CN103827396A - Steel slit dam - Google Patents

Steel slit dam Download PDF

Info

Publication number
CN103827396A
CN103827396A CN201280045942.0A CN201280045942A CN103827396A CN 103827396 A CN103827396 A CN 103827396A CN 201280045942 A CN201280045942 A CN 201280045942A CN 103827396 A CN103827396 A CN 103827396A
Authority
CN
China
Prior art keywords
steel
steel pipe
pipe column
tubing
sleeve pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201280045942.0A
Other languages
Chinese (zh)
Other versions
CN103827396B (en
Inventor
江守良介
川端规之
堀谦吾
加藤贵章
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Metal Products Co Ltd
Original Assignee
Nippon Steel and Sumikin Metal Products Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel and Sumikin Metal Products Co Ltd filed Critical Nippon Steel and Sumikin Metal Products Co Ltd
Publication of CN103827396A publication Critical patent/CN103827396A/en
Application granted granted Critical
Publication of CN103827396B publication Critical patent/CN103827396B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/02Fixed barrages

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Revetment (AREA)
  • Joining Of Building Structures In Genera (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

Provided is a steel slit dam composed of several self-standing steel tubes having a sleeve foundation tube vertically buried in the ground and a cylindric steel post inserted into the sleeve foundation tube in upright position. The dam is characterized in that the upper end of the foundation sleeve tubes is substantially flushed with the ground, a horizontal element intended to sustain the steel beams in their upright position protrudes on their inner wall surface, a vertical element protrudes on the outer surface of the steel posts inserted in the sleeve foundation tubes and is positioned below the horizontal element, a space formed between the inner wall surface of the sleeve foundation tubes and the outer surface of the steel posts is filled with a filler material.

Description

Steel slit dam
Technical field
The invention belongs to the technical field of steel slit dam, it is multiple by vertical steel pipe column the steel tubing that inserts the self-supporting that is embedded in the inside of the basic sleeve pipe tubing in base concrete and form that this steel slit dam separates required arranged spaced, thereby effectively catch driftwood or mud-rock flow etc. and flow down thing, furthermore, the present invention is made as the removably steel slit dam of structure about a kind of by above-mentioned steel pipe column.
Background technology
In the past, as driftwood seizure work countermeasure or mud-rock flow seizure work countermeasure, used and separated that certain intervals configures multiple steel tubings and the steel slit dam that effectively catches driftwood or mud-rock flow etc. and flow down thing.
For this steel slit dam, there is the technology of various shapes, structure, but as in the time that the local failure due to deteriorated or handstone, driftwood etc. year in year out due to member makes to catch the situation of hydraulic performance decline, repair relatively easy shape, structure, have following prior art (for example, with reference to patent documentation 1,2).
In above-mentioned patent documentation 1, one multiple steel pipes of imbedding of configuration spaced apart in base concrete are disclosed, insert in the inside of this steel pipe the driftwood catch fan that pile body forms with steel pipe.
This driftwood catch fan flatly connects pin and imbeds steel pipe and pile body steel pipe, realizes the anti-loose of pile body steel pipe.In the time that pile body is damaged with steel pipe, extract this pin, only change pile body steel pipe.
In above-mentioned patent documentation 2, the steel through mode debris dam that steel (steel pipe column) form is inserted in the inside that discloses a kind of multiple protection materials in buried foundation concrete.
This steel through mode debris dam is considered position or the water-immersed position etc. that the native gravel of flowing down of above-mentioned steel collides, and surrounds to the structure till this position and form by above-mentioned protection material.
Patent documentation 1: Japanese patent laid-open 11-29920 communique
Patent documentation 2: Japan Patent Beneficial 5-96123 communique
Summary of the invention
The invention that above-mentioned patent documentation 1,2 relates to is, commonly so that be anchored on imbedding steel pipe or protecting material from the outstanding invention that is configured to prerequisite of the upper surface of base concrete of base concrete.
Therefore, using these structures when there is the situation of basic courses department in the streams of flowing water all the time, this protuberance is required to abrasion or corrosion countermeasure, the problem that therefore exists problem that material cost, processing cost increase and application property to decline.
And, by making to imbed steel pipe or protection material is outstanding from base concrete upper surface, and must use than long the imbedding steel pipe or protecting material of the heeling-in length of basic courses department, also there is the problem of material cost increase.
And then; also there are the following problems: while insertion being imbedded in external force the situation of post member effect of the inside of steel pipe or protection material; at the contact site of their upper ends; in order to prevent distortion, breakage, and the reinforcement of flange in order to give circumference stress (hoop stress) etc. must be set.
In addition, in Fig. 5, Fig. 6 of above-mentioned patent documentation 2, disclose the flange (flat board of the arcuation of growing in horizontal direction) 10,11 that forms discontinuous shape respectively at protection material 5 and steel 6, made the structure of flange 10,11 engagements each other.
But the flange 11 of the steel 6 that engage with the flange 10 of protection material 5 similarly makes plate facing to installing up and down with the flange 10 of this protection material 5, therefore the area of coincidence part (contact site) is larger.
Therefore, when the situation that above-mentioned steel 6 acted in external force, the flange 11 of steel 6 collides to the flange 10 of the protection material 5 of the side of being located thereon, and therefore bending force generation effect has base end part (installation position) distortion of this flange 11, damaged worry.
Therefore, require to make to protect the structure design such as the flange 10 of material 5 sides and flange 11 both sides' of steel 6 sides thickness of slab thickening or the rigidity of raising base end part, also have uneconomic problem.
The steel tubing of the self-supporting that the object of the present invention is to provide a kind of inside for the basic sleeve pipe tubing in buried foundation concrete to insert steel pipe column and to form vertically, upper end (top) by making basic sleeve pipe tubing and base concrete upper surface are unified into roughly same plane etc., and can reduce material cost, processing cost, and also excellent steel slit dam of economy, view.
As the means of the problem for solving above-mentioned background technology, the steel slit dam that invention described in technical scheme 1 relates to, it is characterized in that: it forms by multiple self-supporting steel tubings are set, this self-supporting steel tubing comprises to be imbedded the basic sleeve pipe tubing of ground vertically and inserts in this basis sleeve pipe tubing and upright steel pipe column;
The roughly same plane of upper surface with above-mentioned ground is imbedded in the upper end of above-mentioned basic sleeve pipe tubing, and side wall surface is given prominence to the horizontal member that is provided with the orthostatism that keeps above-mentioned steel pipe column therein;
Insert the outstanding vertical member that is provided with the below that is positioned above-mentioned horizontal member of outer peripheral face of the above-mentioned steel pipe column in above-mentioned basic sleeve pipe tubing;
In the gap that the interior sidewall surface of above-mentioned basic sleeve pipe tubing and the outer peripheral face of above-mentioned steel pipe column form, be filled with filler.
Invention described in technical scheme 2, it is characterized in that: in the steel slit dam described in technical scheme 1, on the relative wall of the interior sidewall surface of above-mentioned basic sleeve pipe tubing, 2 above-mentioned horizontal members are set altogether, the limit of the above-mentioned steel pipe column side of this horizontal member is formed as the arcuation of depression in the mode of the outer peripheral face of this steel pipe column along circle.
Invention described in technical scheme 3, is characterized in that: in the steel slit dam described in technical scheme 1 or 2, be provided with and the locating stop of the vertical member butt of above-mentioned steel pipe column in the soffit of above-mentioned horizontal member.
Invention described in technical scheme 4, it is characterized in that: in the steel slit dam in technical scheme 1 to 3 described in any one, above-mentioned vertical member is wire floor elongated in vertical direction, is provided with altogether 2 above-mentioned vertical members in the mode of the tubular axis balanced configuration with respect to above-mentioned steel pipe column.
Invention described in technical scheme 5, is characterized in that: in the steel slit dam in technical scheme 1 to 4 described in any one, above-mentioned basic sleeve pipe tubing is to engage rectangular steel tube in the upper surface of substrate to form.
Invention described in technical scheme 6, is characterized in that: in the steel slit dam in technical scheme 1 to 5 described in any one, above-mentioned filler is, below be filled with noggin piece, above this noggin piece, fill plaster or concrete and form.
According to the steel slit dam the present invention relates to, bring into play following effect.
(1) upper end of basic sleeve pipe tubing (top) and the upper surface of ground are unified into roughly same plane, therefore just can implement without making basic sleeve pipe tubing expose (giving prominence to) from ground.
Thereby the abrasion to protuberance or corrosion countermeasure necessary in above-mentioned patent documentation 1,2 do not need completely, correspondingly can cut down material cost, processing cost, have economy.And; because the total length (height dimension) of basic sleeve pipe tubing is by protecting foundation; also do not need completely for the compression flange etc. of protuberance being given to circumference stress therefore necessary in above-mentioned patent documentation 1,2, correspondingly can cut down material cost, processing cost, there is economy.
(2) self-supporting steel tubing can be implemented basic sleeve pipe tubing is not engaged with the engagement member such as pin or bolt to the structure engaging with steel pipe column.Thereby economy, application property excellence.
And, due to the style characteristic of the horizontal member of above-mentioned basic sleeve pipe tubing and the vertical member of steel pipe column, to steel pipe column external force action, make vertical member butt (contact) in the time of horizontal member, act on the stress of vertical member different from above-mentioned patent documentation 2, shear strength plays a role more strongly compared with bending force.And the masterpiece of wish floating is for steel pipe column when the water yield increases, vertical member is connected to horizontal member, and prevents floating.Therefore,, compared with above-mentioned patent documentation 2, can realize and can reduce reasonable, the economic structure designs such as thickness of slab.
(3) in the present embodiment, the rectangular steel tube that is formed linearity by the interior sidewall surface of basic sleeve pipe tubing is implemented, and therefore the mounting edge of the horizontal member engaging can be formed as to linearity and implement.And the vertical member of steel pipe column also can be with rectangular-shaped enforcement.Therefore,, with implement the patent documentation 2 of the member (flange 10,11) suitable with these with annual ring shape compared with, can cut off simply processing or weld job, therefore economy, application property excellence.
(4) the only steel pipe column for erecting in vertical direction of the extending part of the self-supporting steel tubing of formation steel slit dam, gives observer simple and salubrious impression, and view is better.
(5) repair of self-supporting steel tubing is main only for the replacing operation of the steel pipe column that exposes, has economy.As long as the plaster or the concrete that form filler are also broken in this replacing operation into pieces, the noggin piece such as sand, blinding of its below is discharged by blowing (blow), steel pipe column is carried out rotating operation and drawn by heavy-duty machine, and carry out the installation exercise of new steel pipe column, therefore can simple and easy and promptly implement.
Accompanying drawing explanation
Fig. 1 is the generalized schematic of the unitary construction of the steel slit dam that relates to of embodiments of the present invention.
Fig. 2 A is the amplification elevational schematic view of the self-supporting steel tubing of the steel slit dam that relates to of pie graph 1, the plan view that B is A.
Fig. 3 A is the lateral view of Fig. 2, the plan view that B is A.
Fig. 4 is the schematic perspective view of the self-supporting steel tubing that relates to of Fig. 3 A.In addition, omit for convenience's sake the diagram of base concrete 5, crab-bolt 6.
Fig. 5 is the exploded perspective view of Fig. 4.
Fig. 6 A~C is the key diagram that is periodically shown in basic sleeve pipe tubing interpolation and enters the step that steel pipe column arranges.In addition, omit for convenience's sake the diagram of base concrete 5, crab-bolt 6.
Fig. 7 is the stereogram that forms the self-supporting steel tubing of the steel slit dam that relates to of variation.
Fig. 8 is the key diagram that is shown in basic sleeve pipe tubing interpolation and enters the step that steel pipe column arranges.A is stereogram, and B is plan view.
Fig. 9 is the key diagram that is shown in basic sleeve pipe tubing interpolation and enters the step that steel pipe column arranges.A is stereogram, and B is plan view.
Figure 10 is the key diagram for the energy absorbing structure of steel slit dam is described.A is the elevation of schematic configuration, and B is the ideograph of the relation of expression power, and C is the chart that represents the relation of horizontal movement and horizontal load.
Figure 11 is the key diagram for the energy absorbing structure of steel slit dam is described.A is the elevation of schematic configuration, and B is the ideograph of the relation of expression power, and C is the chart that represents the relation of horizontal shift and horizontal load.
The specific embodiment
Below, with reference to the accompanying drawings the embodiment of steel slit dam of the present invention is described.
As shown in Figure 1, this steel slit dam 10 forms for multiple self-supporting steel tubings 3 are set, and this self-supporting steel tubing 3 comprises and separates required interval and imbed the basic sleeve pipe tubing 1 of ground 30 (being base concrete 5) vertically herein and insert upright circular steel pipe column 2 in this basis sleeve pipe tubing 1.In addition, as ground 30, be preferably base concrete 5, even if but also can implement for other have carried out the natural ground of foundation improvement, the natural ground that does not carry out foundation improvement etc.In the present embodiment, to adopting base concrete 5 to describe as the example of the situation of ground 30.
As shown in Figure 2 and Figure 3, roughly same plane is imbedded into the upper end (top) of above-mentioned base concrete 5 in the upper end of above-mentioned basic sleeve pipe tubing 1, in the inner the outstanding horizontal member 1a that the orthostatism that keeps above-mentioned steel pipe column 2 is set of the wall of side.
Be inserted into the outstanding vertical member 2a that is positioned the below of above-mentioned horizontal member 1a by rotating operation that is provided with of outer peripheral face of the steel pipe column 2 in above-mentioned basic sleeve pipe tubing 1.
The gap-fill forming at the wall of inner side and the outer peripheral face of above-mentioned steel pipe column 2 of above-mentioned basic sleeve pipe tubing 1 has filler 4.
In addition, the steel slit dam 10 of the present embodiment is implemented for 8 self-supporting steel tubings 3 are to the setting of horizontal a line shape, but the magnitude setting of this self-supporting steel tubing 3 and form is set is not limited thereto.Magnitude setting is according to the hypothesis flow of the width dimensions in riverbed or river etc. and suitably increase and decrease, and form is set can be with various changes such as horizontal two row shapes or sawtooth clathrates.
And, horizontal member 1a, the 1a of the basic sleeve pipe tubing 1 of the present embodiment, be held in their steel pipe column 2, with the flow direction orthogonal direction of river on arrange in a continuous manner.Its reason is to consider that horizontal member 1a not guarantees the structure member of steel slit dam 10 desired rigidity, does not wish external force generation effect via steel pipe column 2.
Below, the inscape of the self-supporting steel tubing 3 that forms steel slit dam 10 is described.
Above-mentioned basic sleeve pipe tubing 1 forms for rectangular steel tube (also can be round steel pipe) 12 weldings are engaged (also can be bolted joints) by the upper face center portion at substrate 11.Aforesaid substrate 11 is large square of the shape of cross section of more above-mentioned rectangular steel tube 12, and comprises multiple (in illustrated example being 4) bolt hole 11a at its peripheral edge portion.
In addition, if the size of basic steel tubing 1 is illustrated, the substrate 11 of the present embodiment is to be the square about 700mm on one side, and thickness is 9mm left and right.The foursquare shape of cross section that above-mentioned rectangular steel tube 12 is 9mm for one side for 500mm, thickness, and be highly 600mm left and right.
And the above-mentioned horizontal member 1a that is arranged at the interior sidewall surface of above-mentioned basic sleeve pipe tubing 1 (rectangular steel tube 12) uses steel plate (as an example, thickness is 22mm left and right), and amounts to 2 in the relative wall setting of interior sidewall surface.The limit of steel pipe column 2 sides of above-mentioned horizontal member 1a, 1a be with the mode of the outer peripheral face along this steel pipe column 2 be formed as depression arcuation, and with keep above-mentioned steel pipe column 2 orthostatism structure implement.
In addition, the horizontal member 1a of the present embodiment is arranged at the left bottom-right position of 100mm from the top of above-mentioned basic sleeve pipe tubing 1, but also can suitably change design.
And then, in the present embodiment, in the soffit of above-mentioned horizontal member 1a, hang down and be provided with the locating stop 1b that locates this steel pipe column 2 with the vertical member 2a butt of steel pipe column 2.This locating stop 1b inserts the steel pipe column 2 in basic sleeve pipe tubing 1 operating personnel except having rotating operation can (for example be positioned appropriate position by the sense of touch of finger, as made as legend vertical member 2a stop at the central portion below of horizontal member 1a) construction on advantage beyond, also have advantages of and after the installation exercise of steel pipe column 2 completes, prevent from causing steel pipe column 2 to rotate to seek anti-loose because of external force.
In addition, as an example, the locating stop 1b of the present embodiment is preferably the big or small steel that use height 50mm left and right, width 40mm left and right, thickness 16mm left and right, and makes its upper end be fused to the bottom of above-mentioned horizontal member 1a.With respect to the welding position of the locating stop 1b of this horizontal member 1a, be located at for making vertical member 2a, 2a be positioned at the preferably position (with reference to Fig. 2~Fig. 5) of the central portion below of (stopping at) above-mentioned horizontal member 1a, 1a.
In addition, the soffit that position is set is not limited to horizontal member 1a of this locating stop 1b, the vertical member 2a that can also be connected to steel pipe column 2 is condition, is fused to the interior sidewall surface of basic sleeve pipe tubing 1 and implements, or be also fusiblely connected to interior sidewall surface and horizontal member 1a and implement.
Secondly, the steel pipe column 2 of above-mentioned circle, its upper surface welding is bonded to hangs iron 2b, is bonded to vertical member 2a in the outer peripheral face welding of its bottom.This vertical member 2a is preferably the floor that uses wire elongated in vertical direction, and with roughly symmetrical configuration and be provided with and amount to 2 of the tubular axis with respect to steel pipe column 2.
In addition, the steel pipe column 2 of the present embodiment is that diameter (φ) is that 318.5mm left and right, thickness are the circular cross-section of 10.3mm left and right, and is highly the size of 2600mm left and right.And above-mentioned vertical member 2a is preferably the steel that use height about 100mm, width 35mm left and right, thickness 16mm left and right size, and be arranged at the left bottom-right position of 40mm from the soffit of the horizontal member 1a of above-mentioned basic sleeve pipe tubing 1.
In addition, the position that above-mentioned vertical member 2a is set is not limited thereto, as long as the position of the below by making above-mentioned steel pipe column 2 erect rear implemented rotating operation on the substrate 11 of above-mentioned basic sleeve pipe tubing 1 to be positioned at above-mentioned horizontal member 1a (being preferably 10~50mm left and right), can suitably change design.
Secondly, the concrete diagram of above-mentioned filler 4 is omitted for convenience's sake, the below in the gap forming in the interior sidewall surface of above-mentioned basic sleeve pipe tubing 1 and the outer peripheral face of above-mentioned steel pipe column 2 has been partially filled the noggin piece such as sand, blinding, is filling plaster (or concrete) to till the top of above-mentioned basic sleeve pipe tubing 1 and form above this noggin piece.In a word, the performance of this plaster makes the effect of the lid that the noggin piece such as sand, blinding do not overflow to outside.
In addition, the ratio of the fill volume of above-mentioned noggin piece and plaster can suitably change design, in the present embodiment, fills with the ratio of about 8:2.
Therefore, the construction method of above-mentioned self-supporting steel tubing 3 is for first, separates required interval and be horizontal a line shape and imbed multiple (in legend being 8) basic sleeve pipe tubing 1 vertically in base concrete 5.
Particularly, load this basis sleeve pipe tubing 1 setting to arranging on the concrete till height of the substrate 11 of above-mentioned basic sleeve pipe tubing 1, crab-bolt 6 is passed to the bolt hole 11a of this substrate 11 and squeezed into, thereby above-mentioned basic sleeve pipe tubing 1 is fixed on this concrete.After this, by concrete being set to till the upper end (top) of above-mentioned basic sleeve pipe tubing 1 and vertical this basis sleeve pipe tubing 1 imbedding is fixed on to base concrete 5.
Then, for the steel pipe column 2 of above-mentioned circle, utilization is arranged at hanging iron 2b and by heavy-duty machines such as cranes, its lifting being erected of its upper surface, and the inside of above-mentioned basic sleeve pipe tubing 1 is inserted in the mode as shown in Fig. 6 A~Fig. 6 B in its bottom and load and erect on substrate 11.Inserting operation carries out with the mode that vertical member 2a, 2a do not contact horizontal member 1a, the 1a of the outstanding interior sidewall surface that is arranged on basic sleeve pipe tubing 1 with above-mentioned steel pipe column 2.In this operation, because vertical member 2a adopts the shape elongated in vertical direction, cross-sectional area is very little, so can carry out reposefully.
So, the above-mentioned steel pipe column 2 that is arranged at the substantial middle portion on the substrate 11 of above-mentioned basic sleeve pipe tubing 1 erects by the clamping effect of above-mentioned horizontal member 1a, the 1a posture of being kept upright.
Then, as shown in Fig. 6 B~Fig. 6 C, operating personnel carries out rotating operation by above-mentioned steel pipe column 2 to a direction (being clockwise in legend), obtain the sense of touch that the outstanding vertical member 2a that is arranged at this steel pipe column 2 is connected to the locating stop 1b of basic sleeve pipe tubing 1, operation stops operating.So, vertical member 2a, the 2a of above-mentioned steel pipe column 2 are positioned respectively the central portion below of above-mentioned horizontal member 1a, 1a.
Then, filler 4 is filled in to the gap that the interior sidewall surface of above-mentioned basic sleeve pipe tubing 1 and the outer peripheral face of above-mentioned steel pipe column 2 form.Particularly, after the noggin piece such as sand, blinding of first scene being taked to wait is filled to the most probably left and right in above-mentioned gap, bear down on one till plaster (or concrete) being filled to the top of basic sleeve pipe tubing 1.
Carry out the above-mentioned job step corresponding with the necessary radical of self-supporting steel tubing 3 by phase (or sequentially) at the same time, finish self-supporting steel tubing 3 and then finish the operation of constructing of steel slit dam 10.
Therefore, bring into play following effect according to the steel slit dam 10 of constructing by above-mentioned steps.
(1) upper end of basic sleeve pipe tubing 1 (top) and the upper surface of base concrete 5 are unified into same plane, therefore just can implement without making basic sleeve pipe tubing 1 (rectangular steel tube 12) expose (giving prominence to) from base concrete 5.
Therefore, the abrasion to protuberance or corrosion countermeasure necessary in above-mentioned patent documentation 1,2 do not need completely, correspondingly can cut down material cost, processing cost, have economy.And; because the total length (height dimension) that basic sleeve pipe tubing 1 is is protected by base concrete 5; also do not need completely for the compression flange etc. of protuberance being given to circumference stress therefore necessary in above-mentioned patent documentation 1,2; correspondingly can cut down material cost, processing cost, there is economy.
(2) self-supporting steel tubing 3 can be by not implementing basic sleeve pipe tubing 1 with the engagement member such as pin or bolt with the structure that steel pipe column 2 engages joint.Therefore, economy, application property excellence.
And, due to the style characteristic of the horizontal member 1a of above-mentioned basic sleeve pipe tubing 1 and the vertical member 2a of steel pipe column 2, to steel pipe column 2 external force actions, it is different from above-mentioned patent documentation 2 that butt (contact) acts on the stress of vertical member 2a in the time of horizontal member 1a, shear strength generation effect more strongly compared with bending force.And the masterpiece of wish floating is for steel pipe column 2 when the water yield increases, vertical member 2a is connected to horizontal member 1a, and prevents floating.Therefore,, compared with above-mentioned patent documentation 2, can realize and can reduce reasonable, the economic structure designs such as thickness of slab.
(3) in the present embodiment, the rectangular steel tube 12 that is formed linearity by the interior sidewall surface of basic sleeve pipe tubing 1 is implemented, and therefore the mounting edge of the horizontal member 1a engaging can be formed as to linearity and implement.And the vertical member 2a of steel pipe column 2 also can be with rectangular-shaped enforcement.Thereby, with implement the patent documentation 2 of the member (flange 10,11) that is equivalent to these with annual ring shape compared with, can cut off simply processing or weld job, therefore economy, application property excellence.
(4) the only steel pipe column 2 for erecting in vertical direction of the extending part of the self-supporting steel tubing 3 of formation steel slit dam 10, gives observer simple and salubrious impression, and view is better.
(5) repair of self-supporting steel tubing 3 is main only for the replacing operation of the steel pipe column 2 that exposes, has economy.As long as the plaster (plaster bears down on one) that forms filler 4 is also broken in this replacing operation into pieces, the noggin piece such as sand, blinding of its below is discharged by blowing, steel pipe column 2 is carried out to rotating operation and draws by heavy-duty machine to other direction (being counterclockwise in diagram), and the installation exercise that carries out new steel pipe column 2 can (specifically sequentially be numbered [0026]~[0028] with reference to above-mentioned paragraph), thereby can simple and easy and promptly implement.
Below with reference to the accompanying drawings embodiment is illustrated, but the present invention is not limited to the embodiment of legend, prudent for the purpose of, the scope of the variation that comprises common the carried out design alteration of the dealer who does not depart from its technical thought range, application.
For example, the horizontal member 1a of legend for arrange in the relative configuration of interior sidewall surface of basic sleeve pipe tubing 1 (rectangular steel tube 12) amount to 2 implement, but be not limited thereto, also can amount to 4 horizontal member 1a with discontinuous shape setting in each interior sidewall surface of this basis sleeve pipe tubing 1 and implement.
And the flat shape of above-mentioned horizontal member 1a is also not limited to the arcuation that forms depression in the mode of the outer peripheral face along steel pipe column 2.Can also guarantee the gap that steel pipe column 2 and vertical member 2a pass through, and can to keep the orthostatism of steel pipe column 2 be condition, for example amounting to 4 flat shapes in each interior sidewall surface setting of basic sleeve pipe tubing 1 is that rectangular-shaped horizontal member 1a implements.
Certainly, the number of the vertical member 2a of above-mentioned steel pipe column 2 is also not limited to 2, can suitably change design according to structure design.
And, the height of the self-supporting steel tubing 3 of legend is implemented exposed division with 2m left and right except embedment length (being the height dimension of basic sleeve pipe tubing 1: 600mm left and right), but be not limited thereto, in the time that the height of basic sleeve pipe tubing 1 is the situation of 900mm left and right, implement exposed division etc. with 3m left and right, can suitably change design according to the supposition flow of the river arranging etc.But the height of self-supporting steel tubing 3 is preferably in the scope of 1.5~5m aspect structure design except embedment length.
And then the configuration space of adjacent above-mentioned self-supporting steel tubing 3 determines according to on-the-spot investigation result is set, therefore not identical, suitably change design according to situation, generally speaking adopt the interval of 1~7m left and right.
And, as shown in Fig. 7~Fig. 9, also can steel pipe column 2 be made as square and non-circular.In example shown in Fig. 7~Fig. 9, steel pipe column 2 is observed and is had tetragonal shape from top.Square by steel pipe column 2 is made as, and the structure of change horizontal member 1a, vertical member 2a also changes steel pipe column 2 is inserted into basic sleeve pipe tubing 1 and makes its upright order.In addition, also steel pipe column 2 can be made as and then different shapes (for example polygonal shape or the oblong shape etc. except quadrangle).
Particularly, the horizontal member 1a that is arranged at the interior sidewall surface of basic sleeve pipe tubing 1 (rectangular steel tube 12) uses steel plate, and amounts to 2 in the relative wall setting of interior sidewall surface.The limit of steel pipe column 2 sides of horizontal member 1a, 1a is to be formed as linearity in the mode of the plane outer peripheral face along this steel pipe column 2, and with keep steel pipe column 2 orthostatism structure implement.That is, observe from top, horizontal member 1a, 1a have in the upper rectangular shape of extending of glide direction (direction that in figure, SD represents).In in the interior sidewall surface of basic sleeve pipe tubing 1 and wall glide direction SD subtend, wall fixed level member 1a, a 1a therein.At another wall, horizontal member 1a, 1a are separated by the mode that separates gap 20.
In the outer peripheral face of the bottom of above-mentioned square steel pipe column 2 with the orthogonal direction of glide direction SD on the wall of subtend, vertical member 2a respectively one by one welding engages.This vertical member 2a, 2a are preferably and use elongated wire floor in vertical direction. Vertical member 2a, 2a be disposed in the wall engaging through welding with glide direction SD on the direct of travel end side that is opposition side.
When this steel pipe column 2 is inserted to basic sleeve pipe tubing 1, promote steel pipe column 2 and it is erected by the heavy-duty machine such as crane, and inner and erect by inserting basic sleeve pipe tubing 1 as its bottom is as shown in Fig. 7~Fig. 9.Inserting operation is to be undertaken by the mode that is formed at the gap 20 between interior sidewall surface and the horizontal member of basic sleeve pipe tubing 1 with vertical member 2a, 2a.So, be arranged in above-mentioned basic sleeve pipe tubing 1 near and glide direction SD on the steel pipe column 2 of the direct of travel position that is opposition side erect (state shown in Fig. 8) by the clamping effect of horizontal member 1a, the 1a posture of being kept upright.
Then,, as shown in Fig. 8 and Fig. 9, operating personnel in the enterprising line slip operation of glide direction SD, stops slide at the time point that makes steel pipe column 2 slide into the substantial middle position of basic sleeve pipe tubing 1 by above-mentioned steel pipe column 2.So, the below (state shown in Fig. 9) that the vertical member 2a of steel pipe column 2,2a are positioned respectively horizontal member 1a, 1a.In addition, in this position, also can be by by being arranged at horizontal member 1a, 1a with steel pipe column 2 butts for the locating stop of locating.Later order is identical with the order that circular steel pipe column 2 is set.
Secondly,, with reference to Figure 10 and Figure 11, the energy absorbing structure of steel slit dam 10 is described.In steel slit dam 10, the filler 4 being filled between steel pipe column 2 and basic sleeve pipe tubing 1 is brought into play function as energy absorption material.And, contacting with the top edge of basic sleeve pipe tubing 1 by steel pipe column 2, steel pipe column 2 is brought into play function as energy-absorbing member.
As shown in Figure 10 (A), if horizontal load F acts on the head of steel pipe column 2, this load is transmitted downwards through steel pipe column 2.Near the bottom of steel pipe column 2, covered by filler 4.And the basic sleeve pipe tubing 1 that is filled with filler 4 is embedded in ground 30.Therefore, through steel pipe column 2 transmit and come load be absorbed by the ground reaction force of filler 4.As shown in Figure 10 (B), steel pipe column 2 now becomes the state by filler ground spring-loaded with respect to the region of its lower end side of horizontal load F.As shown in Figure 10 (C), along with horizontal load F becomes large, it is large that the distortion of filler becomes, and the horizontal movement of steel pipe column 2 increases thereupon.Till this energy absorption of utilizing filler distortion proceeds to horizontal load F and reaches maximum ground reaction force and steel pipe column 2 and contact with the top edge of basic sleeve pipe tubing 1.
As shown in Figure 11 (A), after steel pipe column 2 contacts with the top edge of basic sleeve pipe tubing 1, the wall generation depressed deformation of steel pipe column 2, carries out energy absorption by this depressed deformation.As shown in Figure 11 (B), steel pipe column 2 now becomes horizontal load and acts on upper end, and with the rightabout depression load of horizontal load in the state of half-way (position contacting with the upper edge of basic sleeve pipe tubing 1).As shown in Figure 11 (C), along with horizontal load F becomes large, it is large that depressed deformation becomes, and the horizontal movement of steel pipe column 2 increases thereupon.Till the energy absorption of this depressed deformation that utilizes steel pipe column 2 proceeds to crumble load and steel pipe column 2 that horizontal load F reaches steel pipe column 2 and crumbles.
In addition, horizontal load F pair with the orthogonal directive effect of horizontal member 1a, 1a (with reference to Fig. 4 and Fig. 7) direction respect to one another.In the example of Fig. 7, horizontal load F is to glide direction SD effect.As long as horizontal load F is to this directive effect, steel pipe column 2 can be not by horizontal member 1a, 1a obstruction and in horizontal direction top offset.So, horizontal member 1a, 1a be by configuring in relative mode, and can be in the time arranging the posture of support steel tubing string 2, on the other hand, in the time that horizontal load F acts on steel pipe column 2, can make steel pipe column 2 to horizontal direction displacement for avoiding bearing this load.
Utilizability in industry
The present invention can be used for steel slit dam.
symbol description
1 basic sleeve pipe tubing
1a horizontal member
1b locating stop
2 steel pipe columns
The vertical member of 2a
2b hangs iron
3 self-supporting steel tubings
4 fillers
5 base concretes
6 crab-bolts
10 self-supporting steel tubings
11 substrates
11a bolt hole
12 rectangular steel tubes
30 grounds

Claims (6)

1. a steel slit dam, is characterized in that: it is to form by multiple self-supporting steel tubings are set, and this self-supporting steel tubing comprises to be imbedded the basic sleeve pipe tubing of ground vertically and insert in this basis sleeve pipe tubing and upright steel pipe column;
The roughly same plane of upper surface with described ground is imbedded in the upper end of described basic sleeve pipe tubing, and side wall surface is given prominence to the horizontal member that is provided with the orthostatism that keeps described steel pipe column therein;
Insert the outstanding vertical member that is provided with the below that is positioned described horizontal member of outer peripheral face of the described steel pipe column in described basic sleeve pipe tubing;
In the gap of the interior sidewall surface of described basic sleeve pipe tubing and the formation of the outer peripheral face of described steel pipe column, be filled with filler.
2. steel slit dam as claimed in claim 1, it is characterized in that: described horizontal member, on the wall of the subtend of the interior sidewall surface of described basic sleeve pipe tubing, be provided with altogether 2, the limit of the described steel pipe column side of this horizontal member is the arcuation that is formed as depression in the mode of the outer peripheral face of this steel pipe column along circle.
3. steel slit dam as claimed in claim 1 or 2, is characterized in that: be provided with and the locating stop of the vertical member butt of described steel pipe column in the soffit of described horizontal member.
4. steel slit dam as claimed any one in claims 1 to 3, is characterized in that: described vertical member is the floor of wire elongated in vertical direction, and has 2 with respect to the tubular axis balanced configuration of described steel pipe column.
5. the steel slit dam as described in any one in claim 1 to 4, is characterized in that: described basic sleeve pipe tubing is to engage rectangular steel tube in the upper surface of substrate to form.
6. the steel slit dam as described in any one in claim 1 to 5, is characterized in that: described filler is, below be filled with noggin piece, above this noggin piece, be filled with plaster or concrete and form.
CN201280045942.0A 2011-09-21 2012-09-20 Steel slit dam Expired - Fee Related CN103827396B (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2011-205469 2011-09-21
JP2011205469 2011-09-21
PCT/JP2012/074082 WO2013042735A1 (en) 2011-09-21 2012-09-20 Steel slit dam

Publications (2)

Publication Number Publication Date
CN103827396A true CN103827396A (en) 2014-05-28
CN103827396B CN103827396B (en) 2015-08-26

Family

ID=47914495

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201280045942.0A Expired - Fee Related CN103827396B (en) 2011-09-21 2012-09-20 Steel slit dam

Country Status (4)

Country Link
JP (1) JP5956450B2 (en)
CN (1) CN103827396B (en)
TW (1) TWI567268B (en)
WO (1) WO2013042735A1 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6227316B2 (en) * 2013-07-30 2017-11-08 日鐵住金建材株式会社 Flotage trap and its assembly method
JP6595891B2 (en) * 2015-12-04 2019-10-23 日鉄建材株式会社 Steel slit dam
JP7001507B2 (en) * 2018-03-16 2022-01-19 株式会社共生 Permeation type dam and its construction method
JP7251974B2 (en) * 2018-12-27 2023-04-04 日鉄建材株式会社 Installation method and installation structure of driftwood trapping
JP7211808B2 (en) * 2018-12-27 2023-01-24 日鉄建材株式会社 Driftwood catcher, method for constructing driftwood catcher, and installation structure for driftwood catcher
JP7211809B2 (en) * 2018-12-27 2023-01-24 日鉄建材株式会社 Driftwood catcher, method for constructing driftwood catcher, and installation structure for driftwood catcher
JP7280085B2 (en) * 2019-03-26 2023-05-23 日鉄建材株式会社 Raising member for steel column member and installation method of steel column member using the same member

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2400497Y (en) * 1999-11-18 2000-10-11 赵永 Fence for damming river
JP2001182040A (en) * 1999-12-28 2001-07-03 Nippon Steel Metal Prod Co Ltd Driftwood preventive fence
JP2011089393A (en) * 2011-02-04 2011-05-06 Nippon Steel & Sumikin Metal Products Co Ltd Erosion control bank and construction method of the same

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2587493Y2 (en) * 1992-06-01 1998-12-16 鈴木 宏 Protection of steel transmission type sabo dam
JPH1129920A (en) * 1997-07-11 1999-02-02 Nippon Steel Metal Prod Co Ltd Driftwood prevention fence
TWM351233U (en) * 2008-10-09 2009-02-21 Wen-Qian Wu Floating type worktable for making caisson
JP5226584B2 (en) * 2009-03-31 2013-07-03 日鐵住金建材株式会社 Steel slit dam, its construction method and repair method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2400497Y (en) * 1999-11-18 2000-10-11 赵永 Fence for damming river
JP2001182040A (en) * 1999-12-28 2001-07-03 Nippon Steel Metal Prod Co Ltd Driftwood preventive fence
JP2011089393A (en) * 2011-02-04 2011-05-06 Nippon Steel & Sumikin Metal Products Co Ltd Erosion control bank and construction method of the same

Also Published As

Publication number Publication date
CN103827396B (en) 2015-08-26
JP5956450B2 (en) 2016-07-27
JPWO2013042735A1 (en) 2015-03-26
TWI567268B (en) 2017-01-21
WO2013042735A1 (en) 2013-03-28
TW201315863A (en) 2013-04-16

Similar Documents

Publication Publication Date Title
CN103827396A (en) Steel slit dam
JP4812324B2 (en) Retaining wall and its construction method
CN108278116B (en) Shallow-buried large-span pipe curtain supporting system and construction method thereof
JP5555643B2 (en) Structure and construction method of mountain retaining support
KR101200927B1 (en) Cnnecting structure of precast body and pile and constructing method of the same
JP2013136922A (en) Earth retaining wall supporting method, earth retaining wall supporting structure, and underground skeleton constructing method
CN109372129A (en) The novel full assembly concrete frame joint of one kind and its construction method
JP2011157812A (en) Retaining wall and construction method therefor
JP3701280B2 (en) Yamadome support
CN110777809A (en) Deep foundation pit combined support adjacent to existing building and construction method thereof
CN113174988A (en) Double-wall concrete open caisson structure and construction method
JP6207949B2 (en) Retaining wall structure
CN103485333A (en) Corrugated hollow steel pipe friction pile and construction method thereof
KR101169462B1 (en) Top-down construction method using post member
JP2014114540A (en) Building and building method, and rebuilding method
CN109797753B (en) Upright column pile suitable for high rock surface field foundation pit and construction method of lattice column
KR200443476Y1 (en) Structure for supporting wall
KR101314764B1 (en) Retaining wall using corrugated steel plate and construction method thereof
KR101072286B1 (en) Prefabricated retaining wall
KR102226508B1 (en) Construction method for earthquake resistant diaphragm wall and earthquake resistant diaphragm wall manufactured by thereof
KR101511172B1 (en) A joint structure of a CFT composite column and RC wide girder
CN105804095A (en) Prefabricated grid beam used for supporting side slopes and supporting method thereof
CN103374920B (en) First shaft lining structure and construction method thereof
CN206607595U (en) A kind of T-shaped pattern foundation pit supporting structure
CN202298627U (en) Foundation pit supporting structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150826

Termination date: 20190920