CN103825755B - Power secondary system modeling method and system - Google Patents

Power secondary system modeling method and system Download PDF

Info

Publication number
CN103825755B
CN103825755B CN201310618436.2A CN201310618436A CN103825755B CN 103825755 B CN103825755 B CN 103825755B CN 201310618436 A CN201310618436 A CN 201310618436A CN 103825755 B CN103825755 B CN 103825755B
Authority
CN
China
Prior art keywords
model
service
secondary system
business
kinds
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310618436.2A
Other languages
Chinese (zh)
Other versions
CN103825755A (en
Inventor
苏扬
温柏坚
谢善益
刘玮
邓大为
黄红远
陈宏辉
黄曙
周安
孙超
杨骥
卓顺城
张延佳
邬怡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Dispatch Control Center of Guangdong Power Grid Co Ltd
Original Assignee
Electric Power Dispatch Control Center of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Dispatch Control Center of Guangdong Power Grid Co Ltd filed Critical Electric Power Dispatch Control Center of Guangdong Power Grid Co Ltd
Priority to CN201310618436.2A priority Critical patent/CN103825755B/en
Publication of CN103825755A publication Critical patent/CN103825755A/en
Application granted granted Critical
Publication of CN103825755B publication Critical patent/CN103825755B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a power secondary system modeling method and a system. A model which is established according to the method and the system comprises a data model, a resource model and a dependence relationship model. The problems in the three aspects of classification object management, the combination of management object organization and power grid architecture, and the description of a complex relationship are solved. The complexity and the maintenance difficulty, which are caused by the fact that the same model is used to solve the problems in the three aspects, are avoided. Related concepts of an IEC61970 CIM model is introduced into the resource model. Each management object of a secondary system is combined with a power grid primary model. A unified model of primary and secondary models of a power grid are provided. For a business dependence relationship description method, four kinds of basic services are summarized. Public infrastructure services are abstracted. The complex multi-to-multi dependence relationship is decomposed to various kinds of services. Re-organization is carried out under the guidance of finally reflecting the business operation condition. The problem of defining the dependence relationship among a business, software and hardware and between the business and other businesses is solved.

Description

The modeling method of electric power secondary system and system
Technical field
The present invention relates to technical field of electric power, more particularly to a kind of electric power secondary system modeling method and system.
Background technology
Nearly ten years, the continuous development of power system and information technology, electric power secondary system(Hereinafter referred to as electrical secondary system) Monitoring range constantly extend, technical merit improve constantly.Information & Communication Technology(Hereinafter referred to as ICT)Progress have become as The great motive force of modern power network technology development, constructed electric power secondary system based on present information with communication technology, The base structure of power infrastructures is changed on quite big degree, becomes electric power primary system safe and reliable, stable, economical The important technology guarantee running.In the case, due to widespread deployment and the interconnection of electrical secondary system, such as physics peace in it Entirely, run the problem of the aspects such as safety, information security, be likely to involve stablizing of power system, the reliability of impact electrical network supplies Electricity.
Being continuously increased and extend with intelligent operation main station system and digital transformer substation application, electric power secondary system is hard Part equipment is increasing, and business interconnection form is increasingly sophisticated, in the urgent need to build meet the supervision of electric power secondary system feature with Management system.
Supervisory systems collects various service datas, such as electrical secondary system service operation state, secondary device operation conditions, net Network interconnection situation, system information safety, building environment parameter etc..Service data or Alarm Classification are showed O&M by supervisory systems Librarian use.Because electric power secondary system technology is across power system, Automated condtrol, computer science, communication technology etc. All multi-specialized, supervisory systems is supplied to the librarian use of different majors according to specialty by Data Integration.When resultant fault occurs When, need operation maintenance personnel not only to have higher level professional technology in addition it is also necessary to possess quite extensive professional face.ICT at present Industry has general safety management system, NMS etc. instrument, and power industry production control system itself also has biography The monitoring module of system, supervisory systems by each side's Data Integration, but because various monitoring system business visual angles are different, can monitor scope Also different with analysis strategy, the difficulty coordinating each other to analyze is larger, sometimes also can produce inapplicable noise data, impact The actual efficiency of maintenance work.
Current supervisory systems is most to be extended based on universal network management system, inherits joining of universal network management system Put the configuration modeling mechanism in management data base, lower mask body introduces this technology.
Configuration management data base configures modeling technique:Configuration management data base(CMDB)In storage and management enterprise IT architecture The various configuration informations of equipment, it is all closely linked with all service supports and service delivery process, supports the fortune of these flow processs Turn, play the value of configuration information, rely both on the accuracy that related procedure ensures data.In actual project, CMDB It is often thought of as building the basis of other ITIL flow processs and pays the utmost attention to, the success or failure of ITIL project are successfully established CMDB with whether There is very big relation.
70%~80% IT relevant issues and the change of environment have direct relation.Implement difficult point and the weight of change management Point is not instrument, but flow process.Pass through an automatization, repeatable workflow management change so that occurring when changing When, there is a standardized flow process to go to execute, the impact that this change produces to whole system management can be predicted, and These impacts are estimated and control.And the realization key of change management process automation is exactly CMDB modeling.
One typical CMDB allocation models is as shown in figure 1, operation system is split as correlation module and group by from level to level Part, and ICT infrastructure and operation system are associated.Wherein modeling process is through configuration under the premise of clear and definite range of management Item classification, attribute definition, structure definition, are finally by configuration item instantiation, comprise the following steps that:
CI classifies:Whole O&M objects is done a logical partitioning in order to manage, to distinguish pipe by its physical aspect Reason.Using CI classification action, specify scope and the granularity of configuration management, first-level class determines the scope of configuration management, three-level Classification determines the granularity of configuration management.The design of CI classification, can farthest meet management statisticses demand flexible with various Query composition.By the use of CI classification as bridge joint attribute and the intermediate link of CI example, it is easy to the structure CMDB of efficiency.By structure Independent with relation, it is easy to administration extensions in the future and extension, accomplish that application foci solely be easy to safeguard fractionation by point, simultaneously again can To play the effect of efficient combination.
CI attribute definition:For each CI classification, design attributes, so that CI example is inherited.CI attribute is per se with layer Level (public, one-level, two grades, three-level).CI attribute has father and son's succession.CI attribute can divide according to logicality(Management attribute, Technical attributes etc.), each CI attribute is needed design attributes value tied mechanism, is filled in specification and efficiency, simultaneously facilitates follow-up Statistics and calculating.CI attribute have narrow sense and broad sense point(In technological layer, structure attribute, attribute of a relation also can include attribute Line management).
CI structure defines:Excavate further with allocation models, have contemplated that in-depth structural information further at present, will be original Simple parent-child structure type, expand to three kinds of structure types:
Constitute, father and son truly, certain module is some of a program, and such as CPU is the one of computer Partly.
Connect (Is connected to), annexation between the two, the node of such as computer and network.
Need (Is needed for), the supporting role to the opposing party for the side, such as operating system and computer, one Project and a server.
According to these three structure types, to build CI cluster.
CI instantiation:After completing above three steps, the pattern of model determines substantially, completes object according to being specifically monitored object The initialization of example, including work such as object properties, the initialization of relation.
Can achieve that the top-down refinement to IT system splits based on configuration management Database Modeling technology, form multilamellar CI object cluster, thus provide basic model to support for managing and monitoring IT system.
The limitation of configuration management Database Modeling:First, configuration management Database Modeling mode is to be with operation system The configuration information of the various information technoloy equipment of unit description and incidence relation, have between main station system and substation system closely in power system Longitudinal incidence relation and main station system between also have a close horizontal incidence relation, this kind of be associated in configuration management data base and build More difficult description in mould mode;Secondly, configuration management Database Modeling mode focuses on the decomposition of CI, is a kind of static classification model, And during Power System Analysis electrical secondary system fault, be concerned with logic or physics incidence relation, and need to mould Type carries out cutting and reconstruct, needs model to possess preferable dynamic characteristic.
In conventional solution, take, for operation system, the method that configuration management object decomposes layer by layer, system is divided Solution becomes hardware and software, and hardware resolves into the specific equipment such as server, graphics workstation, the network equipment, safety equipment, and pin To its common configuration object of every kind of device abstract;Same can also resolve into application and module one by one to software;And pass through Individually CI inter-item relationship represents the deployment relation of software and hardware, and Fig. 1 is a typical case of EMS system.
Wherein EMS system is disassembled as hardware components, such as HISserver, PASserver, SCADAserver of in figure, often The server of type can also be refined into multiple servers, such as SCADA1, SCADA2, can be abstract for Servers-all type Its computer configuration item of common configuration item, including CPU, internal memory, hard disk, mainboard, operating system;SCADA subsystem branch uses To represent the deployment relation between hardware and software, SCADA subsystem includes two applications of SCADA and ALARM, is all deployed in SCADA1 On SCADA2 main frame;SCADA program branching representation SCADA application includes two examples, and its functional module has included data Reception, data processing, data loading etc., can refine to function point further.It is in the problem of this mode:
1. a system needs description in terms of hardware, software and hardware and software dispose three will have at least three branches, If wanting the dependence between extended software will extend a branch again, when the angle of description increases, numbers of branches can be very Many, redundant node is more, is unfavorable for regular maintenance and the extension of model;
2. often there is the business relations between substantial amounts of boss station in electric power secondary system, can only be in substation in existing scheme Relation with other side is individually described in system and main station system, the maintenance of relation is more difficult, lacks the descriptive power of cross-system;
3. the compass of competency concept such as the distinctive power grid architecture of power system, such as control zone, Zi Kong area is in existing scheme Can only be realized it is impossible to integrally bring the model of each system into power system show on the whole by way of increasing branch Have in administrative mechanism.
4. existing scheme is limited in one's ability to the auxiliary judgment of accident analysis, in such as model above, if certain hardware Certain assembly goes wrong, such as SCADA1 node cpu load too high, can trace back to SCADAserver class clothes from its branch Business device goes wrong, but if the module instance of association correlation subsystem then must travel through other branches, this traversal further When model is huge(Such as up to a hundred nodes, the systems of hundreds of module composition)Inefficiency, and cannot close with other alarms Connection affects speed and the accuracy of scope of business analysis thus reducing fault.
Content of the invention
Based on above-mentioned situation, the present invention proposes a kind of modeling method of electric power secondary system and system, to solve tradition The problems with of model:
1. branch is more, data redundancy, safeguards complicated;
2. cross-system descriptive power is low;
3. the peculiar power grid architecture of power system cannot be incorporated;
4. model interaction analysis ability is weak.
A kind of modeling of electric power secondary system, including the data model unit being sequentially connected, resource model unit and Dependence model unit,
Described data model unit, for classifying to all kinds of monitoring objects of described electrical secondary system, forms data mould Type;
Described resource model unit, for extending described data model on the basis of IEC61970 CIM primary equipment model Described in all kinds of monitoring objects, formed resource model;
Described dependence model unit, for, on the basis of described resource model, described electrical secondary system being divided into not With business, comprise all kinds of services that service operation is relied in each business, service refines be associated with that it is relied on each again Class monitoring object, forms dependence model.
A kind of modeling method of electric power secondary system, including step:
Set up data model, resource model and the dependence model of described electrical secondary system successively,
The method for building up of described data model, is the process that all kinds of monitoring objects to described electrical secondary system are classified;
The method for building up of described resource model, is to extend described data on the basis of IEC61970 CIM primary equipment model The process of all kinds of monitoring objects described in model;
The method for building up of described dependence model, is on the basis of described resource model, and described electrical secondary system is divided For different business, in each business, comprise all kinds of services that service operation is relied on, service refines and is associated with it and relied on All kinds of monitoring objects process.
The model set up with system using the modeling method of the electric power secondary system of the present invention, including data model, money Source model and dependence model, solve the combination of object Classification Management, the tissue of management object and power grid architecture respectively, answer The problem of description three aspect of miscellaneous relation, it is to avoid solve the problems, such as complexity and the maintenance being brought in tripartite face with same model Difficulty.Wherein, introduce IEC61970CIM model related notion in resource model, by each management object of electrical secondary system and electrical network One time model combines, there is provided electrical network one secondary model unified model;The dependence of service-oriented describes method, summarizes four Class infrastructure service, abstract common base service, complicated multi-to-multi dependence decomposes in all kinds of services, and with final Reflection service operation situation is that guiding reorganizes, and solves business and software, hardware, and the dependence and other business between The problem of contextual definition.
Brief description
Fig. 1 is a typical CMDB allocation models schematic diagram;
Fig. 2 is the structural representation of the modeling of electric power secondary system of the present invention;
Fig. 3 is the schematic flow sheet of the modeling method of electric power secondary system of the present invention;
Fig. 4 is resource classification schematic diagram in data model;
Fig. 5 is operational relation classification schematic diagram in data model;
Fig. 6 is function/business/classification of service schematic diagram in data model;
Fig. 7 is rule classification schematic diagram in data model;
Fig. 8 is resource model schematic diagram;
Fig. 9 is dependence model schematic.
Specific embodiment
The core concept of the present invention is:Build one kind and pass through induction and conclusion information technoloy equipment, electric grid secondary equipment, common software With the feature of business software, abstract public characteristic formation hierarchical structure, establish including electrical secondary system main website end and substation end industry Business system, ICT infrastructure, electric grid secondary equipment are used for retouching in the interior model having clear and definite syntax and semantics definition, this model State running status and the health indicator of each ingredient of electrical secondary system.Model is divided into three parts:Data model, resource model and Dependence model.Wherein data model solves the description of all software and hardware classification in electrical secondary system, and resource model solves secondary The problem how model of system is docked with existing model of electrical network, dependence model solves complicated association description, has Beneficial to accident analysis.Below in conjunction with the accompanying drawings and embodiment, the present invention is described in further detail.It should be appreciated that herein Described specific embodiment, only in order to explain the present invention, does not limit protection scope of the present invention.
The monitoring system of the electric power secondary system of the present invention, as shown in Fig. 2 include be sequentially connected data model unit, Resource model unit and dependence model unit.
Described data model unit, for classifying to all kinds of monitoring objects of described electrical secondary system, forms data mould Type;
Described resource model unit, for extending described data model on the basis of IEC61970 CIM primary equipment model Described in all kinds of monitoring objects, formed resource model;
Described dependence model unit, for, on the basis of described resource model, described electrical secondary system being divided into not With business, comprise all kinds of services that service operation is relied in each business, service refines be associated with that it is relied on each again Class monitoring object, forms dependence model.
As a preferred embodiment, when setting up described data model, will be right for all kinds of monitorings of described electrical secondary system As being divided into resource, operation information, function/business/service and regular four classes.
As a preferred embodiment, in the method for building up of described dependence model, in each business, comprise business Run all kinds of services packages being relied on to include network service, calculate service, database service and application service four class infrastructure service.
Electric power secondary system modeling method of the present invention, as shown in figure 3, include step:
Step S101, set up the data model of described electrical secondary system, the method for building up of described data model, is to described two The process that all kinds of monitoring objects of subsystem are classified;
Step S102, set up the resource model of described electrical secondary system, the method for building up of described resource model, be The process of all kinds of monitoring objects described in described data model is extended on the basis of IEC61970 CIM primary equipment model;
Step S103, set up the dependence model of described electrical secondary system, the method for building up of described dependence model, be On the basis of described resource model, described electrical secondary system is divided into different business, in each business, comprises service operation institute All kinds of services relying on, service refines the process being associated with all kinds of monitoring objects that it is relied on again.
Data model
Data model is by the main website end in electrical secondary system and substation end supervision object, including information technoloy equipment, electrical network two The feature analysiss of secondary device, common software and professional software, form a kind of disaggregated model of description electrical secondary system, it is to build money Source model and the basis of dependence model.Data model in electrical secondary system health model is divided into resource, operation information, work( Energy/business/service and four classification of rule.
1. resource
From the angle of electric power secondary system O&M and management system, in electrical secondary system, each ingredient is a kind of money Source, they are that the operation of electrical secondary system provides certain function, and the ruuning situation of electrical secondary system and health degree can be by weighing The function ruuning situation of each resource obtains, and therefore resource is the fundamental unit of observation electrical secondary system operation conditions.This specification is pressed The mode existing according to resource is divided into software and the logic module of logic-oriented resource, towards the equipment of physical resource with set Slave component, its composition is as shown in Figure 4.
2. operation information
All kinds of running state information can be produced, O&M and management platform also will simultaneously in the running of electric power secondary system Write result category information using this category information through calculating and analyzing to produce to divide.It is all kinds of that two category informations all reflect electric power secondary system The ruuning situation of resource.This specification is divided into raw information and analysis result according to the characteristic of operation information, and its composition is such as Shown in Fig. 5.
3. function/business/service
Function/business/service is from the angle of service operation, the resource of all kinds of supporting businesses to be divided according to its attribute character For common base service, including calculating service, database service and network service, and application service.Wherein calculate service be Refer to provide the service of computing resource, such as main frame;Database service refers to provide data access class resource for service operation, including Real-time database, timing sequence library and relational database etc.;Network service refers to provide the resource of network environment for service operation, including exchange Machine, router and all kinds of safety equipment etc.;Application service is the business function that supporting business runs, and such as supports front service fortune The station end telemechanical business of row, a business can also become the application service of an other business, and such as front service supports SCADA, therefore preposition is also a kind of application service.Classification of service is as shown in Figure 6.
4. rule
Rule defines the criterion of the dynamic operation data of the analysis each ingredient of electric power secondary system, and it is divided into business row For rule, security association rule, performance evaluation rule and accident analysis rule.Wherein business conduct rule is to divide from operational angle The various actions feature that analysis electric power secondary system runs, and the state according to this characteristic evaluating service operation;Security association rule It is from information security angle analysis electric power secondary system running status, and calculate all kinds of indexs of safe operation;Performance evaluation is advised It is then to analyze electric power secondary system overall operation state from system performance perspective, and the runnability of all kinds of resource of computing system refers to Mark;Accident analysis rule is the running status of service operation angle analysis each business of electric power secondary system from system, and ties Close the operation information analysis simultaneously positioning failure root of fault warning and all kinds of resource.Rule classification is as shown in Figure 7.
Resource model
Resource model is that all kinds of supervision described in growth data model on the basis of IEC61970 CIM are right As model, thus defining the entire object model of electrical network one secondary bond, for the supervision of electrical secondary system and statistical analysiss. It solves the problems, such as that existing scheme cannot incorporate the peculiar power grid architecture of power system.
Resource model is all kinds of supervision objects described in growth data model on the basis of CIM, such as exists Secondary device model is extended, under plant stand and under control centre, extension electrical secondary system is divided under each electrical network primary equipment in transformer station , contain subsystem, equipment and public infrastructure, be mainly used in the software system resource of description main website or substation and its prop up Support the ICT infrastructure resources of its operation.Structure is as shown in Figure 8.
Wherein, subsystem, equipment, three classes of public infrastructure are comprised in the electrical secondary system in control centre and plant stand, Secondary device under primary equipment in plant stand is classified as equipment class.Analog quantity, quantity of state can be comprised under each of model class Deng measurement data class.
Dependence model
Dependence model is on the basis of resource model, and electrical secondary system is divided into different business, each business In comprise all kinds of services that service operation is relied on, service refines all kinds of supervision objects being associated with it and being relied on, again for two The accident analysis of subsystem and positioning.
Dependence model is on the basis of resource model, and electrical secondary system is divided into different business, each business In comprise all kinds of services that service operation is relied on, service refines all kinds of supervision objects being associated with it and being relied on, again for two The accident analysis of subsystem and positioning.Its framework is as shown in Figure 9.
Wherein, the business being comprised under control centre and transformer station is from operational angle, application to be reclassified, such as before Purchase of property business, SCADA business, AGC business etc., often middle business is by a series of related software modules and hardware in existing system The resources such as facility support, and these Resource Abstracts supporting are become various services by dependence model, and every kind of service is related Business provides a kind of service ability, and such as network service provides the network interconnection to process with ability to communicate, calculating service providing data There is provided the various application functions needed for data access capabilities, application service offer business with the ability of computing, database service.
Every kind of service is associated with specific resource again, and such as network service is filled with specific switch, router, isolation The association such as put, calculate service versus server association, database service associate with specific database instance, application service and specifically Subsystem or functional module association.
Rely on and service this intermediary layer, business is decoupled to related logic or physical resource by dependence model, thus Provide method for flexible these resources that divide.Such as one main frame can dispose preposition application, as front service Calculate service it is also possible to deployment SCADA applies the calculating service as SCADA business simultaneously, therefore such host resource is just Can be placed under the calculating service in common base service, and the service using correlation in other business can arrive this public base Associate in plinth service, the data redundancy that minimizing multiple spot association easily causes is occurred with inconsistent situation.
A kind of business can also provide for another one business and support, and in this case, former business is exactly latter The application service of business.The miscellaneous service having dependence can be associated by the concept using application service, including main website Or between all kinds of business in substation, and between related business between main website and substation, the telemechanical business of such as substation is just propped up Support main website front service, it can be considered that substation telemechanical business is the application service of main website front service, sets up dependence.
The dependence between business and all kinds of resource can be set up according to the incidence relation between business and service, thus real Now when certain resource breaks down, can association analysiss to the related service relying on this resource, provide for fault location rapidly A kind of clustering method.Due to having business dependence, secondary device and related primary equipment to have dependence between substation and main website Relation, therefore can be with the impact to main website for the analysis substation fault, a secondary device fault to other side's with dependence model Impact, is electric network fault analysis and early warning provides flexible analysis model and supports.
System features
The having the characteristics that of this programme:
1. scheme solves object Classification Management, electrical network respectively using data model, resource model and dependence model The combination of existing framework, a difficult problem for description three aspect of complex relationship, it is to avoid solve the problems, such as tripartite face institute with same model The complexity brought and maintenance difficulties.
2. data model is summarized according to the feature sorted generalization of software and hardware in electric grid secondary system, can be more comprehensively anti- Answer the classification relation of all kinds of object of observations that electrical secondary system comprised, including electric grid secondary equipment, general purpose I T equipment, operation system And its module, all kinds of service etc., and include the rule that the electrical secondary system to collection monitors data processing.
3. resource model, can be by power grid architecture and electrical secondary system frame according to existing electric network model IEC61970 CIM Structure blends, and unified resource mould is brought into using the control centre of CIM and plant stand branch in main website and substation in the vertical In type, transformer stations different in the horizontal or main station system extend in plant stand branch and branch of control centre;Simultaneously according to CIM Master control area and Zi Kong area by unified for dispatching of power netwoks departments at different levels in a resource model, thus by electrical secondary system and electrical network frame Structure and Utilities Electric Co.'s organizational structure combine.
4. dependence model adopts the modeling pattern of service-oriented, according to the sorting technique of system operation required service, Take out network service, calculate service, database service and application service four class infrastructure service, and operation system is decomposed into respectively All kinds of work organizations are got up using the power grid architecture concept in resource model by kind of business simultaneously, every class business and four kinds of bases Dependence is set up in service, thus solving business and software, hardware, and the dependence definition and other business between is asked Topic.
Scheme compared to existing technology, the present invention has advantages below:
1. solve branch more, data redundancy, safeguard complicated problem, solve asking of tripartite face using three models Topic, sets up associated with each other, reduces redundant node, and maintenance can also separately separately maintain as needed.Data model definitions are each Plant classification, just need when classification changes to safeguard;Resource model describes all kinds of supervision objects, does not include the association of complexity Relation, just needs to safeguard when a change occurs to an object;Dependence model service-oriented, concludes according to four class infrastructure services and closes System, and take out common base service, the relation centralized management to common source, so that the maintenance conditioning of relation is clear.
2. solve the problems, such as that cross-system descriptive power is low, on the one hand utilize the power grid architecture of IEC61970 CIM general Read and organic combination between longitudinal boss station gets up;On the other hand transversely break system boundary, according between each resource of operational control Dependence, provide unified horizontal, longitudinal Extended model and support for analyzing the ruuning situation of electrical secondary system and fault.
3. solve the problems, such as to incorporate the peculiar power grid architecture of power system, using the primary equipment of IEC61970 CIM The secondary device of transformer substation end can be associated to related primary equipment, solve secondary device method for organizing such as by model What problem of being combined with power grid architecture, for judging that the impact to electrical network overall operation situation for the electrical secondary system provides model support.
4. solve the problems, such as that model interaction analysis ability is weak, with the dependence model of special service-oriented, pass through The four class infrastructure services that combing supporting business runs, abstract common base service, complicated multi-to-multi dependence decomposes In all kinds of services, and reorganized for guiding with being finally reflected service operation situation, both served and simplify, raising can be safeguarded Property purpose, again enhance analysis service operation situation model support ability.
Note:The present invention has carried out dependence test in intra-company, and empirical tests are capable of above-mentioned beneficial effect, has good Good practicality and market prospect.
It is also possible to pass through first to set up list on the basis of original Database Modeling technology based on configuration management in addition to this programme The model of individual system, realizes similar effect in the method setting up model between system.But due to configuration management Database Modeling skill Art solves intrinsic restriction of all the problems with model, its extensibility of increase with scale of model and can safeguard by Substantially reduce, can not really meet the modeling requirement to whole electrical secondary system for the power grid user.
Embodiment described above only have expressed the several embodiments of the present invention, and its description is more concrete and detailed, but simultaneously Therefore the restriction to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, some deformation can also be made and improve, these broadly fall into the guarantor of the present invention Shield scope.Therefore, the protection domain of patent of the present invention should be defined by claims.

Claims (6)

1. a kind of modeling of electric power secondary system is it is characterised in that include data model unit, the resource mould being sequentially connected Type unit and dependence model unit,
Described data model unit, for classifying to all kinds of monitoring objects of described electrical secondary system, forms data model, institute State data model for the description to software and hardware classification all in described electrical secondary system;
Described resource model unit, for extending institute in described data model on the basis of IEC61970 CIM primary equipment model All kinds of monitoring objects of description, form resource model;
Described dependence model unit, for, on the basis of described resource model, described electrical secondary system being divided into different Business, comprises all kinds of services that service operation is relied in each business, service refines all kinds of prisons being associated with it and being relied on again Survey object, form dependence model.
2. electric power secondary system according to claim 1 modeling it is characterised in that
When setting up described data model, by all kinds of monitoring objects of described electrical secondary system be divided into resource, operation information, function/ Business/service and regular four classes.
3. electric power secondary system according to claim 1 and 2 modeling it is characterised in that
In the method for building up of described dependence model, in each business, comprise all kinds of services package purse ropes that service operation is relied on Network service, calculating service, database service and application service four class infrastructure service.
4. a kind of modeling method of electric power secondary system is it is characterised in that include step:
Set up data model, resource model and the dependence model of described electrical secondary system successively,
The method for building up of described data model, is the process that all kinds of monitoring objects to described electrical secondary system are classified, described Data model is used for the description to software and hardware classification all in described electrical secondary system;
The method for building up of described resource model, is to extend described data model on the basis of IEC61970 CIM primary equipment model Described in all kinds of monitoring objects process;
The method for building up of described dependence model, is on the basis of described resource model, described electrical secondary system is divided into not With business, comprise all kinds of services that service operation is relied in each business, service refines be associated with that it is relied on each again The process of class monitoring object.
5. electric power secondary system according to claim 4 modeling method it is characterised in that
When setting up described data model, by all kinds of monitoring objects of described electrical secondary system be divided into resource, operation information, function/ Business/service and regular four classes.
6. the electric power secondary system according to claim 4 or 5 modeling method it is characterised in that
In the method for building up of described dependence model, in each business, comprise all kinds of services package purse ropes that service operation is relied on Network service, calculating service, database service and application service four class infrastructure service.
CN201310618436.2A 2013-11-27 2013-11-27 Power secondary system modeling method and system Active CN103825755B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310618436.2A CN103825755B (en) 2013-11-27 2013-11-27 Power secondary system modeling method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310618436.2A CN103825755B (en) 2013-11-27 2013-11-27 Power secondary system modeling method and system

Publications (2)

Publication Number Publication Date
CN103825755A CN103825755A (en) 2014-05-28
CN103825755B true CN103825755B (en) 2017-02-15

Family

ID=50760602

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310618436.2A Active CN103825755B (en) 2013-11-27 2013-11-27 Power secondary system modeling method and system

Country Status (1)

Country Link
CN (1) CN103825755B (en)

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104579784B (en) * 2015-01-15 2017-12-22 珠海市鸿瑞信息技术股份有限公司 Power industry Control System NetWork management method based on multidimensional virtual link
CN105160119B (en) * 2015-09-16 2019-01-11 中国电力科学研究院 A kind of second power equipment emulation modelling method based on strategy file
CN105629103A (en) * 2015-12-23 2016-06-01 广州市优普计算机有限公司 Online monitoring method based on transformer substation operation and maintenance network shutdown
CN105824279A (en) * 2016-03-15 2016-08-03 江苏方天电力技术有限公司 Method for establishing flexible and effective CMDB (Configuration Management Database) of machine room monitoring system
CN107071013A (en) * 2017-03-30 2017-08-18 国网福建省电力有限公司 A kind of the service response method and service system of intelligent substation access regulation and control main website
CN107480883B (en) * 2017-08-11 2020-11-10 国电南瑞科技股份有限公司 Transformer substation secondary system resource configuration method and system
CN107729939B (en) * 2017-10-17 2020-06-02 广东电网有限责任公司电力科学研究院 CIM (common information model) expansion method and device for newly added power grid resources
CN107918835A (en) * 2017-12-13 2018-04-17 国网辽宁省电力有限公司电力科学研究院 Become the universal secondary device platform of the more scenes of adapted towards electric power
CN112052294B (en) * 2019-06-05 2023-01-31 烽火通信科技股份有限公司 General data configuration method and system for service call
CN111985558A (en) * 2020-08-19 2020-11-24 安徽蓝杰鑫信息科技有限公司 Electric energy meter abnormity diagnosis method and system
CN112055065A (en) * 2020-08-27 2020-12-08 国电南瑞科技股份有限公司 Relay protection SaaS layer application data processing method based on regulation and control cloud
CN112231705B (en) * 2020-09-23 2023-07-28 四川中电启明星信息技术有限公司 Information system reliability improving method based on secondary division
CN112215523A (en) * 2020-10-29 2021-01-12 中国人民解放军国防科技大学 Method and device for analyzing capability dependency relationship in complex system architecture
CN113535680A (en) * 2021-07-16 2021-10-22 国家电网有限公司 Configuration management data processing system and method
CN113672203B (en) * 2021-08-26 2022-04-08 优维科技(深圳)有限公司 Model inheritance method for CMDB configuration management

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101710735A (en) * 2009-12-11 2010-05-19 江西省电力科学研究院 Sharing modeling method of intelligent substation and primary station
CN102510127A (en) * 2011-10-21 2012-06-20 南京南瑞继保电气有限公司 Method for unifying models of on-line monitored first and secondary equipment of power grid
CN103366051A (en) * 2013-06-26 2013-10-23 中国南方电网有限责任公司 Method and system for modeling of primary equipment and secondary equipment

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101710735A (en) * 2009-12-11 2010-05-19 江西省电力科学研究院 Sharing modeling method of intelligent substation and primary station
CN102510127A (en) * 2011-10-21 2012-06-20 南京南瑞继保电气有限公司 Method for unifying models of on-line monitored first and secondary equipment of power grid
CN103366051A (en) * 2013-06-26 2013-10-23 中国南方电网有限责任公司 Method and system for modeling of primary equipment and secondary equipment

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
基于 IEC61970 的电力系统二次设备 CIM 建模初探;毛鹏等;《继电器》;20060601;第35卷(第11期);全文 *
电力网一、二次系统可靠性分析与应用;吴国沛;《中国博士学位论文全文数据库工程科技Ⅱ辑》;20131115(第11期);正文第1-118页 *

Also Published As

Publication number Publication date
CN103825755A (en) 2014-05-28

Similar Documents

Publication Publication Date Title
CN103825755B (en) Power secondary system modeling method and system
Guo et al. Complex power system status monitoring and evaluation using big data platform and machine learning algorithms: a review and a case study
CN108197131A (en) A kind of construction method and device of electric power asset portrait
CN106357414B (en) Information interacting method and system for base station electric generation management
CN107657389A (en) A kind of demand Side Management platform
CN108777637A (en) A kind of data center's total management system and method for supporting server isomery
CN106451761A (en) Dynamic data driving-based automatic monitoring and analysis system for widespread blackout
CN111125450A (en) Management method of multilayer topology network resource object
CN111353085A (en) Cloud mining network public opinion analysis method based on feature model
CN110245163A (en) A kind of Operation of Electric Systems hidden troubles removing method
CN106649034B (en) Visual intelligent operation and maintenance method and platform
CN111538720A (en) Method and system for cleaning basic data in power industry
CN113706101B (en) Intelligent system architecture and method for power grid project management
CN110415136A (en) A kind of electric power scheduling automatization system service ability assessment system and method
CN112784129A (en) Pump station equipment operation and maintenance data supervision platform
CN106897186A (en) Cluster real-time monitoring system and monitoring method based on MES
Peng et al. Research on data quality detection technology based on ubiquitous state grid internet of things platform
Xiang et al. Digital twin-driven service collaboration
Wang et al. An intelligent DevOps platform research and design based on machine learning
CN112508276B (en) Power grid rapid diagnosis and optimization system and optimization method
CN116150257B (en) Visual analysis method, system and storage medium for electric power communication optical cable resources
Zuo et al. ZAlert: A Real Time Prediction Framework For Network Alert
Yu et al. Research on integrated operation and maintenance acquisition and monitoring technology for new generation dispatching control system
CN116961241B (en) Unified application monitoring platform based on power grid business
Yang Research on Risk Intelligent Assessment Method of IT Operation and Maintenance Based on Cloud Computing

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant