CN103752622B - A kind of heavy plate rolling control method eliminating strand edge fault - Google Patents
A kind of heavy plate rolling control method eliminating strand edge fault Download PDFInfo
- Publication number
- CN103752622B CN103752622B CN201310717218.4A CN201310717218A CN103752622B CN 103752622 B CN103752622 B CN 103752622B CN 201310717218 A CN201310717218 A CN 201310717218A CN 103752622 B CN103752622 B CN 103752622B
- Authority
- CN
- China
- Prior art keywords
- rolling
- steel
- continuous casting
- casting billet
- broadening
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Metal Rolling (AREA)
Abstract
A kind of heavy plate rolling control method eliminating strand edge fault, comprises the steps: 1) after continuous casting billet comes out of the stove, before starting rolling, carry out turning steel, former continuous casting billet edge both sides become entrance milling train rolled piece end to end, start shaping stage rolling;2) last passage of roll forming, uses webbing broadening milling method;3) shaping stage has rolled rear steel plate 90 degree and has turned steel, and original continuous casting billet both sides become the both sides entering milling train rolled piece again, start broadening stage rolling;4) broadening rolls last passage, uses webbing broadening milling method;5) after broadening stage rolling completes steel plate again 90 degree turn steel, start the rolling in last finish rolling stage;6) finishing cutting plate operation is entered.The present invention is by turning steel rolling three times, continuous casting billet edge fault is transformed into the most cut slab part end to end, retains the plan view control advantage of original twice turn of steel rolling, and finished steel plate does not haves " bucket waist " phenomenon, conscientiously reduce trimming amount, decrease and cut damage.
Description
Technical field
The present invention relates to the operation of rolling control technology of heavy plate mill, particularly relate to a kind of elimination strand limit
The heavy plate rolling control method of portion's defect.
Background technology
During Heavy plate production, finished steel plate edge is it sometimes appear that crack defect, and these comprise scarce
The steel plate edge fallen into is required for cut, thus reduces the recovery rate of product, and then reduces production effect
Benefit.Therefore, for Strip edge fault problem, it is necessary to take technical measures, alleviate or even disappear
Generation except edge fault.Being specifically defined as of edge cracks defect:
Hot-strip limit is split defect and is referred to that rupturing occur in one or both sides along its length, steel plate edge
(Di Hongshuan etc., " hot rolled strip edge fault formation mechenism and present Research ", Henan Metallurgical, 2008
June in year).
Edge cracks defect in other documents, the edge that is sometimes otherwise known as line defect (edge seam
Defect, " removing method of low-carbon hot-rolled steel edge line defect ", Chinese patent
CN102699028A) or edge black line (summer Xiao Ming etc., " hot-strip edge black line mechanism of production ",
Steel research journal, in June, 2010).
The reason producing edge cracks mainly has two classes: one is that the continuous casting billet that continuous casting production process causes lacks
Falling into, such as continuous casting billet marginal existence micro-crack, rimhole and edge have and are mingled with, and these defects exist
The rolling link of follow-up rolling, is exaggerated dominant displaying;Two is the defect that the operation of rolling causes,
The corner metal of rolled piece flow to upper and lower surface (Di Hongshuan etc. the, " heat of rolled piece in the operation of rolling
Roll strip edge fault formation mechenism and present Research ", Henan Metallurgical, in June, 2008).
The steel produced for continuous hot-rolling mill about edge cracks defect, existing patent and document great majority
Volume, the technical scheme that rarer heavy plate mill is relevant is disclosed.
Hot continuous rolling and the similarities and differences of heavy plate mill: identical point is: continuous hot-rolling mill and heavy plate mill broadly fall into heat
Rolling (hot rolling) process, rolled plate temperature is at 1200~700 DEG C, and the product that both produce is all
Cut the part end to end of milling material.Difference: hot continuous rolling produces the finishing mill of line and uses multi-frame to roll continuously
The milling train arrangement of system, hot continuous rolling produces the roughing mill of line and is disposed with strength edger roll or other side pressures dress
Putting, be used for continuous casting billet width adjustment to band steel finished width, it is single that heavy plate mill produces the finishing mill of line
Machine frame rolling mill, uses the mode of production of reversing tandem rolling, and what heavy plate mill product line had has single list
Frame roughing mill, some finishing mills also serve as roughing mill, the most do not configure strength edger roll, cloth before and after milling train
It is equipped with and turns steel rider road, by the steel plate before and after rolling pass 90 degree rotation, adjust steel plate width, institute
With the operation of rolling of heavy plate mill multi-pass, generally at whole twice steel of operation of rolling transfer, according to turning
Three rolling sequences it have been divided into: roll forming stage, broadening rolling sequence, extension roll before and after steel
In the stage, seeing Fig. 1, (detail describes and sees " China's Medium and Heavy Plate Rolling technology and equipment " 1.7.1
Joint, Wang Guodong, metallurgical industry publishing house, 2009).
Divide into continuous casting working procedure reason due to the reason of generation edge cracks and rolling process reason two is big
Class, existing correlation technique for the most a certain class reason, provides various technical scheme mostly.
The edge fault caused for rolling process, it is horizontal that major measure includes being intended to improve temperature band steel
The process management measures such as the heating of temperature homogeneity, rolling line cooling water use (see Chinese patent CN
102699028A, CN101912875A);Improved by side-pressing device, reduce the uneven change of edge
The steel edge portion deformation of shape improves (Japan Patent JP10156408) (summer Xiao Ming etc., " hot-strip
Edge black line mechanism of production ", steel research journal, in June, 2010);Rolled by adjustment level
The technological parameters such as machine drafts and speed are alleviated edge inhomogeneous deformation situation and (are seen Chinese patent
CN102527735A).
The edge fault caused for continuous casting working procedure, major measure concentrates on the technological parameter of continuous casting working procedure
The research and development of optimization and continuous casting equipment use technology, and (Chinese patent CN102101124, Wang Yaoshan " should
The research of Edge Cracks on Medium and Heavy Plate problem is solved by slab edge part shading technology ", Gansu is metallurgical, 2010 4
Month etc.).
The present invention is directed to the edge fault that continuous casting working procedure causes, utilize slab to turn the feature of steel rolling, if
Counting out brand-new roll control scheme, the finished product edge eliminating continuous casting working procedure reason at rolling process lacks
Falling into, this is the unusual part of the present invention.
Owing to hereinafter when turning steel rolling method pluses and minuses, steel plate finished product will be compared more different
Flat shape profile is good and bad, (selects from " thick in China so plan view control is briefly described below
Plate rolling technique and equipment " 1.7.4.1 joint).
" in Heavy Plate Production, affect lumber recovery because of have crop end, trimming, iron scale,
Rolling useless, mass defect etc., wherein the bad damage of cutting caused of flat shape account for the biggest ratio.Middle thickness
Flat shape after the particularity of the plate operation of rolling causes it to roll is much the most rectangular, necessary before delivery
Carry out crop end and trimming processes.Therefore the flat shape Changing Pattern in the research operation of rolling, makes to roll
The flat shape of steel plate processed is squaring, reduces crop end and trim losses, to the lumber recovery improving steel plate
Play an important role.
It is exactly the squaring technology of rolled plate that flat shape controls technology actual, plan view control
Main Means is the Varied section blank rolling using pony-roughing pass, and foremost is Kawasaki, Japan Shui Dao factory
Exploitation MAS rolling (Mizushima automatic plan view pattern control system,
Ji Shui island flat shape autocontrol method), rolling initial shaping stage and broadening stage rolling
Time, along rolling direction, rolled piece two ends are rolled into wedge shape, make the corner of rolled piece in the operation of rolling subsequently
Being filled, whole rolled piece is approximate rectangular, thus decreases the loss of crop end and trimming.”
Current modernization heavy and medium plate mill has all possessed similar MAS rolling based on webbing
The plane control function of broadening rolling.
Continuous casting billet edge micro-crack defect, and then the slab finished product edge caused is caused for continuous casting working procedure
Defect, the measure of prior art concentrates on continuous casting working procedure.Straight yet with current continuous casting working procedure
Connecing export--the edge fault of continuous casting billet lacks sufficiently accurate detection means, mainly by artificial naked eyes
Observing the defects such as the bubble of edge, pin hole, take time and effort, loss is high, and the most directly at table
The defects such as the micro-crack that face manifests, after needing cutting sampling, observe sample sections with microscope and could examine
Measuring, this detection method is not suitable for the application of big industrial production.This has resulted in continuous casting working procedure improvement
The difficulty of effect assessment, when continuous casting working procedure is varied from, needs the longer cycle, until rolling
After completing, the continuous casting working procedure change impact on edge fault could be judged, but also easily lack with Equations of The Second Kind
The producing cause fallen into is obscured.
Consider the productive prospecting of heavy plate mill, if production process only turns a steel so that continuous casting billet
Edge be ultimately converted to steel plate end to end, the finishing after rolling of the steel plate head portion can be cut before dispatching from the factory
Remove, the impact on finished product defect of the continuous casting billet edge fault can be eliminated.Actual production practice in it has also been found that
Using the milling method only once turning steel, edge fault incidence considerably reduces, but another is asked
Topic occurs in that, i.e. steel plain shape defect.Owing to once turning steel, there is no shaping stage, shape rank
The plan view control method of last passage of section also cannot use, and causes the width in steel plate length direction
The most uneven, have significantly " bucket waist " (seeing Fig. 2), although edge fault is few, but
Owing to flat shape is bad, edge is cut damage and is not declined, and is not reaching to final raising lumber recovery
Purpose.
Existing hot continuous rolling, the Patents of slab edge fault and open source literature, head are mitigated or eliminated
Pain doctor's head, pin pain doctor's pin, the slab defects causing continuous casting working procedure concentrates on continuous casting working procedure and solves.
Existing slab includes that the technical scheme of hot continuous rolling operation concentrates on two aspects, and one is temperature related process
Parameter optimization and the improvement of cooling water equipment, two be the improvement of side-pressing device and horizontal rolling mill reduction amount,
The adjustment of the technological parameters such as speed.With regard to heavy plate rolling process, these technical measures the most fully profit
With the technique of Heavy plate production, installation feature.On the other hand, only reduce and once turn steel, then cause
Though the sideline problem solved, create the new problem that flat shape is bad, it is not reaching to reduce
Edge cuts the final purpose of damage.
Summary of the invention
It is an object of the invention to provide a kind of heavy plate rolling control method eliminating strand edge fault,
The continuous casting billet edge fault that elimination continuous casting working procedure the produces impact on slab finished product defect, reduces finished steel
The excision loss of edges of boards portion, can be inherently eliminated the continuous casting billet edge such as continuous casting billet micro-crack, pin hole and lack
Fall into the slab edge fault caused, improve productivity effect.
For reaching above-mentioned purpose, the technical scheme is that
A kind of heavy plate rolling control method eliminating strand edge fault, comprises the steps:
1) after continuous casting billet is come out of the stove, before arriving milling train, before starting rolling, carry out turning steel operation, turn steel
After completing, the edge both sides of original continuous casting billet become the rolled piece of entrance milling train end to end, start
The rolling of shaping stage, is i.e. originally present the continuous casting billet edge of quality of edges defect, is converted into
The part end to end of the rolled piece entering milling train in roll forming stage;
2) in last passage in roll forming stage, use webbing broadening milling method, control with this
The profile end to end of finished steel plate is straight;
3) after shaping stage has rolled, steel plate 90 degree turns steel, and original continuous casting billet both sides become again
Enter the both sides of the rolled piece of milling train, now start the rolling in broadening stage;
4) in last passage of broadening rolling sequence, reuse webbing broadening milling method, control
Two side profile of finished product straight;
5) after broadening stage rolling completes, steel plate again 90 degree turn steel, now original continuous casting billet two
Side part is converted into and enters the rolled piece of milling train end to end, starts rolling of last finish rolling stage
System, i.e. at final rolling sequence, is originally present the edge of the continuous casting billet of the defects such as bubble,
It is converted to the part end to end of last mill product steel plate;
6), after steel plate rolling completes, follow-up finishing cutting plate operation is entered.
In milling method of the present invention,
After continuous casting billet is come out of the stove, before arriving milling train, before starting rolling, first carry out turning steel operation, turn
After steel completes, the edge both sides of original continuous casting billet, become and enter the rolled piece of milling train end to end, start into
The rolling in shape stage, is i.e. originally present the continuous casting billet edge of the edge mass defect such as bubble, pin hole, turns
Change the part end to end of the rolled piece entering milling train in roll forming stage into.
In last passage in roll forming stage, use webbing broadening milling method, it is therefore an objective to control
The profile end to end of finished product is straight;
After shaping stage has rolled, steel plate 90 degree turns steel, original continuous casting billet both sides, again becomes
Enter the both sides of the rolled piece of milling train, now start the rolling in broadening stage;
In last passage of broadening rolling sequence, reuse webbing broadening milling method, it is therefore an objective to
Control two side profile straight of finished product;
After broadening stage rolling completes, steel plate again 90 degree turn steel, now original continuous casting billet both sides
Part, is converted into the rolled piece in order to enter milling train end to end, starts the rolling in last finish rolling stage.
I.e. at final rolling sequence, it is originally present the edge of the continuous casting billet of the defects such as bubble, is converted to
The part end to end of rear mill product.On the other hand, due in shaping stage above and broadening stage
Last passage employs webbing broadening milling method, it is ensured that the flat shape approximation square of finished steel plate
Shape, it is to avoid " bucket waist " phenomenon occurs.
After steel plate rolling completes, enter follow-up finishing cutting plate operation.Now make due to slab defects
The sideline become has been transformed into the position end to end of finished steel plate by new milling method, and sideline is to steel plate end
Distance is within 40mm, and this is to be determined by factors such as the overall reductions of the operation of rolling, and owing to examining
Considering the fluctuation to steel plate material property end to end, steel plate resection end to end is at more than 100mm, namely
Say that the position the showing sideline defect pattern distance away from steel plate end is much smaller than in view of material property
Steel plate reality excise distance end to end, i.e. completely eliminate continuous casting billet quality of edges defect to slab finished product
The impact that lumber recovery causes.
In place of the main difference of the present invention and prior art:
Existing mill milling process control technology, does not control skill specially for steel plate edge defect
Art, technical measures relevant to milling train in prior art scheme, nothing more than in: reduction in pass and roll
The adjusting and optimizing of speed processed, steel plate sticks up use of discount control (ski) coefficient etc.
Existing mill milling flow process includes five kinds, sees Fig. 3~Fig. 7:
1. pattern a, direct axial rolling;
2. pattern b, rolls forward steel → transverse rolling;
3. pattern c, axial rolling → turn steel → transverse rolling;
4. pattern d, rolls forward steel → transverse rolling → turn steel → axial rolling;
5. pattern e, axial rolling → turn steel → transverse rolling → turn steel → axial rolling.
Wherein the control mode of twice turn of steel is common pattern, i.e. pattern e.
For purposes of illustration only, the rolling along continuous casting billet raw footage direction is called axial rolling, along continuous casting below
The rolling of base former width is referred to as transverse rolling.
Technical scheme essence is that the steel grade easily sent out edge fault is treated with a certain discrimination, has increased one newly
Kind of rolling mode f, it may be assumed that roll forward steel-transverse rolling-turn steel-axial rolling-turn steel-transverse rolling.
Beneficial effects of the present invention:
The present invention is by the new course control method for use turning steel rolling for three times, and the edge fault of continuous casting billet turns
Change to the part end to end of final cut slab, remain the flat of original twice turn of steel rolling simultaneously
Face shape controls advantage, and plan view control function is properly functioning, and finished steel plate does not haves as only one
Secondary turn steel the most significant " bucket waist " phenomenon, conscientiously reduce trimming amount, decrease and cut damage.
Technical solution of the present invention is produced line at slab and is implemented, and can promote lumber recovery about 2%.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of three rolling sequences of existing Medium and Heavy Plate Rolling technology.
Fig. 2 is the schematic diagram of one of steel plate defect phenomenon " bucket waist ".
Fig. 3~Fig. 7 is the schematic diagram of five kinds of patterns in existing mill milling flow process.
Fig. 8 is the inventive method (schematic diagram of pattern f).
Fig. 9 is the control flow chart of the embodiment of the present invention.
Detailed description of the invention
Below in conjunction with embodiment and accompanying drawing, the present invention will be further described.
See Fig. 8, a kind of heavy plate rolling control method eliminating strand edge fault of the present invention, bag
Include following steps:
1) after continuous casting billet is come out of the stove, before arriving milling train, before starting rolling, carry out turning steel operation, turn steel
After completing, the edge both sides of original continuous casting billet become the rolled piece of entrance milling train end to end, start
The rolling of shaping stage, is i.e. originally present the continuous casting billet edge of quality of edges defect, is converted into
The part end to end of the rolled piece entering milling train in roll forming stage;
2) in last passage in roll forming stage, use webbing broadening milling method, control with this
The profile end to end of finished steel plate is straight;
3) after shaping stage has rolled, steel plate 90 degree turns steel, and original continuous casting billet both sides become again
Enter the both sides of the rolled piece of milling train, now start the rolling in broadening stage;
4) in last passage of broadening rolling sequence, reuse webbing broadening milling method, control
Two side profile of finished product straight;
5) after broadening stage rolling completes, steel plate again 90 degree turn steel, now original continuous casting billet two
Side part is converted into and enters the rolled piece of milling train end to end, starts rolling of last finish rolling stage
System, i.e. at final rolling sequence, is originally present the edge of the continuous casting billet of the defects such as bubble,
It is converted to the part end to end of last mill product steel plate;
6), after steel plate rolling completes, follow-up finishing cutting plate operation is entered.
Detailed description of the invention in the slab automation control system controlled based on model process is as follows:
Initially set up edge fault easy hair-care articles kind special code, according to easy hair-care articles kind special code, be given
New mill milling process control pattern, turns punching block formula i.e. three times, turns under punching block formula at three times, when even
Strand come out of the stove arrive before roughing mill turn position, steel rider road after, control system is given and turns steel instruction, operation
Personnel complete to turn steel operation, and model system is adopted new plate size information, is then automatically performed follow-up
Shaping, broadening, the rolling in extension stage, the finished product after having rolled need to be carried out end to end at finishing procedure
Excision operation.
1, set up edge fault and easily send out steel grade code table
In production schedule arranging system, increase edge fault easily send out steel grade code table, when establishment produces meter
When drawing, if treating that rolled steel plate is the type that edge fault easily sends out in steel grade code table, then generate new rolling
Mode flags (represents the rolling mode f) shown in Fig. 8 of the present invention.Concrete steel grade is according to producing warp
Test acquisition.
2, the milling train setting model control system of milling train
When receiving continuous casting billet to be rolled and possessing new rolling mode mark, automatically proceed to new roll control mould
Formula, particular flow sheet is as follows.
2.1 flipper guides automatically open up the given of width
Steel plate not grazing flipper guide during for ensureing to turn steel, flipper guide is opened aperture and is calculated as follows.
Wherein: side_guide_open_width: flipper guide opens aperture, unit: mm;
Slab_length: continuous casting billet length;Slab_width: continuous casting billet width, unit: mm.
2.2 roll after forward steel terminates, the adjustment of continuous casting billet dimension information and again carry out milling train setting
Roll after forward steel terminates, it should return original mill milling process control flow, because carrying out
Turning steel operation, continuous casting billet length and width dimension information in the controls needs again to exchange, and completes long
After the exchanging of wide dimension information, re-executing the precomputation function of milling train setting model, milling train is according to more
The new continuous casting billet information crossed, uses conventional secondary to turn steel and calculates setting process, provide corresponding passage
Number, drafts, speed etc. technique initialization parameter, the operation of rolling according to secondary turn steel flow process continue into
OK, until terminating.
So edge of continuous casting billet is changed into the part end to end of rolling slab, and part is in follow-up essence end to end
Whole operation is cut, thus completely eliminates the shadow that continuous casting billet quality of edges defect causes to slab finished product
Ring.On the other hand, owing to remaining remaining twice turn of steel, plan view control function is properly functioning,
Finished steel plate does not haves significant as only once turning steel " bucket waist " phenomenon, conscientiously reduces
Trimming amount, decreases and cuts damage.
Embodiment
If continuous casting billet length slab_length3 rice, width 2 meters, steel grade is that certain easily sends out edge fault steel
Kind.
Seeing Fig. 9, working out a production plan the stage before the rolling, this continuous casting billet is in computer systems
The new rolling mode label stamped.
Before the rolling, milling train Controlling model is judged to use new rolling mode.
After roughing mill forward steel rider road come by steel plate, control system is automatically given and turns steel instruction, and beats
Open flipper guide.
Flipper guide aperture=461mm.
When turning after steel completes, in the controls, slab_length=2m, slab_width=3m,
And data based on this, proceed to secondary and turn punching block formula, re-start rolling setup algorithm, according to this
Secondary result of calculation has continued the follow-up operation of rolling.
The present invention adapts to wide, and easy to use, solves the continuous casting billet edge that continuous casting working procedure causes and lacks
Falling into the slab edge fault caused, on the heavy plate mill with Automated condtrol, this technology is entirely capable of
Enough promote the use of, there is wide Technique Popularizing prospect.
Claims (1)
1. eliminate a heavy plate rolling control method for strand edge fault, it is characterized in that, including walking as follows
Rapid:
1) after continuous casting billet is come out of the stove, before arriving milling train, before starting rolling, carry out turning steel operation, turn steel
After completing, the edge both sides of original continuous casting billet become the rolled piece of entrance milling train end to end, start
The rolling of shaping stage, is i.e. originally present the continuous casting billet edge of quality of edges defect, is converted into
The part end to end of the rolled piece entering milling train in roll forming stage;
2) in last passage in roll forming stage, use webbing broadening milling method, control with this
The profile end to end of finished steel plate is straight;
3) after shaping stage has rolled, steel plate 90 degree turns steel, and original continuous casting billet both sides become again
Enter the both sides of the rolled piece of milling train, now start the rolling in broadening stage;
4) in last passage of broadening rolling sequence, reuse webbing broadening milling method, control
Two side profile of finished product straight;
5) after broadening stage rolling completes, steel plate again 90 degree turn steel, now original continuous casting billet two
Side part is converted into and enters the rolled piece of milling train end to end, starts rolling of last finish rolling stage
System, i.e. at final rolling sequence, is originally present the edge of the continuous casting billet of the defects such as bubble,
It is converted to the part end to end of last mill product steel plate;
6), after steel plate rolling completes, follow-up finishing cutting plate operation is entered.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310717218.4A CN103752622B (en) | 2013-12-23 | 2013-12-23 | A kind of heavy plate rolling control method eliminating strand edge fault |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310717218.4A CN103752622B (en) | 2013-12-23 | 2013-12-23 | A kind of heavy plate rolling control method eliminating strand edge fault |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103752622A CN103752622A (en) | 2014-04-30 |
CN103752622B true CN103752622B (en) | 2016-08-24 |
Family
ID=50520027
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310717218.4A Active CN103752622B (en) | 2013-12-23 | 2013-12-23 | A kind of heavy plate rolling control method eliminating strand edge fault |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103752622B (en) |
Families Citing this family (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105013817A (en) * | 2014-04-28 | 2015-11-04 | 宝山钢铁股份有限公司 | Heavy plate rolling method |
CN104148405B (en) * | 2014-08-21 | 2016-04-20 | 柳州钢铁股份有限公司 | The method for controlling shape in cut deal broadening stage |
CN106140826A (en) * | 2015-04-27 | 2016-11-23 | 鞍钢股份有限公司 | A kind of steel-plate shape control method |
CN105290116B (en) * | 2015-11-23 | 2017-04-19 | 广西柳州银海铝业股份有限公司 | Method for controlling transverse rolling width and longitudinal rolling width of moderately-thick plate |
CN107363093B (en) * | 2016-05-12 | 2019-01-08 | 鞍钢股份有限公司 | A kind of thin specification steel plate milling method improving the preceding intermediate blanket shape of rolling |
CN108246812B (en) * | 2017-12-22 | 2019-06-04 | 包头钢铁(集团)有限责任公司 | A kind of hot rolled steel plate edge sticks up the control method of skin |
CN109365527B (en) * | 2018-11-30 | 2020-02-07 | 湖南华菱湘潭钢铁有限公司 | Rolling method of wide and thick steel plate with large spreading ratio |
CN110216145B (en) * | 2019-07-10 | 2020-12-15 | 太原科技大学 | Magnesium alloy plate fine-grain chemical edge cracking rolling method |
CN110681696A (en) * | 2019-09-19 | 2020-01-14 | 宝钢特钢韶关有限公司 | Rolling process of high-sulfur steel |
CN111445441B (en) * | 2020-03-03 | 2023-02-17 | 首钢京唐钢铁联合有限责任公司 | Strip steel head defect processing method and device |
CN113695396B (en) * | 2020-05-23 | 2023-03-21 | 南阳汉冶特钢有限公司 | Method for rolling 40-70mm medium plate by using continuous casting billet corner cracks without cleaning and with low trimming cut amount |
CN112139243A (en) * | 2020-08-27 | 2020-12-29 | 柳州钢铁股份有限公司 | Method for improving steel plate tail rectangularity in medium and heavy plate rolling process |
CN114247757B (en) * | 2021-12-02 | 2023-10-27 | 北京科技大学设计研究院有限公司 | Control method for automatic steel turning of wide and thick plate rolling line |
CN114535339B (en) * | 2022-01-31 | 2023-10-10 | 安泰科技股份有限公司 | Processing method of large-size homogenized high-purity rhenium plate |
CN115446125B (en) * | 2022-08-16 | 2024-02-02 | 北京科技大学 | Automatic steel-turning control method for medium plate based on machine vision |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07204706A (en) * | 1994-01-17 | 1995-08-08 | Nippon Steel Corp | Method for control rolling thick plate having excellent homogeniety in the width direction |
CN1850373A (en) * | 2006-04-29 | 2006-10-25 | 东北大学 | Method for rolling variable-width steel plate |
CN1850376A (en) * | 2006-04-29 | 2006-10-25 | 东北大学 | Method for rolling trapezoidal width steel plate |
CN102101124A (en) * | 2009-12-22 | 2011-06-22 | 鞍钢股份有限公司 | Production method for eliminating edge defects of hot rolled strip steel |
CN102886381A (en) * | 2011-07-22 | 2013-01-23 | 宝山钢铁股份有限公司 | Thick plate rolling method |
-
2013
- 2013-12-23 CN CN201310717218.4A patent/CN103752622B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07204706A (en) * | 1994-01-17 | 1995-08-08 | Nippon Steel Corp | Method for control rolling thick plate having excellent homogeniety in the width direction |
CN1850373A (en) * | 2006-04-29 | 2006-10-25 | 东北大学 | Method for rolling variable-width steel plate |
CN1850376A (en) * | 2006-04-29 | 2006-10-25 | 东北大学 | Method for rolling trapezoidal width steel plate |
CN102101124A (en) * | 2009-12-22 | 2011-06-22 | 鞍钢股份有限公司 | Production method for eliminating edge defects of hot rolled strip steel |
CN102886381A (en) * | 2011-07-22 | 2013-01-23 | 宝山钢铁股份有限公司 | Thick plate rolling method |
Non-Patent Citations (1)
Title |
---|
提高宽厚板产品成材率措施分析;于峰等;《鞍钢技术》;20070410(第02期);第23-27页 * |
Also Published As
Publication number | Publication date |
---|---|
CN103752622A (en) | 2014-04-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103752622B (en) | A kind of heavy plate rolling control method eliminating strand edge fault | |
CN102699028B (en) | Method for eliminating linear edge defects of hot-rolled low-carbon steel | |
RU2591788C2 (en) | Method of producing hot-rolled silicon steel | |
CN106984652B (en) | The method for controlling finishing stand sideslip according to breakdown bar camber | |
CN103484643B (en) | Method for preventing hot rolling edge fractures in oriented silicon steel | |
CN103567222B (en) | A kind of iron and steel and aluminium alloy plate carries product hot rolling mixed production line and production technology | |
CN108480415A (en) | A kind of online roll-in thermoforming process of hot plate/band and its application | |
JP2014521517A (en) | A method for pre-controlling the shape of the head and tail of a continuously cast slab to reduce the amount of cutting of the head and tail of a hot rolled intermediate slab | |
CN208321724U (en) | Hot plate/with on-line continuous hot bending shape device and with the production line of the device | |
CN1857807A (en) | Hot rolling process of wide flat bar steel | |
CN106734239B (en) | Base head and tail width control method and device and constant width machine among a kind of constant width machine | |
CN104399745B (en) | A kind of steekle mill production line configuring roughing mill and method of work thereof | |
CN106413928B (en) | Manufacturing method, steel plate off-position setting device, steel plate off-position setting method and the steel sheet manufacturing method of hot rolled steel plate | |
CN109433826A (en) | Medium thin slab continuous casting and rolling unit and its production method | |
CN104415968B (en) | Hot-rolling high-speed tool steel bar and wire producing process | |
CN109570241A (en) | A kind of wedge-shaped control system and method with sideslip protection | |
CN104438355A (en) | Hot rolling flattening technology for eliminating strip steel wave shape defects | |
CN105195807A (en) | Shearing method of flying shears | |
CN105013819B (en) | A kind of preparation method of hot rolling electrical steels | |
CN209334441U (en) | Medium thin slab continuous casting and rolling unit | |
CN103817155B (en) | Thickness is greater than 50mm steel plate board-shape control method | |
CN104353675B (en) | The control method of a kind of planisher band head plate shape rolling parameter and planisher | |
CN104399748B (en) | A kind of production technology that can replace conventional broadband steel hot continuous rolling | |
CN105855315A (en) | Production method for steel plate | |
CN103624088A (en) | Method for eliminating transverse cracks on steel plate tail |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |