-14 | 北京瑞佳晨科技有限公司 | 一种虚拟地球仪系统辅助的在线定位系统 |
WO2010151311A1 (en) * | 2009-06-26 | 2010-12-29 | Flight Landata, Inc. | Dual-swath imaging system |
US20110234796A1 (en) * | 2010-03-29 | 2011-09-29 | Raytheon Company | System and Method for Automatically Merging Imagery to Provide Enhanced Situational Awareness |
CN102663215A (zh) * | 2012-05-14 | 2012-09-12 | 重庆大学 | 架空输电线路塔-线耦合体系抗冰能力的评估方法 |
Non-Patent Citations (1)
Title |
---|
秦绶坤等: "基于Google Earth 的线路台帐表格生成系统", 《广西电力》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105279299A (zh) * | 2014-07-25 | 2016-01-27 | 国家电网公司 | 电缆管线的线路生成方法和装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Gupta | The pattern of urban land-use changes: A case study of the Indian cities | |
CN102975743B (zh) | 轨旁设备自动布置方法 | |
CN104599069A (zh) | 一种基于环境因子及地理特征的输电线路路径规划方法 | |
CN109115190A (zh) | 基于互联网的中低压配电网工程勘测智能终端及方法 | |
CN108550086A (zh) | 一种暗挖车站施工进度的识别方法及系统 | |
CN204515127U (zh) | 一种基于cors基站的地面沉降监测系统 | |
CN103854231A (zh) | 利用Google Earth提高输电线路运管质效的方法 | |
CN206710628U (zh) | 一种地下管道电子信息标识和巡检确认系统 | |
CN110858006A (zh) | 一种基于gis的地下管网物探系统及其方法 | |
CN203250029U (zh) | 一种新型高精度gis测距手持机 | |
CN108458708A (zh) | 一种公路资产定位方法和系统 | |
CN203433731U (zh) | 一种用于研究城市轨道交通地下线路沉降的模型 | |
Kim et al. | Improvement of the planting method to increase the carbon reduction capacity of urban street trees | |
EA201301262A1 (ru) | Городская пространственная структура и способ ее создания | |
Lyu et al. | Evaluation of Landscape Resources of Urban Forest Park Based on GIS–Take Beijing Tongzhou Grand Canal Forest Park as an Example | |
CN108805336A (zh) | 一种基于电网地理信息系统选取共享杆塔的方法及装置 | |
CN202735520U (zh) | 基于gps定位的输电线路标定装置 | |
Yu et al. | Using 3D geographic information system to improve sales comparison approach for real estate valuation | |
Wen-xin et al. | Identification and Analysis of Urban Functional Areas Based on VGI Data | |
Kotova | Geoinformation research and vegetation mapping (digest based on the proceedings of the InterCarto. InterGIS conference. 1994–2020) | |
Shi et al. | Analyzing and Optimizing AED Placement Locations in Big Cites—A Geographical Information System Analysis | |
Li et al. | Urban transformation of Fotang town in the recent 20 years-a sample in small city fostering program of Zhejiang Province, China | |
Shi et al. | Research of station zone spatial circle and internal mechanism in TOD pattern: Taking Nanjing Metro Line 2 Jiqingmen Station as example | |
Montalbano et al. | The Green Way of the Apulian Aqueduct. A regional corridor for the enhancement of the environmental heritage and local culture | |
Zhou | 3D Traffic noise mapping in city central area |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20140611 |