CN103845914B - Arrangement method of double reboilers as well as double-reboiler equipment - Google Patents

Arrangement method of double reboilers as well as double-reboiler equipment Download PDF

Info

Publication number
CN103845914B
CN103845914B CN201310475147.1A CN201310475147A CN103845914B CN 103845914 B CN103845914 B CN 103845914B CN 201310475147 A CN201310475147 A CN 201310475147A CN 103845914 B CN103845914 B CN 103845914B
Authority
CN
China
Prior art keywords
reboiler
reboilers
double
tower
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310475147.1A
Other languages
Chinese (zh)
Other versions
CN103845914A (en
Inventor
杨明刚
卢夺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LUOYANG RUIZE PETROCHEMICAL ENGINEERING Co Ltd
Original Assignee
LUOYANG RUIZE PETROCHEMICAL ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LUOYANG RUIZE PETROCHEMICAL ENGINEERING Co Ltd filed Critical LUOYANG RUIZE PETROCHEMICAL ENGINEERING Co Ltd
Priority to CN201310475147.1A priority Critical patent/CN103845914B/en
Publication of CN103845914A publication Critical patent/CN103845914A/en
Application granted granted Critical
Publication of CN103845914B publication Critical patent/CN103845914B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relates to an arrangement method of double reboilers as well as double-reboiler equipment. The arrangement method of the double reboilers is that the two reboilers are arranged vertically; the bottom of the reboiler positioned below is provided with a tower bottom liquid phase inlet connected with a tower bottom liquid phase outlet pipeline, and the top of the reboiler is provided with two outlets connected with two bottom inlets of the reboiler positioned above; the top of the reboiler positioned above is provided with a gas phase outlet, and a gas phase passes through the outlet, and finally enters a tower body; pipe passes of the two reboilers are provided with mutual individual outlets and inlets. After the arrangement scheme provided by the invention is adopted for the double reboilers, not only is the requirement for 'being short and straight as much as possible' for pipelines by the technical design met, but also the stress requirement for the pipelines by the pipeline design is met, and the safe, stable and long-cycle running of the double reboilers and the pipelines thereof is ensured; meanwhile, the design number of pipes, pipe fittings and supports is reduced; the occupied area of the equipment is reduced; the construction cost is reduced; meanwhile, the running cost of the equipment is also reduced so as to create great profit for enterprises.

Description

The method for arranging of two reboiler and two reboiler equipment
Technical field
The present invention relates to crude oil manufacture field, particularly relate to the layout of refinery device " two reboiler ".
Background technology
Reboiler is a kind of equipment being used for improving liquid-phase vaporization rate at the bottom of tower common in petrochemical plant.Along with the requirement of petrochemical equipment to energy resource consumption is more and more higher, when apparatus design, more and more start to adopt " two reboiler " pattern.When device goes into operation, use wherein, using steam medium as thermal source, liquid phase at the bottom of tower is heated; During normal operating, use other one, using the process fluid medium in device as thermal source, liquid phase at the bottom of tower is heated, does not re-use steam, to reach the object that economize energy consumes.At present, the design of the routine of this pattern is that two reboilers are arranged in tower both sides respectively, is arranged in the both sides of distance tower 4m respectively, with reference to figure 1 for certain company 1,400,000 tons/year of continuous reformer deheptanizer C402, deheptanizer reboiler E402A/B.
When adopting this Design Mode, consider from the angle of technological design, require that the pipe resistance connecting tower and reboiler minimizes, accomplish to try one's best short and straight.And consider from the angle of pipe design, because the pipeline diameter of reboiler is larger, temperature is higher, flexible poor, in order to meet the requirement of pipeline stress design, also to meet two reboiler " opens stops ", " a cold heat " impact on the equipment mouth of pipe simultaneously, require that pipeline will by meeting the requirement of pipeline flexible by natural torsion.The conflicting requirement of two design specialist often causes in actual device and occurs that reboiler resistance drop is excessive, or the problem such as pipe flange face leakage.
How to solve requirement conflicting between technological design and pipe design, just become the key that two reboiler is arranged.
Summary of the invention
Main purpose of the present invention is, overcome existing pair of reboiler and arrange the defect existed, and provide a kind of method for arranging of two reboilers newly, it can ensure production engineering specifications, can ensure pipe design requirement again.
Another object of the present invention is to, a kind of two reboiler equipment adopting above-mentioned method for arranging of the present invention to arrange are provided.
For achieving the above object, following technical scheme is adopted:
1. two reboiler shell side arranged in series;
2. be positioned at the reboiler of below, an entrance is established in bottom, is connected with liquid-phase outlet pipeline at the bottom of tower, and two outlets are established at top, is connected with two bottom inlets of the reboiler being positioned at top; An outlet is established at the reboiler top being positioned at top, and gas phase finally enters tower body through this outlet;
3. two reboiler tube sides establish separate gateway, can use different heat source mediums.
The object of the invention to solve the technical problems realizes by the following technical solutions.The method for arranging of the two reboilers proposed according to the present invention, it is arranged one on the other by two reboilers, establishes liquid phase entrance at the bottom of a tower, be connected with liquid-phase outlet pipeline at the bottom of tower bottom the reboiler below being positioned at, two outlets are established at top, are connected with two bottom inlets of the reboiler being positioned at top; A gaseous phase outlet is established at the reboiler top being positioned at top, and gas phase finally enters tower body through this outlet; The tube side of two reboilers establishes separate entry and exit.
The object of the invention to solve the technical problems also can be applied to the following technical measures to achieve further.
More preferably, the method for arranging of aforesaid pair of reboiler, wherein also comprises fixed connecting piece bottom the reboiler of top and between the reboiler top of below.
The object of the invention to solve the technical problems also realizes by the following technical solutions.According to two reboiler equipment that the present invention proposes, it comprises two reboilers arranged one on the other, and be provided with liquid phase entrance at the bottom of a tower bottom the reboiler below being positioned at, top is provided with two outlets, is connected with two bottom inlets of the reboiler being positioned at top; The reboiler top being positioned at top is provided with a gaseous phase outlet; The tube side of two reboilers is provided with separate entry and exit.
The object of the invention to solve the technical problems also can be applied to the following technical measures to achieve further.
More preferably, aforesaid pair of reboiler equipment, wherein also comprises fixed connecting piece bottom the reboiler of top and between the reboiler top of below.
By technique scheme, the present invention at least has following advantages and beneficial effect: after two reboiler adopts arrangement of the present invention, both the requirement of technological design to pipeline " short and straight " had been met as far as possible, meet again the stress requirement of pipe design to pipeline, ensure safe, steady, the long-term operation of two reboiler and pipeline thereof.Meanwhile, decrease the design quantity of pipe, pipe fitting, support, decrease occupation area of equipment, reduce construction cost, also reduce the operating cost of device simultaneously, for enterprise creates higher profit.
Above-mentioned explanation is only the general introduction of technical solution of the present invention, in order to technological means of the present invention can be better understood, and can be implemented according to the content of description, and can become apparent to allow above and other object of the present invention, feature and advantage, below especially exemplified by preferred embodiment, and coordinate accompanying drawing, be described in detail as follows.
Accompanying drawing explanation
Fig. 1 is certain company 1,400,000 tons/year of continuous reformer deheptanizer C402 and deheptanizer reboiler E402A/B layout drawing.
Fig. 2 is of the present invention pair of reboiler device structure schematic diagram.
[symbol description]
10:E402A deheptanizer reboiler 20:E402A/B deheptanizer reboiler
30:C402 deheptanizer
1: liquid phase entrance 2 at the bottom of tower: gaseous phase outlet
3: process liquid inlets 4: Process fluid outlet
5: steam inlet 6: condensate water exports
7: outlet 8: entrance
9: fixed connecting piece
Detailed description of the invention
For further setting forth the present invention for the technological means reaching predetermined goal of the invention and take and effect, below in conjunction with accompanying drawing and preferred embodiment, to method for arranging and two its detailed description of the invention of reboiler equipment, method, feature and effect thereof of the two reboilers proposed according to the present invention, be described in detail as follows.
As shown in Figure 2, for two reboiler device structure schematic diagrames of one embodiment of the invention, that is by the schematic diagram of method for arranging cloth postpone of of the present invention pair of reboiler, concrete method for arranging is: arranged one on the other by two reboilers, its shell side is connected in series, and establishes liquid phase entrance 1 at the bottom of a tower, be connected with liquid-phase outlet pipeline at the bottom of tower bottom the reboiler below being positioned at, top establishes two to export 7, is connected with two bottom inlets 8 of the reboiler being positioned at top; A gaseous phase outlet 2 is established at the reboiler top being positioned at top, and gas phase finally enters tower body through this outlet.The tube side of two reboilers establishes separate entry and exit, can use different heat source mediums.In the present embodiment, for making the connection of two reboilers more firm, be fixedly connected with the reboiler top being positioned at below bottom the reboiler being positioned at top, namely fixed connecting piece 9 be set bottom the reboiler of top and between the reboiler top of below.
At the beginning of device goes into operation, also do not produce in device and can, for the thermal source of liquid phase heating at the bottom of tower, steam can only be used as thermal source.At this moment, the steam inlet 5 and the condensate water outlet 6(that open the reboiler tube side being positioned at below refer to Fig. 2), in order to liquid phase at the bottom of heating tower, close process liquid inlets 3 and Process fluid outlet 4.Liquid phase at the bottom of tower enters heat exchanger by the reboiler shell side bottom inlet being positioned at below, and through being positioned at the reboiler heating of below, gas phase goes out heat exchanger from the reboiler top exit being positioned at top, returns tower body, completes heating process.
After device normally goes into operation, produce in device and for the thermal source of liquid phase heating at the bottom of tower, at this moment, process liquid inlets 3 and the Process fluid outlet 4 of the reboiler tube side being positioned at top can have been opened, in order to liquid phase at the bottom of heating tower, steam off entrance 5 and condensate water outlet 6.Liquid phase at the bottom of tower enters heat exchanger by the reboiler shell side bottom inlet being positioned at top, and through being positioned at the reboiler heating of top, gas phase goes out heat exchanger from the reboiler top exit being positioned at top, returns tower body, completes heating process.
Two reboiler adopts above arranged superposed scheme, the pipeline connecting tower and reboiler is in hot all the time, the operating mode of " one opens one stops ", " a cold heat " when need not consider that two reboiler is arranged apart, decrease the natural torsion requirement of pipeline, both met the requirement of technological design to pipeline " short and straight ", met again the stress requirement of pipe design to pipeline as far as possible.
The above, it is only preferred embodiment of the present invention, not any pro forma restriction is done to the present invention, although the present invention discloses as above with preferred embodiment, but and be not used to limit the present invention, any those skilled in the art, do not departing within the scope of technical solution of the present invention, make a little change when the technology contents of above-mentioned announcement can be utilized or be modified to the Equivalent embodiments of equivalent variations, in every case be do not depart from technical solution of the present invention content, according to any simple modification that technical spirit of the present invention is done above embodiment, equivalent variations and modification, all still belong in the scope of technical solution of the present invention.

Claims (4)

1. the method for arranging of a two reboiler, two reboilers are it is characterized in that to arrange one on the other, liquid phase entrance (1) at the bottom of a tower is established bottom reboiler below being positioned at, be connected with liquid-phase outlet pipeline at the bottom of tower, two outlets (7) are established at top, are connected with two bottom inlets (8) of the reboiler being positioned at top; A gaseous phase outlet (2) is established at the reboiler top being positioned at top, and gas phase finally enters tower body through this outlet; The tube side of two reboilers establishes separate entry and exit.
2. the method for arranging of according to claim 1 pair of reboiler, is characterized in that also comprising fixed connecting piece (9) bottom the reboiler of top and between the reboiler top of below.
3. two reboiler equipment, it is characterized in that it comprises two reboilers arranged one on the other, be provided with liquid phase entrance (1) at the bottom of a tower bottom reboiler below being positioned at, top is provided with two outlets (7), is connected with two bottom inlets (8) of the reboiler being positioned at top; The reboiler top being positioned at top is provided with a gaseous phase outlet (2); The tube side of two reboilers is provided with separate entry and exit.
4. according to claim 3 pair of reboiler equipment, is characterized in that also comprising fixed connecting piece (9) bottom the reboiler of top and between the reboiler top of below.
CN201310475147.1A 2013-10-12 2013-10-12 Arrangement method of double reboilers as well as double-reboiler equipment Active CN103845914B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310475147.1A CN103845914B (en) 2013-10-12 2013-10-12 Arrangement method of double reboilers as well as double-reboiler equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310475147.1A CN103845914B (en) 2013-10-12 2013-10-12 Arrangement method of double reboilers as well as double-reboiler equipment

Publications (2)

Publication Number Publication Date
CN103845914A CN103845914A (en) 2014-06-11
CN103845914B true CN103845914B (en) 2015-05-20

Family

ID=50854309

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310475147.1A Active CN103845914B (en) 2013-10-12 2013-10-12 Arrangement method of double reboilers as well as double-reboiler equipment

Country Status (1)

Country Link
CN (1) CN103845914B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5402647A (en) * 1994-03-25 1995-04-04 Praxair Technology, Inc. Cryogenic rectification system for producing elevated pressure nitrogen
CN101104116A (en) * 2006-07-11 2008-01-16 蒋建君 Double distilling device
CN101391152A (en) * 2008-10-22 2009-03-25 天津大学 Double-reboiler batch extraction rectification device and method using absorption heat pump
CN101782270A (en) * 2010-02-26 2010-07-21 艾欧史密斯(中国)热水器有限公司 Condensing gas boiler
CN103183577A (en) * 2011-12-29 2013-07-03 中国石油化工集团公司 Heat exchange system and heat exchange method for carbon five extractive distillation
CN203483879U (en) * 2013-10-12 2014-03-19 洛阳瑞泽石化工程有限公司 Double-reboiler equipment

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5402647A (en) * 1994-03-25 1995-04-04 Praxair Technology, Inc. Cryogenic rectification system for producing elevated pressure nitrogen
CN101104116A (en) * 2006-07-11 2008-01-16 蒋建君 Double distilling device
CN101391152A (en) * 2008-10-22 2009-03-25 天津大学 Double-reboiler batch extraction rectification device and method using absorption heat pump
CN101782270A (en) * 2010-02-26 2010-07-21 艾欧史密斯(中国)热水器有限公司 Condensing gas boiler
CN103183577A (en) * 2011-12-29 2013-07-03 中国石油化工集团公司 Heat exchange system and heat exchange method for carbon five extractive distillation
CN203483879U (en) * 2013-10-12 2014-03-19 洛阳瑞泽石化工程有限公司 Double-reboiler equipment

Also Published As

Publication number Publication date
CN103845914A (en) 2014-06-11

Similar Documents

Publication Publication Date Title
CN102175351B (en) Device for testing thermal performance and fluid resistance of liquid-liquid heat exchanger
CN206122541U (en) Oven
CN205088180U (en) Coke oven crude gas tedge heat transfer device
CN203923684U (en) A kind of steam modernization system of energy-saving and emission-reducing setting machine
CN103845914B (en) Arrangement method of double reboilers as well as double-reboiler equipment
CN203483879U (en) Double-reboiler equipment
CN201100503Y (en) An energy-saving concretion prevention structure for oil supply tube
CN205119567U (en) Be applied to secondary heat recovery's dynamic energy storage hot -water cylinder
CN103868374B (en) A kind of dividing wall type heat exchanger
CN208485920U (en) Water cooled rolls heat utilization device and annealing furnace system
CN208466920U (en) A kind of mid-frequency induction heating push-making angle fitting device
CN202705852U (en) Outlet local heating device of high-temperature asphalt tank
CN208398686U (en) A kind of energy-saving crude oil heating device
CN207632896U (en) The heating system of strip pickling acid
CN206069399U (en) Water reutilization system of dissolution
CN205227772U (en) High -efficient commercial electric heat water dispenser
CN207622551U (en) A kind of crude naphthalene production single-furnace double-tower
CN203419888U (en) Diesel and wax oil hydrogenation device hydrogen presenting system
CN204201359U (en) A kind of double-ply bellows compensator
CN203719471U (en) Dividing wall type heat exchanger
CN204461151U (en) High-pressure natural gas vacuum furnace
CN208025848U (en) A kind of Heat-conduction oil circulation system
CN203626737U (en) Heat exchanger transfer device of oil field combination station heat medium heating device
CN209783353U (en) Device for heating viscous liquid
CN202687187U (en) Heating unit of large floating roof tank storing easy-coagulating and highly viscous crude oil at normal temperature

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant