CN103821142A - 预应力高强混凝土管桩桩身的钢结构 - Google Patents
预应力高强混凝土管桩桩身的钢结构 Download PDFInfo
- Publication number
- CN103821142A CN103821142A CN201410096846.XA CN201410096846A CN103821142A CN 103821142 A CN103821142 A CN 103821142A CN 201410096846 A CN201410096846 A CN 201410096846A CN 103821142 A CN103821142 A CN 103821142A
- Authority
- CN
- China
- Prior art keywords
- prestressed
- pipe pile
- pile body
- steel structure
- strength concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 23
- 239000010959 steel Substances 0.000 title claims abstract description 23
- 239000011372 high-strength concrete Substances 0.000 title claims abstract description 13
- 230000002787 reinforcement Effects 0.000 claims abstract description 8
- 238000005452 bending Methods 0.000 abstract description 5
- 230000021715 photosynthesis, light harvesting Effects 0.000 abstract description 3
- 238000005516 engineering process Methods 0.000 abstract description 2
- 238000010276 construction Methods 0.000 description 3
- 238000013461 design Methods 0.000 description 3
- 238000006073 displacement reaction Methods 0.000 description 2
- 239000011513 prestressed concrete Substances 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 239000004567 concrete Substances 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005265 energy consumption Methods 0.000 description 1
- 230000009916 joint effect Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 108090000623 proteins and genes Proteins 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
本发明涉及建筑用桩的钢结构,具体是一种预应力高强混凝土管桩桩身的钢结构,包括若干预应力纵筋、螺旋网筒以及若干环形箍筋,所述螺旋网筒是由多根钢丝按一定的螺距以螺旋角旋向相反的方向交叉绑扎在一起形成的,所述若干预应力纵筋沿圆周方向均匀的排布于螺旋网筒形成的圆内,若干预应力纵筋形成的圆与螺旋网筒形成的圆同心,所述若干环形箍筋由上而下均匀的绑扎于螺旋网筒外侧。本发明所述预应力高强混凝土管桩桩身的钢结构相对于现有技术,螺旋网筒能够大大地增加预应力管桩的抗剪承载力,预应力纵筋增强了抗弯性能,同时螺旋网筒与环形箍筋的相配合能够提高管桩桩身内的预应力纵筋之间的整体性,增强了抗震耗能性能。
Description
技术领域
本发明涉及建筑用桩的钢结构,具体是一种预应力高强混凝土管桩桩身的钢结构。
背景技术
预应力高强混凝土管桩(PHC桩)作为预制桩基础的一种,以其桩身强度高、单桩竖向承载力大、成桩质量可靠、施工周期短、单位承载力造价比便宜、设计选用范围广等优点被国内外广泛应用。目前,我国对管桩的设计、生产、施工等都有一些规定,如GB13476-2009《先张法预应力混凝土管桩》标准,03SG409 《预应力混凝土管桩》图集等,除此之外,广东、上海、浙江、江苏、天津、河南等地还根据自身的特定制定了地方标准。这些规范及标准中大多规定管桩的适用范围为非抗震区和抗震设防烈度为6度、7度的地区,而在抗震设防烈度8度及以上的地区,则不宜采用或需要另行验算,对于如何进行“抗震设计另行计算”,并没有明确的技术规定。
我国约有79%的国土面积处在6度以上的抗震区,有8%的国土面积处于较高烈度设防区(烈度≥8度),且在较低抗震设防烈度区域发生较高烈度的地震并不鲜见。特别是近年来,国内外大地震、特大地震频发,因此引发广大学者对管桩基础在高烈度区应用的讨论以及对预应力管桩基础在大地震中的表现的关切。从地震发生时桩基础的受力分析可知,最大剪力、轴力和弯矩均发生在管桩与承台连接处,在三者的共同作用下发生连接节点变形,当变形过大时,桩基因失去承载能力而破坏。因此在地震区应用管桩基础时,应十分重视管桩桩基础的抗水平荷载及水平位移的能力。一些管桩实体抗剪试验和抗弯试验表明管桩有一定的抗斜截面破坏能力和抗弯性能,但是同时还应认识到,地震时,作用在管桩桩基础上的外力受许多不确定因素的影响,管桩的内力分布及变形是相当复杂的,还有待于进一步研究。
对于上述PHC桩的抗水平荷载及水平位移的能力主要体现在管桩桩身的抗剪承载力和抗震耗能性能两方面。目前有关国家规范及图集中涉及的PHC桩产品更多的关注管桩的竖向受压承载力,而都没能很好的解决这两方面的问题,从而限制了PHC桩在高烈度地区的推广应用。所以关于这方面的研究水平还有待提高。
发明内容
本发明为了提高管桩桩身的抗剪承载力和抗振耗能性能,提供了一种预应力高强混凝土管桩桩身的钢结构。
本发明是通过以下技术方案实现的:预应力高强混凝土管桩桩身的钢结构,包括若干预应力纵筋、螺旋网筒以及若干环形箍筋,所述螺旋网筒是由多根钢丝按一定的螺距以螺旋角旋向相反的方向交叉绑扎在一起形成的,所述若干预应力纵筋沿圆周方向均匀的排布于螺旋网筒形成的圆内,若干预应力纵筋形成的圆与螺旋网筒形成的圆同心,所述若干环形箍筋由上而下均匀的绑扎于螺旋网筒外侧。
本发明所述预应力高强混凝土管桩桩身的钢结构相对于现有技术,螺旋网筒能够大大地增加预应力管桩的抗剪承载力,预应力纵筋增强了抗弯性能,同时螺旋网筒与环形箍筋的相配合能够提高管桩桩身内的预应力纵筋之间的整体性,增强了抗震耗能性能,从而抵抗更大的水平荷载作用。
附图说明
图1为本发明所述预应力高强混凝土管桩桩身的钢结构的结构示意图。
图2为图1中A-A剖的截面图。
图中:1-预应力纵筋,2-螺旋网筒,3-环形箍筋。
具体实施方式
预应力高强混凝土管桩桩身的钢结构,包括若干预应力纵筋1、螺旋网筒2以及若干环形箍筋3,所述螺旋网筒2是由多根钢丝按一定的螺距以螺旋角旋向相反的方向交叉绑扎在一起形成的,所述若干预应力纵筋1沿圆周方向均匀的排布于螺旋网筒2形成的圆内,若干预应力纵筋1形成的圆与螺旋网筒2形成的圆同心,所述若干环形箍筋3由上而下均匀的绑扎于螺旋网筒2外侧。
进一步,所述螺旋网筒2的钢丝数量与预应力纵筋1的数量相等。可保证桩身沿环向抗弯承载力及抗剪承载力获得同步提高,保证了沿环向桩身抗震延性的一致性。
进一步,所述螺旋网筒2的钢丝上的任意一点的切线与水平线的夹角为60°。螺旋网筒2的钢丝与环形截面受剪时混凝土内部的主拉应力方向正交,可以最大幅度地提高桩身斜截面抗剪承载力。
Claims (3)
1.预应力高强混凝土管桩桩身的钢结构,其特征在于,包括若干预应力纵筋(1)、螺旋网筒(2)以及若干环形箍筋(3),所述螺旋网筒(2)是由多根钢丝按一定的螺距以螺旋角旋向相反的方向交叉绑扎在一起形成的,所述若干预应力纵筋(1)沿圆周方向均匀的排布于螺旋网筒(2)形成的圆内,若干预应力纵筋(1)形成的圆与螺旋网筒(2)形成的圆同心,所述若干环形箍筋(3)由上而下均匀的绑扎于螺旋网筒(2)外侧。
2.根据权利要求1所述的预应力高强混凝土管桩桩身的钢结构,其特征在于,所述螺旋网筒(2)的钢丝数量与预应力纵筋(1)的数量相等。
3.根据权利要求1或2所述的预应力高强混凝土管桩桩身的钢结构,其特征在于,所述螺旋网筒(2)的钢丝上的任意一点的切线与水平线的夹角为60°。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410096846.XA CN103821142B (zh) | 2014-03-17 | 2014-03-17 | 预应力高强混凝土管桩桩身的钢结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410096846.XA CN103821142B (zh) | 2014-03-17 | 2014-03-17 | 预应力高强混凝土管桩桩身的钢结构 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103821142A true CN103821142A (zh) | 2014-05-28 |
CN103821142B CN103821142B (zh) | 2015-08-12 |
Family
ID=50756410
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410096846.XA Active CN103821142B (zh) | 2014-03-17 | 2014-03-17 | 预应力高强混凝土管桩桩身的钢结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103821142B (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106481514A (zh) * | 2016-10-08 | 2017-03-08 | 霍尔果斯新国金新能源科技有限公司 | 塔筒及其钢筋笼 |
CN106499591A (zh) * | 2016-10-08 | 2017-03-15 | 霍尔果斯新国金新能源科技有限公司 | 塔筒及其钢筋笼 |
CN106759440A (zh) * | 2016-12-27 | 2017-05-31 | 中国铁塔股份有限公司盐城市分公司 | 铁塔地脚螺栓加固方法 |
CN113565090A (zh) * | 2021-08-06 | 2021-10-29 | 上海渝冠技术服务中心 | 一种双柱笼大直径预制管桩 |
CN115538419A (zh) * | 2022-10-27 | 2022-12-30 | 国网上海市电力公司 | 一种预应力混凝土管桩 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010048039A (ja) * | 2008-08-25 | 2010-03-04 | Japan Pile Corp | プレストレスト鉄筋コンクリート杭 |
CN103147439A (zh) * | 2013-02-07 | 2013-06-12 | 江苏东浦管桩有限公司 | 先张法预应力混凝土实心桩 |
CN203741831U (zh) * | 2014-03-17 | 2014-07-30 | 太原理工大学 | 预应力高强混凝土管桩桩身的钢结构 |
-
2014
- 2014-03-17 CN CN201410096846.XA patent/CN103821142B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010048039A (ja) * | 2008-08-25 | 2010-03-04 | Japan Pile Corp | プレストレスト鉄筋コンクリート杭 |
CN103147439A (zh) * | 2013-02-07 | 2013-06-12 | 江苏东浦管桩有限公司 | 先张法预应力混凝土实心桩 |
CN203741831U (zh) * | 2014-03-17 | 2014-07-30 | 太原理工大学 | 预应力高强混凝土管桩桩身的钢结构 |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106481514A (zh) * | 2016-10-08 | 2017-03-08 | 霍尔果斯新国金新能源科技有限公司 | 塔筒及其钢筋笼 |
CN106499591A (zh) * | 2016-10-08 | 2017-03-15 | 霍尔果斯新国金新能源科技有限公司 | 塔筒及其钢筋笼 |
CN106759440A (zh) * | 2016-12-27 | 2017-05-31 | 中国铁塔股份有限公司盐城市分公司 | 铁塔地脚螺栓加固方法 |
CN106759440B (zh) * | 2016-12-27 | 2019-07-09 | 中国铁塔股份有限公司盐城市分公司 | 铁塔地脚螺栓加固方法 |
CN113565090A (zh) * | 2021-08-06 | 2021-10-29 | 上海渝冠技术服务中心 | 一种双柱笼大直径预制管桩 |
CN115538419A (zh) * | 2022-10-27 | 2022-12-30 | 国网上海市电力公司 | 一种预应力混凝土管桩 |
Also Published As
Publication number | Publication date |
---|---|
CN103821142B (zh) | 2015-08-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103821142B (zh) | 预应力高强混凝土管桩桩身的钢结构 | |
CN105297617B (zh) | 双柱式摇摆隔震桥墩结构体系 | |
CN201310090Y (zh) | 预应力钢管混凝土管桩 | |
CN101748861A (zh) | Pvc管钢筋混凝土-钢管混凝土叠合构件 | |
CN203741831U (zh) | 预应力高强混凝土管桩桩身的钢结构 | |
CN105133793A (zh) | 空间约束的多腔管中管钢筋混凝土巨柱及施工方法 | |
CN101701485A (zh) | 中空钢管-钢筋混凝土叠合构件 | |
CN103114520A (zh) | 空腹式大跨填土复合波纹钢板拱桥结构 | |
CN105648900A (zh) | 一种新型复式钢管混凝土墩柱 | |
CN204753836U (zh) | 预制钢筋混凝土梁和叠合柱的连接节点 | |
CN103015629A (zh) | 一种内置pvc管增强钢筋混凝土组合柱 | |
CN101025035A (zh) | 钢管-钢骨混凝土异型柱 | |
CN204530422U (zh) | 一种用于frp管混凝土拱圈与基础的连接结构 | |
CN104652430A (zh) | 复合配筋部分预应力混凝土实心方桩及其制作方法 | |
CN103334427A (zh) | 异型预制高强混凝土薄壁钢管桩 | |
CN109972789A (zh) | 一种抗震式钢筋混凝土结构柱 | |
CN104088399A (zh) | 十字形钢管-钢骨再生混凝土组合柱 | |
CN204418422U (zh) | 一种混凝土组合剪力墙 | |
CN202644386U (zh) | 后张法预应力钢管高强混凝土叠合桥墩 | |
CN105672574A (zh) | 年轮式配筋高强混凝土圆柱 | |
CN102155013A (zh) | 先张法预应力混凝土动荷载桩 | |
CN215907080U (zh) | 一种大直接波纹管浆锚搭接装配式剪力墙 | |
CN205531020U (zh) | 配并束螺旋箍筋方钢管高强混凝土柱 | |
CN105019353B (zh) | 一种根部设置防屈曲耗能结构的方法及圆钢管桥墩 | |
CN205000555U (zh) | 空间约束的多腔管中管钢筋混凝土巨柱 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |