CN103763397A - Intelligent resource pool capacity managing and controlling method based on remote automatic operation - Google Patents

Intelligent resource pool capacity managing and controlling method based on remote automatic operation Download PDF

Info

Publication number
CN103763397A
CN103763397A CN201410052840.2A CN201410052840A CN103763397A CN 103763397 A CN103763397 A CN 103763397A CN 201410052840 A CN201410052840 A CN 201410052840A CN 103763397 A CN103763397 A CN 103763397A
Authority
CN
China
Prior art keywords
resource pool
resource
threshold values
controlling method
method based
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410052840.2A
Other languages
Chinese (zh)
Inventor
周兴东
黄文载
胡永华
张羿
徐兵元
谷雨
宋涛
彭勇
耿贞伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Power Grid Co Ltd
Tongfang Technology of Yunnan Power Grid Co Ltd
Original Assignee
Yunnan Power Grid Co Ltd
Tongfang Technology of Yunnan Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Power Grid Co Ltd, Tongfang Technology of Yunnan Power Grid Co Ltd filed Critical Yunnan Power Grid Co Ltd
Priority to CN201410052840.2A priority Critical patent/CN103763397A/en
Publication of CN103763397A publication Critical patent/CN103763397A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D10/00Energy efficient computing, e.g. low power processors, power management or thermal management

Abstract

The invention relates to an intelligent resource pool capacity managing and controlling method based on remote automatic operation. The managing and controlling method mainly aims at the problem of how to efficiently use virtual resources in a resource pool, according to a set operating state threshold value of the resource pool, and a remote automatic operation mode is fully used in the resource pool to adjust and control the startup and shutdown states of the resources in real time, so that the purposes of saving energy, protecting environment and improving economic benefits are achieved on the premise that normal and stable operation of the system is ensured.

Description

A kind of intelligent resource pool volume weight tube control method based on remote automation operation
Technical field
The invention belongs to resource pool volume weight tube control method technical field.
Background technology
The management and control of resource pool capacity refers in order to reach the maximized target of economy and productivity effect, according to existing resource pond situation, utilizes scientific and technical analysis means, and hardware resource is carried out to reasonable management and control allotment.It is the key of establishing regional development direction, reasonable Arrangement production factors, is also the important measures that solve unlimitedness and the finiteness contradiction that resource system is supplied with of economic system growth.Its basic task is, under the prerequisite of resource capacity and economy balance, on time and space optimal with and Resources allocation, rational deployment productivity, to reach economic sustainable development and the continuous utilization of resource, obtains the object of optimum economic benefit.Optimal Distribution feature according to resource on the different periods, realizes control and the decision-making of resources development and utilization window of opportunity.
Under existing resource pond management and control pattern, more conventional means are artificial on-site supervision resource running statuses, when running status is during higher than setting, often can not pinpoint the problems timely, timely extended resources disposal ability, thereby affect operation system treatment effeciency, sometimes even cause the phenomenons such as systemic breakdown, deadlock; When running status is during lower than setting, often can not be reduced in time the resource quantity of operation, or reduce in time related resource configuration, thereby cause resource in a large number in idle state, cause the wasting of resources, highly energy-consuming.Improved enterprise's O&M cost.
The present invention provides a kind of intelligent resource pool volume weight tube control method based on remote automation operation in order to overcome the weak point of above-mentioned prior art existence just, first adopt remote operation technology, attendant is in schedule O&M process, just removed from and will arrive on-the-spot operation, thereby improved operating efficiency, saved time cost; Using automation management and control pattern automatic monitoring resource pool ruuning situation in real time simultaneously, under different conditions, automatically regulate the running status of resource, guaranteed the promptness of regulation and control, guaranteed the stability high efficiency in the operation of peak period system, at low peak period, reduce again the idle amount of resource simultaneously, reached energy-conserving and environment-protective, cost-saving, the object of increasing economic efficiency.
Summary of the invention
A kind of intelligent resource pool volume weight tube control method based on remote automation operation, the inventive method is mainly for resource pool capacity management and control field, by the monitoring thread in program, by Real-time Collection monitor data, and the threshold values that pre-sets of comparison judges whether to open resource, or dormant resources.
The technology technical scheme of this method is as follows:
In cloud computing resource pool, after having set up virtual resource framework, for resource pool, first set a running status threshold values; In service at resource pool, when resource pool running status is during higher than threshold values, take the form of remote automation operation, virtual resource in resting state is opened, when resource pool running status is during lower than threshold values, take equally remote operation form, by the virtual resource dormancy in idle state.
the invention has the beneficial effects as follows:
Under the prerequisite of resource capacity and economy balance, on time and space, optimal is used and Resources allocation, and rational deployment productivity, to reach economic sustainable development and the continuous utilization of resource, obtain the object of optimum economic benefit, also produce good energy conservation and environmental protection benefit simultaneously.The present invention can guarantee that resource pool running status remains on a state relatively efficiently.In peak period, both guarantee like this stability of system operation, at low peak period, reduced again the idle amount of resource simultaneously, to reaching energy-conserving and environment-protective, the object of increasing economic efficiency.
Below in conjunction with accompanying drawing and example, further set forth content of the present invention.
Accompanying drawing explanation
Fig. 1 is configuration diagram of the present invention;
What Fig. 1 represented is physical structure layer used in whole method, dispatch layer interface, and collector, the overall physical logic relation between database and monitoring program.
Fig. 2 monitor portion of the present invention realizes schematic diagram;
what Fig. 2 represented is disconnected logic and the related procedure that in the whole method of the present invention, monitoring program is sentenced part.
Embodiment
In cloud computing resource pool, after having set up virtual resource framework, for resource pool, first set a running status threshold values; In service at resource pool, when resource pool running status is during higher than threshold values, take the form of remote automation operation, virtual resource in resting state is opened, when resource pool running status is during lower than threshold values, take equally remote operation form, by the virtual resource dormancy in idle state.
Concrete methods of realizing is: first set a running status threshold values, as: resource pool CPU is set, memory usage is 60% threshold values, in resource pool, start monitoring program, to CPU, internal memory is monitored in real time, as resource pool CPU, when internal memory moves utilance higher than threshold values, take the form of remote automation operation, the virtual resource in resting state is opened; When resource pool running status is during lower than threshold values, take equally remote operation form, by the virtual resource dormancy in idle state.By above operation, guarantee that resource pool running status remains on a state relatively efficiently.In peak period, both guarantee like this stability of system operation, at low peak period, reduced again the idle amount of resource simultaneously, to reaching energy-conserving and environment-protective, the object of increasing economic efficiency.
Step is:
1) in cloud resource pool, set up relevant virtual resource framework, and by the collection cpu of the virtual management and control software of bottom, the interface opening of memory usage;
2) write collector program, by above-mentioned interface, carry out and within every five minutes, gather a cpu, the utilization rate data of internal memory, and be stored in database;
3) write monitoring program, a running status threshold values is set, as cpu threshold values and internal memory threshold values; And carry out cpu in the every five minutes storehouses of fetching data, the data of internal memory, then compare with the threshold values pre-setting;
4) when the monitor data gathering is during higher than set threshold values, Automatically invoked physical layer interface is to the operation of starting shooting in resting state resource; When threshold values lower than set, Automatically invoked physical layer interface is to carrying out sleep operation in idle state resource;
5), after calling interface has operated, continue, by thread, resource is carried out to service data collection, and compare in real time with threshold values, in real time monitoring.

Claims (1)

1. the intelligent resource pool volume weight tube control method based on remote automation operation, is characterized in that: in cloud computing resource pool, after having set up virtual resource framework, for resource pool, first set a running status threshold values; In service at resource pool, when resource pool running status is during higher than threshold values, take the form of remote automation operation, virtual resource in resting state is opened, when resource pool running status is during lower than threshold values, take equally remote operation form, by the virtual resource dormancy in idle state.
CN201410052840.2A 2014-02-17 2014-02-17 Intelligent resource pool capacity managing and controlling method based on remote automatic operation Pending CN103763397A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410052840.2A CN103763397A (en) 2014-02-17 2014-02-17 Intelligent resource pool capacity managing and controlling method based on remote automatic operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410052840.2A CN103763397A (en) 2014-02-17 2014-02-17 Intelligent resource pool capacity managing and controlling method based on remote automatic operation

Publications (1)

Publication Number Publication Date
CN103763397A true CN103763397A (en) 2014-04-30

Family

ID=50530555

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410052840.2A Pending CN103763397A (en) 2014-02-17 2014-02-17 Intelligent resource pool capacity managing and controlling method based on remote automatic operation

Country Status (1)

Country Link
CN (1) CN103763397A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1310869A1 (en) * 2001-11-12 2003-05-14 Hewlett-Packard Company Data processing system and method
CN101859261A (en) * 2010-06-09 2010-10-13 中兴通讯股份有限公司 Control method and control equipment for releasing memory
CN101945353A (en) * 2009-07-07 2011-01-12 中国移动通信集团山东有限公司 Method and system for remote adjustment of system resources

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1310869A1 (en) * 2001-11-12 2003-05-14 Hewlett-Packard Company Data processing system and method
CN101945353A (en) * 2009-07-07 2011-01-12 中国移动通信集团山东有限公司 Method and system for remote adjustment of system resources
CN101859261A (en) * 2010-06-09 2010-10-13 中兴通讯股份有限公司 Control method and control equipment for releasing memory

Similar Documents

Publication Publication Date Title
CN103345298B (en) Method of data center energy saving system based on virtual IT resource distribution technology
CN103957231A (en) Virtual machine distributed task scheduling method under cloud calculating platform
CN106059835B (en) A kind of High-reliability Control method of low energy consumption computer set group node
WO2013097318A1 (en) Intelligent power utilization system and method for parks
CN204497749U (en) Be provided with the comprehensive generating system of reactive power compensator
CN103345415A (en) Terminal energy-saving method and device for management timer
CN105975049B (en) A kind of accidental task low energy consumption dispatching method of tasks synchronization
CN103701889A (en) Data center energy saving method on basis of cloud computing
CN204615404U (en) Ventilation air gas/photovoltaic generating system that automatic power factor regulates
CN103078955A (en) Device and method for transferring state of cloud computing platform server
CN103970256B (en) Energy saving method and system based on memory compaction and CPU dynamic frequency modulation
CN204376518U (en) A kind of solar energy management devices of energy-saving self-controlling
CN102436297A (en) Method for saving energy and reducing noise of storage device by use of temperature fusion control
CN103092326A (en) Host energy saving method based on time
CN103400217A (en) Wind power compatibility network safety analysis method for coordinated dispatching of wind power and conventional energy sources
CN105824687B (en) A kind of method and device of Java Virtual Machine performance automated tuning
CN107506286A (en) CPU and memory block automatically upper inserting method and system
CN104796673B (en) A kind of cloud video monitoring system task cut-in method towards energy optimization
CN101833366B (en) Low-power-consumption dynamic node controlling method for cluster job management system
CN107895973A (en) Wind power plant Active Generation upper limit dynamic adjusts the real power control method with recovering automatically
CN103763397A (en) Intelligent resource pool capacity managing and controlling method based on remote automatic operation
CN102662759A (en) Energy saving method based on CPU (central processing unit) load in cloud OS (operating system)
CN206094438U (en) A building concentrator and a long -range building temperature control system of remote control room temperature
CN206017180U (en) A kind of solar energy water pump control system
CN205117503U (en) Environmental protection and energy saving diesel generating set based on multi -cylinder automatic switching

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140430

WD01 Invention patent application deemed withdrawn after publication