CN103790230A - Novel post-earthquake self-reset concrete framework structural system - Google Patents

Novel post-earthquake self-reset concrete framework structural system Download PDF

Info

Publication number
CN103790230A
CN103790230A CN201410061677.6A CN201410061677A CN103790230A CN 103790230 A CN103790230 A CN 103790230A CN 201410061677 A CN201410061677 A CN 201410061677A CN 103790230 A CN103790230 A CN 103790230A
Authority
CN
China
Prior art keywords
cup
shaped foundation
foundation
frame column
reinforcing bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410061677.6A
Other languages
Chinese (zh)
Other versions
CN103790230B (en
Inventor
高娇娇
王威
苏经宇
马东辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Science and technology innovation service center of Hunan Miluo circular economy industrial park
Original Assignee
Beijing University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing University of Technology filed Critical Beijing University of Technology
Priority to CN201410061677.6A priority Critical patent/CN103790230B/en
Publication of CN103790230A publication Critical patent/CN103790230A/en
Application granted granted Critical
Publication of CN103790230B publication Critical patent/CN103790230B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The invention relates to a novel post-earthquake self-reset concrete framework structural system, and belongs to the technical field of earthquake prevention and disaster reduction. The initial rigidity of an embedded type cup-shaped foundation is basically the same as the rigidity of a cast-in-place concrete structure, under the condition of a small interlayer displacement angle, prestressed steel keeps elasticity, energy consummation steel bars enter the plastic state to dissipate energy, and the embedded type cup-shaped foundation can reset to the initial position after the earthquake action. Compared with the prior art, the novel post-earthquake self-reset concrete framework structural system overturns a traditional concrete structural building foundation, and basically solves the difficult problems that concrete structures are not easy to assemble and poor in ductility. Compared with the traditional concrete structural foundation, the novel post-earthquake self-reset concrete framework structural system has the advantages of being high in safety performance, small in environmental pollution, few in accident, low in manufacturing cost of projects and the like.

Description

Self-resetting concrete frame structure system after a kind of novel shake
Technical field
The present invention relates to Self-resetting concrete frame structure system after a kind of novel shake, belong to protection against and mitigation of earthquake disasters technical field.
Background technology
In earthquake, collapsing of building structure is to threaten people's life safety and the topmost reason that causes any property loss.Wenchuan and Yaan earthquake show that concrete structure anti-seismic performance is not good, weak foundation, China's concrete structure is main architecture structure form at present, especially prestressed reinforced concrete construction technology is in international most advanced level, the application of prestressing technique can reduce the amount of deflection of beam, increase the span of beam, also can play the effect of the rear Self-resetting of shake.Performance prestressing technique advantage, applies it on concrete frame basis, can improve anti-seismic performance and the self-resetting capability of cup-shaped foundation, and concrete frame basic engineering obtains the fine or not quality that directly has influence on concrete structure.If concrete component does not destroy, lost efficacy in basis, just do not reach the original intention of seismic design of structures, more can not meet the design concept of " strong basis plinth ".
In recent years, concrete anti-earthquake research based on performance design and design are conceived to promote the rear performance of concrete structure shake more and more, to guarantee the safety of China's primary structure form-concrete structure, to by the ingehious design to structure, reduce to greatest extent earthquake loss.Compare with basis with superstructure, the anti-seismic performance of superstructure and basic junction is more important.But in earthquake, junction does not show due ductility and good anti-seismic performance, and has occurred prematurely the phenomenon such as gap, crackle.After earthquake, even if structure does not collapse, also can be because of excessive expendable plasticity permanent set has occurred, and finally still need to be removed, to rebuild.At present, concrete superstructure becomes one of the primary study in concrete structure field content with basic being connected.
Summary of the invention
The object of the invention is to propose Self-resetting concrete frame structure system after a kind of novel shake of one that belongs to protection against and mitigation of earthquake disasters technical field, its object is to improve concrete structure anti-seismic performance, repairs difficulty and maintenance cost after reducing shake.After novel shake, Self-resetting concrete frame structure cup-shaped foundation basic comprising comprises the members such as frame column, cup-shaped foundation, prestressed reinforcement, power consumption reinforcing bar.Concrete structure is in work progress, cup-shaped foundation and frame column are prefabricated units, frame column has run through power consumption reinforcing bar while construction in workshop, reserving hole by power consumption reinforcing bar through cup-shaped foundation, and apply prestressing force, utilize permanent ground tackle to be fixed on the bottom of cup-shaped foundation, then with performance prestressed high reinforcing bar the reserving hole through frame column and cup-shaped foundation, this prestressed reinforcement make frame column with basic be connected tightr.Outstanding cone-shaped end is arranged at frame column bottom, and cup-shaped foundation is provided with cone tank in relevant position, and such mosaic joint can guarantee that frame column is connected closely with cup-shaped foundation, and larger opposing shearing is provided.The power consumption reinforcing bar main dissipative member of type of attachment for this reason, makes it have better Hysteresis Behavior, and ductility factor greatly improves.
For achieving the above object, the technical solution used in the present invention is Self-resetting concrete frame structure system after a kind of novel shake, the initial stiffness of mosaic cup-shaped foundation and the rigidity of cast-in-place concrete structure are substantially suitable, the in the situation that of less at relative storey displacement angle, prestressed reinforcement still keeps elasticity, power consumption reinforcing bar enters plastic state with dissipation energy, and after geological process, mosaic cup-shaped foundation can be returned to its initial position.
Prestressed applying makes concrete frame structure can obtain higher safety factor.The major advantage of this frame structure system: have self-centering ability, thereby greatly reduced the rear permanent set of shake; Initial stiffness is large similar to cast-in-place concrete structure rigidity; Geological process lower prestress reinforcing bar keeps elasticity, and nonelastic deformation concentrates on power consumption reinforcing bar, and carrys out dissipation energy by the nonelastic deformation of power consumption reinforcing bar; After greatly reducing shake, repair difficulty and cost.
Compared with prior art, the present invention has following beneficial effect.
1, after novel shake in Self-resetting concrete frame structure system, the cup-shaped foundation, the frame column that adopt are all prefabricated units, can be in factory process, assemble job site, and such construction method can solve the difficult problem that prefabricated concrete structure basis is difficult for assembling.
2, Self-resetting concrete frame structure system after described novel shake, adopt prefabricated units to carry out Assembling completely, cancel the traditional approach of job site concreting, effectively guarantee construction quality, the environment pollution of having avoided concreting to cause completely, realize site operation " anhydrous, without fire, dustless " three without standard, reduced the generation of the hazardous accidents such as fire.When the present invention removes at member, can recycle efficiently, reduce building waste, real realization the theory of environmental protection, be concrete frame structure a kind of green, sustainable development basis.
3, Self-resetting concrete frame structure system after described novel shake, adopts prestressing force Self-resetting base form, has realized the Self-resetting of shake posterior nodal point, has greatly reduced the rear rehabilitation cost of shake; Improve the anti-seismic performance of basis and superstructure junction, thereby improve the anti-seismic performance of frame structure system.
4, after the novel shake that the present invention proposes, Self-resetting concrete frame structure system is to the overturning of traditional concrete structure building foundation, and has substantially solved the poor difficult problem of difficult assembling, ductility of concrete structure; The plurality of advantages such as compared with traditional concrete structure basis, it is high that it has security performance, and environment pollution is little, and the few and construction costs of security incident is low.
Accompanying drawing explanation
Fig. 1 is Self-resetting suspension column position view of the present invention.
Fig. 2 is the generalized section of Self-resetting of the present invention basis and frame column.
Fig. 3 is the fractionation schematic diagram of Self-resetting of the present invention basis and frame column.
Fig. 4 is cup-shaped foundation floor map of the present invention.
Fig. 5 is cup-shaped foundation side elevation schematic diagram of the present invention.
Fig. 6 is frame column generalized section of the present invention.
Fig. 7 is the three-dimensional assembling drawing of frame structure system of the present invention.
In figure: 1, power consumption reinforcing bar, 2, prestressed reinforcement, 3, permanent ground tackle, 4, cup-shaped foundation, 5, frame column, 6, pea gravel concreten, 7, cone-shaped end, 8, the reserved power consumption of cup-shaped foundation reinforcing bar hole, 9, the reserved prestressed reinforcement hole of cup-shaped foundation, 10, cone tank, 11, the reserved prestressed reinforcement hole of frame column.
The specific embodiment
Below in conjunction with accompanying drawing, the present invention is described in detail.
As shown in Fig. 1-7, Self-resetting concrete frame structure system after a kind of novel shake, this frame structure system comprises lower floor's frame foundation, upper strata concrete structure; Lower floor's frame foundation is made up of frame set; Every framing group comprises cup-shaped foundation 4, frame column 5; Described cup-shaped foundation 4 is platform shape cone structure, the platform shape cone platform of cup-shaped foundation 4 is provided with the groove step with frame column 5 cylindroid assemblings, in the middle of groove step, be provided with cone tank 10, cone tank 10 two ends of groove step plane are provided with the reserved power consumption of cup-shaped foundation reinforcing bar hole 8 side by side, and cone tank 10 intermediate layers of groove step plane are provided with the reserved prestressed reinforcement hole 9 of cup-shaped foundation side by side; The reserved power consumption of described cup-shaped foundation reinforcing bar hole 8 is parallel construction with the reserved prestressed reinforcement hole 9 of cup-shaped foundation.
Frame column 5 is cylindricality conehead structure, and frame column 5 one end are cone-shaped end 7, and can match with the cone tank of cup-shaped foundation 4 10, and the other end is cylindrical cross-section; In the middle of frame column 5, being provided with the reserved prestressed reinforcement hole 11 of frame column aligns with the reserved prestressed reinforcement hole 9 of cup-shaped foundation side by side of cup-shaped foundation 4; In frame column 5, be furnished with the power consumption reinforcing bar 1 coordinating with the reserved power consumption of the cup-shaped foundation reinforcing bar hole 8 in cup-shaped foundation 4; Prestressed reinforcement 2 is reserved the reserved prestressed reinforcement hole 9 of prestressed reinforcement hole 11, cup-shaped foundation by frame column cup-shaped foundation 4 is connected with frame column 5; Power consumption reinforcing bar 1 is fixing by permanent ground tackle 3 with prestressed reinforcement 2; Described pea gravel concreten 6 is filled in cylindroid and the cup-shaped foundation 4 groove surface contact positions of frame column 5.
After novel shake of the present invention in Self-resetting concrete frame structure cup-shaped foundation, frame column 5 has run through power consumption reinforcing bar 1 when prefabricated, in the time that frame column 5 and cup-shaped foundation 4 are assembled, power consumption reinforcing bar 1, through the power consumption reinforcing bar reserving hole 8 of cup-shaped foundation, utilizes permanent ground tackle 3 power consumption reinforcing bar 1 to be anchored in to the bottom of cup-shaped foundation 4.
After described novel shake, in Self-resetting concrete frame structure cup-shaped foundation, cup-shaped foundation 4 positions are at post and ground connecting place; After completing the assembling of every framing and joining, build upper strata concrete structure, thereby form concrete frame structure system.
After described novel shake, in Self-resetting concrete frame structure cup-shaped foundation, described cup-shaped foundation 4 is as follows with the connection procedure of frame column 5.
S1 is at the prefabricated cup-shaped foundation power consumption reinforcing bar hole 8 of factory or job site and reserved prestressed reinforcement hole 9.
S2 completes after the prefabricated work of cup-shaped foundation power consumption reinforcing bar hole 8 and reserved prestressed reinforcement hole 9, assemble at the construction field (site), by vertical frame column 5 cup-shaped foundation 4 that inserts, the cone-shaped end 7 of frame column 5 bottoms inserts in the cone tank 10 of cup-shaped foundation 4 just, the power consumption reinforcing bar 1 of frame column inserts in the reserving hole 8 of cup-shaped foundation 4, now utilize total powerstation test block trestle 5 whether vertical with cup-shaped foundation 4, after guaranteeing vertically, utilize permanent ground tackle 3 that power consumption reinforcing bar 1 is carried out to anchoring in cup-shaped foundation 4 bottoms.
After 1 anchoring of S3 power consumption reinforcing bar, prestressed reinforcement 2 is run through to the reserving hole 9 of frame column reserving hole 11 and cup-shaped foundation 4, two ends apply prestressing force, prestressed size, by calculative determination in early stage, utilizes permanent ground tackle 3 that prestressed reinforcement 2 is anchored at respectively to frame column 5 tops and cup-shaped foundation 4 bottoms.
After S4 assembling, by cup-shaped foundation 4 and frame column 5 integral lifting, be installed on ground, again use the verticality of total powerstation test block trestle, after guaranteeing vertically, build pea gravel concreten at the gap place of cup-shaped foundation and frame column.
After S5 completes the assembling of every framing and joins, build upper strata concrete structure, thereby form concrete frame structure system.

Claims (4)

1. a Self-resetting concrete frame structure system after novel shake, is characterized in that: this frame structure system comprises lower floor's frame foundation, upper strata concrete structure; Lower floor's frame foundation is made up of frame set; Every framing group comprises cup-shaped foundation (4), frame column (5); Described cup-shaped foundation (4) is platform shape cone structure, the platform shape cone platform of cup-shaped foundation (4) is provided with the groove step with the assembling of frame column (5) cylindroid, in the middle of groove step, be provided with cone tank (10), cone tank (10) two ends of groove step plane are provided with cup-shaped foundation reserved power consumption reinforcing bar hole (8) side by side, and cone tank (10) intermediate layer of groove step plane is provided with the reserved prestressed reinforcement hole (9) of cup-shaped foundation side by side; Described cup-shaped foundation reserved power consumption reinforcing bar hole (8) is parallel construction with the reserved prestressed reinforcement hole (9) of cup-shaped foundation;
Frame column (5) is cylindricality conehead structure, and frame column (5) one end is cone-shaped end (7), and can match with the cone tank of cup-shaped foundation (4) (10), and the other end is cylindrical cross-section; In the middle of frame column (5), being provided with the reserved prestressed reinforcement hole (11) of frame column aligns with the reserved prestressed reinforcement hole (9) of cup-shaped foundation side by side of cup-shaped foundation (4); In frame column (5), be furnished with the power consumption reinforcing bar (1) coordinating with the cup-shaped foundation reserved power consumption reinforcing bar hole (8) in cup-shaped foundation (4); Prestressed reinforcement (2) is reserved the reserved prestressed reinforcement hole (9) of prestressed reinforcement hole (11), cup-shaped foundation by frame column cup-shaped foundation (4) is connected with frame column (5); Power consumption reinforcing bar (1) is fixing by permanent ground tackle (3) with prestressed reinforcement (2); Described pea gravel concreten (6) is filled in cylindroid and cup-shaped foundation (4) the groove surface contact position of frame column (5).
2. according to the connection procedure of lower floor's frame foundation described in claim 1, it is characterized in that:
S1 is at factory or job site prefabricated cup-shaped foundation power consumption reinforcing bar hole (8) and reserved prestressed reinforcement hole (9);
S2 completes after the prefabricated work of cup-shaped foundation power consumption reinforcing bar hole (8) and reserved prestressed reinforcement hole (9), assemble at the construction field (site), frame column (5) is vertically inserted to cup-shaped foundation (4), the cone-shaped end (7) of frame column (5) bottom inserts in the cone tank (10) of cup-shaped foundation (4) just, the power consumption reinforcing bar (1) of frame column inserts in the reserving hole (8) of cup-shaped foundation (4), now utilize total powerstation test block trestle (5) whether vertical with cup-shaped foundation (4), after guaranteeing vertically, utilize permanent ground tackle (3) reinforcing bar (1) that will consume energy to carry out anchoring in cup-shaped foundation (4) bottom,
After the anchoring of S3 power consumption reinforcing bar (1), prestressed reinforcement (2) is run through to the reserving hole (9) of frame column reserving hole (11) and cup-shaped foundation (4), two ends apply prestressing force, prestressed size, by calculative determination in early stage, utilizes permanent ground tackle (3) that prestressed reinforcement (2) is anchored at respectively to frame column (5) top and cup-shaped foundation (4) bottom;
After S4 assembling, by cup-shaped foundation (4) and frame column (5) integral lifting, be installed on ground, again use the verticality of total powerstation test block trestle, after guaranteeing vertically, build pea gravel concreten at the gap place of cup-shaped foundation and frame column;
After S5 completes the assembling of every framing and joins, build upper strata concrete structure, thereby form concrete frame structure system.
3. Self-resetting concrete frame structure system after the novel shake of one according to claim 1, it is characterized in that: after described novel shake in Self-resetting concrete frame structure cup-shaped foundation, frame column (5) has run through power consumption reinforcing bar (1) when prefabricated, in the time that frame column (5) is assembled with cup-shaped foundation (4), power consumption reinforcing bar (1) is through the power consumption reinforcing bar reserving hole (8) of cup-shaped foundation, utilizes permanent ground tackle (3) reinforcing bar (1) that will consume energy to be anchored in the bottom of cup-shaped foundation (4).
4. Self-resetting concrete frame structure system after the novel shake of one according to claim 1, is characterized in that: after described novel shake, in Self-resetting concrete frame structure cup-shaped foundation, cup-shaped foundation (4) position is at post and ground connecting place; After completing the assembling of every framing and joining, build upper strata concrete structure, thereby form concrete frame structure system.
CN201410061677.6A 2014-02-24 2014-02-24 Novel post-earthquake self-reset concrete framework structural system Active CN103790230B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410061677.6A CN103790230B (en) 2014-02-24 2014-02-24 Novel post-earthquake self-reset concrete framework structural system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410061677.6A CN103790230B (en) 2014-02-24 2014-02-24 Novel post-earthquake self-reset concrete framework structural system

Publications (2)

Publication Number Publication Date
CN103790230A true CN103790230A (en) 2014-05-14
CN103790230B CN103790230B (en) 2017-01-18

Family

ID=50666247

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410061677.6A Active CN103790230B (en) 2014-02-24 2014-02-24 Novel post-earthquake self-reset concrete framework structural system

Country Status (1)

Country Link
CN (1) CN103790230B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105649101A (en) * 2016-01-22 2016-06-08 湖州职业技术学院 Reinforced concrete vibration-isolated foundation
CN108049517A (en) * 2018-01-11 2018-05-18 重庆大学 A kind of external replaceable energy consuming components Self-resetting RC frame foot joints
CN109267584A (en) * 2018-11-09 2019-01-25 沈阳建筑大学 Assembly concrete prismoid shaped basis and column steel connection structure and assembly method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09100538A (en) * 1995-10-06 1997-04-15 Kajima Corp Foundation structure for building
CN2330704Y (en) * 1998-06-12 1999-07-28 李岭群 Castin-situ vibration-damping device for foundation socket
CN102409606A (en) * 2011-07-29 2012-04-11 清华大学 Self-resetting pier column structural system with built-in energy dissipation assembly and implementing method for self-resetting piper column structural system
CN103276793A (en) * 2013-06-08 2013-09-04 北京工业大学 Hollow irregular column multi-layer high-rise assembling steel frame-central support system
CN103362210A (en) * 2013-07-08 2013-10-23 中国矿业大学 Prestress assembly frame structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09100538A (en) * 1995-10-06 1997-04-15 Kajima Corp Foundation structure for building
CN2330704Y (en) * 1998-06-12 1999-07-28 李岭群 Castin-situ vibration-damping device for foundation socket
CN102409606A (en) * 2011-07-29 2012-04-11 清华大学 Self-resetting pier column structural system with built-in energy dissipation assembly and implementing method for self-resetting piper column structural system
CN103276793A (en) * 2013-06-08 2013-09-04 北京工业大学 Hollow irregular column multi-layer high-rise assembling steel frame-central support system
CN103362210A (en) * 2013-07-08 2013-10-23 中国矿业大学 Prestress assembly frame structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105649101A (en) * 2016-01-22 2016-06-08 湖州职业技术学院 Reinforced concrete vibration-isolated foundation
CN108049517A (en) * 2018-01-11 2018-05-18 重庆大学 A kind of external replaceable energy consuming components Self-resetting RC frame foot joints
CN108049517B (en) * 2018-01-11 2024-02-06 重庆大学 External replaceable energy consumption assembly self-resetting RC frame column foot node
CN109267584A (en) * 2018-11-09 2019-01-25 沈阳建筑大学 Assembly concrete prismoid shaped basis and column steel connection structure and assembly method

Also Published As

Publication number Publication date
CN103790230B (en) 2017-01-18

Similar Documents

Publication Publication Date Title
CN103696498B (en) Easily steel hetermorphiscal column-center support is repaired after a kind of shake
CN205875395U (en) Prestressing force is from restoring to throne assembled concrete frame beam column node
CN103669570B (en) A kind of novel shake easily repairs steel hetermorphiscal column-prestressing force center support afterwards
CN104895249B (en) It is a kind of can in-situ immobilization combination suspension column
CN103669650B (en) Easily steel shaped pile frame-steel plate shear force wall is repaired after a kind of shake
CN103711215B (en) Easily steel shaped pile frame-accentric support frame is repaired after a kind of shake
CN103669594B (en) Steel Framed Structure with Special-Shaped Columns node is easily repaired after a kind of shake
CN102758499A (en) Precast prestressed steel girder with post-seismic restorable function
CN103696503A (en) Novel post-earthquake easy-to-repair steel irregular column framework
CN103669567B (en) Easily steel hetermorphiscal column-prestressing force accentric support frame is repaired after a kind of shake
CN206256622U (en) Damage with runback bit function can repair assembled coupled column
CN103790259B (en) Self-resetting concrete frame-central support structure system after a kind of shake
CN103711329A (en) Method for reinforcing structure by means of method of externally attaching steel-reinforced concrete framework
CN103790230A (en) Novel post-earthquake self-reset concrete framework structural system
CN205875394U (en) Antidetonation concrete beam column that dry process is connected
CN103790258B (en) Self-resetting concrete frame-eccentrically braces structure system after a kind of shake
CN102011434A (en) BRB (buckling restrained brace) concrete frame beam-column joint
CN103953134A (en) Shear wall with energy-consuming strips embedded between border and built-in steel plates and steel braces, and making method
CN112096115A (en) Reinforcing structure for improving earthquake-proof performance of earthquake-damaged RC frame structure and construction method
CN103669722B (en) Steel Framed Structure with Special-Shaped Columns suspension column is easily repaired after a kind of shake
CN208152256U (en) A kind of repair type super high rise structure
CN103195162B (en) Standard unit assembled energy dissipating and damping structure system
CN103790172B (en) Self-resetting concrete frame structure cup-shaped foundation after shake
CN213509716U (en) Reinforcing structure for improving earthquake damage RC frame structure earthquake resistance
CN209637263U (en) Additional lateral resisting Cable Structure for reinforcing masonry structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200824

Address after: Room 302, No. 8319, Yanshan Road, Bengbu City, Anhui Province

Patentee after: Bengbu Lichao Information Technology Co.,Ltd.

Address before: 100124 Chaoyang District, Beijing Ping Park, No. 100

Patentee before: Beijing University of Technology

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201130

Address after: 414400 100m northwest of the intersection of Longzhou North Road and Longzhou South Road, Miluo City, Yueyang City, Hunan Province

Patentee after: Science and technology innovation service center of Hunan Miluo circular economy industrial park

Address before: Room 302, No. 8319, Yanshan Road, Bengbu City, Anhui Province

Patentee before: Bengbu Lichao Information Technology Co.,Ltd.

TR01 Transfer of patent right