CN103758389B - Heat preservation steel plate silo with silo roof of parallel structure and manufacturing method of heat preservation steel plate silo - Google Patents

Heat preservation steel plate silo with silo roof of parallel structure and manufacturing method of heat preservation steel plate silo Download PDF

Info

Publication number
CN103758389B
CN103758389B CN201410044300.XA CN201410044300A CN103758389B CN 103758389 B CN103758389 B CN 103758389B CN 201410044300 A CN201410044300 A CN 201410044300A CN 103758389 B CN103758389 B CN 103758389B
Authority
CN
China
Prior art keywords
silo
storehouse
top panel
skeleton
steel plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410044300.XA
Other languages
Chinese (zh)
Other versions
CN103758389A (en
Inventor
刘全义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Beicang Grain Storage Project & Equipment Co ltd
Original Assignee
Harbin Beicang Grain Storage Project & Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Beicang Grain Storage Project & Equipment Co Ltd filed Critical Harbin Beicang Grain Storage Project & Equipment Co Ltd
Priority to CN201410044300.XA priority Critical patent/CN103758389B/en
Publication of CN103758389A publication Critical patent/CN103758389A/en
Application granted granted Critical
Publication of CN103758389B publication Critical patent/CN103758389B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

The invention provides a heat preservation steel plate silo with a silo roof of a parallel structure and a manufacturing method of the heat preservation steel plate silo. When the silo roof is laid, in China and various countries in the world, mostly, a top plate is segmented radially according to the center to the circumference of the boundary, so that a welding seam structure similar to the longitudes of the earth is formed. Thus, firstly, steel plates need to be prefabricated and cut into a trapezoidal shape or a triangular shape; after the steel plates are conveyed to a field, the triangular plates and the trapezoidal plates are assembled according to the radial longitude structure; due to the fact that the original steel plates are of a rectangular shape, many scraps are generated in the cutting process, meanwhile many joints are generated, and therefore labor and materials are wasted. The heat preservation steel plate silo with the silo roof of the parallel structure comprises a foundation (1) and a silo body (3) installed on the foundation (1). The silo body is provided with a heat preservation layer (5). The silo roof (2) of the silo comprises a frame (4) and a top board (6). The silo roof of the silo is conic or a truncated cone side face is adopted by the bottom and a protruding center top face is adopted by the upper face. A body of the top board is of an equal-width continuous mat formation structure. The heat preservation steel plate silo with the silo roof of the parallel structure and the manufacturing method of the heat preservation steel plate silo are applied to barns.

Description

Heat preservation steel plate silo with parallel construction Cang Ding and preparation method thereof
Technical field
The present invention relates to a kind of employing parallel construction Hold Ceiling, the large insulation steel plate of construction speed can be increased substantially Silo.
Background technology
Mat formation top, storehouse time, domestic so that countries in the world, be mostly by top board according to center to the circumference on border radially Split, form the welding line structure of similar terrestrial meridian, first have to for this be cut into trapezoidal or triangle by prefabricated for steel plate, transport to Behind scene, triangular form, trapezoidal plate are carried out assembly according to radial through line structure, owing to the original plate of steel is rectangle, cut out Produce more waste material during system, concurrently form more seam, useless work waste material.Fusion length is reduced when making top, airproof storehouse Being very important, tradition causes the biggest manpower and materials to waste through line structure.But everybody has been accustomed to for these years.
Summary of the invention
Summary of the invention:
It is an object of the invention to provide a kind of making simply, directly can carry out site operation paving with the raw steel of rolling The heat preservation steel plate silo with parallel construction Cang Ding of dress, cost is low, construction is fast, steady quality.
With the heat preservation steel plate silo of parallel construction Cang Ding, its composition includes: basis, be arranged on described on the basis of cylinder Storehouse, described silo has heat-insulation layer, and the Cang Ding of described silo is taper or taper type, described Cang Ding include skeleton and Top board, described top board main body is the continuous paving structure of equal in width.
The described heat preservation steel plate silo with parallel construction Cang Ding, the olive shape center of described roof plate of silo includes Triangle, trapezoidal and bar shaped paving structure;Described skeleton is circular cone or pyramid or frustum form skeleton, described top board and institute The skeleton stated is fixing to be connected.
The described heat preservation steel plate silo with parallel construction Cang Ding, after described roof plate of silo welding fabrication, with described The welding of silo last layer wallboard, form overall airtight construction.
The method of construction of a kind of heat preservation steel plate silo with parallel construction Cang Ding, does basis, makes ground floor storehouse cylinder Wallboard, makes skeleton, makes Cang Ding, described making Cang Ding, is the circumference outer that the storehouse top panel of initial one is taped against skeleton On relevant position, storehouse top panel is mated formation one by one, until olive shape center, middle storehouse top panel of mating formation is fixed with skeleton, adjacent storehouse Fixing connection between top panel;From opposite side, the storehouse top panel of initial one is taped against the relevant position, circumference outer of skeleton, by Bar storehouse top panel is mated formation, until olive shape center, middle storehouse top panel of mating formation is fixed with skeleton, fixing between the top panel of adjacent storehouse Connecting, both sides collectively form described top board main body;By triangle storehouse top panel, bar shaped storehouse end face in olive shape center Plate, rectangle storehouse top panel are combined and fix;The skeleton of all storehouses top panel and Cang Ding is fixed, and is formed in olive shape center Cross connecting structure, the whole Cang Ding of final closing, centered by storehouse is pushed up, finds out top, storehouse cylindrical, removes into the excess portion beyond circle Point.
The method of construction of a kind of airtight silo of the heat-insulating steel plate with parallel construction Cang Ding, does basis, makes ground floor storehouse The wallboard of cylinder, makes skeleton, makes Cang Ding, described making Cang Ding, is the circumference that the storehouse top panel of initial one is taped against skeleton On relevant position, outer, storehouse top panel is mated formation one by one, and until olive shape center, middle storehouse top panel of mating formation is fixed with skeleton, phase Between the top panel of adjacent storehouse, spot welding is fixed;From opposite side, the storehouse top panel of initial one is taped against the relevant position, circumference outer of skeleton On, storehouse top panel is mated formation one by one, until olive shape center, middle storehouse top panel of mating formation is fixing with skeleton to be connected, adjacent storehouse end face Plate spot welding is fixed, and both sides collectively form described top board main body;By triangle storehouse top panel, fan-shaped storehouse in olive shape center Top panel, rectangle storehouse top panel are combined and fix;Between the top panel of all storehouses, after spot welding, full weld is formed equidistant successively Weld seam reinforced structure, forms intersection weld seam reinforced structure in olive shape center, the whole Cang Ding of final closing, in Cang Ding being The heart, finds out top, storehouse cylindrical, removes into the redundance beyond circle.
The manufacture method of the described heat preservation steel plate silo with parallel construction Cang Ding, described storehouse top panel thickness is The roll bending uncoiling of 1.5-5mm or the stripe board after using the uncoiling of length more than 2 meters smooth.
The manufacture method of the described heat preservation steel plate silo with parallel construction Cang Ding, between described storehouse top panel, institute The Cang Ding stated and described storehouse cylinder link position all use sequential welding structure.
Beneficial effect:
1. the present invention use rectangle imposite from edge to center construction mat formation, use and progressive mat formation, revolutionize generation The radial paving structure of commonly used traditional Citrullus vulgaris formula of cutting certainly in boundary, the plasticity making full use of top board (metallic plate) becomes Shape.Reduce cutting, reduce welded seam length more than 40%.This method is constructed without cutting sheet material, simple and fast, spreads than tradition Dress improves efficiency 50%.Stock utilization improves more than 20%, mats formation than tradition and improves efficiency 50%.There is do not suspected prominent Effect.
The present invention is mated formation by monoblock rectangular slab, and arranges olive-type center so that seam of mating formation, fusion length are notable Reduce.As used airtight all-welded structure, overall airtight effect significantly improves, and the performance of top board structure significantly improves.
The Cang Ding of the present invention uses inner framework structure so that top board steel plate uses thickness to significantly reduce, and carrying is reasonably distributed, Wind resistance, anti-snow effect are significantly strengthened, hence it is evident that increase integral rigidity.
The planarization of the present invention smooths apparently higher than version before this, molding posterior pyramids surface, integrated stress peak value Significantly reducing, the overall stiffness of panel significantly improves.Wind loading rating improves 2 grades.
The present invention makes storehouse push up distribution of force more reasonable structure by arranging olive shape center;Described skeleton is circular cone Or pyramid or frustum form skeleton, described top board is fixing with described skeleton is connected after, formation light truss structure.
Seal the product of the present invention of version, after described roof plate of silo welding fabrication, most go up one with described silo Layer wallboard welding, forms overall airtight construction, it is possible to carries out overall stifling deinsectization, effectively ensures Class of food crop.
Parallel construction weld seam in the top board method for paving of the present invention, is directly to use the bar steel plate of whole to be formed, is Tradition storehouse plate was laid the most in the world, made full use of a kind of brand-new structure that the plasticity of steel plate completes.Shape The construction speed become is fast, and fusion length significantly reduces, and saves material, and air-tightness is good, good etc. the advantage of overall leveling is all Traditional is beyond one's reach through parallel paving structure at all.The present invention has technological progress significantly, will lead and change whole History built by the silo in the individual world.
By spot welding in advance, the version of final full weld, define reasonable stress, moulded uniformly, good absorbing, whole The New Type Bin top that the smooth performance of body is good, being integrated with force resolution transmission can be adjusted by olive shape center.
Accompanying drawing illustrates:
Accompanying drawing 1 is the structural representation of this product.
Accompanying drawing 2 is the top view of accompanying drawing 1.
The partial enlarged drawing of accompanying drawing 3 accompanying drawing 1.
Detailed description of the invention:
Embodiment 1:
With the heat preservation steel plate silo of parallel construction Cang Ding, its composition includes: basis 1, be arranged on described on the basis of Silo 3, described silo has heat-insulation layer 5, and the top, storehouse 2 of described silo includes skeleton 4 and top board 6.Described silo Cang Ding is cone, or bottom uses the side of frustum, and slightly convex center end face is used above.Described top board master Body is the continuous paving structure of equal in width.
Embodiment 2
The heat preservation steel plate silo with parallel construction Cang Ding described in embodiment 1, in the olive shape of described roof plate of silo Heart district 7 includes triangle, trapezoidal and bar shaped paving structure;Described skeleton is circular cone or pyramid or frustum form skeleton, described Top board and described skeleton fixing be connected.
Embodiment 3:
The heat preservation steel plate silo with parallel construction Cang Ding described in embodiment 1 or 2, described roof plate of silo welding fabrication After, weld with described silo last layer wallboard, form overall airtight construction.
Embodiment 4:
The method of construction of the heat preservation steel plate silo with parallel construction Cang Ding described in embodiment 1 or 2, does basis, makes The wallboard of ground floor storehouse cylinder, makes skeleton, makes Cang Ding, described making Cang Ding, is that the storehouse top panel of initial one is taped against bone On the relevant position, circumference outer of frame, storehouse top panel is mated formation one by one, until olive shape center, mat formation middle storehouse top panel and skeleton Fixing between fixing, adjacent storehouse top panel connect;From opposite side, the storehouse top panel of initial one is taped against the circumference outer phase of skeleton Answering on position, storehouse top panel is mated formation one by one, until olive shape center, middle storehouse top panel of mating formation is fixed with skeleton, adjacent Cang Ding Fixing connection between panel, both sides collectively form described top board main body;In olive shape center by triangle storehouse top panel, Bar shaped storehouse top panel, rectangle storehouse top panel are combined and fix;The skeleton of all storehouses top panel and Cang Ding is fixed, in olive shape Form cross connecting structure in heart district, final close whole Cang Ding, centered by storehouse is pushed up, find out top, storehouse cylindrical, remove into circle with Outer redundance.
Embodiment 5:
The method of construction of a kind of airtight silo of the heat-insulating steel plate with parallel construction Cang Ding described in embodiment 1 or 2 or 3, Do basis, make the wallboard of ground floor storehouse cylinder, make skeleton, make Cang Ding, described making Cang Ding, be by the Cang Ding of initial one Panel is taped against on the relevant position, circumference outer of skeleton, and storehouse top panel is mated formation one by one, until olive shape center, mat formation middle Cang Ding Panel is fixed with skeleton, and between the top panel of adjacent storehouse, spot welding is fixed;From opposite side, the storehouse top panel of initial one is taped against skeleton On relevant position, circumference outer, storehouse top panel is mated formation one by one, until olive shape center, middle storehouse top panel of mating formation welds with skeleton Connecting, the top panel spot welding of adjacent storehouse is fixed, and both sides collectively form described top board main body;By triangle in olive shape center Storehouse top panel, fan-shaped storehouse top panel, rectangle storehouse top panel are combined and fix;Between the top panel of all storehouses after spot welding successively completely Weldering forms equidistant weld seam reinforced structure, forms intersection weld seam reinforced structure, finally close whole storehouse in olive shape center Top, centered by storehouse is pushed up, finds out top, storehouse cylindrical, removes into the redundance beyond circle.
Embodiment 6:
The manufacture method of the heat preservation steel plate silo with parallel construction Cang Ding described in embodiment 4 or 5, described storehouse end face Plate thickness is the roll bending uncoiling of 1.5-5mm or the stripe board after using the uncoiling of more than 2 meters smooth.
Embodiment 7:
The manufacture method of the heat preservation steel plate silo with parallel construction Cang Ding described in embodiment 4 or 5 or 6, described storehouse Between top panel, described Cang Ding all use sequential welding structure with described storehouse cylinder link position.

Claims (7)

1. with a heat preservation steel plate silo of parallel construction Cang Ding, its composition includes: basis, be arranged on described on the basis of Silo, described silo has heat-insulation layer, it is characterized in that: the Cang Ding of described silo is taper or taper type, described storehouse Top includes that skeleton and top board, described top board include that top board main body and olive shape center, described top board main body are equal in width Paving structure continuously, the top board that described equal in width is mated formation continuously is taped against the circumference outer of skeleton.
Heat preservation steel plate silo with parallel construction Cang Ding the most according to claim 1, is characterized in that: the olive of roof plate of silo Olive shape center includes triangle, trapezoidal and bar shaped paving structure;Described skeleton is circular cone or pyramid or frustum form skeleton, Described top board is fixing with described skeleton to be connected.
Heat preservation steel plate silo with parallel construction Cang Ding the most according to claim 1 and 2, is characterized in that: described cylinder After Hold Ceiling welding fabrication, weld with described silo last layer wallboard, form overall airtight construction.
4. a method of construction for the heat preservation steel plate silo with parallel construction Cang Ding that one of claim 1-3 is described, does base Plinth, makes the wallboard of ground floor storehouse cylinder, makes skeleton, makes Cang Ding, it is characterized in that: described making Cang Ding, is by initial one Storehouse top panel be taped against on the relevant position, circumference outer of skeleton, storehouse top panel is mated formation one by one, until olive shape center, mats formation Middle storehouse top panel is fixed with skeleton, fixing between the top panel of adjacent storehouse connect;From opposite side, the storehouse top panel of initial one is taped against On the relevant position, circumference outer of skeleton, storehouse top panel is mated formation one by one, until olive shape center;In mating formation, storehouse top panel with Skeleton is fixed, fixing between the top panel of adjacent storehouse connect, and the storehouse top panel that both sides have been laid collectively forms described top board master Body;In olive shape center, triangle storehouse top panel, bar shaped storehouse top panel, rectangle storehouse top panel are combined and fix; The skeleton of all storehouses top panel and Cang Ding is fixed, and forms cross connecting structure in olive shape center, final closes whole Cang Ding, Centered by storehouse is pushed up, find out top, storehouse cylindrical, remove into the redundance beyond circle.
5. a method of construction for the airtight silo of the heat-insulating steel plate with parallel construction Cang Ding that one of claim 1-3 is described, Do basis, make the wallboard of ground floor storehouse cylinder, make skeleton, make Cang Ding, it is characterized in that: described making Cang Ding, be to rise The storehouse top panel of beginning bar is taped against on the relevant position, circumference outer of skeleton, and storehouse top panel is mated formation one by one, until olive shape center, Middle storehouse top panel of mating formation is fixed with skeleton, and between the top panel of adjacent storehouse, spot welding is fixed;From opposite side by the storehouse top panel of initial one Being taped against on the relevant position, circumference outer of skeleton, storehouse top panel is mated formation one by one, until olive shape center, middle storehouse top panel of mating formation Being welded to connect with skeleton, the top panel spot welding of adjacent storehouse is fixed, and the storehouse top panel that both sides have been laid collectively forms described top board Main body;In olive shape center, triangle storehouse top panel, fan-shaped storehouse top panel, rectangle storehouse top panel are combined and consolidate Fixed;Between the top panel of all storehouses, after spot welding, full weld forms equidistant weld seam reinforced structure successively, is formed in olive shape center Intersection weld seam reinforced structure, the whole Cang Ding of final closing, centered by storehouse is pushed up, finds out top, storehouse cylindrical, removes into beyond round many Remaining part is divided.
The manufacture method of the heat preservation steel plate silo with parallel construction Cang Ding the most according to claim 5, is characterized in that: institute The roll bending uncoiling that storehouse top panel thickness is 1.5-5mm stated or the stripe board after using the uncoiling of more than 2 meters smooth.
7. according to the manufacture method of the heat preservation steel plate silo with parallel construction Cang Ding described in claim 5 or 6, its feature Be: between described storehouse top panel, described Cang Ding all use sequential welding structure with described storehouse cylinder link position.
CN201410044300.XA 2014-02-02 2014-02-02 Heat preservation steel plate silo with silo roof of parallel structure and manufacturing method of heat preservation steel plate silo Expired - Fee Related CN103758389B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410044300.XA CN103758389B (en) 2014-02-02 2014-02-02 Heat preservation steel plate silo with silo roof of parallel structure and manufacturing method of heat preservation steel plate silo

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410044300.XA CN103758389B (en) 2014-02-02 2014-02-02 Heat preservation steel plate silo with silo roof of parallel structure and manufacturing method of heat preservation steel plate silo

Publications (2)

Publication Number Publication Date
CN103758389A CN103758389A (en) 2014-04-30
CN103758389B true CN103758389B (en) 2017-01-11

Family

ID=50525693

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410044300.XA Expired - Fee Related CN103758389B (en) 2014-02-02 2014-02-02 Heat preservation steel plate silo with silo roof of parallel structure and manufacturing method of heat preservation steel plate silo

Country Status (1)

Country Link
CN (1) CN103758389B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112012545A (en) * 2020-08-18 2020-12-01 上海建工四建集团有限公司 Construction method of steel plate silo

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06141666A (en) * 1992-11-13 1994-05-24 Hokoku Kogyo Co Ltd Roof of housing for drying and storing grain
CN2314020Y (en) * 1997-09-18 1999-04-14 李晓平 Prefabricated assembled shell born with cross arched beams
CN201687248U (en) * 2010-02-05 2010-12-29 扬州牧羊仓储工程有限公司 Metal heat preservation silo for storing grain bulk materials
CN203729644U (en) * 2014-02-02 2014-07-23 刘全义 Heat preservation steel plate silo with parallel structure silo top

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06141666A (en) * 1992-11-13 1994-05-24 Hokoku Kogyo Co Ltd Roof of housing for drying and storing grain
CN2314020Y (en) * 1997-09-18 1999-04-14 李晓平 Prefabricated assembled shell born with cross arched beams
CN201687248U (en) * 2010-02-05 2010-12-29 扬州牧羊仓储工程有限公司 Metal heat preservation silo for storing grain bulk materials
CN203729644U (en) * 2014-02-02 2014-07-23 刘全义 Heat preservation steel plate silo with parallel structure silo top

Also Published As

Publication number Publication date
CN103758389A (en) 2014-04-30

Similar Documents

Publication Publication Date Title
CN106736271B (en) A kind of production method of rolling/compacting rectangle steel tubing string
CN104002402B (en) A kind of general web mold structure of wind electricity blade
CN103758389B (en) Heat preservation steel plate silo with silo roof of parallel structure and manufacturing method of heat preservation steel plate silo
CN203320812U (en) concrete anti-cracking reinforcing mesh
CN105113435A (en) Culvert mouth of corrugated steel pipe culvert
CN203742227U (en) Heat preservation steel plate silo with heat preservation layers of parallel structure
CN202416300U (en) Quick coupling of prefabricated concrete pile
CN203729644U (en) Heat preservation steel plate silo with parallel structure silo top
CN105537886A (en) Automatic manufacturing process for butterfly rebars of tunnel grid rebar truss
CN104947948B (en) A kind of reinforcement means of rammed earth body of wall
CN104607815A (en) Method for manufacturing and controlling camber of crane main girder
CN204343442U (en) A kind of prefabricated assembling type reinforced concrete air-condition plate
CN106120583A (en) A kind of U-shaped pin-connected panel double-wall corrugated Guan Bi steel corrugated culvert pipe
CN106958323B (en) A kind of band divides the light steel pipe-timber with small diameter combination load-bearing pillar and the practice of chamber steel plate
CN103437349B (en) The construction method of steel concrete perfusion shaped pile
CN205276992U (en) Self -supporting chimney
CN205776400U (en) A kind of for poured band of outer wall of basement structure
CN206570996U (en) A kind of novel fabricated shear wall with foundation reinforcer
CN207597718U (en) The anti-buckling concrete filled steel tube coupled column of built-in circulating type tie hoop
CN103924810B (en) Heat preservation steel plate silo and method of construction with parallel construction heat-insulation layer
CN206309050U (en) A kind of booster stations cracking cement bar bracing means
CN107558666A (en) A kind of anti-buckling concrete filled steel tube coupled column of built-in circulating type tie hoop
CN204435861U (en) For building the formwork structure of circular concrete column
CN204343705U (en) A kind of yurt adopting compound wallboard
CN206988591U (en) A kind of NEW TYPE OF COMPOSITE bellows

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20160125

Address after: Harbin City Development Zone, Heilongjiang province 150000 Yingbin Road District No. 26 East Lake Road

Applicant after: HARBIN BEICANG GRAIN STORAGE PROJECT & EQUIPMENT Co.,Ltd.

Address before: Harbin City Development Zone, Heilongjiang province 150078 Yingbin Road District No. 26 East Lake Street

Applicant before: Liu Quanyi

GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Heat preservation steel plate silo with silo roof of parallel structure and manufacturing method of heat preservation steel plate silo

Effective date of registration: 20190627

Granted publication date: 20170111

Pledgee: Heilongjiang Modern Agriculture Fund (L.P.)

Pledgor: HARBIN BEICANG GRAIN STORAGE PROJECT & EQUIPMENT Co.,Ltd.

Registration number: 2019230000002

PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20201026

Granted publication date: 20170111

CI03 Correction of invention patent
CI03 Correction of invention patent

Correction item: preservation of patent right

Correct: Cancellation of the effective notice of the preservation

False: Preservation of patent right

Number: 49-02

Volume: 36

PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20201201

Granted publication date: 20170111

PD01 Discharge of preservation of patent
PD01 Discharge of preservation of patent

Date of cancellation: 20231201

Granted publication date: 20170111

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170111