CN103850426B - Scaffold built-in fitting and use the scaffold of this built-in fitting to build technique - Google Patents

Scaffold built-in fitting and use the scaffold of this built-in fitting to build technique Download PDF

Info

Publication number
CN103850426B
CN103850426B CN201410068281.4A CN201410068281A CN103850426B CN 103850426 B CN103850426 B CN 103850426B CN 201410068281 A CN201410068281 A CN 201410068281A CN 103850426 B CN103850426 B CN 103850426B
Authority
CN
China
Prior art keywords
built
fitting
scaffold
wall
extension
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410068281.4A
Other languages
Chinese (zh)
Other versions
CN103850426A (en
Inventor
张俊国
黄启春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201410068281.4A priority Critical patent/CN103850426B/en
Publication of CN103850426A publication Critical patent/CN103850426A/en
Application granted granted Critical
Publication of CN103850426B publication Critical patent/CN103850426B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The present invention relates to technical field of buildings, particularly relate to scaffold built-in fitting and use the scaffold of this built-in fitting to build technique.The scaffold built-in fitting that the present invention provides, has the advantage that by arranging through hole in extension one end, and arranges flexible pull head on through hole, makes built-in fitting construct during Specific construction very convenient;By arranging flexible pull head on through hole, extension can be pulled out body of wall after condensing by body of wall easily makes it be connected with scaffold;The elbow arranged on embedding part, further increases built-in fitting intensity during specifically used;Technique built by the scaffold that the present invention provides, have the advantage that easy construction during Specific construction, save material, do not affect secondary structure construction, later stage decorations impact is preferably minimized degree, eliminate later stage percolating water hidden danger of the prior art, and the hidden danger that secondary structure construction built-in fitting is easily removed by workman.

Description

Scaffold built-in fitting and use the scaffold of this built-in fitting to build technique
Technical field
The present invention relates to technical field of buildings, particularly relate to scaffold built-in fitting and use the foot hands of this built-in fitting Technique built by frame.
Background technology
Requisite scaffold to be used in construction, the firmness of scaffold affects constructor The personal safety of member, therefore, scaffold should have with body of wall and is connected reliably.
In prior art, Patent document number is scaffold connecting component, scaffold disclosed in 200920071975 Wall-connecting piece, comprises built-in fitting, and described built-in fitting is: 90 degree of bendings of band steel as built-in fitting, embedment In fixing building structure, the band steel another side of an angle of 90 degrees is become to extend, by single fastener and scaffold Support is fastenedly connected, and described single fastener is the semicircular securing member of two band trip bolts, or also cross Band steel and the bolt of bracket holes, the technical scheme disclosed in this patent overcomes built-in fitting in conventional solution And use the deficiency of welding connecting mode between scaffolding steel pipe, but in technical scheme disclosed in this patent Built-in fitting becomes 90 jiaos, and therefore, technical scheme disclosed in this patent exists built-in fitting, and in loading process, intensity is relatively Little deficiency.
Summary of the invention
The scaffold built-in fitting that the present invention provides, it is intended to overcome scaffold built-in fitting in prior art specifically to make The deficiency that during with, intensity is relatively low, built-in fitting constructs inconvenience during pre-buried.
In order to solve above-mentioned technical problem, the present invention adopts the following technical scheme that scaffold built-in fitting, including Embedded part body, described embedded part body includes the embedding part imbedding building masonry wall and stretches out outside body of wall and foot The extension that hand cradle is connected, one end of described extension is connected with one end of embedding part and both are 90 degree of angles, The other end of described embedding part is provided with embedding part in more than 30 degree and less than 90 degree of elbows, described extension The other end be provided with through hole, be provided with in described through hole after cast and stretch the flexible pull head of extension.
As preferably, described flexible pull head is flexible wire, by flexibility pull head is set to flexible metal Silk, scaffold built-in fitting during pre-buried, easy construction, improve efficiency of construction.
As preferably, described embedding part undulate, by embedding part is set to waveform, scaffold is pre- Embedded part can bear bigger active force during specifically used, improves the intensity of scaffold built-in fitting.
Technique built by the scaffold using above-mentioned scaffold built-in fitting, comprises the following steps:
A, the embedment of built-in fitting: built-in fitting is fixed on the vertical reinforcement for improving strength of wall body, makes The extension of built-in fitting is adjacent to the template for cast wall, and makes the embedding part of built-in fitting Stretch into etc. inside cast wall;
B, the cast of body of wall: pour into body of wall with mould material;
C, the dismounting of template: by form removable after in b step, the body of wall of cast condenses;
D, the molding of built-in fitting: after step c completes, operate flexible pull head the stretching built-in fitting on through hole Go out portion's pull-out body of wall, make extension and wall body vertical;
E, the building of scaffold: scaffold is connected with extension by connector.
As preferably, the built-in fitting in described a step is fixed on vertical reinforcement by flexible wire, will Built-in fitting is fixed on vertical reinforcement by tinsel, and scaffold built-in fitting convenient fixing, standing back is put can To be conveniently adjusted, easy construction.
As preferably, the connector in described step e is fastener, is attached by fastener, improves pre- Embedded part and the bonding strength of scaffold.
The scaffold built-in fitting that the present invention provides, has the advantage that by arranging logical in one end of extension Hole, and flexible pull head is set on through hole, make built-in fitting construct during Specific construction very convenient, Will not interfere with the template for cast wall;And by arranging flexible pull head, body of wall on through hole Extension can pull out body of wall easily after condensation makes it be connected with scaffold;Now, extension and embedment Portion improves scaffold built-in fitting intensity in use on same straight line, it addition, on embedding part The elbow arranged, further increases built-in fitting intensity during specifically used.
Technique built by the scaffold that the present invention provides, and has the advantage that by using in technique scheme Scaffold built-in fitting, construct in build process very convenient, scaffold built-in fitting intensity of scaffold is high, Improve the security performance of scaffold;And the easy construction during Specific construction of this technique, saving material, Do not affect secondary structure construction, later stage decorations impact is preferably minimized degree, eliminates in prior art Later stage percolating water hidden danger, and the secondary structure construction hidden danger easily removed by workman of built-in fitting.
Accompanying drawing explanation
Accompanying drawing 1 is a kind of structural front view of scaffold built-in fitting in the present invention,
Accompanying drawing 2 is the another kind of structural front view of scaffold built-in fitting in the present invention,
The position view of built-in fitting when accompanying drawing 3 is wall pouring of the present invention,
Accompanying drawing 4 is scaffold built-in fitting position view operationally in the present invention.
Detailed description of the invention
Below in conjunction with the accompanying drawings, the scaffold built-in fitting of the present invention is described further.Such as Fig. 1, Fig. 2, figure Shown in 3, Fig. 4, scaffold built-in fitting, including embedded part body 1, described embedded part body 1 includes embedment The embedding part 11 of building masonry wall 2 with stretch out the outer extension 12 being connected with scaffold of body of wall 2, described in stretch out The one end in portion 12 is connected with one end of embedding part 11 and both are 90 degree of angles, described embedding part 11 another One end is provided with embedding part 11 in more than 30 degree and less than 90 degree of elbows 14, described embedding part 11, curved 14 and extension 12 be the integral structure using galvanized steel plain sheet to make, the other end of described extension 12 It is provided with through hole 13, in described through hole 13, is provided with the flexible pull head 15 stretching extension 12 after cast, institute Stating flexible pull head 15 can be flexible wire, it is also possible to for other flexibility silk ribbon, due to the entrance of built-in fitting Portion is during construction in later period inside embedment body of wall 2, and extension 12 body of wall to be stretched out 2 of built-in fitting is outside, And body of wall 2 uses pouring procedure to obtain, therefore, the flexible silk ribbon that flexible pull head 15 is arranged can be kept away Exempt from body of wall 2 flexible pull head 15 in casting process to interfere with the template 3 for cast wall 2, pass through Flexibility pull head 15 is set to flexible wire, scaffold built-in fitting during pre-buried, easy construction, carry High efficiency of construction.
As in figure 2 it is shown, optional, described embedding part 11 undulate, by being set to embedding part 11 Waveform, scaffold built-in fitting can bear bigger active force during specifically used, improves scaffold The intensity of built-in fitting.
Such as Fig. 3, shown in Fig. 4, the scaffold of above-mentioned scaffold built-in fitting is used to build technique, including following step Rapid:
A, the embedment of built-in fitting: built-in fitting is fixed on the vertical reinforcement 21 for improving body of wall 2 intensity On, owing to body of wall 2 to be made by reinforcing bar in body of wall 2 laid inside to be cast when cast Os Draconis, it is therefore convenient to built-in fitting is fixed on the reinforcing bar making Os Draconis, pre-buried The extension 12 of part is adjacent to the template 3 for cast wall 2, and makes the embedment of built-in fitting It is internal that portion 11 such as stretches at the cast wall 2;
B, the cast of body of wall 2: pour into body of wall 2 with mould material;
C, the dismounting of template 3: after in b step, the body of wall 2 of cast condenses, template 3 is removed;
D, the molding of built-in fitting: after step c completes, operate the flexible pull head 15 on through hole by built-in fitting Extension 12 pull out body of wall 2, make extension 12 vertical with body of wall 2;
E, the building of scaffold: scaffold 5 is connected with extension 12 by connector.
Optionally, the built-in fitting in above-mentioned a step is fixed on vertical reinforcement 21 by flexible wire, also Built-in fitting can be arranged on vertical reinforcement 21 by the method for welding, owing to using welding method by pre-buried After part is arranged on vertical reinforcement 21, the position of built-in fitting has no idea to adjust, and therefore, uses welding method Time, built-in fitting position should be determined accurately, built-in fitting is fixed on vertical reinforcement 21 by tinsel, foot Hand cradle built-in fitting convenient fixing, standing back puts and can be conveniently adjusted, easy construction.
Optionally, the connector in above-mentioned step e is fastener, and described fastener is in construction conventional Fastener, is attached by fastener, improves the bonding strength of built-in fitting and scaffold.
These are only the preferred embodiment of the present invention, it is intended to embody prominent technique effect and the advantage of the present invention, It it is not the restriction to technical scheme.Those skilled in the art will appreciate that all based on Amendment, change or the substitute technology feature that the technology of the present invention content is made, all should be covered by institute of the present invention In the technology category that attached claim is advocated.

Claims (3)

1. a technique built by scaffold, and including scaffold built-in fitting, described scaffold built-in fitting includes built-in fitting Body (1), described embedded part body (1) includes the embedding part (11) imbedding building masonry wall (2) With stretch out the extension (12) that body of wall (2) is connected outward, the one of described extension (12) with scaffold End is connected with one end of embedding part (11) and both are 90 degree of angles, described embedding part (11) The other end be provided with embedding part (11) in more than 30 degree and be less than 90 degree of elbows (14), described in stretch The other end going out portion (12) is provided with through hole (13), is provided with in described through hole (13) after cast Stretch the flexible pull head (15) of extension (12);
Described flexible pull head (15) is flexible wire;
Described embedding part (11) undulate;
It is characterized in that, comprise the following steps:
A, the embedment of built-in fitting: built-in fitting is fixed on the vertical reinforcement for improving body of wall (2) intensity (21), on, the extension (12) of built-in fitting and the template (3) for cast wall (2) are made It is adjacent to, and it is internal to make the embedding part (11) of built-in fitting the cast wall (2) such as stretch into;
B, the cast of body of wall (2): pour into body of wall (2) with mould material;
C, the dismounting of template (3): by template (3) after in b step, the body of wall (2) of cast condenses Remove;
D, the molding of built-in fitting: after step c completes, operate the flexible pull head (15) on through hole by pre-buried The extension (12) pull-out body of wall (2) of part, makes extension (12) vertical with body of wall (2);
E, the building of scaffold: scaffold (5) is connected with extension (12) by connector.
Technique built by scaffold the most according to claim 1, it is characterised in that: pre-in described a step Embedded part is fixed on vertical reinforcement (21) by flexible wire.
Technique built by scaffold the most according to claim 1, it is characterised in that: the company in described step e Fitting is fastener.
CN201410068281.4A 2014-02-27 2014-02-27 Scaffold built-in fitting and use the scaffold of this built-in fitting to build technique Expired - Fee Related CN103850426B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410068281.4A CN103850426B (en) 2014-02-27 2014-02-27 Scaffold built-in fitting and use the scaffold of this built-in fitting to build technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410068281.4A CN103850426B (en) 2014-02-27 2014-02-27 Scaffold built-in fitting and use the scaffold of this built-in fitting to build technique

Publications (2)

Publication Number Publication Date
CN103850426A CN103850426A (en) 2014-06-11
CN103850426B true CN103850426B (en) 2016-09-07

Family

ID=50858533

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410068281.4A Expired - Fee Related CN103850426B (en) 2014-02-27 2014-02-27 Scaffold built-in fitting and use the scaffold of this built-in fitting to build technique

Country Status (1)

Country Link
CN (1) CN103850426B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107653984A (en) * 2017-08-31 2018-02-02 上海二十冶建设有限公司 Simple and easy method for wall body built-in fitting fabrication and installation

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61107836U (en) * 1984-12-21 1986-07-08
CN201406826Y (en) * 2009-05-11 2010-02-17 中天建设集团有限公司 Wall-connecting component of scaffold
CN202559704U (en) * 2012-05-02 2012-11-28 安宜建设集团有限公司 Energy-saving safe overhanging scaffold for building construction
CN202731280U (en) * 2012-08-31 2013-02-13 中国建筑第四工程局有限公司 Tool type outer scaffold wall connecting piece
CN203008342U (en) * 2012-08-17 2013-06-19 姚磊 Light inclined-pulling type scaffold

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61107836U (en) * 1984-12-21 1986-07-08
CN201406826Y (en) * 2009-05-11 2010-02-17 中天建设集团有限公司 Wall-connecting component of scaffold
CN202559704U (en) * 2012-05-02 2012-11-28 安宜建设集团有限公司 Energy-saving safe overhanging scaffold for building construction
CN203008342U (en) * 2012-08-17 2013-06-19 姚磊 Light inclined-pulling type scaffold
CN202731280U (en) * 2012-08-31 2013-02-13 中国建筑第四工程局有限公司 Tool type outer scaffold wall connecting piece

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107653984A (en) * 2017-08-31 2018-02-02 上海二十冶建设有限公司 Simple and easy method for wall body built-in fitting fabrication and installation

Also Published As

Publication number Publication date
CN103850426A (en) 2014-06-11

Similar Documents

Publication Publication Date Title
CN206360363U (en) A kind of aluminum alloy pattern plate bracing device
CN103850426B (en) Scaffold built-in fitting and use the scaffold of this built-in fitting to build technique
CN205822364U (en) A kind of scalable downcomer
CN106284744A (en) Big module heat-insulating wall structure
CN205423691U (en) Novel combination formula wedge cover
CN206495496U (en) A kind of aluminum alloy mould plate shear wall top bracing means
CN206158192U (en) Concrete pump pipe's simple easily fixable device on concrete face
CN105839796B (en) A kind of assembled integral insulation wallboard fastening piece
CN205134546U (en) But quick detachable I -steel built -in fitting of encorbelmenting of cyclic utilization
CN205481857U (en) Explosion -proof curved solar energy slot type condenser system of heat that exempts from is exempted from to debug in installation
CN105133835B (en) Connecting element of Pi 48 single steel pipe and combined steel formwork
CN205712954U (en) Joint structure is installed in EPS finished product moulding bar planting
CN206844630U (en) Fixed metal form back cord
CN206831917U (en) A kind of refrigerator drainpipe
CN205591550U (en) Prefabricated sleeve pipe of floor pipeline preformed hole
CN205776944U (en) Fixed system installed by a kind of rotatable curtain wall
CN205804962U (en) A kind of building template fixture
CN205619777U (en) Heat cyclic utilization device of metallurgical stove
CN205412139U (en) Attachment device of dismouting rim net
CN203891450U (en) Threaded rod rapid connecting part
CN210365088U (en) Pipe pillow for drainage pipe of reinforced concrete pipe
CN207419991U (en) A kind of staircase crosshead support structure
CN205400027U (en) Scaffold connects snap ring soon
CN208352865U (en) One kind can expand cable suspension device
CN213509617U (en) Wire rope tightener

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Zhang Junguo

Inventor after: Huang Qichun

Inventor before: Huang Chuanbao

Inventor before: Sun Weiwei

Inventor before: Wang Lin

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20160812

Address after: 450003, Henan, Zhengzhou Jinshui District Garden Road West, agricultural road south 6, 1 units, 22, 2207

Applicant after: The Second Construction Company Ltd of China Construction Second Bureau

Address before: 322100 Dongyang, Zhejiang Province, Wu Ning West Road, No. 55, No.

Applicant before: ZHEJIANG HAITIAN CONSTRUCTION GROUP Co.,Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160907