CN103774697B - Waterproofing of movement joints structure can inspection system and construction method thereof - Google Patents
Waterproofing of movement joints structure can inspection system and construction method thereof Download PDFInfo
- Publication number
- CN103774697B CN103774697B CN201410056876.8A CN201410056876A CN103774697B CN 103774697 B CN103774697 B CN 103774697B CN 201410056876 A CN201410056876 A CN 201410056876A CN 103774697 B CN103774697 B CN 103774697B
- Authority
- CN
- China
- Prior art keywords
- deformation joint
- groove
- discharge opening
- discharge hose
- roll material
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Building Environments (AREA)
Abstract
The invention discloses a kind of waterproofing of movement joints structure can inspection system and construction method thereof, the method comprises: in deformation joint both sides with existing technology, PVC roll material is adopted to form embedding anchor formula water-tight structure, PVC roll material embedding distortion is made to stitch interior formation groove, the PVC roll material longitudinally segmentation of seam indent channel-shaped is separated, form multistage pilot trench, every cross-talk groove is equipped with a discharge opening, discharge hose is connect under discharge opening, discharge hose passes from top to bottom and extruded sheet runs through through hole, and be placed in and conveniently contact part, short tube is inserted in the lower end of discharge hose, the lower end of short tube is provided with capping apparatus able to turn on or off.The present invention, arranges leak device by subregion, and the infiltration that may exist in deformation joint is caused daylight, can accomplish visual inspection at any time, to the seepage of deformation joint, can not only find early, can also reduce maintenance range, make increase flexibility maintenance time.
Description
Technical field
The present invention relates to the realm of building construction, being specifically related to waterproofing of movement joints structure can inspection system and construction method thereof.
Background technology
Basement roof and other outdoor horizontal deformation joint ubiquity Seepages, often have the saying that ten seams nine leak in industry.Produce the reason of this phenomenon except design and construction may have problems, cannot carry out operating repairs, cause its seepage and put aside into trouble, be also very important factor.
Traditional deformation joint structure cannot check, if there is seepage, can only develop as one pleases, until cause damage, outside being revealed in, just can be found.And during maintenance, cannot breakthrough be confirmed, thus have to carry out large-scale destructiveness and overhaul.
In view of this, be badly in need of seeking a kind of novel deformation joint structure, can check easily at any time, thus just be found before seepage does not lead to trouble, to greatly reduce its infringement.
Summary of the invention
Technical problem to be solved by this invention is the problem that deformation joint structure cannot check seepage.
In order to solve the problems of the technologies described above, the technical solution adopted in the present invention is to provide a kind of waterproofing of movement joints structure can inspection system, comprising:
Groove, the top being recessed into deformation joint by PVC roll material is formed, the two ends of described PVC roll material are fixed on the building body end face of deformation joint both sides respectively by the sticky anchor mode of embedding, extruded sheet be arranged on described PVC roll material below and between the building body being folded in deformation joint both sides; Described groove is multistage pilot trench by multiple separates along its length;
Leak device, comprise discharge hose, described every cross-talk groove is equipped with a discharge opening, the relevant position of described extruded sheet is provided with corresponding with described discharge opening runs through through hole, described discharge hose is connected with the lower end of described discharge opening through the through hole that runs through on described extruded sheet from top to bottom, and the external part of described discharge hose is provided with plugging device.
In said system, described plugging device is capping, and the lower end of described discharge hose is fitted with short tube, and described capping spiral shell is contained in the lower end of described short tube.
In said system, the top and bottom of described discharge hose are fixed respectively by stainless steel pipe collar and described discharge opening and described short tube.
In said system, the cross section of described partition is U-shaped, and mid portion cuts off perpendicular to described groove, and two side is adhesively fixed with the sidewall of described groove respectively.
In said system, described plugging device is binder clip.
Present invention also offers a kind of waterproofing of movement joints structure can the construction method of inspection system, comprises the following steps:
Sandwiched extruded sheet in deformation joint, the end face of extruded sheet is lower than the end face of deformation joint both sides building body;
PVC roll material is laid at the end face of deformation joint both sides building body, and make PVC roll material be recessed into formation groove in deformation joint, the two ends of PVC roll material are fixed on the building body end face of deformation joint both sides respectively by the sticky anchor mode of embedding, are multistage pilot trench by multiple separates along its length in groove;
Every cross-talk groove is equipped with a discharge opening, the relevant position of extruded sheet is provided with corresponding with discharge opening runs through through hole, discharge hose penetrates running through through hole and being connected to the lower end of discharge opening on extruded sheet from top to bottom, whether the lower end of discharge hose is provided with plugging device, open plugging device and can inspect deformation joint and seep water.
In above-mentioned construction method, the lower end of described discharge hose is fitted with short tube, and described plugging device is capping, and described capping spiral shell is contained in the lower end of described short tube.
In above-mentioned construction method, the top and bottom of described discharge hose are fixed respectively by stainless steel pipe collar and described discharge opening and described short tube.
In above-mentioned construction method, the cross section of described partition is U-shaped, and mid portion cuts off perpendicular to described groove, and two side is adhesively fixed with the sidewall of described groove respectively.
In above-mentioned construction method, described plugging device is binder clip.
The present invention, by subregion, leak device is set, and the infiltration that may exist in deformation joint is caused daylight, visual inspection at any time can be accomplished, to the seepage of deformation joint, can not only find early, maintenance range can also be reduced, make increase flexibility maintenance time, that is: inspection door is become daily sluicing flow guide system, treat that suitable chance is keeped in repair again.When seepage is not serious, even can substitute maintenance with safeguarding.
Accompanying drawing explanation
Fig. 1 is that in the present invention, waterproofing of movement joints structure can the top view of inspection system;
Fig. 2 is the A-A sectional drawing in Fig. 1;
Fig. 3 is the B-B sectional drawing in Fig. 1;
Fig. 4 is that in the present invention, waterproofing of movement joints structure can the sectional drawing of embodiment 2 of inspection system.
Detailed description of the invention
The invention provides a kind of waterproofing of movement joints structure can inspection system and construction method thereof, by subregion, leak device is set, the infiltration that may exist in deformation joint is caused daylight, visual inspection at any time can be accomplished, Timeliness coverage also finds out seepage scope, be convenient to specifically determine maintenance program, reduce maintenance and destroy.Below in conjunction with specific embodiments and the drawings, the present invention is described in detail.
Embodiment 1.
As shown in Figure 1, Figure 2 and Figure 3, waterproofing of movement joints structure provided by the invention can comprise the groove 10 be arranged on deformation joint and the leak device 40 be arranged in groove 10 by inspection system.Wherein, groove 10 is positioned at the upper end of deformation joint.
Conveniently design, extruded sheet 70 is folded with between the both sides building body 60 of deformation joint bottom, the end face of extruded sheet 70 is lower than the end face of deformation joint both sides building body 60, with existing technology, PVC roll material is adopted to form embedding anchor formula water-tight structure, namely lay PVC roll material 50 at the end face of deformation joint both sides building body 60, and form groove 10 within the top making PVC roll material 50 be recessed into deformation joint.The two ends of PVC roll material 50 are fixed on the building body 60 of deformation joint both sides respectively by the sticky anchor formula of embedding, and arrange waterstop.Groove 10 is separated into multistage pilot trench (gutter) by multiple partition 20 along its length, and partition 20 adopts butyronitrile rubber foam soft board, and thickness is about 10mm, and profile and groove 10 coincide, and adopt extraordinary MR adhesive and PVC roll material to seal cementation.The setting position of partition 20 and spacing should be determined in conjunction with the flat Section Design of deformation joint, and be not generally located at complexity place, flat cutting face, length is no more than 50m.
In the present embodiment, the cross section of partition 20 is U-shaped, and mid portion cuts off perpendicular to groove 10, and two side is adhesively fixed with the sidewall of groove 10 respectively.
Leak device 40 comprises discharge opening 41 and discharge hose 43, and discharge opening 41 adopts aluminum alloy material, and discharge hose 43 adopts transparent PVC.
Every cross-talk groove is equipped with a discharge opening 41, the end face outer circumference surface of discharge opening 41 is provided with collar flange, the thick 2.0mm of collar flange, external diameter lOmm, and the lower end of discharge opening 41 is that internal diameter is not less than 8mm, wall thickness 2.0mm, the straight tube of long 30mm.The external surface of straight tube is provided with helical form concave, to increase frictional resistance.
PVC roll material is opened the through hole of a diameter 6mm, and particular location should be located at deformation joint bottom space and comparatively open wide place, i.e. clear, easily touches, and has operating space.Discharge opening 41 inserts in through hole, and the diameter due to through hole is slightly less than the external diameter of the straight tube of discharge opening 41, and therefore, after being inserted in aluminium alloys discharge opening 41, PVC roll material natural shrinking, holds discharge opening 41 tightly.Before being inserted in aluminium alloys discharge opening 41, first inside annular flange flange, inner corner trim place applies extraordinary MR adhesive.The relevant position of extruded sheet 70 is provided with corresponding with discharge opening 41 runs through through hole 30, and discharge hose 43 penetrates from top to bottom and extruded sheet 70 runs through through hole 30, and is connected to the lower end of discharge opening 41, and the external part of discharge hose 43 is provided with plugging device.
In the present embodiment, plugging device is capping 45, and an aluminium alloys short tube 44 is inserted in discharge hose 43 lower end, the lower end of aluminium alloys short tube 44 is stretched out discharge hose 43 and is provided with screw thread, capping 45 spiral shell is contained in the lower end of aluminium alloys short tube 44, is blocked by discharge hose 43, avoids infiltration to flow out.The outer circumference surface of capping is provided with vertical striped, when being intended to rotarily open or close, increases frictional force.
The length of discharge hose 43 is exposed the position of inspection door depending on end and determines, and can apart from the requirement of ground 1.5m after pulling out with full regular inspection apparent time.Be received at ordinary times in furred ceiling, an exposure 20mm.
The top and bottom of discharge hose 43 are respectively equipped with pipe collar 42, discharge hose 43 and discharge opening 41 and aluminium alloys short tube 44 are fixed by pipe collar 42.
Embodiment 2.
As shown in Figure 4, the difference of the present embodiment and embodiment 1 is that the lower end of discharge hose 43 does not arrange aluminium alloys short tube and capping, but uses binder clip clamp.That is, in example 2, what plugging device adopted is binder clip 46.The present embodiment, structure is relatively simple, and cost is low, is applicable to the occasion not having aesthetic.
In conjunction with above-mentioned introduction, waterproofing of movement joints structure provided by the invention can inspection system construction method comprise the following steps:
Sandwiched extruded sheet in deformation joint, the end face of extruded sheet is lower than the end face of deformation joint both sides building body;
PVC roll material is laid at the end face of deformation joint both sides building body, and make PVC roll material be recessed into formation groove in deformation joint, the two ends of PVC roll material are fixed on the building body end face of deformation joint both sides respectively by the sticky anchor mode of embedding, are multistage pilot trench by multiple separates along its length in groove;
Every cross-talk groove is equipped with a discharge opening, the relevant position of extruded sheet is provided with corresponding with discharge opening runs through through hole, discharge hose penetrates into from top to bottom and extruded sheet runs through through hole, and be connected to the lower end of discharge opening, whether the external part of discharge hose is provided with plugging device, open plugging device and can inspect deformation joint and seep water.
Scheme provided by the invention, open plugging device can inspect deformation joint and whether seep water, engineering roadblock is solved with simple technique, to the seepage of deformation joint, can not only find early, can also maintenance range be reduced, make increase flexibility maintenance time, that is: inspection door is become daily sluicing flow guide system, treat that suitable chance is keeped in repair again.When seepage is not serious, even can substitute maintenance with safeguarding.
The present invention is not limited to above-mentioned preferred forms, and anyone should learn the structure change made under enlightenment of the present invention, and every have identical or close technical scheme with the present invention, all falls within protection scope of the present invention.
Claims (10)
1. waterproofing of movement joints structure can inspection system, it is characterized in that, comprising:
Groove, the top being recessed into deformation joint by PVC roll material is formed, the two ends of described PVC roll material are fixed on the building body end face of deformation joint both sides respectively by the sticky anchor mode of embedding, extruded sheet be arranged on described PVC roll material below and between the building body being folded in deformation joint both sides; Described groove is multistage pilot trench by multiple separates along its length;
Leak device, comprise discharge hose, described every cross-talk groove is equipped with a discharge opening, the relevant position of described extruded sheet is provided with corresponding with described discharge opening runs through through hole, described discharge hose is connected with the lower end of described discharge opening through the through hole that runs through on described extruded sheet from top to bottom, and the lower external part of described discharge hose is provided with plugging device.
2. the system as claimed in claim 1, is characterized in that, described plugging device is capping, and the lower end of described discharge hose is fitted with short tube, and described capping spiral shell is contained in the lower end of described short tube.
3. system as claimed in claim 2, is characterized in that, the top and bottom of described discharge hose are fixed respectively by stainless steel pipe collar and described discharge opening and described short tube.
4. the system as claimed in claim 1, is characterized in that, the cross section of described partition is U-shaped, and mid portion cuts off perpendicular to described groove, and two side is adhesively fixed with the sidewall of described groove respectively.
5. the system as claimed in claim 1, is characterized in that, described plugging device is binder clip.
6. waterproofing of movement joints structure can the construction method of inspection system, it is characterized in that, comprises the following steps:
Sandwiched extruded sheet in deformation joint, the end face of extruded sheet is lower than the end face of deformation joint both sides building body;
PVC roll material is laid at the end face of deformation joint both sides building body, and make PVC roll material be recessed into formation groove in deformation joint, the two ends of PVC roll material are fixed on the building body end face of deformation joint both sides respectively by the sticky anchor mode of embedding, are multistage pilot trench by multiple separates along its length in groove;
Every cross-talk groove is equipped with a discharge opening, the relevant position of extruded sheet is provided with corresponding with discharge opening runs through through hole, discharge hose penetrates running through through hole and being connected to the lower end of discharge opening on extruded sheet from top to bottom, whether the lower end of discharge hose is provided with plugging device, open plugging device and can inspect deformation joint and seep water.
7. construction method as claimed in claim 6, it is characterized in that, the lower end of described discharge hose is fitted with short tube, and described plugging device is capping, and described capping spiral shell is contained in the lower end of described short tube.
8. construction method as claimed in claim 7, is characterized in that, the top and bottom of described discharge hose are fixed respectively by stainless steel pipe collar and described discharge opening and described short tube.
9. construction method as claimed in claim 6, it is characterized in that, the cross section of described partition is U-shaped, and mid portion cuts off perpendicular to described groove, and two side is adhesively fixed with the sidewall of described groove respectively.
10. construction method as claimed in claim 6, it is characterized in that, described plugging device is binder clip.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410056876.8A CN103774697B (en) | 2014-02-19 | 2014-02-19 | Waterproofing of movement joints structure can inspection system and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410056876.8A CN103774697B (en) | 2014-02-19 | 2014-02-19 | Waterproofing of movement joints structure can inspection system and construction method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103774697A CN103774697A (en) | 2014-05-07 |
CN103774697B true CN103774697B (en) | 2015-08-12 |
Family
ID=50567408
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410056876.8A Expired - Fee Related CN103774697B (en) | 2014-02-19 | 2014-02-19 | Waterproofing of movement joints structure can inspection system and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103774697B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109881847A (en) * | 2019-02-21 | 2019-06-14 | 西安市建筑设计研究院有限公司 | Deformation joint drain structure equipped with basement roof outdoor ground or roofing |
CN114016551B (en) * | 2021-10-13 | 2022-11-22 | 浙江万华建设有限公司 | Water seepage early warning type deformation joint for basement bottom plate and construction method of water seepage early warning type deformation joint |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100934283B1 (en) * | 2007-08-09 | 2009-12-28 | 김기철 | Expansion joint waterproofing and waterproofing method of concrete structure using expansion joint member |
KR20110079578A (en) * | 2011-04-19 | 2011-07-07 | 정영수 | Waterproof structure and waterproof method for the same |
CN203334324U (en) * | 2013-06-13 | 2013-12-11 | 中国十七冶集团有限公司 | Basement water-seepage prevention device |
CN203834523U (en) * | 2014-02-19 | 2014-09-17 | 深圳大学建筑设计研究院 | System capable of inspecting waterproof structures of deformation joint |
-
2014
- 2014-02-19 CN CN201410056876.8A patent/CN103774697B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN103774697A (en) | 2014-05-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203654994U (en) | Waterproof heat insulation window hole lower opening structure | |
CN103774697B (en) | Waterproofing of movement joints structure can inspection system and construction method thereof | |
CN104452949A (en) | Embedded leak-proof joint | |
CN203834523U (en) | System capable of inspecting waterproof structures of deformation joint | |
CN205746584U (en) | A kind of photoconduction daylight illuminating system | |
CN205421752U (en) | Adopt glass curtain wall building's hidden downspout | |
CN204905803U (en) | Cable watertight fittings | |
CN204164532U (en) | Pre-buried Matheson and Dresser joint system | |
CN103133785A (en) | Water-proof processing structure of tube-penetrating position on wall | |
FI128880B (en) | A drainage system | |
CN208793812U (en) | A kind of antiseepage built-in pipe | |
CN208331499U (en) | A kind of clamping structure of pipe | |
CN204326394U (en) | Positively fixed type roof vent pipe | |
CN204418598U (en) | A kind of closed toilet warterproof structure | |
CN203880250U (en) | Novel PPR pipe and connecting part used for being connected with same | |
CN2814074Y (en) | Device for sealing up pipe in the wall | |
CN104358948A (en) | Pre-buried anti-leaking connector system | |
CN105484452A (en) | Upright-put roofing exhaust pipe | |
CN217811995U (en) | A antiseep structure for going out roofing pipeline multichannel waterproof fortification | |
CN106088488A (en) | Groove drainage system | |
CN220226253U (en) | Supporting structure suitable for single-side formwork of outer wall | |
CN216344653U (en) | Pipeline plugging device | |
CN206829514U (en) | A kind of metal Roof hole waterproof treatment device | |
CN211286331U (en) | Improved roof rainwater pipe structure | |
CN103774803B (en) | Horizontal-type double-layer drainage apparatus for falling in water and mounting method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee | ||
CP01 | Change in the name or title of a patent holder |
Address after: 518000 B, School of architecture and regulation, Shenzhen University, Shenzhen, Guangdong, Nanshan District Patentee after: Shenzhen University architectural design and Research Institute Co Ltd Address before: 518000 B, School of architecture and regulation, Shenzhen University, Shenzhen, Guangdong, Nanshan District Patentee before: The Institute of Architecture Design & Research, Shenzhen University |
|
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150812 Termination date: 20200219 |
|
CF01 | Termination of patent right due to non-payment of annual fee |