CN103801846B - Shake Large Steel tubing string docking connection method under load situation - Google Patents

Shake Large Steel tubing string docking connection method under load situation Download PDF

Info

Publication number
CN103801846B
CN103801846B CN201410082561.0A CN201410082561A CN103801846B CN 103801846 B CN103801846 B CN 103801846B CN 201410082561 A CN201410082561 A CN 201410082561A CN 103801846 B CN103801846 B CN 103801846B
Authority
CN
China
Prior art keywords
waveform
steel pipe
pipe
steel
interface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410082561.0A
Other languages
Chinese (zh)
Other versions
CN103801846A (en
Inventor
赵永杰
刘和平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Jinhai Modern Construction Technology Co ltd
Original Assignee
HUNAN JINHAI STEEL STRUCTURE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUNAN JINHAI STEEL STRUCTURE CO Ltd filed Critical HUNAN JINHAI STEEL STRUCTURE CO Ltd
Priority to CN201410082561.0A priority Critical patent/CN103801846B/en
Publication of CN103801846A publication Critical patent/CN103801846A/en
Application granted granted Critical
Publication of CN103801846B publication Critical patent/CN103801846B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K31/00Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups
    • B23K31/02Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups relating to soldering or welding

Abstract

The present invention relates to Large Steel tubing string docking attachment means and method under big steel building, more particularly to vibrations load situation.The steel pipe interface of large-scale steel pipe support column is generally handled using docking mode, and the processing of this docking mode there are following defect:Interface position welding quality requires very strict, it is difficult to reach inspection of quality requirement;Steel pipe column mother metal institutional framework changes in the range of steel pipe interface position both sides 50mm, crystal grain is roughened, and produces welding heat affected line;Under mechanical shock load action, weld bond position steel pipe column mother metal CRACKING ACCIDENT.In order to solve the above technical problems, making the butt welding of large-scale steel pipe support column reach safety, economy, service-strong requirement.The present invention is the installation waveform bushing pipe inside Large Steel tubing string interface, and waveform bushing pipe is installed inside steel pipe column interface, and waveform bushing pipe two ends waveform is welded on the inside of two steel pipe columns, and steel pipe column interface on the outside of waveform bushing pipe with welding together.

Description

Shake Large Steel tubing string docking connection method under load situation
Technical field:
The present invention relates to big steel building, more particularly under vibrations load situation Large Steel tubing string docking attachment means and Method.
Background technology:
Current many industrial factory buildings, civil buildings are all used as agent structure using steel construction.Some of industry or The agent structure of civilian vestibule is when from supporting member, it is considered to which component all directions stress equalization often uses large-scale steel pipe It is used as support column.By existing process processing method, the steel pipe interface of large-scale steel pipe support column is generally handled using docking mode, and The large-scale steel pipe support column interface of this docking mode processing generally there are following defect:
1:The steel pipe interface position weld seam welding quality of Large Steel tubing string requires very strict, weld bond scarfing cinder, polishing work Amount is very big, and labor strength is high;
2:Steel pipe column interface position weldquality is often difficult to reach inspection of quality requirement;
3:In the case of Large Steel tubing string interface position multiple-pass weld repeatedly welding, steel pipe interface position both sides 50mm scopes Interior steel pipe column mother metal institutional framework changes, crystal grain roughening, produces welding heat affected line.Under vibrations load action, Weld bond position steel pipe column mother metal cracking is easily caused, it is unfavorable to structure stress;
4:Under mechanical shock load action, the steel pipe interface docking location of steel pipe column is easy to occur weld bond cracking or welded Mouth position steel pipe column mother metal CRACKING ACCIDENT, scaffold building workload is big in the case of work high above the ground when reprocessing, and reprocesses construction extremely Inconvenience, reprocesses construction welding quality and is difficult to reach acceptance specification requirement, easily cause and repeatedly do over again, even result in body supports post office Portion or integral replacing, cause great engineering safety hidden danger.
The content of the invention:
In order to solve the above technical problems, it is an object of the invention to provide large-scale steel pipe under a kind of novel vibration loading condition Post docks attachment means and method, the butt welding of large-scale steel pipe support column is reached safety, economy, service-strong requirement.
Large Steel tubing string docking attachment means are pacified inside Large Steel tubing string interface under present invention vibrations load situation Fill waveform bushing pipe, it is characterised in that:Waveform bushing pipe is installed inside steel pipe column interface, waveform bushing pipe two ends waveform is welded On the inside of two steel pipe columns, steel pipe column interface on the outside of waveform bushing pipe with welding together.
Waveform bushing pipe is characterised by that thickness is waveform bushing pipe two ends wave peak width chi in steel pipe column thickness t or t+2mm, pipe Very little is 600 --- 900mm, two ends wave base width dimensions are 300 --- 600mm, crest, wave base radius are 50 --- 100mm, Form one of difference of height 100 --- 200mm waves.
Connection method of the present invention is carried out according to the following steps:
A:Blanking, mouth of pipe polishing are segmented by design requirement, stayed behind mouth of pipe mating interface gap, in system during steel pipe column production Make scene or job site ground to assemble the docking of steel pipe column main body, the interim tack-weld of interface position, tack weld thickness >= 3mm, length ﹥ 40mm, 300~600mm of spacing.
B:After in place, the every dimensional check of steel pipe column docking is errorless, you can install in place with waveform bushing pipe in managing.In pipe Waveform bushing pipe is installed uses interim tack-weld, tack weld thickness >=3mm, length ﹥ 40mm, 300~600mm of spacing in place.
C:After steel pipe column is completed, external interface position butt welding, the butt weld of external interface position are carried out first Carry out managing interior waveform bushing pipe and supervisor's waveform welding procedure again after welding quality passed examination, it is interim fixed during welding procedure Site welding line must be abraded using abrasive machine.
The present invention compared with prior art, under equal execution conditions, due to the installation of waveform bushing pipe in pipe, makes in pipe Waveform bushing pipe becomes the interior lining panel of the docking mouth of pipe, is again enhanced pipe joint position intensity.While bushing pipe waveform weld seam It it also avoid welding the heat affecting to pipeline quality of parent material;Avoid the generation of welding heat affected line, it is to avoid steel pipe column docking Weld bond polishing recondition, reduces welding procedure workload;It ensure that welding quality;Reduce labor strength;Avoid The influence that weld bond ftractures to construction quality, it is ensured that construction quality;Weld bond position steel pipe is female after the completion of avoiding project installation Material CRACKING ACCIDENT, eliminates when reprocessing scaffold building work in the case of work high above the ground, reprocesses construction welding quality and be difficult to reach and test Receive code requirement predicament;Avoid engineering safety hidden danger.Also reduce Construction Cost simultaneously.
Brief description of the drawings:
Fig. 1 is that the docking connection construction process that generally uses of steel pipe mating interface processing of original large-scale steel pipe support column is shown It is intended to;
Fig. 2 is Large Steel tubing string docking attachment means and method docking connection construction process under present invention vibrations load situation Schematic diagram.
Embodiment:
It is visible referring to the drawings 1, accompanying drawing 2, Large Steel tubing string docking attachment means and method under present invention vibrations load situation It is different from the building form of the steel pipe mating interface handling process of original steel pipe support post.
Original large-scale steel pipe mating interface position is in the case of multiple-pass weld repeatedly welding, and construction quality is difficult to be protected Card, while steel pipe mother metal institutional framework changes in the range of steel pipe interface position both sides 50mm, crystal grain is roughened, in vibrations Under load action, weld bond position steel pipe mother metal cracking is easily caused, it is unfavorable to structure stress.
The present invention installs waveform bushing pipe 2 inside the interface of Large Steel tubing string 1, and the two ends waveform 3 of waveform bushing pipe 2 is welded In the inner side of two steel pipe columns 1, the interface of steel pipe column 1 is formd one new large-scale with welding together on the outside of waveform bushing pipe 2 Mouth of pipe docking mode.Under equal execution conditions, due to the installation of waveform bushing pipe 2 in pipe, obtain pipe joint position intensity To strengthen;Bushing pipe waveform weld seam it also avoid welding the heat affecting to pipeline quality of parent material simultaneously;Due to waveform bushing pipe 2 in pipe Weld substrate effect, it is ensured that welding quality, reduce labor strength;Avoid shadow of the weld bond cracking to construction quality Ring, it is ensured that engineering total quality;Reduce Construction Cost.
Embodiment 1
Steel pipe column diameter 1000mm, thickness of pipe wall 20mm, waveform liner diameter 956mm, thickness of pipe wall 22mm, crest, wave base half Waveform bushing pipe two ends wave peak width size is 800mm in footpath 100mm, pipe, and two ends wave base width dimensions are 600mm.Welding quality It is qualified.
Embodiment 2
Steel pipe column diameter 800mm, thickness of pipe wall 16mm, waveform liner diameter 764mm, thickness of pipe wall 16mm, crest, wave base radius Waveform bushing pipe two ends wave peak width size is 700mm in 75mm, pipe, and two ends wave base width dimensions are 550mm.Welding quality is closed Lattice.
Embodiment 3
Steel pipe column diameter 600mm, thickness of pipe wall 12mm, waveform liner diameter 572mm, thickness of pipe wall 12mm, crest, wave base radius Waveform bushing pipe two ends wave peak width size is 600mm in 50mm, pipe, and two ends wave base width dimensions are 500mm.Welding quality is closed Lattice.

Claims (1)

  1. It is the waveform installed inside Large Steel tubing string interface 1. shaking Large Steel tubing string docking connection method under load situation Bushing pipe, the circular tube wall laminating steel pipe column wall of waveform bushing pipe, waveform bushing pipe thickness is in steel pipe column thickness t or t+2mm, pipe Waveform bushing pipe two ends wave peak width size is 600 --- 900mm, two ends wave base width dimensions are 300 --- 600mm, crest, ripple Bottom radius is 50 --- 100mm, form one of difference of height 100 --- 200mm waves, it is characterised in that connection method is pressed Following steps are carried out:
    A:Blanking, mouth of pipe polishing are segmented by design requirement, stayed behind the mouth of pipe mating interface gap during steel pipe column production, it is existing making Steel pipe column main body is docked on field or job site ground to be assembled, the interim tack-weld of interface position, tack weld thickness >=3mm, Length ﹥ 40mm, 300~600mm of spacing;
    B:After in place, the every dimensional check of steel pipe column docking is errorless, you can install in place with waveform bushing pipe in managing, the interior waveform of pipe Bushing pipe is installed uses interim tack-weld, tack weld thickness >=3mm, length ﹥ 40mm, 300~600mm of spacing in place;
    C:After steel pipe column is completed, external interface position butt welding is carried out first, and waveform bushing pipe two ends waveform is welded Carry out managing interior waveform bushing pipe and steel again on the inside of two steel pipe columns, after external interface position butt weld welding quality passed examination Tubing string waveform welding procedure, during welding procedure, interim tack-weld weld seam must be abraded using abrasive machine.
CN201410082561.0A 2014-03-09 2014-03-09 Shake Large Steel tubing string docking connection method under load situation Active CN103801846B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410082561.0A CN103801846B (en) 2014-03-09 2014-03-09 Shake Large Steel tubing string docking connection method under load situation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410082561.0A CN103801846B (en) 2014-03-09 2014-03-09 Shake Large Steel tubing string docking connection method under load situation

Publications (2)

Publication Number Publication Date
CN103801846A CN103801846A (en) 2014-05-21
CN103801846B true CN103801846B (en) 2017-08-22

Family

ID=50699487

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410082561.0A Active CN103801846B (en) 2014-03-09 2014-03-09 Shake Large Steel tubing string docking connection method under load situation

Country Status (1)

Country Link
CN (1) CN103801846B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107127470A (en) * 2017-06-30 2017-09-05 北京首钢建设集团有限公司 A kind of interface uses the pipe installation method for welding cage plate
CN108161267B (en) * 2018-01-30 2020-08-21 舞阳钢铁有限责任公司 Welding method for tensile rib plate of pipeline welded junction in high-temperature environment

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2578644Y (en) * 2002-11-09 2003-10-08 刘爱忠 Metal corrugated pipes

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0659553B2 (en) * 1983-11-16 1994-08-10 石川島播磨重工業株式会社 Welding method for lining pipe
CN102554484A (en) * 2012-01-11 2012-07-11 阮继成 Metal pipe welding method and metal pipe welding assembly
CN103056541A (en) * 2012-12-12 2013-04-24 山东杭萧钢构有限公司 Pipe truss or tubular column butt joint structure and butt joint method
CN203751545U (en) * 2014-03-09 2014-08-06 湖南金海钢结构股份有限公司 Connection device for butt joint of large-scale steel pipe columns under condition of vibration load

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2578644Y (en) * 2002-11-09 2003-10-08 刘爱忠 Metal corrugated pipes

Also Published As

Publication number Publication date
CN103801846A (en) 2014-05-21

Similar Documents

Publication Publication Date Title
CN103801846B (en) Shake Large Steel tubing string docking connection method under load situation
JP2015229173A (en) Welding jig for steel material and welding method
CN202571712U (en) Rapid positioning device for pipe butting
CN203336093U (en) Coal gas down-flow tube in blast furnace system
CN203751545U (en) Connection device for butt joint of large-scale steel pipe columns under condition of vibration load
CN104014168B (en) A kind of thickener bolted steel structure pond body
CN102162304B (en) Construction method for installing viscous damper
CN202152896U (en) Plastic-pipe welding structure with steel frame
CN109434315B (en) Processing and manufacturing process of integrated box shear wall structure
CN204174937U (en) The construction equipment of recyclable wire rope draw ring
CN202021448U (en) Aligning device of large-caliber pipeline
CN204248325U (en) A kind of sheet-metal duct assembling tool
CN206600529U (en) A kind of arch active support for large-diameter steel pipe inner spout
CN204921558U (en) A interim connecting device that is used for component and bracket to dock
CN205036103U (en) A push up tight reinforcing apparatus for concrete floor
CN207935583U (en) pipeline flexible connection structure
CN104439775B (en) A kind of welding method of diaphragm plate unit
CN203868513U (en) Guiding device for high-temperature high-pressure pipelines of waste heat boilers
CN204025904U (en) A kind of chimney counterpart device
CN103056541A (en) Pipe truss or tubular column butt joint structure and butt joint method
CN101870049A (en) Adjustable telescopic welding sleeve of steel-structure tube truss and air butt construction method
CN204983616U (en) Scaffold is wall pole even
CN205867936U (en) Diameter -variable absorption tower flip -chip transition device
CN104625553A (en) Tool for adjusting alignment tolerance of welding junction assembly
CN104264971A (en) Finalization scaffold wall connecting piece and using method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 411100 Jinhai Road, Jiuhua demonstration area, Xiangtan, Hunan 1

Patentee after: HUNAN JINHAI STEEL STRUCTURE CO.,LTD.

Address before: 410000 Jinhai Road, Jiuhua demonstration area, Xiangtan, Hunan 1

Patentee before: HUNAN JINHAI STEEL STRUCTURE Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221202

Address after: 416014 Ma'an Industrial Park, Hexi Town, Jishou City, Xiangxi Tujia and Miao Autonomous Prefecture, Hunan Province

Patentee after: Hunan Jinhai Modern Construction Technology Co.,Ltd.

Address before: 411100 Jinhai Road, Jiuhua demonstration area, Xiangtan, Hunan 1

Patentee before: HUNAN JINHAI STEEL STRUCTURE CO.,LTD.