CN103821163A - Method for hoisting and constructing reinforcement cages of concrete diaphragm walls - Google Patents

Method for hoisting and constructing reinforcement cages of concrete diaphragm walls Download PDF

Info

Publication number
CN103821163A
CN103821163A CN201410050762.2A CN201410050762A CN103821163A CN 103821163 A CN103821163 A CN 103821163A CN 201410050762 A CN201410050762 A CN 201410050762A CN 103821163 A CN103821163 A CN 103821163A
Authority
CN
China
Prior art keywords
reinforcing cage
hoisting
cage
reinforcement
reinforcing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410050762.2A
Other languages
Chinese (zh)
Inventor
刘文兵
马海贤
李春生
刘宏伟
岳新凯
梁纯
朱善美
黄景新
杨曦
沙伟
贾晓炯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fourth Engineering Co Ltd of CTCE Group
Original Assignee
Fourth Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Engineering Co Ltd of CTCE Group filed Critical Fourth Engineering Co Ltd of CTCE Group
Priority to CN201410050762.2A priority Critical patent/CN103821163A/en
Publication of CN103821163A publication Critical patent/CN103821163A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a method for hoisting and constructing reinforcement cages of concrete diaphragm walls. The method includes steps of (1), constructing high-water-level foundation pit supports; (2), hoisting travel paths according to construction requirements, in other words, selecting constructed circle paths according to the weights of the hoisted reinforcement cages, and generally adopting rigid concrete pavements with the thicknesses of 20cm as the travel paths for cranes; (3), selecting reinforcement cage processing sites, and in other words, determining the positions and the quantity of the reinforcement cage processing sites according to the standard requirement that the travel distance of each loaded caterpillar crane is not longer than 50m. The bearing capacity of foundations of the constructed circle paths needs to meet computing requirements. The method has the advantages that the long and heavy reinforcement cages which have gravity centers difficult to determine and are easy to deform can be easily and conveniently hoisted by the method, the hoisting efficiency is high, the safety is good, and the reinforcement cages can be effectively protected against deformation.

Description

Ground-connecting-wall reinforcing bar cage hoisting construction method
Technical field
The invention belongs to a kind of construction method, specifically the construction method of the large yielding reinforcing bar cage hoisting of a kind of irregular weight.
Background technology
Be subject to each side restriction in China's urban ground traffic, flourishing urban traffic pressure is increasing, and underground traffic is in Rapid development stage, goes along with sb. to guard him and adopt the form of ground-connecting-wall more and more when underground construction.Reinforcing bar cage hoisting is the pith in ground-connecting-wall construction, and this engineering method is very important for the completing property of reinforcing cage and the safety of reinforcement cage hoisting, agility.
Summary of the invention
The object of this invention is to provide a kind of irregular, weight is large, yielding ground-connecting-wall reinforcing bar cage hoisting construction method; select this method lifting; be difficult to determine for center of gravity; large, the yielding reinforcing bar cage hoisting of length weight; lift very easy; lifting efficiency is higher, and safety is better, and the distortion of protection reinforcing cage is very good.
Technical scheme of the present invention is as follows:
Ground-connecting-wall reinforcing bar cage hoisting construction method, is characterized in that, comprises the following steps:
(1) high water level bracing of foundation pit construction;
(2) construction requirement of lifting walking road;
According to the weight of lifting reinforcing cage, select the perimeter path built, the circumferential road bearing capacity of foundation soil of building must meet calculation requirement, generally adopts rigid concrete road surface that 20cm the is thick walking road as crane.
(3) select reinforcing cage processing place;
According to code requirement, crawler crane when walking load travel distance must not exceed 50m and determine that reinforcing cage processes position and the number in place;
(4) processing of reinforcing cage construction
Select the tonnage number of crawler crane lifting according to the weight of reinforcing cage, then select the processing of reinforcing cage entirety or segmental machining according to sling height, and determine the length of every section;
(5) reinforcing cage hoisting point position and suspension centre Reinforcement Measures
According to the length of reinforcing cage and plane position of centre of gravity, select reasonably longitudinally to lift by crane number, span all guarantees in 10m, hoisting point position should be chosen in the vertical transverse truss intersection point of reinforcing cage place, the suspension ring of reinforcing cage adopt round steel to make ∏ type according to calculating, the main longitudinal reinforcement welding in following and bottom surface, weld with the main longitudinal reinforcement in top on top mouthful, lengthways main steel bar and the whole full welds of transverse horizontal muscle in the scope of reinforcing cage body suspension centre 1m;
(6) instrument of lifting
When reinforcement cage hoisting, adopt two crawler cranes, under drop hanger, shoulder pole is set, shoulder pole is divided into pulley, and on pulley, wire rope adopts snap ring to link with the suspension centre of reinforcing cage;
(7) reinforcing cage is installed
Reinforcing cage adopts two crawler cranes to carry out parallel lifting, and when the about 1m of reinforcement cage hoisting is high, main hoisting 1 starts to promote, utilize the pulley on shoulder pole to complete turning of reinforcing cage, after ground-connecting-wall reinforcing cage is vertical, removes pair and hang 2, utilize main hoisting transportation reinforcing cage to notch, after artificial righting, start to transfer reinforcing cage.
Ground-connecting-wall reinforcing bar cage hoisting of the present invention, adopts the parallel lifting of major-minor crawler crane, has reduced the degree of difficulty that reinforcement cage hoisting is turned.Guarantee the distortion of reinforcing cage, simplified the transportation of reinforcing cage, in each operation of construction and link, carried out meticulous planning, in work progress, constantly optimized, guaranteed construction safety and quality.
Accompanying drawing explanation
Fig. 1 reinforcing cage major-minor hangs parallel lifting figure.
Main hoisting lifting figure after Fig. 2 turns.
The specific embodiment
Referring to accompanying drawing, ground-connecting-wall reinforcing bar cage hoisting construction method, comprises the following steps:
(1) high water level bracing of foundation pit construction;
(2) construction requirement of lifting walking road;
According to the weight of lifting reinforcing cage, select the perimeter path built, the circumferential road bearing capacity of foundation soil of building must meet calculation requirement, generally adopts rigid concrete road surface that 20cm the is thick walking road as crane.
(3) select reinforcing cage processing place;
According to code requirement, crawler crane when walking load travel distance must not exceed 50m and determine that reinforcing cage processes position and the number in place;
(4) processing of reinforcing cage construction
Select the tonnage number of crawler crane lifting according to the weight of reinforcing cage, then select the processing of reinforcing cage entirety or segmental machining according to sling height, and determine the length of every section;
(5) reinforcing cage hoisting point position and suspension centre Reinforcement Measures
According to the length of reinforcing cage and plane position of centre of gravity, select reasonably longitudinally to lift by crane number, span all guarantees in 10m, hoisting point position should be chosen in the vertical transverse truss intersection point of reinforcing cage place, the suspension ring of reinforcing cage adopt round steel to make ∏ type according to calculating, the main longitudinal reinforcement welding in following and bottom surface, weld with the main longitudinal reinforcement in top on top mouthful, lengthways main steel bar and the whole full welds of transverse horizontal muscle in the scope of reinforcing cage body suspension centre 1m;
(6) instrument of lifting
When reinforcement cage hoisting, adopt two crawler cranes, under drop hanger, shoulder pole is set, shoulder pole is divided into pulley, and on pulley, wire rope adopts snap ring to link with the suspension centre of reinforcing cage;
(7) reinforcing cage is installed
Reinforcing cage adopts two crawler cranes to carry out parallel lifting, and when the about 1m of reinforcement cage hoisting is high, main hoisting 1 starts to promote, utilize the pulley on shoulder pole to complete turning of reinforcing cage, after ground-connecting-wall reinforcing cage is vertical, removes pair and hang 2, utilize main hoisting transportation reinforcing cage to notch, after artificial righting, start to transfer reinforcing cage.

Claims (1)

1. ground-connecting-wall reinforcing bar cage hoisting construction method, is characterized in that, comprises the following steps:
(1) high water level bracing of foundation pit construction;
(2) construction requirement of lifting walking road;
According to the weight of lifting reinforcing cage, select the perimeter path built, the circumferential road bearing capacity of foundation soil of building must meet calculation requirement, generally adopts rigid concrete road surface that 20cm the is thick walking road as crane;
(3) select reinforcing cage processing place;
According to code requirement, crawler crane when walking load travel distance must not exceed 50m and determine that reinforcing cage processes position and the number in place;
(4) processing of reinforcing cage construction
Select the tonnage number of crawler crane lifting according to the weight of reinforcing cage, then select the processing of reinforcing cage entirety or segmental machining according to sling height, and determine the length of every section;
(5) reinforcing cage hoisting point position and suspension centre Reinforcement Measures
According to the length of reinforcing cage and plane position of centre of gravity, select reasonably longitudinally to lift by crane number, span all guarantees in 10m, hoisting point position should be chosen in the vertical transverse truss intersection point of reinforcing cage place, the suspension ring of reinforcing cage adopt round steel to make ∏ type according to calculating, the main longitudinal reinforcement welding in following and bottom surface, weld with the main longitudinal reinforcement in top on top mouthful, lengthways main steel bar and the whole full welds of transverse horizontal muscle in the scope of reinforcing cage body suspension centre 1m;
(6) instrument of lifting
When reinforcement cage hoisting, adopt two crawler cranes, under drop hanger, shoulder pole is set, shoulder pole is divided into pulley, and on pulley, wire rope adopts snap ring to link with the suspension centre of reinforcing cage;
(7) reinforcing cage is installed
Reinforcing cage adopts two crawler cranes to carry out parallel lifting, and when the about 1m of reinforcement cage hoisting is high, main hoisting starts to promote, utilize the pulley on shoulder pole to complete turning of reinforcing cage, after ground-connecting-wall reinforcing cage is vertical, removes pair and hang, utilize main hoisting transportation reinforcing cage to notch, after artificial righting, start to transfer reinforcing cage.
CN201410050762.2A 2014-02-13 2014-02-13 Method for hoisting and constructing reinforcement cages of concrete diaphragm walls Pending CN103821163A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410050762.2A CN103821163A (en) 2014-02-13 2014-02-13 Method for hoisting and constructing reinforcement cages of concrete diaphragm walls

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410050762.2A CN103821163A (en) 2014-02-13 2014-02-13 Method for hoisting and constructing reinforcement cages of concrete diaphragm walls

Publications (1)

Publication Number Publication Date
CN103821163A true CN103821163A (en) 2014-05-28

Family

ID=50756431

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410050762.2A Pending CN103821163A (en) 2014-02-13 2014-02-13 Method for hoisting and constructing reinforcement cages of concrete diaphragm walls

Country Status (1)

Country Link
CN (1) CN103821163A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108622785A (en) * 2018-05-11 2018-10-09 中铁四局集团有限公司 A kind of hoisting method of steel reinforcement cage
CN109626213A (en) * 2019-01-25 2019-04-16 中铁四局集团第三建设有限公司 A kind of ground-connecting-wall overlength steel reinforcement cage once lifts the construction method for quickly entering slot
CN109914388A (en) * 2019-03-05 2019-06-21 上海市基础工程集团有限公司 Steel reinforcement cage reinforcing device and method that ultra-deep underground continuous wall is overweight
CN110745683A (en) * 2019-10-17 2020-02-04 中铁科工集团装备工程有限公司 Hoisting device and method for reinforcement cage of underground continuous wall
CN110877863A (en) * 2019-11-29 2020-03-13 深圳宏业基岩土科技股份有限公司 Construction method for hoisting wall-connected reinforcement cage by combining stress gauge
CN111155529A (en) * 2020-01-03 2020-05-15 广西路桥工程集团有限公司 Method for lowering underground diaphragm wall reinforcement cage
CN111778961A (en) * 2020-05-19 2020-10-16 中交第二航务工程局有限公司 Production line arrangement and hoisting process for underground diaphragm wall reinforcement cage

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101994318A (en) * 2010-12-07 2011-03-30 中交四航局第一工程有限公司 Lifting frame, hoisting system and hoisting method for vertically and rotatably hoisting steel reinforcement cage
CN102328881A (en) * 2011-08-31 2012-01-25 中国建筑第二工程局有限公司 Device and method for hoisting entire oversized steel reinforcement cage in one step
CN202298606U (en) * 2011-09-26 2012-07-04 中交第二航务工程局有限公司 Descending frame for mounting reinforcement cage of pile foundation
CN103397629A (en) * 2013-08-16 2013-11-20 中国建筑第八工程局有限公司 Construction method for lifting overlong reinforcement cage by one step

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101994318A (en) * 2010-12-07 2011-03-30 中交四航局第一工程有限公司 Lifting frame, hoisting system and hoisting method for vertically and rotatably hoisting steel reinforcement cage
CN102328881A (en) * 2011-08-31 2012-01-25 中国建筑第二工程局有限公司 Device and method for hoisting entire oversized steel reinforcement cage in one step
CN202298606U (en) * 2011-09-26 2012-07-04 中交第二航务工程局有限公司 Descending frame for mounting reinforcement cage of pile foundation
CN103397629A (en) * 2013-08-16 2013-11-20 中国建筑第八工程局有限公司 Construction method for lifting overlong reinforcement cage by one step

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
吴维: "城市地铁竖井地下连续墙钢筋笼吊装专项方案", 《城市建设理论研究(电子版)》, no. 6, 30 April 2012 (2012-04-30), pages 1 - 10 *
周冠南: "地下连续墙钢筋笼吊点设置与加固", 《城市轨道交通研究》, no. 12, 31 December 2012 (2012-12-31), pages 97 - 102 *
朱永伟: "地下连续墙钢筋笼吊装施工技术", 《土工基础》, vol. 26, no. 2, 15 June 2013 (2013-06-15) *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108622785A (en) * 2018-05-11 2018-10-09 中铁四局集团有限公司 A kind of hoisting method of steel reinforcement cage
CN109626213A (en) * 2019-01-25 2019-04-16 中铁四局集团第三建设有限公司 A kind of ground-connecting-wall overlength steel reinforcement cage once lifts the construction method for quickly entering slot
CN109914388A (en) * 2019-03-05 2019-06-21 上海市基础工程集团有限公司 Steel reinforcement cage reinforcing device and method that ultra-deep underground continuous wall is overweight
CN110745683A (en) * 2019-10-17 2020-02-04 中铁科工集团装备工程有限公司 Hoisting device and method for reinforcement cage of underground continuous wall
CN110877863A (en) * 2019-11-29 2020-03-13 深圳宏业基岩土科技股份有限公司 Construction method for hoisting wall-connected reinforcement cage by combining stress gauge
CN110877863B (en) * 2019-11-29 2021-01-05 深圳宏业基岩土科技股份有限公司 Construction method for hoisting wall-connected reinforcement cage by combining stress gauge
CN111155529A (en) * 2020-01-03 2020-05-15 广西路桥工程集团有限公司 Method for lowering underground diaphragm wall reinforcement cage
CN111778961A (en) * 2020-05-19 2020-10-16 中交第二航务工程局有限公司 Production line arrangement and hoisting process for underground diaphragm wall reinforcement cage

Similar Documents

Publication Publication Date Title
CN103821163A (en) Method for hoisting and constructing reinforcement cages of concrete diaphragm walls
CN103184722B (en) Large-span double-layer Bailey truss structure and construction method thereof
CN101858059A (en) Construction method of erecting prestressed concrete beam on river
CN102644290A (en) Steel cofferdam construction method suitable for deep silt-layer bridge construction in shallow sea area
CN104805857A (en) Detachable cyclic utilization bottomless steel jacket box and construction method thereof
CN107893427A (en) A kind of prefabricated assembled cored slab column foundation for transmission line of electricity
CN203531005U (en) Steel structure combined type tower crane base structure
CN203144907U (en) Large-span dual-layer bailey truss structure
CN206680994U (en) Assembled steel reinforced cage descending frame
CN211141313U (en) Portal crane suitable for hoisting low-height underground continuous wall reinforcement cage
CN202689496U (en) Moving platform for steel pipe concrete post concrete casing
CN102587377B (en) Drop hammer type pile sinking device and pile sinking method thereof
CN104499706A (en) Elevator well template platform and construction method thereof
CN204608812U (en) One detachably recycles bottomless steel jacket box
CN103352598B (en) Positioning tower used for mounting multilayer cubic blocks in deep water
CN206753488U (en) A kind of artificial digging pile reaming auxiliary equipment
CN206655065U (en) Combined type support post and overhead rail system for overhead rail system
CN201943006U (en) Main tower zone movable bracket for assisting non-variable amplitude girder erecting crane to erect steel box girders
CN211898417U (en) Construction structure based on cutter-suction type ground is wall local to replace campshed and is strutted
CN205223849U (en) Bridge anticollision barrier template is lifted by crane and concrete defect patching device
CN201128882Y (en) Lifting and supporting brackets integrated construction device for bridge arch rib
CN204919307U (en) Antidetonation high -strength concrete pier
CN209443849U (en) Prefabricated factory for bridge construction
CN210562265U (en) Ground anchor reinforcing structure of communication tower
CN108341030B (en) A kind of floating platform unbalanced load compensation device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20140528

RJ01 Rejection of invention patent application after publication