CN103835378A - Closing structure for expansion joint reserved in wall surface or roof surface - Google Patents

Closing structure for expansion joint reserved in wall surface or roof surface Download PDF

Info

Publication number
CN103835378A
CN103835378A CN201410048775.6A CN201410048775A CN103835378A CN 103835378 A CN103835378 A CN 103835378A CN 201410048775 A CN201410048775 A CN 201410048775A CN 103835378 A CN103835378 A CN 103835378A
Authority
CN
China
Prior art keywords
gypsum plank
end cap
shrinkage joint
keel
joint closing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410048775.6A
Other languages
Chinese (zh)
Inventor
徐金宝
邱生
陆全云
季震宇
付聪
周雅萍
赵金星
王爱多
周晓杰
顾鑫
杨文武
李泉
韩涛
徐杰
滕忠
朱慈英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Gold Mantis Construction Decoration Co Ltd
Original Assignee
Suzhou Gold Mantis Construction Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Gold Mantis Construction Decoration Co Ltd filed Critical Suzhou Gold Mantis Construction Decoration Co Ltd
Priority to CN201410048775.6A priority Critical patent/CN103835378A/en
Publication of CN103835378A publication Critical patent/CN103835378A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Floor Finish (AREA)

Abstract

The invention discloses a closing structure for an expansion joint reserved in a wall surface or a roof surface. The closing structure for the expansion joint reserved in the wall surface or the roof surface comprises a main keel (1), auxiliary keels (2), closing strips (5), first layers of gypsum boards (4) and second layers of gypsum boards (6), wherein the auxiliary keels (2) and the main keel (1) are fixed, and the first layers of gypsum boards (4) are fixed under the auxiliary keels (2); the second layers of gypsum boards (6) arranged in the closing strips (5) are fixed under the first layers of gypsum boards (4); a first connecting seam between the auxiliary keels (2) and a second connecting seam between the first layers of gypsum boards (4) are mutually staggered. According to the closing structure for the expansion joint reserved in the wall surface or the roof surface, the problems that the sizes of expansion joints are not uniform and edge bending, edge breakage, lack of keratin and edge cracking occur are solved, positioning is easy, the structure is firm, construction is convenient, the sizes of reserved grooves are uniform, common problems are solved, the amount of labor used during construction is reduced, sources are created, and energy is saved.

Description

Metope and end face stay shrinkage joint closing-in structure
Technical field
The present invention relates to a kind of metope and end face and stay shrinkage joint closing-in structure.
Background technology
Wall, the processing of end face shrinkage joint in interior decoration engineering, at present the general common fault of shrinkage joint bottling technique exists: stitch not of uniform sizely cause, the bending chip unfilled corner in corner, along limit cracking, large, the follow-up maintenance recruitment of difficulty of construction is many etc.Conventional top, wall stay technique seam mode to have following drawback: 1, shrinkage joint not of uniform sizely causes, corner bending, chip, unfilled corner matter, ftractures along limit.2, difficulty of construction is large, generally common fault is difficult to control, once occur that the follow-up maintenance recruitment of quality problems is many and be difficult to thoroughly reparation etc.
Summary of the invention
Goal of the invention of the present invention is: provide a kind of metope and end face to stay shrinkage joint closing-in structure, it uses the end cap of " L " shape to solve the shrinkage joint problem such as cause not of uniform size by Bian.
Technical scheme of the present invention is: a kind of metope and end face stay shrinkage joint closing-in structure, and it comprises main joist, pays keel, end cap, first floor gypsum plank, second layer gypsum plank two; Described pair of keel and main joist are fixed, and first floor gypsum plank is fixed on to be paid under keel; The described second layer gypsum plank two being placed in end cap, is fixed on first floor gypsum plank below; Mutual dislocation between connecting sewing two between connecting sewing one and first floor gypsum plank between described pair of keel.
Below technique scheme is further expalined:
Connecting sewing one between described pair of keel is wide is 10mm.
Connecting sewing two between described first floor gypsum plank is wide is 10mm.
Between described second layer gypsum plank two, leave connecting sewing three, the wide 10mm of connecting sewing three.
Described end cap is L40-13 type end cap.
Described end cap end opening is with claw.
Described second layer gypsum plank two and end cap inner edge leave the gap of 5mm.
Described second layer gypsum plank two has glue with the gap filling that end cap inner edge leaves.
Described end cap is articles made of aluminium alloy.
Described end cap surface spraying is roasting to be moulded.
Advantage of the present invention is: metope of the present invention and end face stay shrinkage joint closing-in structure, it by Bian use that the end cap of " L " shape has solved that shrinkage joint not of uniform sizely causes, corner bending, chip, unfilled corner matter, along limit problems of crack; Location is simple, sound construction, convenient construction; Stay groove consistent size effectively to get rid of common fault; Reduce the engineering amount of labour used, increase income energy-conservation.
Brief description of the drawings
Below in conjunction with drawings and Examples, the present invention is described further:
Fig. 1 is the structural profile schematic diagram of the embodiment of the present invention;
Fig. 2 is the end cap schematic diagram of the embodiment of the present invention;
Wherein: 1 main joist; 2 pairs of keel; 3 self-tapping screws; 4 first floor gypsum planks; 5 end caps; 6 second layer gypsum planks.
Detailed description of the invention
Embodiment: as shown in Figure 1: a kind of metope and end face stay shrinkage joint closing-in structure, it comprises main joist 1, pays keel 2, self-tapping screw 3, end cap 5, first floor gypsum plank 4, second layer gypsum plank 6.Gypsum plank is Thistle board.Pay keel 2 for model be 50.
Determine basic unit's size process Installation main joist 1 routinely according to designing requirement.Pay the connecting sewing one between keel 2 the wide 10mm of being: to pay the middle 10mm spatial balance of staying of keel 2 for two and install.Pay keel 2 fixing with main joist 1.Article two, end cap 5 balances are fixed on first floor gypsum plank 4 times, and 10mm space is stayed in centre; When second layer gypsum plank 6 is installed, stay 5mm seam by the aluminium limit of end cap 5, and it is fixing to add glue self-tapping screw 3, makes it meet flexible requirement.When second layer gypsum plank 6 is installed, they use self-tapping screw 3 to fix satisfied flexible requirement in the middle 10mm space of staying respectively.
First floor gypsum plank 4 is fixed on pays keel 2 times; Be placed in the second layer gypsum plank 6 in end cap 5, be fixed on first floor gypsum plank 4 belows; Pay mutual dislocation between the connecting sewing one between keel 2 and the connecting sewing two between first floor gypsum plank 4.Connecting sewing two between first floor gypsum plank 4 is wide is 10mm.Between second layer gypsum plank 6, leave connecting sewing three, the wide 10mm of connecting sewing three.Second layer gypsum plank 6 and end cap 5 inner edges leave the gap of 5mm, are filled with glue in gap.
As shown in Figure 2, end cap 5 is L40-13 type articles made of aluminium alloy, and end cap 5 end openings of L40-13 type, with claw, have had reliable controlled while having avoided the Puttying of interface cracking phenomena surface.End cap 5 surface sprayings are roasting not to be moulded: easy to change, not oxidizable, aluminium alloy extrusions is not yielding.
First floor gypsum plank one is pressed left side keel 30mm, fixes by self-tapping screw 3 left sides; First floor gypsum plank two presses the left side to pay keel 10mm, is fixed on the keel of the right (with former rim gypsum plate) by self-tapping screw 3; Article two, L40-13 type articles made of aluminium alloy balance is fixed on first floor gypsum plank 4 times, and 10mm space is stayed in centre, and distance accurately reaches engineering design requirement; When second layer gypsum plank 6 is installed, stay 5mm to stitch and fill glue by end cap 5 aluminium limits, fixing by self-tapping screw 3.Before batch ash, adjust land plaster to tamp by white glue with vinyl.
It should be pointed out that for the present invention through absolutely proving, also can there is the embodiment of multiple conversion and remodeling, be not limited to above-mentioned specific embodiment.Above-described embodiment is as just explanation of the present invention, instead of limitation of the present invention.In a word, protection scope of the present invention should comprise those apparent conversion or alternative and remodeling to those skilled in the art.

Claims (10)

1. metope and end face stay a shrinkage joint closing-in structure, it is characterized in that: it comprises main joist (1), pays keel (2), end cap (5), first floor gypsum plank (4), second layer gypsum plank (6); Described pair of keel (2) are fixing with main joist (1), and first floor gypsum plank (4) is fixed on to be paid under keel (2); The described second layer gypsum plank (6) being placed in end cap (5), is fixed on first floor gypsum plank (4) below; Mutual dislocation between connecting sewing two between connecting sewing one between described pair of keel (2) and first floor gypsum plank (4).
2. metope according to claim 1 and end face stay shrinkage joint closing-in structure, it is characterized in that: connecting sewing one between described pair of keel (2) is wide is 10mm.
3. metope according to claim 1 and end face stay shrinkage joint closing-in structure, it is characterized in that: connecting sewing two between described first floor gypsum plank (4) is wide is 10mm.
4. metope according to claim 1 and end face stay shrinkage joint closing-in structure, it is characterized in that: between described second layer gypsum plank (6), leave connecting sewing three, the wide 10mm of connecting sewing three.
5. metope according to claim 1 and end face stay shrinkage joint closing-in structure, it is characterized in that: described end cap (5) is L40-13 type end cap.
6. metope according to claim 1 and end face stay shrinkage joint closing-in structure, it is characterized in that: described end cap (5) end opening is with claw.
7. metope according to claim 1 and end face stay shrinkage joint closing-in structure, it is characterized in that: described second layer gypsum plank (6) and end cap (5) inner edge leave the gap of 5mm.
8. metope according to claim 7 and end face stay shrinkage joint closing-in structure, it is characterized in that: in the gap that described second layer gypsum plank (6) and end cap (5) inner edge leave, be filled with glue.
9. metope according to claim 1 and end face stay shrinkage joint closing-in structure, it is characterized in that: described end cap (5) is articles made of aluminium alloy.
10. metope according to claim 9 and end face stay shrinkage joint closing-in structure, it is characterized in that: described end cap (5) surface spraying is roasting to be moulded.
CN201410048775.6A 2014-02-12 2014-02-12 Closing structure for expansion joint reserved in wall surface or roof surface Pending CN103835378A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410048775.6A CN103835378A (en) 2014-02-12 2014-02-12 Closing structure for expansion joint reserved in wall surface or roof surface

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410048775.6A CN103835378A (en) 2014-02-12 2014-02-12 Closing structure for expansion joint reserved in wall surface or roof surface

Publications (1)

Publication Number Publication Date
CN103835378A true CN103835378A (en) 2014-06-04

Family

ID=50799241

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410048775.6A Pending CN103835378A (en) 2014-02-12 2014-02-12 Closing structure for expansion joint reserved in wall surface or roof surface

Country Status (1)

Country Link
CN (1) CN103835378A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105019633A (en) * 2015-07-30 2015-11-04 苏州金螳螂建筑装饰股份有限公司 New-technology wallpaper-groove stitching structure
CN107524273A (en) * 2016-06-20 2017-12-29 五冶集团上海有限公司 A kind of wooden facing retraction slot installation method
CN109487945A (en) * 2018-11-28 2019-03-19 金螳螂精装科技(苏州)有限公司 A kind of tee T aluminum strip mounting structure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1018449A (en) * 1996-06-28 1998-01-20 Natl House Ind Co Ltd Joint structure
CN2705521Y (en) * 2004-05-12 2005-06-22 上海拉法基小野田石膏建材有限公司 Decorative face partitionw all gypsum board
DE202005013091U1 (en) * 2005-08-19 2005-10-27 Beck, Walter, Dipl.-Ing. Movement joint sealing profile for building, has seal covering gap between component and profile, where profile between component and wall is fastened to component by fastener and seal is fit to fastener or profile
CN202324290U (en) * 2011-11-18 2012-07-11 中建七局建筑装饰工程有限公司 Mounting structure for suspended ceiling at deformation joint on roof
CN103437475A (en) * 2013-08-30 2013-12-11 陕西建工集团总公司 Construction method of architectural structure gypsum board with paper surface hung ceiling
CN203782901U (en) * 2014-02-12 2014-08-20 苏州金螳螂建筑装饰股份有限公司 Expansion joint keeping cover structure for wall face and top face

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1018449A (en) * 1996-06-28 1998-01-20 Natl House Ind Co Ltd Joint structure
CN2705521Y (en) * 2004-05-12 2005-06-22 上海拉法基小野田石膏建材有限公司 Decorative face partitionw all gypsum board
DE202005013091U1 (en) * 2005-08-19 2005-10-27 Beck, Walter, Dipl.-Ing. Movement joint sealing profile for building, has seal covering gap between component and profile, where profile between component and wall is fastened to component by fastener and seal is fit to fastener or profile
CN202324290U (en) * 2011-11-18 2012-07-11 中建七局建筑装饰工程有限公司 Mounting structure for suspended ceiling at deformation joint on roof
CN103437475A (en) * 2013-08-30 2013-12-11 陕西建工集团总公司 Construction method of architectural structure gypsum board with paper surface hung ceiling
CN203782901U (en) * 2014-02-12 2014-08-20 苏州金螳螂建筑装饰股份有限公司 Expansion joint keeping cover structure for wall face and top face

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105019633A (en) * 2015-07-30 2015-11-04 苏州金螳螂建筑装饰股份有限公司 New-technology wallpaper-groove stitching structure
CN105019633B (en) * 2015-07-30 2017-12-22 苏州金螳螂建筑装饰股份有限公司 Wallpaper groove novel process closing-in structure
CN107524273A (en) * 2016-06-20 2017-12-29 五冶集团上海有限公司 A kind of wooden facing retraction slot installation method
CN109487945A (en) * 2018-11-28 2019-03-19 金螳螂精装科技(苏州)有限公司 A kind of tee T aluminum strip mounting structure
CN109487945B (en) * 2018-11-28 2023-11-28 金螳螂精装科技(苏州)有限公司 T-shaped aluminum strip mounting structure

Similar Documents

Publication Publication Date Title
CN104594535B (en) Combination carrying construction unit curtain wall
CN103835378A (en) Closing structure for expansion joint reserved in wall surface or roof surface
CN104963421A (en) Pre-fabricated external insulation board, thermal-insulating wall formed by assembly thereof and construction method of thermal-insulating wall
CN105569278B (en) A kind of complexity hyperbolic moulding aluminium sheet structure and its construction technology
CN204960002U (en) Novel assembled coincide floor bottom piece structure
CN203782901U (en) Expansion joint keeping cover structure for wall face and top face
CN204040374U (en) A kind of mounting structure of shingle nail
CN105863100A (en) Ceramic foaming thermal insulation wall plate building and mounting structure and mounting method
CN203296304U (en) Combined insulation board
CN206367559U (en) The modular floor and its paving structure of ship's space
CN209494108U (en) GRG furred ceiling
CN106193434A (en) A kind of building structure lightweight combination type building panel
CN102733513A (en) Lower end fixing device of glass partition wall
CN105926927A (en) Composite building template
CN203129396U (en) Installing structure of prefabricated forming gypsum board
CN204081081U (en) A kind of furred ceiling of novel crack resistence and wall connecting node structure
CN205399732U (en) Pottery foam insulation wall panel building mounting structure
CN205063146U (en) Stiff and straight line furred ceiling turning structure of gypsum of preventing ftractureing
CN203867179U (en) Template assembly at joint of transverse component and longitudinal component
CN103835455A (en) Closing structure for technological seam reserved in wall surface or roof surface
CN204551860U (en) One is special stays trough rim keel
CN204370655U (en) Large space multi-level many Curved surface heterotypes almag bar ceilings
CN206956518U (en) A kind of small-sized chamfering formwork of box beam
CN203856171U (en) Wood-plastic floor board
CN106567496A (en) Composite board and production method and application thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20140604

RJ01 Rejection of invention patent application after publication