CN103835319A - 混凝土扩盘半面桩受压状态下现场可观测实桩试验方法 - Google Patents

混凝土扩盘半面桩受压状态下现场可观测实桩试验方法 Download PDF

Info

Publication number
CN103835319A
CN103835319A CN201410040654.7A CN201410040654A CN103835319A CN 103835319 A CN103835319 A CN 103835319A CN 201410040654 A CN201410040654 A CN 201410040654A CN 103835319 A CN103835319 A CN 103835319A
Authority
CN
China
Prior art keywords
stake
pile
round tube
cavity
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410040654.7A
Other languages
English (en)
Other versions
CN103835319B (zh
Inventor
钱永梅
王若竹
徐光涵
金玉杰
田伟
崔健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jilin Jianzhu University
Original Assignee
Jilin Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jilin Jianzhu University filed Critical Jilin Jianzhu University
Priority to CN201410040654.7A priority Critical patent/CN103835319B/zh
Publication of CN103835319A publication Critical patent/CN103835319A/zh
Application granted granted Critical
Publication of CN103835319B publication Critical patent/CN103835319B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

一种混凝土扩盘半面桩受压状态下现场可观测实桩试验方法,属于建筑技术领域,是将一根圆形管压入施工现场的地下,沿圆形管一侧向地下挖掘出一个土坑,土坑的深度到达圆形管底部,并且靠近圆形管的一面是垂直的平整立面,并且使圆形管沿轴向露出一半,将圆形管取出,在腔体上与实际的混凝土扩盘桩扩大盘的高度位置相同处挖一个空腔,向半圆腔体内放入钢筋笼,再将一块透明的板材固定在平整立面上,然后向半圆腔体内灌注混凝土,形成混凝土扩盘桩的半面桩,通过千斤顶对半面桩顶部施加压力,检测土体承载力,在透明板材后面半面桩扩大盘的对应位置的土坑内设置数码摄像机,记录压力变化情况,获得的信息再通过分析计算得到荷载位移关系。

Description

混凝土扩盘半面桩受压状态下现场可观测实桩试验方法
技术领域
本发明属于建筑技术领域,是一种展示扩盘桩受力状态的试验方法。
背景技术
随着我国建筑业的蓬勃发展及高层建筑的逐渐增加,桩基础在重要性越显突出。与直孔桩相比,底扩桩、两节和三节扩孔灌注桩、支盘桩、挤扩多盘桩等变截面桩逐渐发展起来。从混凝土扩盘桩的桩身构造及形成机理可知,该型桩具有单桩承载力高、抗拔能力强、材料用量省、施工操作简便、工期短、设计灵活、适用区域广等诸多方面优点。可以说混凝土扩盘桩具有潜在的、巨大的经济价值和社会效益,有着强大的市场竞争能力,尤其在经济迅速发展的今天,更显示出强大的生命力和发展前途。
然而,由于承力扩大盘的设置,使盘上一定范围内土体与桩分离,且盘下土体产生滑移破坏,桩周土体的破坏状态与直孔桩相比有了很大变化。由于目前关于桩的现场试验研究,还仅限于通过静载试验施加荷载,记录桩端力-位移曲线;埋置压力盒和埋置应变片来推测桩下土体破坏状态和荷载传递规律,这种传统方法存在只有测试数据,却看不到土体变化的缺点。而且,对工程桩进行试验时,不允许加载至破坏,很难得到极限荷载值,只能通过模拟、推算等方法进行估测;而对试验桩进行试验时,可能由于对其极限承载力的估计不足,试验时达到其最大加载而未破坏,无法较准确地确定单桩的极限承载力。
发明内容
本发明要解决的技术问题是提供一种混凝土扩盘半面桩受压状态下现场可观测实桩试验方法。
试验方法的设计思路:
(1) 现场大比例试验桩要做成半面桩,如何制作才能保证质量,且简单可行;
(2) 为保证能够观测土体破坏全过程,必须保证半面桩的截面是可见的,由于试验桩尺寸较大,因此观测预留的空间较大,如何保证周围土体的稳定。
(3)试验加载过程如何实现。
本发明解决技术问题的方案由以下步骤完成:
1、将一根圆形管垂直压入施工现场的地下,圆形管内直径与混凝土扩盘桩桩身的直径相同,圆形管长度与混凝土扩盘桩桩身长度相同; 
2、沿圆形管一侧向地下挖掘出一个土坑,土坑的深度到达圆形管底部,并且靠近圆形管的一面是垂直的平整立面,并且使圆形管沿轴向露出一半;
3、将圆形管取出,平整立面上出现一个半圆的腔体,在腔体上与实际的混凝土扩盘桩扩大盘的高度位置相同处挖一个空腔,空腔的形状是垂直分开的半个扩大盘形状;
4、向半圆腔体内放入钢筋笼,再将一块透明的板材固定在平整立面上,然后向半圆腔体内灌注混凝土,使半圆腔体及空腔处形成一个混凝土扩盘桩的半面桩;
5、在土坑周围的地表上安装一个配重体,配重体中部下方安装有一台液压千斤顶,液压千斤顶位置对应混凝土扩盘桩的半面桩顶部中心,检测土体承载力,依据土体承载力及混凝土扩盘桩的承载力确定配重的重量及加载千斤顶的吨位,通过液压千斤顶逐级向半面桩施加压力;
6、在透明板材后面半面桩扩大盘的对应位置的土坑内设置数码摄像机,在配重支撑侧面及桩顶侧面安装电子位移计,通过位移差确定桩的竖向位移,在桩底桩侧及扩大盘上下位置安装压力传感器,记录压力变化情况,对液压千斤顶向半面桩施加压力的过程进行记录,获得的信息再通过分析计算得到荷载位移关系,及桩周土体应力变化结果。
其中,圆形管由高强度材料制成,可以是钢管。
透明板材为高强度透明材料制成,可以是高强夹丝玻璃或有机玻璃。
透明板材的固定方法可以在透明板材的四个周边处支撑水平方向的支撑杆,支撑杆与透明板材垂直,支撑杆的另一端支撑在与透明板材对应的土坑壁上。
本发明方法能够清楚的观察记录实桩在受压情况下桩土共同工作的发展情况和土体破坏的全过程;同时可以收集应力、应变、沉降等相关数据信息,由于是现场实桩试验,土体基本不受扰动。与实验室模型试验相比,最大限度地消除了试验中土体状态的偏差,试验结果的真实性较好。
附图说明
附图1为试验场地及试验设备的剖面图。
具体实施方式
图中标号1为半面桩,2为半面桩的扩大盘,3为透明板材,4为配重体,5为液压千斤顶,6为数码摄像机。
本发明由以下步骤完成:
1、将一根圆形管垂直压入施工现场的地下,圆形管内直径与混凝土扩盘桩桩身的直径相同,圆形管长度与混凝土扩盘桩桩身长度相同; 
2、沿圆形管一侧向地下挖掘出一个土坑,土坑的深度到达圆形管底部,并且靠近圆形管的一面是垂直的平整立面,并且使圆形管沿轴向露出一半;
3、将圆形管取出,平整立面上出现一个半圆的腔体,在腔体上与实际的混凝土扩盘桩扩大盘的高度位置相同处挖一个空腔,空腔的形状是垂直分开的半个扩大盘形状;
4、向半圆腔体内放入钢筋笼,再将一块透明的板材固定在平整立面上,然后向半圆腔体内灌注混凝土,使半圆腔体及空腔处形成一个混凝土扩盘桩的半面桩;
5、在土坑周围的地表上安装一个配重体,配重体中部下方安装有一台液压千斤顶,液压千斤顶位置对应混凝土扩盘桩的半面桩顶部中心,检测土体承载力,配重的重量及加载千斤顶的吨位大于土体承载力及混凝土扩盘桩的承载力,通过液压千斤顶逐级向半面桩施加压力;
6、在透明板材后面半面桩扩大盘的对应位置的土坑内设置数码摄像机,在配重支撑侧面及桩顶侧面安装电子位移计,通过位移差确定桩的竖向位移,在桩底桩侧及扩大盘上下位置安装压力传感器,记录压力变化情况,对液压千斤顶向半面桩施加压力的过程进行记录,获得的信息再通过分析计算得到荷载位移关系,及桩周土体应力变化结果。

Claims (6)

1.一种混凝土扩盘半面桩受压状态下现场可观测实桩试验方法,其特征包括以下步骤完成:
(1)将一根圆形管垂直压入施工现场的地下,圆形管内直径与混凝土扩盘桩桩身的直径相同,圆形管长度与混凝土扩盘桩桩身长度相同; 
(2)沿圆形管一侧向地下挖掘出一个土坑,土坑的深度到达圆形管底部,并且靠近圆形管的一面是垂直的平整立面,并且使圆形管沿轴向露出一半;
(3)将圆形管取出,平整立面上出现一个半圆的腔体,在腔体上与实际的混凝土扩盘桩扩大盘的高度位置相同处挖一个空腔,空腔的形状是垂直分开的半个扩大盘形状;
(4)向半圆腔体内放入钢筋笼,再将一块透明的板材固定在平整立面上,然后向半圆腔体内灌注混凝土,使半圆腔体及空腔处形成一个混凝土扩盘桩的半面桩;
(5)在土坑周围的地表上安装一个配重体,配重体中部下方安装有一台液压千斤顶,液压千斤顶位置对应混凝土扩盘桩的半面桩顶部中心,检测土体承载力,依据土体承载力及混凝土扩盘桩的承载力确定配重的重量及加载千斤顶的吨位,通过液压千斤顶逐级向半面桩施加压力;
(6)在透明板材后面半面桩扩大盘的对应位置的土坑内设置数码摄像机,在配重支撑侧面及桩顶侧面安装电子位移计,通过位移差确定桩的竖向位移,在桩底桩侧及扩大盘上下位置安装压力传感器,记录压力变化情况,对液压千斤顶向半面桩施加压力的过程进行记录,获得的信息再通过分析计算得到荷载位移关系,及桩周土体应力变化结果。
2.根据权利要求1所述的试验方法,其特征在于:圆形管由高强度材料制成。
3.根据权利要求2所述的试验方法,其特征在于:圆形管是钢管。
4.根据权利要求1所述的试验方法,其特征在于:透明板材为高强度透明材料制成。
5.根据权利要求4所述的试验方法,其特征在于:透明板材是高强夹丝玻璃或有机玻璃。
6.根据权利要求1所述的试验方法,其特征在于:透明板材的固定方法是在透明板材的四个周边处支撑水平方向的支撑杆,支撑杆与透明板材垂直,支撑杆的另一端支撑在与透明板材对应的土坑壁上。
CN201410040654.7A 2014-01-28 2014-01-28 混凝土扩盘半面桩受压状态下现场可观测实桩试验方法 Active CN103835319B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410040654.7A CN103835319B (zh) 2014-01-28 2014-01-28 混凝土扩盘半面桩受压状态下现场可观测实桩试验方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410040654.7A CN103835319B (zh) 2014-01-28 2014-01-28 混凝土扩盘半面桩受压状态下现场可观测实桩试验方法

Publications (2)

Publication Number Publication Date
CN103835319A true CN103835319A (zh) 2014-06-04
CN103835319B CN103835319B (zh) 2015-09-09

Family

ID=50799184

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410040654.7A Active CN103835319B (zh) 2014-01-28 2014-01-28 混凝土扩盘半面桩受压状态下现场可观测实桩试验方法

Country Status (1)

Country Link
CN (1) CN103835319B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105220716A (zh) * 2015-09-08 2016-01-06 吉林建筑大学 半面桩小比例模型竖向抗压、抗拔试验多用加载台架
CN105241754A (zh) * 2015-09-08 2016-01-13 吉林建筑大学 半面桩小比例模型竖向抗压试验装置
CN106053127A (zh) * 2016-05-30 2016-10-26 吉林建筑大学 利用可拆装取土器进行半面桩原状土模型试验的方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1455055A (zh) * 2003-04-11 2003-11-12 董天文 端承型大直径桩墩竖向承载力检测方法
CN101936005A (zh) * 2009-07-01 2011-01-05 张国梁 混凝土桩的施工方法
CN202073128U (zh) * 2011-04-14 2011-12-14 吉林建筑工程学院 用于挤扩多盘桩桩周土体破坏试验的加载装置
CN202073127U (zh) * 2011-04-14 2011-12-14 吉林建筑工程学院 用于桩周土体破坏试验使用的半面桩
JP2012229566A (ja) * 2011-04-26 2012-11-22 Nippon Concrete Ind Co Ltd コンクリート製品およびコンクリート製品配筋用の組立治具
CN103149091A (zh) * 2013-02-26 2013-06-12 吉林建筑工程学院 建筑桩抗拔竖向拉力加载试验装置

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1455055A (zh) * 2003-04-11 2003-11-12 董天文 端承型大直径桩墩竖向承载力检测方法
CN101936005A (zh) * 2009-07-01 2011-01-05 张国梁 混凝土桩的施工方法
CN202073128U (zh) * 2011-04-14 2011-12-14 吉林建筑工程学院 用于挤扩多盘桩桩周土体破坏试验的加载装置
CN202073127U (zh) * 2011-04-14 2011-12-14 吉林建筑工程学院 用于桩周土体破坏试验使用的半面桩
JP2012229566A (ja) * 2011-04-26 2012-11-22 Nippon Concrete Ind Co Ltd コンクリート製品およびコンクリート製品配筋用の組立治具
CN103149091A (zh) * 2013-02-26 2013-06-12 吉林建筑工程学院 建筑桩抗拔竖向拉力加载试验装置

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105220716A (zh) * 2015-09-08 2016-01-06 吉林建筑大学 半面桩小比例模型竖向抗压、抗拔试验多用加载台架
CN105241754A (zh) * 2015-09-08 2016-01-13 吉林建筑大学 半面桩小比例模型竖向抗压试验装置
CN105220716B (zh) * 2015-09-08 2017-05-10 吉林建筑大学 半面桩小比例模型竖向抗压、抗拔试验多用加载台架
CN106053127A (zh) * 2016-05-30 2016-10-26 吉林建筑大学 利用可拆装取土器进行半面桩原状土模型试验的方法
CN106053127B (zh) * 2016-05-30 2021-04-13 吉林建筑大学 利用可拆装取土器进行半面桩原状土模型试验的方法

Also Published As

Publication number Publication date
CN103835319B (zh) 2015-09-09

Similar Documents

Publication Publication Date Title
CN108872530B (zh) 一种模拟非对称小净距隧道开挖过程的大型模型试验装置
Franza et al. Centrifuge modeling study of the response of piled structures to tunneling
Lee et al. Analysis of load sharing behavior for piled rafts using normalized load response model
CN202433536U (zh) 一种隧道穿越地裂缝带的物理模型试验系统
CN101514977B (zh) 地下工程模型试验三维加载导向框装置
Parsa-Pajouh et al. Experimental and numerical investigations to evaluate two-dimensional modeling of vertical drain–assisted preloading
Meguid et al. Investigation of tunnel-soil-pile interaction in cohesive soils
CN103398902A (zh) 高地应力柔性加载瞬间卸载试验装置及试验方法
CN106337446B (zh) 一种桩基抗拔室内试验装置及其实验方法
CN103149091A (zh) 建筑桩抗拔竖向拉力加载试验装置
CN101832993A (zh) 强夯法加固地基模型试验半模试验箱
Bhattacharjee et al. Development of numerical model of wrap-faced walls subjected to seismic excitation
Mashhoud et al. Shaking table test study on dynamic behavior of micropiles in loose sand
CN112414733B (zh) 一种盾构隧道结构力学性能模型试验系统及方法
CN106504630A (zh) 穿越岩溶地层的隧道实验系统
Zhou et al. Experimental study on the vertical bearing capacity of stiffened deep cement mixing piles
Xu et al. Shanghai center project excavation induced ground surface movements and deformations
CN109975117A (zh) 顶管实验箱及实验方法
Torres et al. A full-scale timbrel cross vault subjected to vertical cyclical displacements in one of its supports
CN103835319B (zh) 混凝土扩盘半面桩受压状态下现场可观测实桩试验方法
CN105300811A (zh) 大尺寸土壤循环剪切试验机
CN110528602A (zh) 地下连续墙不同地下水位工况下土的侧压力试验模拟装置
Deepa et al. Centrifuge model tests on soil-nailed slopes subjected to seepage
CN204510292U (zh) 一种桩土模型模拟实验桩
CN115235880A (zh) 一种基坑土体渗流侵蚀破坏测试的可视化试验系统及方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant