CN103853601A - Workflow task creating method and device - Google Patents

Workflow task creating method and device Download PDF

Info

Publication number
CN103853601A
CN103853601A CN201210506310.1A CN201210506310A CN103853601A CN 103853601 A CN103853601 A CN 103853601A CN 201210506310 A CN201210506310 A CN 201210506310A CN 103853601 A CN103853601 A CN 103853601A
Authority
CN
China
Prior art keywords
task
quantitative value
work
node
present stream
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201210506310.1A
Other languages
Chinese (zh)
Inventor
郭铁志
马向晖
张宝玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANGZHOU LECAST ADVERTISING PLANNING CO Ltd
Original Assignee
HANGZHOU LECAST ADVERTISING PLANNING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANGZHOU LECAST ADVERTISING PLANNING CO Ltd filed Critical HANGZHOU LECAST ADVERTISING PLANNING CO Ltd
Priority to CN201210506310.1A priority Critical patent/CN103853601A/en
Publication of CN103853601A publication Critical patent/CN103853601A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a workflow task creating method and device. The method includes: acquiring a first number of data, to be processed, of a current workflow node; according to the first number, determining a second number of tasks, to be created, of the current workflow node; if a first preset rule is set up, setting a task type value of the current workflow node as a splitting type; if a second preset rule is set up, setting a task creation limit of the splitting type as the second number; starting the current workflow node; creating tasks in the second number to process the data to be processed. The method and device according to the embodiments has the advantages that multiple tasks are dynamically created in the workflow running process, the corresponding amount of tasks are created according to the amount of data, to be processed actually, of the workflow node, system resource consumption is low when less data needs to be processed, and data processing efficiency is improved when more data needs to be processed.

Description

A kind of workflow task creation method and device
Technical field
The application relates to technical field of data processing, particularly a kind of workflow task creation method and device.
Background technology
At present, generally before work flow operation, task creation type and the parameter to its each workflow node arranges, as the task creation type of a certain workflow node of this workflow is set to split type, and split task creation quantitative value corresponding to type and be set to a certain numerical value, in the time of work flow operation, realize by creating the task of this numerical value and treat deal with data and process.
Wherein, workflow node refers to: the transit point in workflow instance between the coupled program (or stage) of each program (or stage).Its type comprises general type, splits type and merges type.
In above-mentioned workflow task establishment scheme, the task type of workflow node and task creation quantitative value thereof are and set in advance, thus, after such scheme workflow brings into operation, when the pending data volume of each workflow node changes (reduce or increase), cannot immediately there is corresponding variation (reduce or increase) in the task amount of workflow node, afterwards cause the system resource waste (having multiple tasks in idle condition) in work flow operation process or treat deal with data treatment effeciency reduce (task of current establishment cannot be processed whole pending data).
Summary of the invention
In view of this, the application's object is to provide a kind of workflow task creation method and device, in order to solve in existing task creation scheme, task creation type and the parameter of each workflow node were set before work flow operation, when making it pending data changing separately, the task amount being created cannot be made corresponding variation in time, and the treatment effeciency that causes the wasting of resources or treat deal with data reduces, and the situation of data congestion even occurs.
The application provides a kind of workflow task creation method, comprising:
Obtain the first quantitative value of the pending data of work at present stream node;
Wherein, described work at present stream node is the workflow node to be started of the workflow in running status;
The second quantitative value of determining the required creation task of described work at present stream node according to described the first quantitative value, described the second quantitative value is more than or equal to 2;
If the first preset rules is set up, the task class offset of described work at present stream node is set for splitting type;
If the second preset rules is set up, the task creation limit value that described fractionation type is set is the second quantitative value;
Start described work at present stream node;
Create the task of described the second quantitative value.
Said method, preferred, the task of described the second quantitative value of described establishment comprises:
In default thread pool, activate the thread of described the second quantitative value;
The thread triggering the activation creates respectively its each self-corresponding task.
Said method, preferred, described the first preset rules is that the current task types value of described work at present stream node is general type or merges type;
If described the first preset rules is false, described method also comprises:
Set up if carry out described the second preset rules, the task creation limit value that described fractionation type is set is the second quantitative value.
Said method, preferred, the second preset rules is that the current task establishment limit value of the fractionation type of work at present stream node is greater than or less than described the second quantitative value;
If described the first preset rules is false and described the second preset rules is false, described method also comprises:
Carry out described startup work at present stream node.
The application also provides a kind of workflow task creation apparatus, comprising:
The first quantitative value acquiring unit, for obtaining first quantitative value of pending data of work at present stream node;
Wherein, described work at present stream node is the workflow node to be started of the workflow in running status;
The second quantitative value acquiring unit, for determine the second quantitative value of the required creation task of described work at present stream node according to described the first quantitative value, described the second quantitative value is more than or equal to 2;
The first setting unit, if set up for the first preset rules, arranges the task class offset of described work at present stream node for splitting type;
The second setting unit, if set up for the second preset rules, the task creation limit value that described fractionation type is set is the second quantitative value;
Trigger start unit, for starting described work at present stream node;
Task creation unit, for creating the task of described the second quantitative value.
Said apparatus, preferred, described task creation unit comprises:
Thread activates subelement, for activate the thread of described the second quantitative value at default thread pool;
Task creation subelement, creates respectively its each self-corresponding task for the thread triggering the activation.
From such scheme, a kind of workflow task creation method and device that the application provides, flow the first quantitative value of the pending data of node by obtaining work at present, determine the second quantitative value of the required creation task of described work at present stream node according to described the first quantitative value, the task class offset that described work at present stream node is set is that fractionation type the task creation limit value that described fractionation type is set are the second quantitative value, thereby start described work at present stream node, create the task of described the second quantitative value, afterwards realize dynamic creation multitask in work flow operation process, create the task of respective numbers according to the data value of the pending data of reality of this workflow node, at hour reduction system resources consumption of pending quantity, and in the time that pending data volume is larger, improve data-handling efficiency.
Brief description of the drawings
In order to be illustrated more clearly in the technical scheme in the embodiment of the present application, below the accompanying drawing of required use during embodiment is described is briefly described, apparently, accompanying drawing in the following describes is only some embodiment of the application, for those of ordinary skill in the art, do not paying under the prerequisite of creative work, can also obtain according to these accompanying drawings other accompanying drawing.
The process flow diagram of a kind of workflow task creation method embodiment mono-that Fig. 1 provides for the application;
The part process flow diagram of a kind of workflow task creation method embodiment bis-that Fig. 2 provides for the application;
The process flow diagram of a kind of workflow task creation method embodiment tri-that Fig. 3 provides for the application;
The structural representation of a kind of workflow task creation apparatus embodiment tetra-that Fig. 4 provides for the application;
The part-structure schematic diagram of a kind of workflow task creation apparatus embodiment five that Fig. 5 provides for the application;
Fig. 6 is that application the application realizes the schematic flow sheet that multitask creates.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present application, the technical scheme in the embodiment of the present application is clearly and completely described, obviously, described embodiment is only some embodiments of the present application, instead of whole embodiment.Based on the embodiment in the application, those of ordinary skill in the art are not making the every other embodiment obtaining under creative work prerequisite, all belong to the scope of the application's protection.
With reference to figure 1, it shows the process flow diagram of a kind of workflow task creation method embodiment mono-that the application provides, and described method can comprise the following steps:
Step 101: the first quantitative value of obtaining the pending data of work at present stream node;
Wherein, described work at present stream node is the workflow node to be started of the workflow in running status.
It should be noted that, it is that described step 101 starting point of carrying out that is triggered can, for the time point before work at present stream node operation in work flow operation process, can also be work flow operation time point before that the embodiment of the present application is applicable in the process of work flow operation and before operation.
Step 102: determine the second quantitative value of the required creation task of described work at present stream node according to described the first quantitative value, described the second quantitative value is more than or equal to 2.
Wherein, described the second quantitative value is more than or equal to 2 expressions: two even more tasks of the first quantitative value needs of described pending data are processed, and ensure that pending data are processed in time.Be the larger situation of pending data volume that the embodiment of the present application is applicable to workflow node, but be equally applicable to the less situation of pending data volume of workflow node.
Step 103: judge whether the first preset rules is set up, if so, execution step 104;
Step 104: the task class offset of described work at present stream node is set for splitting type.
Wherein, described the first preset rules can be empty, after described step 102, gives tacit consent to described the first preset rules and sets up, and carries out described step 104.The task for the required establishment of: work at present stream node of it is also understood that is for being more than or equal to 2, and the non-described fractionation type of initial default type of acquiescence work at present stream node, described the first preset rules is set up thus, the task class offset of described work at present stream node is set for splitting type, make after the operation of work at present stream node starts, can create two or more tasks and treat deal with data and process.
Step 105: judge whether the second preset rules is set up, if so, execution step 106;
Step 106: the task creation limit value that described fractionation type is set is the second quantitative value.
Wherein, described the second preset rules can be empty, gives tacit consent to described the second preset rules and sets up, and after described step 104, carries out described step 106.Be: the acquiescence task creation limit value of the fractionation type that described step 104 arranges is different from described the second quantitative value, carries out thus described step 106.
Step 107: start described work at present stream node.
Step 108: the task of creating described the second quantitative value.
Preferably, create the task of described the second quantitative value by the flow engine of the described work at present stream node in starting state, and then by creating of task, described pending data are processed.
It should be noted that, be more than or equal to 2 from described the second quantitative value, the quantity of creating in described step 108 of task is for being more than or equal to 2.
From such scheme, a kind of workflow task creation method embodiment mono-that the application provides, flow the first quantitative value of the pending data of node by obtaining work at present, determine the second quantitative value of the required creation task of described work at present stream node according to described the first quantitative value, the task class offset that described work at present stream node is set is that fractionation type the task creation limit value that described fractionation type is set are the second quantitative value, thereby start described work at present stream node, create the task of described the second quantitative value, afterwards realize dynamic creation multitask in work flow operation process, create the task of respective numbers according to the data value of the pending data of reality of this workflow node, at hour reduction system resources consumption of pending quantity, and in the time that pending data volume is larger, improve data-handling efficiency.
With reference to figure 2, it shows the part process flow diagram of a kind of workflow task creation method embodiment bis-that the application provides, and wherein, described step 108 can comprise the following steps:
Step S201: the thread that activates described the second quantitative value in default thread pool.
Wherein, described default thread pool comprises at least two threads, activates the thread of described the second quantitative value, specific implementation in the following manner at described step S201 in default thread pool:
In default thread pool, whether be more than or equal to described the second quantitative value in the Thread Count value of unactivated state, if, in default thread pool, activate the thread of described the second quantitative value, otherwise, activate the thread in unactivated state in described thread pool, and wait in described thread pool that the thread that is converted to unactivated state by state of activation is activated.Be: if the number of threads in unactivated state in described thread pool is less than described the second quantitative value, first activate the thread in unactivated state, then after waiting for that other threads are converted to unactivated state, the thread of reactivation transition status.
Preferably, in the specific implementation of described step S201, if be less than described the second quantitative value in the Thread Count value of unactivated state in default thread pool, all right:
Wait for that in described thread pool, the number of threads in unactivated state is more than or equal to described the second quantitative value, activate the thread of described the second quantitative value, replace the thread in unactivated state in the described thread pool of above-mentioned activation, and wait in described thread pool that the thread that is converted to unactivated state by state of activation is activated.Be: wait for when the number of threads in unactivated state in thread pool is more than or equal to described the second quantitative value the thread of the second quantitative value described in reactivation.
Step S202: the thread triggering the activation creates respectively its each self-corresponding task.
It should be noted that, it is corresponding with himself that the thread of described each activation all can create a task, and then by creating of task, described pending data are processed.
From such scheme, a kind of workflow task creation method embodiment bis-that the application provides, flow the first quantitative value of the pending data of node by obtaining work at present, determine the second quantitative value of the required creation task of described work at present stream node according to described the first quantitative value, the task class offset that described work at present stream node is set is that fractionation type the task creation limit value that described fractionation type is set are the second quantitative value, thereby start described work at present stream node, in default thread pool, activate the thread of described the second quantitative value, the thread triggering the activation creates respectively its each self-corresponding task, afterwards realize dynamic creation multitask in work flow operation process, create the task of respective numbers according to the data value of the pending data of reality of this workflow node, simultaneously, adopt Thread Pool Technology, treating deal with data by the multiple tasks of the concurrent establishment of multiple threads processes, at hour reduction system resources consumption of pending quantity, and in the time that pending data volume is larger, adopt the scheme of concurrent establishment processing, further reduce the stand-by period of data processing, improve data-handling efficiency.
With reference to figure 3, it shows the process flow diagram of a kind of workflow task creation method embodiment tri-that the application provides, and described method can comprise the following steps:
Step 301: the first quantitative value of obtaining the pending data of work at present stream node;
Wherein, described work at present stream node is the workflow node to be started of the workflow in running status.
It should be noted that, it is that described step 301 starting point of carrying out that is triggered can, for the time point before work at present stream node operation in work flow operation process, can also be work flow operation time point before that the embodiment of the present application is applicable in the process of work flow operation and before operation.
Step 302: determine the second quantitative value of the required creation task of described work at present stream node according to described the first quantitative value, described the second quantitative value is more than or equal to 2.
Wherein, described the second quantitative value is more than or equal to 2 expressions: two even more tasks of the first quantitative value needs of described pending data are processed, and ensure that pending data are processed in time.Be the larger situation of pending data volume that the embodiment of the present application is applicable to workflow node, but be equally applicable to the less situation of pending data volume of workflow node.
Step 303: judge whether the first preset rules is set up, if so, execution step 304, otherwise, carry out described step 305;
Step 304: the task class offset of described work at present stream node is set for splitting type.
Wherein, described the first preset rules is: the current task types value of described work at present stream node is general type or merges type.If described the first preset rules is false, be: the default task class offset of described work at present stream node is not for general type or merge type, but fractionation type, be that described current task types value is default task class offset,, without carrying out again described step 304, can directly carry out described step 305.
It should be noted that, described default task class offset refers to, flows node before its work flow operation, the task class offset being pre-arranged in described work at present.
Step 305: judge whether the second preset rules is set up, if so, execution step 306;
Step 306: the task creation limit value that described fractionation type is set is the second quantitative value.
Wherein, described the second preset rules can be empty, gives tacit consent to described the second preset rules and sets up, and after described step 303 or described step 304, carries out described step 306.Be: the default task creation limit value (all can be described as current task and create limit value) of the acquiescence task creation limit value of the fractionation type that described step 304 arranges or described work at present stream node is different from described the second quantitative value, carries out thus described step 306.
It should be noted that, described default task creation limit value refers to, flows node before its work flow operation, the task creation limit value of the fractionation type being pre-arranged in described work at present.
Step 307: start described work at present stream node.
Step 308: the task of creating described the second quantitative value.
Preferably, create the task of described the second quantitative value by the flow engine of the described work at present stream node in starting state, and then by creating of task, described pending data are processed.
It should be noted that, be more than or equal to 2 from described the second quantitative value, the quantity of creating in described step 308 of task is for being more than or equal to 2.
From such scheme, a kind of workflow task creation method embodiment tri-that the application provides, flow the first quantitative value of the pending data of node by obtaining work at present, determine the second quantitative value of the required creation task of described work at present stream node according to described the first quantitative value, the task class offset that described work at present stream node is set is that fractionation type the task creation limit value that described fractionation type is set are the second quantitative value, thereby start described work at present stream node, create the task of described the second quantitative value, afterwards realize dynamic creation multitask in work flow operation process, create the task of respective numbers according to the data value of the pending data of reality of this workflow node, at hour reduction system resources consumption of pending quantity, and in the time that pending data volume is larger, improve data-handling efficiency.
Preferably, in the various embodiments described above, described the second preset rules is that the current task establishment limit value of the fractionation type of work at present stream node is greater than or less than described the second quantitative value;
If described the second preset rules is false, described method also comprises:
Carry out the described work at present stream of described startup node.
Wherein, if described the first preset rules is set up, the current task of described work at present stream node creates limit value and is: the task class offset arranging in the embodiment of the present application is the acquiescence task creation limit value that splits type.If described the first preset rules is false, the current task of described work at present stream node creates limit value and is: in the embodiment of the present application, the task class offset that under work at present stream node, workflow is set up between its operation is the acquiescence task creation limit value that splits type.
It should be noted that, if described the second preset rules is false, be: the current task of the fractionation type of described work at present stream node creates limit value and equals described the second quantitative value, be the second quantitative value without carrying out the described task creation limit value that described fractionation type is set, carry out the described work at present stream of described startup node.
With reference to figure 4, it shows the structural representation of a kind of workflow task creation apparatus embodiment tetra-that the application provides, and described device comprises:
The first quantitative value acquiring unit 401, for obtaining first quantitative value of pending data of work at present stream node;
Wherein, described work at present stream node is the workflow node to be started of the workflow in running status.
It should be noted that, it is that described the first quantitative value acquiring unit 401 starting point of carrying out that is triggered can, for the time point before work at present stream node operation in work flow operation process, can also be work flow operation time point before that the embodiment of the present application is applicable in the process of work flow operation and before operation.
The second quantitative value acquiring unit 402, for determine the second quantitative value of the required creation task of described work at present stream node according to described the first quantitative value, described the second quantitative value is more than or equal to 2.
Wherein, described the second quantitative value is more than or equal to 2 expressions: two even more tasks of the first quantitative value needs of described pending data are processed, and ensure that pending data are processed in time.Be the larger situation of pending data volume that the embodiment of the present application is applicable to workflow node, but be equally applicable to the less situation of pending data volume of workflow node.
The first setting unit 403, if set up for the first preset rules, arranges the task class offset of described work at present stream node for splitting type.
Wherein, described the first preset rules can be empty, and the first setting unit 403 is given tacit consent to described the first preset rules establishment, carries out the described task class offset that described work at present stream node is set for splitting type.The task for the required establishment of: work at present stream node of it is also understood that is for being more than or equal to 2, and the non-described fractionation type of initial default type of acquiescence work at present stream node, described the first preset rules is set up thus, the task class offset of described work at present stream node is set for splitting type, make after the operation of work at present stream node starts, can create two or more tasks and treat deal with data and process.
The second setting unit 404, if set up for the second preset rules, the task creation limit value that described fractionation type is set is the second quantitative value.
Wherein, described the second preset rules can be empty, and described the second setting unit 404 is given tacit consent to described the second preset rules establishment, and carrying out the described task creation limit value that described fractionation type is set is the second quantitative value.Be: the acquiescence task creation limit value of the fractionation type that described the first setting unit 403 arranges is different from described the second quantitative value, triggering thus the task creation limit value that described fractionation type is set in described the second setting unit 404 is the second quantitative value.
Trigger start unit 405, for starting described work at present stream node.
Task creation unit 406, for creating the task of described the second quantitative value.
Preferably, create the task of described the second quantitative value by the flow engine of the described work at present stream node in starting state, and then by creating of task, described pending data are processed.
It should be noted that, be more than or equal to 2 from described the second quantitative value, the quantity of creating in described task creation unit 406 of task is for being more than or equal to 2.
From such scheme, a kind of workflow task creation apparatus embodiment tetra-that the application provides, flow the first quantitative value of the pending data of node by obtaining work at present, determine the second quantitative value of the required creation task of described work at present stream node according to described the first quantitative value, the task class offset that described work at present stream node is set is that fractionation type the task creation limit value that described fractionation type is set are the second quantitative value, thereby start described work at present stream node, create the task of described the second quantitative value, afterwards realize dynamic creation multitask in work flow operation process, create the task of respective numbers according to the data value of the pending data of reality of this workflow node, at hour reduction system resources consumption of pending quantity, and in the time that pending data volume is larger, improve data-handling efficiency.
With reference to figure 5, it shows the part-structure schematic diagram of a kind of workflow task creation apparatus embodiment five that the application provides, and wherein, described task creation unit 406 comprises:
Thread activates subelement 461, for activate the thread of described the second quantitative value at default thread pool.
Wherein, described default thread pool comprises at least two threads, activates the thread of described the second quantitative value, specific implementation in the following manner at described thread activation subelement 461 in default thread pool:
In default thread pool, whether be more than or equal to described the second quantitative value in the Thread Count value of unactivated state, if, in default thread pool, activate the thread of described the second quantitative value, otherwise, activate the thread in unactivated state in described thread pool, and wait in described thread pool that the thread that is converted to unactivated state by state of activation is activated.Be: if the number of threads in unactivated state in described thread pool is less than described the second quantitative value, first activate the thread in unactivated state, then after waiting for that other threads are converted to unactivated state, the thread of reactivation transition status.
Preferably, described thread activates in the specific implementation of subelement 461, if be less than described the second quantitative value in the Thread Count value of unactivated state in default thread pool, all right:
Wait for that in described thread pool, the number of threads in unactivated state is more than or equal to described the second quantitative value, activate the thread of described the second quantitative value, replace the thread in unactivated state in the described thread pool of above-mentioned activation, and wait in described thread pool that the thread that is converted to unactivated state by state of activation is activated.Be: wait for when the number of threads in unactivated state in thread pool is more than or equal to described the second quantitative value the thread of the second quantitative value described in reactivation.
Task creation subelement 462, creates respectively its each self-corresponding task for the thread triggering the activation.
It should be noted that, it is corresponding with himself that the thread of described each activation all can create a task, and then by creating of task, described pending data are processed.
From such scheme, a kind of workflow task creation apparatus embodiment five that the application provides, flow the first quantitative value of the pending data of node by obtaining work at present, determine the second quantitative value of the required creation task of described work at present stream node according to described the first quantitative value, the task class offset that described work at present stream node is set is that fractionation type the task creation limit value that described fractionation type is set are the second quantitative value, thereby start described work at present stream node, in default thread pool, activate the thread of described the second quantitative value, the thread triggering the activation creates respectively its each self-corresponding task, afterwards realize dynamic creation multitask in work flow operation process, create the task of respective numbers according to the data value of the pending data of reality of this workflow node, simultaneously, adopt Thread Pool Technology, treating deal with data by the multiple tasks of the concurrent establishment of multiple threads processes, at hour reduction system resources consumption of pending quantity, and in the time that pending data volume is larger, adopt the scheme of concurrent establishment processing, further reduce the stand-by period of data processing, improve data-handling efficiency.
Preferably, in the various embodiments described above, described the first preset rules is: the current task types value of described work at present stream node is general type or merges type.If described the first preset rules is false, be: the default task class offset of described work at present stream node is not for general type or merge type, but fractionation type, be that described current task types value is default task class offset, described the first setting unit 403 is no longer carried out the described task class offset that described work at present stream node is set for splitting type, directly triggers described the second setting unit 404.
Preferably, in the various embodiments described above, described the second preset rules is that the current task establishment limit value of the fractionation type of work at present stream node is greater than or less than described the second quantitative value;
Wherein, if described the first preset rules is set up, the current task of described work at present stream node creates limit value and is: the task class offset arranging in the embodiment of the present application is the acquiescence task creation limit value that splits type.If described the first preset rules is false, the current task of described work at present stream node creates limit value and is: in the embodiment of the present application, the task class offset that under work at present stream node, workflow is set up between its operation is the acquiescence task creation limit value that splits type.
It should be noted that, if described the second preset rules is false, be: the current task of the fractionation type of described work at present stream node creates limit value and equals described the second quantitative value, described the second setting unit 404 is the second quantitative value without carrying out the described task creation limit value that described fractionation type is set, and carries out the described work at present stream of described startup node but trigger described triggering start unit 405.
For example, as shown in Figure 6, for application, the application realizes the schematic flow sheet that multitask creates:
First task quantity is being set;
Create new task A, can be understood as model of creation task A;
Start the thread in thread pool, the concurrent creation task A1 of thread, A2, A3 ... An, wherein n is more than or equal to 2.
Be noted that each embodiment in this instructions all adopts the mode of going forward one by one to describe, what each embodiment stressed is and the difference of other embodiment, between each embodiment identical similar part mutually referring to.
Finally, also it should be noted that, in this article, relational terms such as the first and second grades is only used for an entity or operation to separate with another entity or operational zone, and not necessarily requires or imply and between these entities or operation, have the relation of any this reality or sequentially.And, term " comprises ", " comprising " or its any other variant are intended to contain comprising of nonexcludability, thereby the process, method, article or the equipment that make to comprise a series of key elements not only comprise those key elements, but also comprise other key elements of clearly not listing, or be also included as the intrinsic key element of this process, method, article or equipment.The in the situation that of more restrictions not, the key element being limited by statement " comprising ... ", and be not precluded within process, method, article or the equipment that comprises described key element and also have other identical element.
Above a kind of workflow task creation method provided by the present invention and device are described in detail, applied specific case herein principle of the present invention and embodiment are set forth, the explanation of above embodiment is just for helping to understand method of the present invention and core concept thereof; , for one of ordinary skill in the art, according to thought of the present invention, all will change in specific embodiments and applications, in sum, this description should not be construed as the restriction to the application meanwhile.

Claims (6)

1. a workflow task creation method, is characterized in that, comprising:
Obtain the first quantitative value of the pending data of work at present stream node;
Wherein, described work at present stream node is the workflow node to be started of the workflow in running status;
The second quantitative value of determining the required creation task of described work at present stream node according to described the first quantitative value, described the second quantitative value is more than or equal to 2;
If the first preset rules is set up, the task class offset of described work at present stream node is set for splitting type;
If the second preset rules is set up, the task creation limit value that described fractionation type is set is the second quantitative value;
Start described work at present stream node;
Create the task of described the second quantitative value.
2. method according to claim 1, is characterized in that, the task of described the second quantitative value of described establishment comprises:
In default thread pool, activate the thread of described the second quantitative value;
The thread triggering the activation creates respectively its each self-corresponding task.
3. method according to claim 1, is characterized in that, described the first preset rules is that the current task types value of described work at present stream node is general type or merges type;
If described the first preset rules is false, described method also comprises:
Set up if carry out described the second preset rules, the task creation limit value that described fractionation type is set is the second quantitative value.
4. according to the method described in claim 1,2 or 3, its feature how, and described the second preset rules is that the current task establishment limit value of the fractionation type of work at present stream node is greater than or less than described the second quantitative value;
If described the second preset rules is false, described method also comprises:
Carry out the described work at present stream of described startup node.
5. a workflow task creation apparatus, is characterized in that, comprising:
The first quantitative value acquiring unit, for obtaining first quantitative value of pending data of work at present stream node;
Wherein, described work at present stream node is the workflow node to be started of the workflow in running status;
The second quantitative value acquiring unit, for determine the second quantitative value of the required creation task of described work at present stream node according to described the first quantitative value, described the second quantitative value is more than or equal to 2;
The first setting unit, if set up for the first preset rules, arranges the task class offset of described work at present stream node for splitting type;
The second setting unit, if set up for the second preset rules, the task creation limit value that described fractionation type is set is the second quantitative value;
Trigger start unit, for starting described work at present stream node;
Task creation unit, for creating the task of described the second quantitative value.
6. device according to claim 5, is characterized in that, described task creation unit comprises:
Thread activates subelement, for activate the thread of described the second quantitative value at default thread pool;
Task creation subelement, creates respectively its each self-corresponding task for the thread triggering the activation.
CN201210506310.1A 2012-11-29 2012-11-29 Workflow task creating method and device Pending CN103853601A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210506310.1A CN103853601A (en) 2012-11-29 2012-11-29 Workflow task creating method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210506310.1A CN103853601A (en) 2012-11-29 2012-11-29 Workflow task creating method and device

Publications (1)

Publication Number Publication Date
CN103853601A true CN103853601A (en) 2014-06-11

Family

ID=50861290

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210506310.1A Pending CN103853601A (en) 2012-11-29 2012-11-29 Workflow task creating method and device

Country Status (1)

Country Link
CN (1) CN103853601A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106295670A (en) * 2015-06-11 2017-01-04 腾讯科技(深圳)有限公司 Data processing method and data processing equipment
CN106845741A (en) * 2015-12-03 2017-06-13 北大方正集团有限公司 The customization device and customization method of workflow
CN107707328A (en) * 2016-08-08 2018-02-16 北京京东尚科信息技术有限公司 Summary info transmission method and device
CN110263110A (en) * 2019-05-30 2019-09-20 武汉智云集思技术有限公司 Geographical spatial data loading method, equipment and storage medium based on evacuating algorithm
CN111767129A (en) * 2020-06-30 2020-10-13 深圳职业技术学院 Data flow task processing device and method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106295670A (en) * 2015-06-11 2017-01-04 腾讯科技(深圳)有限公司 Data processing method and data processing equipment
CN106295670B (en) * 2015-06-11 2020-03-17 腾讯科技(深圳)有限公司 Data processing method and data processing device
CN106845741A (en) * 2015-12-03 2017-06-13 北大方正集团有限公司 The customization device and customization method of workflow
CN107707328A (en) * 2016-08-08 2018-02-16 北京京东尚科信息技术有限公司 Summary info transmission method and device
CN107707328B (en) * 2016-08-08 2020-11-24 北京京东尚科信息技术有限公司 Abstract information transmission method and device
CN110263110A (en) * 2019-05-30 2019-09-20 武汉智云集思技术有限公司 Geographical spatial data loading method, equipment and storage medium based on evacuating algorithm
CN110263110B (en) * 2019-05-30 2021-10-12 武汉智云集思技术有限公司 Geographic space data loading method and device based on rarefying algorithm and storage medium
CN111767129A (en) * 2020-06-30 2020-10-13 深圳职业技术学院 Data flow task processing device and method

Similar Documents

Publication Publication Date Title
CN103853601A (en) Workflow task creating method and device
CN102426533B (en) Method and device for installing software
CN107864271B (en) A kind of information loading method and device
CN104035818A (en) Multiple-task scheduling method and device
JP2011501323A5 (en)
CN103455377A (en) System and method for managing business thread pool
CN103207807A (en) Task scheduling method and device
CN105205121A (en) Processing data monitoring method
CN101719079A (en) Method and device for processing tasks
CN106899649A (en) A kind of task requests processing method, device and user equipment
CN106445514B (en) Method and device for managing Activity instance of Android platform
CN106330878A (en) Method and device for managing video streaming resolution
CN106776395A (en) A kind of method for scheduling task and device of shared cluster
CN105389208A (en) Job processing method and apparatus
CN102880471A (en) Command execution method based on command line and command line operating system
CN103354990A (en) System and method for processing virtual machine in cloud platform
CN104391754A (en) Method and device for processing task exception
CN110704226A (en) Data verification method, device and storage medium
CN106874129B (en) Method for determining process scheduling sequence of operating system and control method
CN104166538A (en) Data task processing method and system
CN104166573A (en) Software installation method and device
CN106325991B (en) Instruction scheduling method and device of flow engine
CN105447114A (en) Display method and apparatus for form field
CN104572291A (en) Calling method of processors, and electronic equipment
CN106951264A (en) A kind of available machine time optimization method and device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140611