CN103748849B - Control channel transmission method and base station, terminal - Google Patents
Control channel transmission method and base station, terminal Download PDFInfo
- Publication number
- CN103748849B CN103748849B CN201280007843.3A CN201280007843A CN103748849B CN 103748849 B CN103748849 B CN 103748849B CN 201280007843 A CN201280007843 A CN 201280007843A CN 103748849 B CN103748849 B CN 103748849B
- Authority
- CN
- China
- Prior art keywords
- ereg
- resource block
- physical resource
- under
- resource unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L5/00—Arrangements affording multiple use of the transmission path
- H04L5/0091—Signaling for the administration of the divided path
- H04L5/0094—Indication of how sub-channels of the path are allocated
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L5/00—Arrangements affording multiple use of the transmission path
- H04L5/003—Arrangements for allocating sub-channels of the transmission path
- H04L5/0053—Allocation of signaling, i.e. of overhead other than pilot signals
Abstract
The embodiment of the present application provides control channel transmission method and base station, terminal.On the one hand, the embodiment of the present application is by determining at least one Physical Resource Block pair for transmitting control channel, and then the corresponding eREG of corresponding each eCCE of aggregation level and the aggregation level according to the control channel, determine each Physical Resource Block centering for mapping the eREG information of the control channel, the numbering of the eREG of each Physical Resource Block centering, using the corresponding Resource Unit in the center of each Physical Resource Block pair as Base Serial Number, sequentially to the corresponding Resource Unit cycle arrangement of marginal position, and according to the eREG information of the determination, the control channel is mapped on the corresponding eREG of eREG information of the determination, make it possible on the position of eREG for mapping the control channel, send the control information that the control channel is carried.
Description
Technical field
The application is related to the communication technology, more particularly to control channel transmission method and base station, terminal.
Background technology
In wireless communication system such as Long Term Evolution(Long Term Evolution, LTE)System or advanced Long Term Evolution
(Long Term Evolution Advanced, LTE-A)In system, the physical down transmitted based on precoding mode is introduced
Control channel(Physical Downlink Control Channel, PDCCH), i.e., enhanced Physical Downlink Control Channel
(Enhanced Physical Downlink Control Channel, ePDCCH).EPDCCH can be based on user equipment
(User Equipment, UE)Specific reference signal is demodulated reference signal(Demodulation Reference
Signal, DMRS)To demodulate.EPDCCH is transmitted in the region of a sub-frame transmission downstream data channel, and with physics under
Row shared channel(Physical Downlink Shared Channel, PDSCH)It is frequency division.Base station can be according in terminal
The channel status of report, in the preferable Physical Resource Block of channel condition(Physical Resource Block, PRB)Upper transmission
ePDCCH.Wherein, in a subframe, two Physical Resource Block of time slot can be referred to as Resource Block pair(RB pair), typically
Referred to as Physical Resource Block pair.
However, how not being given at Physical Resource Block centering in the prior art by enhanced resource unit group
(Enhanced Resource Element Group, eREG)Send or receive some control channels such as ePDCCH carryings
Control information.
The content of the invention
The many aspects of the application provide control channel transmission method and base station, terminal, are used to realize in Physical Resource Block
Centering is sent or is received the control information that some control channels such as ePDCCH is carried by eREG.
A kind of one side of the application, there is provided control channel transmission method, including:
It is determined that at least one Physical Resource Block pair for transmitting control channel;
The corresponding eREG of corresponding each eCCE of aggregation level and the aggregation level according to the control channel, it is determined that
Each Physical Resource Block centering is used to map the eREG information of the control channel, the eREG of each Physical Resource Block centering
Numbering, using the corresponding Resource Unit in the center of each Physical Resource Block pair as Base Serial Number, sequentially to edge
The corresponding Resource Unit cycle arrangement in position;
EREG information according to the determination, the eREG information that the control channel is mapped into the determination is corresponding
On eREG;
On the position of eREG for mapping the control channel, the control information that the control channel is carried is sent.
A kind of another aspect of the application, there is provided control channel transmission method, including:
It is determined that at least one Physical Resource Block pair for transmitting control channel;
The corresponding eREG of the corresponding candidate eCCE of candidate's aggregation level Lk and the Lk according to the control channel, it is determined that
Each Physical Resource Block centering is used to map the eREG information of the control channel, the eREG of each Physical Resource Block centering
Numbering, using the corresponding Resource Unit in the center of each Physical Resource Block pair as Base Serial Number, sequentially to edge
The corresponding Resource Unit cycle arrangement in position;Wherein, k is integer, and Lk is any one in k candidate's aggregation level;
EREG information according to the determination, the corresponding eREG of candidate eCCE corresponding to the Lk detects, works as inspection
When surveying correct, parsing obtains the control information that the control channel is carried from the detection correct eREG, when detection not just
When really, to other candidate's aggregation levels corresponding candidate eCCE couples in the k candidate aggregation level in addition to the Lk
The eREG for answering proceeds detection.
A kind of one side of the application, there is provided control channel transmission method, including:
It is determined that at least one Physical Resource Block pair for transmitting control channel;
The corresponding eREG of corresponding each eCCE of aggregation level and the aggregation level according to the control channel, it is determined that
Each Physical Resource Block centering is used to map the eREG information of the control channel, the eREG of each Physical Resource Block centering
It is to be mapped to described each mapping area of Physical Resource Block centering first using first mapping ruler, and using described the
Two mapping rulers are mapped to the eREG of each mapping area of Physical Resource Block centering second, and first mapping area is by passing
Transmission of data Resource Unit composition, second mapping area by described each Physical Resource Block centering reference signal and/or its
The Resource Unit composition of his control channel mapping;
EREG information according to the determination, the eREG information that the control channel is mapped into the determination is corresponding
On eREG;
On the position of eREG for mapping the control channel, the control information that the control channel is carried is sent.
A kind of another aspect of the application, there is provided control channel transmission method, including:
It is determined that at least one Physical Resource Block pair for transmitting control channel;
The corresponding eREG of the corresponding candidate eCCE of candidate's aggregation level Lk and the Lk according to the control channel, it is determined that
Each Physical Resource Block centering is used to map the eREG information of the control channel, the eREG of each Physical Resource Block centering
It is to be mapped to described each mapping area of Physical Resource Block centering first using first mapping ruler, and using described the
Two mapping rulers are mapped to the eREG of each mapping area of Physical Resource Block centering second, and first mapping area is by passing
Transmission of data Resource Unit composition, second mapping area by described each Physical Resource Block centering reference signal and/or its
The Resource Unit composition of his control channel mapping;Wherein, k is integer, and Lk is any one in k candidate's aggregation level;
EREG information according to the determination, the corresponding eREG of candidate eCCE corresponding to the Lk detects, works as inspection
When surveying correct, parsing obtains the control information that the control channel is carried from the detection correct eREG, when detection not just
When really, to other candidate's aggregation levels corresponding candidate eCCE couples in the k candidate aggregation level in addition to the Lk
The eREG for answering proceeds detection.
A kind of another aspect of the application, there is provided base station, including:
Determining unit, for determining at least one Physical Resource Block pair for transmitting control channel, and according to described
The aggregation level of control channel and the corresponding eREG of corresponding each eCCE of the aggregation level, determine each Physical Resource Block pair
In for mapping the eREG information of the control channel, the numbering of the eREG of each Physical Resource Block centering, with described every
The corresponding Resource Unit in center of individual Physical Resource Block pair as Base Serial Number, sequentially to the corresponding resource list of marginal position
First cycle arrangement;
Map unit, for the eREG information determined according to the determining unit, the control channel is mapped to described
On the corresponding eREG of eREG information of determination;
Transmitting element, the position of the eREG for mapping the control channel in the map unit, sends the control
The control information of channel bearing processed.
A kind of another aspect of the application, there is provided terminal, including:
Determining unit, it is determined that at least one Physical Resource Block pair for transmitting control channel, and according to the control
The corresponding eREG of the corresponding candidate eCCE of candidate's aggregation level Lk and the Lk of channel, determine that each Physical Resource Block centering is used
In the eREG information for mapping the control channel, the numbering of the eREG of each Physical Resource Block centering, with described each thing
The corresponding Resource Unit in center of Resource Block pair is managed as Base Serial Number, is sequentially followed to the corresponding Resource Unit of marginal position
Circle permutation;Wherein, k is integer, and Lk is any one in k candidate's aggregation level;
Detection unit, for the eREG information determined according to the determining unit, to the Lk corresponding candidates eCCE couples
The eREG for answering is detected, when detecting correct, parsing obtains the control channel carrying from the detection correct eREG
Control information, when detecting incorrect, other candidates in addition to the Lk in the k candidate aggregation level are polymerized
The corresponding eREG of the corresponding candidate eCCE of rank proceed detection.
A kind of another aspect of the application, there is provided base station, including:
Determining unit, for determining at least one Physical Resource Block pair for transmitting control channel, and according to described
The aggregation level of control channel and the corresponding eREG of corresponding each eCCE of the aggregation level, determine each Physical Resource Block pair
In for mapping the eREG information of the control channel, the eREG of each Physical Resource Block centering is to be reflected using described first
Penetrate rule and be mapped to described each mapping area of Physical Resource Block centering first, and be mapped to using second mapping ruler
The eREG of each mapping area of Physical Resource Block centering second, first mapping area by transmission data Resource Unit
Composition, second mapping area is mapped by described each Physical Resource Block centering reference signal and/or other control channels
Resource Unit is constituted;
Map unit, for the eREG information determined according to the determining unit, the control channel is mapped to described
On the corresponding eREG of eREG information of determination;
Transmitting element, the position of the eREG for mapping the control channel in the map unit, sends the control
The control information of channel bearing processed.
A kind of another aspect of the application, there is provided terminal, including:
Determining unit, for determining at least one Physical Resource Block pair for transmitting control channel, and according to described
The corresponding eREG of the corresponding candidate eCCE of candidate's aggregation level Lk and the Lk of control channel, determine each Physical Resource Block pair
In for mapping the eREG information of the control channel, the eREG of each Physical Resource Block centering is to be reflected using described first
Penetrate rule and be mapped to described each mapping area of Physical Resource Block centering first, and be mapped to using second mapping ruler
The eREG of each mapping area of Physical Resource Block centering second, first mapping area by transmission data Resource Unit
Composition, second mapping area is mapped by described each Physical Resource Block centering reference signal and/or other control channels
Resource Unit is constituted;Wherein, k is integer, and Lk is any one in k candidate's aggregation level;
Detection unit, for the eREG information determined according to the determining unit, to the Lk corresponding candidates eCCE couples
The eREG for answering is detected, when detecting correct, parsing obtains the control channel carrying from the detection correct eREG
Control information, when detecting incorrect, other candidates in addition to the Lk in the k candidate aggregation level are polymerized
The corresponding eREG of the corresponding candidate eCCE of rank proceed detection.
As shown from the above technical solution, on the one hand, the embodiment of the present application is by determining for transmitting control channel at least
One Physical Resource Block pair, and then aggregation level and the aggregation level according to the control channel is corresponding each eCCE pairs
The eREG for answering, determines each Physical Resource Block centering for mapping the eREG information of the control channel, each physics money
The numbering of the eREG of source block centering, is compiled using the corresponding Resource Unit in the center of each Physical Resource Block pair as starting
Number, sequentially to the corresponding Resource Unit cycle arrangement of marginal position, and according to the eREG information of the determination, by the control
Channel is mapped on the corresponding eREG of eREG information of the determination, enabling in the position of the eREG for mapping the control channel
Put, send the control information that the control channel is carried, it is achieved thereby that sending one by eREG in Physical Resource Block pair
The control information that a little control channels such as ePDCCH is carried.
As shown from the above technical solution, on the one hand, the embodiment of the present application is by determining for transmitting control channel at least
One Physical Resource Block pair, and then according to candidate's aggregation level Lk and the Lk corresponding candidate eCCE couples of the control channel
The eREG for answering, determines each Physical Resource Block centering for mapping the eREG information of the control channel, each physics money
The numbering of the eREG of source block centering, is compiled using the corresponding Resource Unit in the center of each Physical Resource Block pair as starting
Number, sequentially to the corresponding Resource Unit cycle arrangement of marginal position;Wherein, k is integer, and Lk is in k candidate's aggregation level
Any one, enabling the eREG information according to the determination, the corresponding eREG of candidate eCCE corresponding to the Lk is carried out
Detection, when detecting correct, parsing obtains the control information that the control channel is carried from the detection correct eREG, when
When detecting incorrect, to other the corresponding times of candidate's aggregation level in the k candidate aggregation level in addition to the Lk
The corresponding eREG of eCCE are selected to proceed detection, it is achieved thereby that receiving some by eREG in Physical Resource Block pair controls letter
The control information that road such as ePDCCH is carried.
As shown from the above technical solution, on the other hand, the embodiment of the present application is by determining for transmitting control channel extremely
A few Physical Resource Block pair, and then corresponding each eCCE of aggregation level and the aggregation level according to the control channel
Corresponding eREG, determines each Physical Resource Block centering for mapping the eREG information of the control channel, described each physics
The eREG of resource block pair is to be mapped to described each map section of Physical Resource Block centering first using first mapping ruler
Domain, and the eREG of each mapping area of Physical Resource Block centering second, institute are mapped to using second mapping ruler
State the first mapping area to be made up of the Resource Unit of transmission data, second mapping area is by described each Physical Resource Block pair
Middle reference signal and/or the Resource Unit composition of other control channels mapping, and according to the eREG information of the determination, by institute
State control channel to be mapped on the corresponding eREG of eREG information of the determination, enabling mapping the control channel
On the position of eREG, the control information that the control channel is carried is sent, it is achieved thereby that passing through in Physical Resource Block pair
EREG sends the control information of some control channels such as ePDCCH carryings.
As shown from the above technical solution, on the other hand, the embodiment of the present application is by determining for transmitting control channel extremely
A few Physical Resource Block pair, and then according to the corresponding candidate eCCE of candidate's aggregation level Lk and the Lk of the control channel
Corresponding eREG, determines each Physical Resource Block centering for mapping the eREG information of the control channel, described each physics
The eREG of resource block pair is to be mapped to described each map section of Physical Resource Block centering first using first mapping ruler
Domain, and the eREG of each mapping area of Physical Resource Block centering second, institute are mapped to using second mapping ruler
State the first mapping area to be made up of the Resource Unit of transmission data, second mapping area is by described each Physical Resource Block pair
Middle reference signal and/or the Resource Unit composition of other control channels mapping;Wherein, k is integer, and Lk is k candidate's polymer grade
Any one in not, enabling the eREG information according to the determination, candidate eCCE corresponding to the Lk is corresponding
EREG is detected, when detecting correct, parsing obtains the control that the control channel is carried from the detection correct eREG
Information processed, when detecting incorrect, to other candidate's aggregation levels in the k candidate aggregation level in addition to the Lk
The corresponding eREG of corresponding candidate eCCE proceeds detection, it is achieved thereby that by eREG receptions one in Physical Resource Block pair
The control information that a little control channels such as ePDCCH is carried.
Brief description of the drawings
In order to illustrate more clearly of the embodiment of the present application or technical scheme of the prior art, below will be to embodiment or existing
The accompanying drawing to be used needed for having technology description is briefly described, it should be apparent that, drawings in the following description are this Shens
Some embodiments please, for those of ordinary skill in the art, without having to pay creative labor, can be with
Other accompanying drawings are obtained according to these accompanying drawings.
The schematic flow sheet of the control channel transmission method that Fig. 1 is provided for the embodiment of the application one;
Fig. 2 is that a positions of the eREG of control channel mapping in the corresponding embodiments of Fig. 1 in Physical Resource Block pair is illustrated
Figure;
Fig. 3 is that another locations of the eREG of control channel mapping in the corresponding embodiments of Fig. 1 in Physical Resource Block pair shows
It is intended to;
Fig. 4 is that another locations of the eREG of control channel mapping in the corresponding embodiments of Fig. 1 in Physical Resource Block pair shows
It is intended to;
Fig. 5 is that another locations of the eREG of control channel mapping in the corresponding embodiments of Fig. 1 in Physical Resource Block pair shows
It is intended to;
Fig. 6 is that another locations of the eREG of control channel mapping in the corresponding embodiments of Fig. 1 in Physical Resource Block pair shows
It is intended to;
The schematic flow sheet of the control channel transmission method that Fig. 7 is provided for another embodiment of the application;
The schematic flow sheet of the control channel transmission method that Fig. 8 is provided for another embodiment of the application;
The schematic flow sheet of the control channel transmission method that Fig. 9 is provided for another embodiment of the application;
The structural representation of the base station that Figure 10 is provided for another embodiment of the application;
The structural representation of the terminal that Figure 11 is provided for another embodiment of the application;
The structural representation of the terminal that Figure 12 is provided for another embodiment of the application;
The structural representation of the base station that Figure 13 is provided for another embodiment of the application;
The structural representation of the terminal that Figure 14 is provided for another embodiment of the application.
Specific embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present application clearer, below in conjunction with the embodiment of the present application
In accompanying drawing, the technical scheme in the embodiment of the present application is clearly and completely described, it is clear that described embodiment is
Some embodiments of the present application, rather than whole embodiments.Based on the embodiment in the application, those of ordinary skill in the art
The every other embodiment obtained under the premise of creative work is not made, belongs to the scope of the application protection.
Technical scheme, can apply to the wireless communication systems such as LTE system or lte-a system.End therein
End can be the user equipment in LTE system or lte-a system(User Equipment, UE);Base station therein can be LTE
ENB in system or lte-a system.
In addition, the terms "and/or", a kind of only incidence relation for describing affiliated partner, expression there may be
Three kinds of relations, for example, A and/or B, can represent:Individualism A, while there is A and B, individualism B these three situations.Separately
Outward, character "/" herein, typicallys represent forward-backward correlation pair as if a kind of relation of "or".
In wireless communication system such as Long Term Evolution(Long Term Evolution, LTE)System or advanced Long Term Evolution
(Long Term Evolution Advanced, LTE-A)In system, downlink multi-access access way generally uses orthogonal frequency division multiplexing
Accessed with multiple access(Orthogonal Frequency Division Multiple Access, OFDMA)Mode.Under system
Row resource has been partitioned into OFDM from the time(Orthogonal Frequency Division
Multiple, OFDM)Symbol, has been partitioned into subcarrier from frequency.
One normal descending sub frame, includes two time slots(slot), each time slot has 7 or 6 OFDM symbols, and one just
Normal descending sub frame contains 14 OFDM symbols or 12 OFDM symbols altogether.LTE Release8/9/10 standards also define resource
Block(Resource Block, RB)Size, Resource Block includes 12 subcarriers on frequency domain, is half son in time domain
Frame duration(I.e. one time slot), i.e., comprising 7 or 6 OFDM symbols.In a subframe, a pair of Resource Block of two time slots claim
Be Resource Block pair(RB pair, RB couples).In actually sending, the Resource Block that resource physically is used is to being called physics
Resource Block pair(Physical RB pair, PRB couples), it is further referred to as unit Physical Resource Block.Therefore, follow-up description nothing
By being PRB, PRB pair or Physical Resource Block or Physical Resource Block pair, all referring to PRB pairs.
The various data carried in subframe, are to mark off various physical channels on the physical time-frequency resource of subframe to organize
Mapping.Various physical channels can substantially be divided into two classes:Control channel and Traffic Channel.Correspondingly, the number that control channel is carried
According to can be described as control data(Can be generally referred to as control information), Traffic Channel carry data can be described as business datum(Typically
It is properly termed as data).The basic goal for sending subframe is transmission services data, and the effect of control channel is for auxiliary activities number
According to transmission.
In LTE system, a complete Physical Downlink Control Channel(Physical Downlink Control
Channel, PDCCH)May map to one or several control channel units(Control Channel Element, CCE).
One PDCCH may map to 1,2,4 or 8 CCE, i.e., be made up of 1,2,4 or 8 CCE, respectively corresponding aggregation level 1, and 2,4,
8。
Due to multi-user's multiple-input and multiple-output(Multiple Input Multiple Output, MIMO)And coordinate multipoint
(Coordinated Multiple Points, CoMP)Etc. the introducing of technology, the physics transmitted based on precoding mode is introduced
Down control channel(Physical Downlink Control Channel, PDCCH), i.e., enhanced physical down control letter
Road(Enhanced Physical Downlink Control Channel, ePDCCH).EPDCCH can be based on the specific ginsengs of UE
Examine signal i.e. demodulated reference signal(Demodulation Reference Signal, DMRS)To demodulate.Each ePDCCH still may be used
To be mapped to the k logic unit similar to CCE, this is defined herein as strengthening control channel unit(enhanced Control
Channel Element, eCCE), need the UE to carry out blind Detecting in end side.The definition of aggregation level in PDCCH is continued to use, is polymerized
Rank is L(L=1,2,4 or 8 etc.)EPDCCH then may map to L eCCE, i.e., be made up of L eCCE.One eCCE is by one
Individual or several eREG compositions.
The schematic flow sheet of the control channel transmission method that Fig. 1 is provided for the embodiment of the application one, as shown in Figure 1.
101st, at least one Physical Resource Block pair for transmitting control channel is determined.
102nd, according to the control channel the corresponding eREG of corresponding each eCCE of aggregation level and the aggregation level,
Each Physical Resource Block centering is determined for mapping the eREG information of the control channel, each Physical Resource Block centering
The numbering of eREG, using the corresponding Resource Unit in the center of each Physical Resource Block pair as Base Serial Number, sequentially to
The corresponding Resource Unit cycle arrangement of marginal position.
103rd, the eREG information according to the determination, the control channel is mapped to the eREG information correspondence of the determination
EREG.
104th, on the position of eREG for mapping the control channel, the control information that the control channel is carried is sent.
It should be noted that 101~104 executive agent can be base station.
Wherein, the control channel is specifically as follows enhanced Physical Downlink Control Channel(Enhanced Physical
Downlink Control Channel, ePDCCH).
Specifically, in 102, the eREG information of the determination can include that eREG numbers and eREG are identified.
Alternatively, in a possible implementation of the present embodiment, the centre bit of each Physical Resource Block pair
Put the center of the Resource Unit that can be each Physical Resource Block centering.
Alternatively, in a possible implementation of the present embodiment, the centre bit of each Physical Resource Block pair
It can be the center of each other Resource Units of the Physical Resource Block centering in addition to the Resource Unit that PDCCH maps to put
Position.
Alternatively, in a possible implementation of the present embodiment, the eREG of each Physical Resource Block centering
Can by described each Physical Resource Block at least one of Resource Unit constitute.
Alternatively, in a possible implementation of the present embodiment, the eREG of each Physical Resource Block centering
Can be by described each Physical Resource Block centering in addition to the Resource Unit that reference signal and/or other control channels map
At least one of other Resource Units Resource Unit is constituted.
Wherein, the reference signal can include but is not limited to public reference signal(Common Reference
Signal, CRS), DMRS, channel state information reference signals(Channel Status Information Reference
Signal, CSI-RS)And location reference signals(Positioning Reference Signal, PRS)At least one of.
Alternatively, in a possible implementation of the present embodiment, in 102, described each Physical Resource Block pair
In eREG numbering, can using the corresponding Resource Unit in the center of each Physical Resource Block pair as starting compile
Number, in the shape of a spiral sequentially to the corresponding Resource Unit cycle arrangement of marginal position.
Specifically, it can be assumed that the center of each Physical Resource Block pair is(A, b), each Physical Resource Block centering
The number of Resource Unit is M.The numbering of the M Resource Unit can be with the center pair of each Physical Resource Block pair
The Resource Unit answered sequentially is incremented by is arranged to the corresponding Resource Unit of marginal position in the shape of a spiral as Base Serial Number, below with
As a example by left-hand circular arrangement.Assuming that each Physical Resource Block centering includes N number of eREG, N is each Physical Resource Block centering
The number of eREG.
So, it is possible, firstly, to according to (x-n) %N=0, the Resource Unit of the M Resource Unit that n-th eREG includes is determined
Numbering.Wherein, n is the eREG numberings of the eREG in each unit resource cell block, and span is 1 to the integer between N;x
It is the Resource Unit numbering in corresponding M Resource Unit, span is 1 to the integer between M.
Then, according to 1Under n+1N is right+2On n+2N is left+3Under n+3N is right+4On n+4N is left+……+knx=x-1, determines n-th position of eREG
Put.Wherein, under n, n is right, n it is upper with n left representations using the corresponding Resource Unit in center as original position, in the shape of a spiral with inverse
Sequentially to marginal position corresponding Resource Unit arrangement unit resource unit, nx is to meet the k institutes of above-mentioned equation really to clockwise
Under fixed n, n is right, n is upper and n is left one.
So far, equation 1 will be metUnder n+1N is right+2On n+2N is left+3Under n+3N is right+4On n+4N is left+……+knxThe 1 of=x-1Under n、1N is right、2On n、
2N is left、3Under n、3N is right、4On n、4N is left... and knxSue for peace in each direction, then n-th eREG can be determined relative to center
The Resource Unit of skew, so that it is determined that n-th position of eREG.
Below will be with a Physical Resource Block pair(168 Resource Units are included altogether), 12 subcarriers are included on frequency domain,
As a example by including 14 OFDM symbols in time domain, its center can be the centre bit of the Resource Unit of Physical Resource Block centering
Put, i.e. the intermediate value of frequency domain and time domain, in order to simplify statement, the 6th subcarrier, the 7th OFDM symbol pair are represented in following form
The Resource Unit answered, i.e.,(6,7).Position below can be simplified with this form and represent.
Assuming that the internal eREG numbers of Physical Resource Block are 16, can be determined n-th in 16 eREG according to (x-n) %16=0
Resource Unit numbering in 168 Resource Units that individual eREG includes.Such as, eREG1 corresponding 168 is can determine that according to the method described above
Resource Unit numbering x in individual Resource Unit is respectively 1,17,33,49,65,81,97,113,129,145 and 161.Then, root
According to 1Under n+1N is right+2On n+2N is left+3Under n+3N is right+4On n+4N is left+……+knx=x-1, determines the position corresponding to above-mentioned each Resource Unit x
Put.
Such as, x=1 substitution above formulas are determined to number the position of the Resource Unit for being 1, due to not having relative to center
Skew, then can determine that the position for numbering the Resource Unit for being 1 is(6,7)
For another example, x=17 substitution above formulas are determined to number the position of the Resource Unit for being 17,1Under n+1N is right+2On n+2N is left+3Under n+
3N is right+4On n=17-1, the Resource Unit offset downward relative to center is 4, relative to the resource that center offsets to the right
Unit is 4, and the Resource Unit offset up relative to center is 6, relative to the Resource Unit that center offsets to the left
It is 2, therefore, then can determine that the position for numbering the Resource Unit for being 17 is(4,9).
For another example, x=33 substitution above formulas are determined to number the position of the Resource Unit for being 33,1Under n+1N is right+2On n+2N is left+3Under n+
3N is right+4On n+4N is left+5Under n+5N is right+2On n=33-1, the Resource Unit offset downward relative to center is 9, relative to center
The Resource Unit for offseting to the right is 9, is 8 relative to the Resource Unit that center offsets up, relative to center to the left
The Resource Unit of skew is 6, therefore, then can determine that the position for numbering the Resource Unit for being 33 is(7,10).
By that analogy, using the above method can determine each eREG includes in 16 eREG Resource Unit relative to
The Resource Unit of Centre position deviation, so that it is determined that in 16 eREG the Resource Unit that each eREG includes position, such as Fig. 2
It is shown.Fig. 2 shows a Physical Resource Block pair being made up of 168 Resource Units, and each lattice represents a resource
Unit, numbering therein is 16 numberings of eREG, is used to represent the eREG belonging to each Resource Unit, and vertical direction represents frequency
Domain resource, horizontal direction represents time-domain resource.
Alternatively, if further considering to deduct the Resource Unit of DMRS mappings, 16 can be determined using the above method
The Resource Unit that each eREG includes in individual eREG relative to Centre position deviation Resource Unit, so that it is determined that 16 eREG
In the positions of Resource Unit that include of each eREG, as shown in figure 3, wherein, the resource list of horizontal line shadow representation DMRS mappings
Unit.Fig. 3 shows one by 168 Resource Units(Wherein, comprising 24 Resource Units of DMRS mappings, over these locations
The eREG and corresponding numbering for having mapped are deducted)The Physical Resource Block pair of composition, each lattice represents a resource
Unit, numbering therein is 16 numberings of eREG, is used to represent the eREG belonging to each Resource Unit, and vertical direction represents frequency
Domain resource, horizontal direction represents time-domain resource.
Alternatively, if skipping 24 Resource Units of DMRS mappings when further considering that eREG maps, i.e., with each
Physical Resource Block is to the corresponding Resource Unit in center selected as Base Serial Number sequentially to the corresponding resource of marginal position
Unit cycle arrangement, the Resource Unit for running into DMRS mappings is then skipped.So that it is determined that each eREG includes in 16 eREG
The position of Resource Unit, as shown in figure 4, wherein, the Resource Unit of horizontal line shadow representation DMRS mappings.Each lattice is represented
One Resource Unit, numbering therein is 16 numberings of eREG, is used to represent the eREG belonging to each Resource Unit, Vertical Square
To frequency domain resource is represented, horizontal direction represents time-domain resource.
Below will be with a Physical Resource Block pair(168 Resource Units are included altogether), 12 subcarriers are included on frequency domain,
As a example by including 14 OFDM symbols in time domain, its center can be the money that Physical Resource Block centering maps except PDCCH
The center of other Resource Units outside source unit.Similarly, it is still assumed that the internal eREG numbers of Physical Resource Block are
16, using the above method each eREG includes in 16 eREG Resource Unit can be determined relative to Centre position deviation
Resource Unit, so that it is determined that in 16 eREG the Resource Unit that each eREG includes position, wherein DMRS mapping 24
The eREG and corresponding numbering mapped on Resource Unit position are deducted, as shown in figure 5, wherein, horizontal line shadow representation
The Resource Unit of DMRS mappings, diagonal line hatches represent the Resource Unit of PDCCH mappings.
Alternatively, if skipping 24 Resource Units of DMRS mappings when further considering that eREG maps, i.e., with physics
The corresponding Resource Unit in center of other Resource Units of the resource block pair in addition to the Resource Unit that PDCCH maps is made
Be Base Serial Number sequentially to the corresponding Resource Unit cycle arrangement of marginal position, the Resource Unit for running into DMRS mappings is then skipped.
So that it is determined that in 16 eREG the Resource Unit that each eREG includes position, as shown in fig. 6, wherein, horizontal line shadow representation
The Resource Unit of DMRS mappings, diagonal line hatches represent the Resource Unit of PDCCH mappings.Each lattice represents a resource list
Unit, numbering therein is 16 numberings of eREG, is used to represent the eREG belonging to each Resource Unit, and vertical direction represents frequency domain
Resource, horizontal direction represents time-domain resource.
Be can be seen that using the technical scheme of the present embodiment from Fig. 2~Fig. 6, had the following advantages:
EREG as much as possible can be distributed in each OFDM symbol;
The performance of each eREG is as equal as possible, i.e. each eREG had both included Physical Resource Block to middle Resource Unit,
Also Resource Unit of the Physical Resource Block to edge is included;
The size approximately equal of each eREG.
So, if centerized fusion transmission is also each as if basic transmitting element, then ensure that using eREG
Individual eREG combines the eCCE to be formed and equally meets above-mentioned three rule.
It is understood that if right-hand circular is arranged, then the equation can be could alternatively be into 1N is right+1Under n+
2N is left+2On n+3N is right+3Under n+4N is left+4On n+……+knx=x-1, other processes are similar to, and here is omitted.
Alternatively, in a possible implementation of the present embodiment, in 102, described each Physical Resource Block pair
In eREG numbering, can using the corresponding Resource Unit in the center of each Physical Resource Block pair as starting compile
Number, annularly sequentially to the corresponding Resource Unit cycle arrangement of marginal position.
In the present embodiment, by determining at least one Physical Resource Block pair for transmitting control channel, and then according to institute
The corresponding eREG of corresponding each eCCE of aggregation level and the aggregation level of control channel are stated, each Physical Resource Block is determined
Centering is used to map the eREG information of the control channel, the numbering of the eREG of each Physical Resource Block centering, with described
The corresponding Resource Unit in center of each Physical Resource Block pair as Base Serial Number, sequentially to the corresponding resource of marginal position
Unit cycle arrangement, and according to the eREG information of the determination, the control channel is mapped to the eREG letters of the determination
Cease on corresponding eREG, enabling on the position of eREG for mapping the control channel, send the control channel and carry
Control information, it is achieved thereby that in Physical Resource Block pair by eREG send some control channels such as ePDCCH carry
Control information.
The schematic flow sheet of the control channel transmission method that Fig. 7 is provided for another embodiment of the application, as shown in Figure 7.
701st, at least one Physical Resource Block pair for transmitting control channel is determined.
702nd, the corresponding eREG of the corresponding candidate eCCE of candidate's aggregation level Lk and the Lk according to the control channel,
Each Physical Resource Block centering is determined for mapping the eREG information of the control channel, each Physical Resource Block centering
The numbering of eREG, using the corresponding Resource Unit in the center of each Physical Resource Block pair as Base Serial Number, sequentially to
The corresponding Resource Unit cycle arrangement of marginal position;Wherein, k is integer, and Lk is any one in k candidate's aggregation level.
703rd, the eREG information according to the determination, the corresponding eREG of candidate eCCE corresponding to the Lk detects,
When detecting correct, parsing obtains the control information that the control channel is carried from the detection correct eREG, works as detection
When incorrect, to the corresponding candidate of other candidate's aggregation levels in the k candidate aggregation level in addition to the Lk
The corresponding eREG of eCCE proceed detection.
It should be noted that 701~703 executive agent can be terminal.
Specifically, when detecting incorrect, to other candidates in the k candidate aggregation level in addition to the Lk
The corresponding eREG of the corresponding candidate eCCE of aggregation level proceed detection, untill detection is correct, or to all of time
Untill selecting the corresponding eREG detections of the corresponding candidate eCCE of aggregation level to finish.
Wherein, the control channel is specifically as follows enhanced Physical Downlink Control Channel(Enhanced Physical
Downlink Control Channel, ePDCCH).
Specifically, at 702, the eREG information of the determination can include that eREG numbers and eREG are identified.
Alternatively, in a possible implementation of the present embodiment, the centre bit of each Physical Resource Block pair
Put the center of the Resource Unit that can be each Physical Resource Block centering.
Alternatively, in a possible implementation of the present embodiment, the centre bit of each Physical Resource Block pair
It can be the center of each other Resource Units of the Physical Resource Block centering in addition to the Resource Unit that PDCCH maps to put
Position.
Alternatively, in a possible implementation of the present embodiment, the eREG of each Physical Resource Block centering
Can by described each Physical Resource Block at least one of Resource Unit constitute.
Alternatively, in a possible implementation of the present embodiment, the eREG of each Physical Resource Block centering
Can be by described each Physical Resource Block centering in addition to the Resource Unit that reference signal and/or other control channels map
At least one of other Resource Units Resource Unit is constituted.
Wherein, the reference signal can include but is not limited to public reference signal(Common Reference
Signal, CRS), DMRS, channel state information reference signals(Channel Status Information Reference
Signal, CSI-RS)And location reference signals(Positioning Reference Signal, PRS)At least one of.
Alternatively, in a possible implementation of the present embodiment, at 702, described each Physical Resource Block pair
In eREG numbering, can using the corresponding Resource Unit in the center of each Physical Resource Block pair as starting compile
Number, in the shape of a spiral sequentially to the corresponding Resource Unit cycle arrangement of marginal position.
Alternatively, in a possible implementation of the present embodiment, at 702, described each Physical Resource Block pair
In eREG numbering, can using the corresponding Resource Unit in the center of each Physical Resource Block pair as starting compile
Number, annularly sequentially to the corresponding Resource Unit cycle arrangement of marginal position.
Detailed description may refer to the associated description in the corresponding embodiments of Fig. 1, and here is omitted.
In the present embodiment, by determining at least one Physical Resource Block pair for transmitting control channel, and then according to institute
The corresponding eREG of the corresponding candidate eCCE of candidate's aggregation level Lk and the Lk of control channel are stated, each Physical Resource Block is determined
Centering is used to map the eREG information of the control channel, the numbering of the eREG of each Physical Resource Block centering, with described
The corresponding Resource Unit in center of each Physical Resource Block pair as Base Serial Number, sequentially to the corresponding resource of marginal position
Unit cycle arrangement;Wherein, k is integer, and Lk is any one in k candidate's aggregation level, enabling according to described true
Fixed eREG information, the corresponding eREG of candidate eCCE corresponding to the Lk is detected, when detecting correct, from the detection
Parsing obtains the control information that the control channel is carried in correct eREG, poly- to the k candidate when detecting incorrect
The corresponding eREG of the corresponding candidate eCCE of other candidate's aggregation levels in conjunction rank in addition to the Lk proceed detection,
It is achieved thereby that receiving the control information that some control channels such as ePDCCH is carried by eREG in Physical Resource Block pair.
The schematic flow sheet of the control channel transmission method that Fig. 8 is provided for another embodiment of the application, as shown in Figure 8.
801st, at least one Physical Resource Block pair for transmitting control channel is determined.
802nd, according to the control channel the corresponding eREG of corresponding each eCCE of aggregation level and the aggregation level,
Each Physical Resource Block centering is determined for mapping the eREG information of the control channel, each Physical Resource Block centering
EREG is to be mapped to described each mapping area of Physical Resource Block centering first using first mapping ruler, and utilizes institute
State the eREG that the second mapping ruler is mapped to each mapping area of Physical Resource Block centering second, first mapping area
Be made up of the Resource Unit of transmission data, second mapping area by described each Physical Resource Block centering reference signal and/
Or the Resource Unit composition of other control channels mapping.
803rd, the eREG information according to the determination, the control channel is mapped to the eREG information correspondence of the determination
EREG on.
804th, on the position of eREG for mapping the control channel, the control information that the control channel is carried is sent.
It should be noted that 801~804 executive agent can be base station.
Wherein, the control channel is specifically as follows enhanced Physical Downlink Control Channel(Enhanced Physical
Downlink Control Channel, ePDCCH).
Specifically, in 802, the eREG information of the determination can include that eREG numbers and eREG are identified.
Alternatively, in a possible implementation of the present embodiment, first mapping ruler reflects with described second
Penetrating rule with identical, or can also be without identical, and the present embodiment is not defined to this.
In the present embodiment, by determining at least one Physical Resource Block pair for transmitting control channel, and then according to institute
The corresponding eREG of corresponding each eCCE of aggregation level and the aggregation level of control channel are stated, each Physical Resource Block is determined
Centering is used to map the eREG information of the control channel, and the eREG of each Physical Resource Block centering is using described first
Mapping ruler is mapped to described each mapping area of Physical Resource Block centering first, and using second mapping ruler mapping
To the eREG of each mapping area of Physical Resource Block centering second, first mapping area by transmission data resource list
Unit's composition, second mapping area is mapped by described each Physical Resource Block centering reference signal and/or other control channels
Resource Unit composition, and according to the eREG information of the determination, the control channel is mapped to the eREG of the determination
On the corresponding eREG of information, enabling on the position of eREG for mapping the control channel, send the control channel and hold
The control information of load, it is achieved thereby that send some control channels such as ePDCCH by eREG in Physical Resource Block pair carrying
Control information.
The schematic flow sheet of the control channel transmission method that Fig. 9 is provided for another embodiment of the application, as shown in Figure 9.
901st, at least one Physical Resource Block pair for transmitting control channel is determined.
902nd, the corresponding eREG of the corresponding candidate eCCE of candidate's aggregation level Lk and the Lk according to the control channel,
Each Physical Resource Block centering is determined for mapping the eREG information of the control channel, each Physical Resource Block centering
EREG is to be mapped to described each mapping area of Physical Resource Block centering first using first mapping ruler, and utilizes institute
State the eREG that the second mapping ruler is mapped to each mapping area of Physical Resource Block centering second, first mapping area
Be made up of the Resource Unit of transmission data, second mapping area by described each Physical Resource Block centering reference signal and/
Or the Resource Unit composition of other control channels mapping;Wherein, k is integer, and Lk is any one in k candidate's aggregation level
It is individual.
903rd, the eREG information according to the determination, the corresponding eREG of candidate eCCE corresponding to the Lk detects,
When detecting correct, parsing obtains the control information that the control channel is carried from the detection correct eREG, works as detection
When incorrect, to the corresponding candidate of other candidate's aggregation levels in the k candidate aggregation level in addition to the Lk
The corresponding eREG of eCCE proceed detection.
It should be noted that 901~903 executive agent can be terminal.
Wherein, the control channel is specifically as follows enhanced Physical Downlink Control Channel(Enhanced Physical
Downlink Control Channel, ePDCCH).
Specifically, in 902, the eREG information of the determination can include that eREG numbers and eREG are identified.
Alternatively, in a possible implementation of the present embodiment, first mapping ruler reflects with described second
Penetrating rule with identical, or can also be without identical, and the present embodiment is not defined to this.
In the present embodiment, by determining at least one Physical Resource Block pair for transmitting control channel, and then according to institute
The corresponding eREG of the corresponding candidate eCCE of candidate's aggregation level Lk and the Lk of control channel are stated, each Physical Resource Block is determined
Centering is used to map the eREG information of the control channel, and the eREG of each Physical Resource Block centering is using described first
Mapping ruler is mapped to described each mapping area of Physical Resource Block centering first, and using second mapping ruler mapping
To the eREG of each mapping area of Physical Resource Block centering second, first mapping area by transmission data resource list
Unit's composition, second mapping area is mapped by described each Physical Resource Block centering reference signal and/or other control channels
Resource Unit composition;Wherein, k is integer, and Lk is any one in k candidate's aggregation level, enabling according to described
The eREG information of determination, the corresponding eREG of candidate eCCE corresponding to the Lk is detected, when detecting correct, from the inspection
Survey parsing in correct eREG and obtain the control information that the control channel is carried, when detecting incorrect, to the k candidate
The corresponding eREG of the corresponding candidate eCCE of other candidate's aggregation levels in aggregation level in addition to the Lk proceed inspection
Survey, it is achieved thereby that receiving the control letter that some control channels such as ePDCCH is carried by eREG in Physical Resource Block pair
Breath.
It should be noted that for foregoing each method embodiment, in order to be briefly described, therefore it is all expressed as a series of
Combination of actions, but those skilled in the art should know, the application is not limited by described sequence of movement because
According to the application, some steps can sequentially or simultaneously be carried out using other.Secondly, those skilled in the art should also know
Know, embodiment described in this description belongs to preferred embodiment, involved action and module not necessarily the application
It is necessary.
In the above-described embodiments, the description to each embodiment all emphasizes particularly on different fields, and does not have the portion described in detail in certain embodiment
Point, may refer to the associated description of other embodiment.
The structural representation of the base station that Figure 10 is provided for another embodiment of the application, as shown in Figure 10, the base of the present embodiment
Station can include determining that unit 1001, map unit 1002 and transmitting element 1003.Wherein it is determined that unit 1001 is used to determine to use
In at least one Physical Resource Block pair of transmission control channel, and the aggregation level according to the control channel and the polymerization
The corresponding eREG of corresponding each eCCE of rank, determine each Physical Resource Block centering for mapping the eREG of the control channel
Information, the numbering of the eREG of each Physical Resource Block centering, with the center correspondence of each Physical Resource Block pair
Resource Unit as Base Serial Number, sequentially to the corresponding Resource Unit cycle arrangement of marginal position;The map unit 1002
For the eREG information determined according to the determining unit 1001, the control channel is mapped to the eREG information of the determination
On corresponding eREG;Transmitting element 1003, the position of the eREG for mapping the control channel in the map unit 1002
On, send the control information that the control channel is carried.
Wherein, the control channel is specifically as follows enhanced Physical Downlink Control Channel(Enhanced Physical
Downlink Control Channel, ePDCCH).
Specifically, the eREG information that the determining unit 1001 determines can include that eREG numbers and eREG are identified.
Alternatively, in a possible implementation of the present embodiment, the centre bit of each Physical Resource Block pair
Put the center of the Resource Unit that can be each Physical Resource Block centering.
Alternatively, in a possible implementation of the present embodiment, the centre bit of each Physical Resource Block pair
It can be the center of each other Resource Units of the Physical Resource Block centering in addition to the Resource Unit that PDCCH maps to put
Position.
Alternatively, in a possible implementation of the present embodiment, the eREG of each Physical Resource Block centering
Can by described each Physical Resource Block at least one of Resource Unit constitute.
Alternatively, in a possible implementation of the present embodiment, the eREG of each Physical Resource Block centering
Can be by described each Physical Resource Block centering in addition to the Resource Unit that reference signal and/or other control channels map
At least one of other Resource Units Resource Unit is constituted.
Wherein, the reference signal can include but is not limited to public reference signal(Common Reference
Signal, CRS), DMRS, channel state information reference signals(Channel Status Information Reference
Signal, CSI-RS)And location reference signals(Positioning Reference Signal, PRS)At least one of.
Alternatively, in a possible implementation of the present embodiment, the eREG of each Physical Resource Block centering
Numbering, can be using the corresponding Resource Unit in the center of each Physical Resource Block pair as Base Serial Number, helically
Shape is sequentially to the corresponding Resource Unit cycle arrangement of marginal position.
Alternatively, in a possible implementation of the present embodiment, if each Physical Resource Block centering
The numbering of eREG, can be in using the corresponding Resource Unit in the center of each Physical Resource Block pair as Base Serial Number
Helical form is sequentially to the corresponding Resource Unit cycle arrangement of marginal position.Correspondingly, map unit 1002 can also further root
According to (x-n) %N=0, the Resource Unit numbering of the M Resource Unit that n-th eREG includes is determined;Wherein, M is each physical resource
The number of the Resource Unit of block centering.Wherein, n is the eREG numberings of each Physical Resource Block centering eREG, and span is arrived for 1
Integer between N, N is the number of the eREG of each Physical Resource Block centering;X is numbered for Resource Unit, and span is 1 to M
Between integer;Then, according to 1Under n+1N is right+2On n+2N is left+3Under n+3N is right+4On n+4N is left+……+knx=x-1 or 1N is right+1Under n+2N is left+2On n+
3N is right+3Under n+4N is left+4On n+……+knx=x-1, determines n-th position of eREG;Wherein, under n, n is right, n is upper and n left representations are with institute
The corresponding Resource Unit in center is stated as original position, in the shape of a spiral with counterclockwise or clockwise sequentially to margin location
Put corresponding Resource Unit arrangement unit resource unit, under nx is n determined by the k for meeting above-mentioned equation, n is right, n is upper and a n left sides
In one;And 1 will be metUnder n+1N is right+2On n+2N is left+3Under n+3N is right+4On n+4N is left+……+knx=x-1 or 1N is right+1Under n+2N is left+2On n+
3N is right+3Under n+4N is left+4On n+……+knxThe 1 of=x-1Under n、1N is right、2On n、2N is left、3Under n、3N is right、4On n、4N is left... and knxIn each direction
Upper summation, determines Resource Units of n-th eREG relative to Centre position deviation, to determine n-th position of eREG.
Alternatively, in a possible implementation of the present embodiment, the eREG of each Physical Resource Block centering
Numbering, can be using the corresponding Resource Unit in the center of each Physical Resource Block pair as Base Serial Number, annularly
Sequentially to the corresponding Resource Unit cycle arrangement of marginal position.
In the present embodiment, base station determines at least one Physical Resource Block for transmitting control channel by determining unit
It is right, and then the corresponding eREG of corresponding each eCCE of aggregation level and the aggregation level according to the control channel, it is determined that
Each Physical Resource Block centering is used to map the eREG information of the control channel, the eREG of each Physical Resource Block centering
Numbering, using the corresponding Resource Unit in the center of each Physical Resource Block pair as Base Serial Number, sequentially to edge
The corresponding Resource Unit cycle arrangement in position, and the eREG information determined according to the determining unit by map unit, by institute
State control channel to be mapped on the corresponding eREG of eREG information of the determination so that transmitting element can be in the map unit
On the position of the eREG for mapping the control channel, the control information that the control channel is carried is sent, it is achieved thereby that in thing
Reason resource block pair sends the control information that some control channels such as ePDCCH is carried by eREG.
The structural representation of the terminal that Figure 11 is provided for another embodiment of the application, as shown in figure 11, the end of the present embodiment
End can include determining that unit 1101 and detection unit 1102.Wherein it is determined that unit 1101, it is determined that for transmitting control channel
At least one Physical Resource Block pair, and according to the corresponding candidate of candidate's aggregation level Lk and the Lk of the control channel
The corresponding eREG of eCCE, determine each Physical Resource Block centering for mapping the eREG information of the control channel, it is described each
The numbering of the eREG of Physical Resource Block centering, using the corresponding Resource Unit in the center of each Physical Resource Block pair as
Base Serial Number, sequentially to the corresponding Resource Unit cycle arrangement of marginal position;Wherein, k is integer, and Lk is k candidate's polymer grade
Not in any one;Detection unit 1102, for the eREG information determined according to the determining unit 1101, to described Lk pairs
The corresponding eREG of candidate eCCE for answering are detected, when detecting correct, parsing obtains institute from the detection correct eREG
State control channel carrying control information, when detect it is incorrect when, in the k candidate aggregation level in addition to the Lk
The corresponding eREG of the corresponding candidate eCCE of other candidate's aggregation levels proceed detection.
Wherein, the control channel is specifically as follows enhanced Physical Downlink Control Channel(Enhanced Physical
Downlink Control Channel, ePDCCH).
Specifically, the eREG information that the determining unit 1101 determines can include that eREG numbers and eREG are identified.
Alternatively, in a possible implementation of the present embodiment, the centre bit of each Physical Resource Block pair
Put the center of the Resource Unit that can be each Physical Resource Block centering.
Alternatively, in a possible implementation of the present embodiment, the centre bit of each Physical Resource Block pair
It can be the center of each other Resource Units of the Physical Resource Block centering in addition to the Resource Unit that PDCCH maps to put
Position.
Alternatively, in a possible implementation of the present embodiment, the eREG of each Physical Resource Block centering
Can by described each Physical Resource Block at least one of Resource Unit constitute.
Alternatively, in a possible implementation of the present embodiment, the eREG of each Physical Resource Block centering
Can be by described each Physical Resource Block centering in addition to the Resource Unit that reference signal and/or other control channels map
At least one of other Resource Units Resource Unit is constituted.
Wherein, the reference signal can include but is not limited to public reference signal(Common Reference
Signal, CRS), DMRS, channel state information reference signals(Channel Status Information Reference
Signal, CSI-RS)And location reference signals(Positioning Reference Signal, PRS)At least one of.
Alternatively, in a possible implementation of the present embodiment, the eREG of each Physical Resource Block centering
Numbering, can be using the corresponding Resource Unit in the center of each Physical Resource Block pair as Base Serial Number, helically
Shape is sequentially to the corresponding Resource Unit cycle arrangement of marginal position.
Alternatively, in a possible implementation of the present embodiment, if each Physical Resource Block centering
The numbering of eREG, can be in using the corresponding Resource Unit in the center of each Physical Resource Block pair as Base Serial Number
Helical form is sequentially to the corresponding Resource Unit cycle arrangement of marginal position.Correspondingly, as shown in figure 12, the end that the present embodiment is provided
End can further include map unit 1201, for according to (x-n) %N=0, determining the M resource list that n-th eREG includes
The Resource Unit numbering of unit;Wherein, M is the number of the Resource Unit of each Physical Resource Block centering.Wherein, n is each physics
The eREG numberings of the eREG of resource block pair, span is 1 to the integer between N, and N is each Physical Resource Block centering
The number of eREG;X is numbered for Resource Unit, and span is 1 to the integer between M;Then, according to 1Under n+1N is right+2On n+2N is left+
3Under n+3N is right+4On n+4N is left+……+knx=x-1 or 1N is right+1Under n+2N is left+2On n+3N is right+3Under n+4N is left+4On n+……+knx=x-1, determines n-th
The position of individual eREG;Wherein, under n, n is right, n it is upper with n left representations using the corresponding Resource Unit in the center as start bit
Put, in the shape of a spiral sequentially to arrange unit resource unit to the corresponding Resource Unit of marginal position counterclockwise or clockwise,
Under nx is n determined by the k for meeting above-mentioned equation, n is right, n is upper and n is left one;And 1 will be metUnder n+1N is right+2On n+2N is left+
3Under n+3N is right+4On n+4N is left+……+knx=x-1 or 1N is right+1Under n+2N is left+2On n+3N is right+3Under n+4N is left+4On n+……+knxThe 1 of=x-1Under n、
1N is right、2On n、2N is left、3Under n、3N is right、4On n、4N is left... and knxSue for peace in each direction, determine n-th eREG relative to centre bit
The Resource Unit of skew is put, to determine n-th position of eREG.
Alternatively, in a possible implementation of the present embodiment, the eREG of each Physical Resource Block centering
Numbering, can be using the corresponding Resource Unit in the center of each Physical Resource Block pair as Base Serial Number, annularly
Sequentially to the corresponding Resource Unit cycle arrangement of marginal position.
In the present embodiment, terminal determines at least one Physical Resource Block for transmitting control channel by determining unit
It is right, and then according to the corresponding eREG of the corresponding candidate eCCE of candidate's aggregation level Lk and the Lk of the control channel, it is determined that
Each Physical Resource Block centering is used to map the eREG information of the control channel, the eREG of each Physical Resource Block centering
Numbering, using the corresponding Resource Unit in the center of each Physical Resource Block pair as Base Serial Number, sequentially to edge
The corresponding Resource Unit cycle arrangement in position;Wherein, k is integer, and Lk is any one in k candidate's aggregation level so that
The eREG information that detection unit can determine according to the determining unit, the corresponding eREG of candidate eCCE corresponding to the Lk enters
Row detection, when detecting correct, parsing obtains the control information that the control channel is carried from the detection correct eREG,
It is corresponding to other candidate's aggregation levels in the k candidate aggregation level in addition to the Lk when detecting incorrect
The corresponding eREG of candidate eCCE proceed detection, it is achieved thereby that receive some by eREG in Physical Resource Block pair controlling
The control information that channel such as ePDCCH is carried.
The structural representation of the base station that Figure 13 is provided for another embodiment of the application, as shown in figure 13, the base of the present embodiment
Station can include determining that unit 1301, map unit 1302 and transmitting element 1303.Wherein it is determined that unit 1301 is used to determine to use
In at least one Physical Resource Block pair of transmission control channel, and the aggregation level according to the control channel and the polymerization
The corresponding eREG of corresponding each eCCE of rank, determine each Physical Resource Block centering for mapping the eREG of the control channel
Information, the eREG of each Physical Resource Block centering is to be mapped to described each physical resource using first mapping ruler
The mapping area of block centering first, and be mapped to described each Physical Resource Block centering second using second mapping ruler and reflect
The eREG in region is penetrated, first mapping area is made up of the Resource Unit of transmission data, and second mapping area is by described
Each Physical Resource Block centering reference signal and/or the Resource Unit composition of other control channels mapping;Map unit 1302, uses
In the eREG information determined according to the determining unit 1301, the control channel is mapped to the eREG information pair of the determination
On the eREG for answering;Transmitting element 1303, the position of the eREG for mapping the control channel in the map unit 1302,
Send the control information that the control channel is carried.
Wherein, the control channel is specifically as follows enhanced Physical Downlink Control Channel(Enhanced Physical
Downlink Control Channel, ePDCCH).
Specifically, the eREG information that the determining unit 1301 determines can include that eREG numbers and eREG are identified.
In the present embodiment, base station determines at least one Physical Resource Block for transmitting control channel by determining unit
It is right, and then the corresponding eREG of corresponding each eCCE of aggregation level and the aggregation level according to the control channel, it is determined that
Each Physical Resource Block centering is used to map the eREG information of the control channel, the eREG of each Physical Resource Block centering
It is to be mapped to described each mapping area of Physical Resource Block centering first using first mapping ruler, and using described the
Two mapping rulers are mapped to the eREG of each mapping area of Physical Resource Block centering second, and first mapping area is by passing
Transmission of data Resource Unit composition, second mapping area by described each Physical Resource Block centering reference signal and/or its
The Resource Unit composition of his control channel mapping, and the eREG information determined according to the determining unit by map unit, will
The control channel is mapped on the corresponding eREG of eREG information of the determination so that transmitting element can be single in the mapping
On the position of the eREG of unit's mapping control channel, the control information that the control channel is carried is sent, it is achieved thereby that
Physical Resource Block centering sends the control information that some control channels such as ePDCCH is carried by eREG.
The structural representation of the terminal that Figure 14 is provided for another embodiment of the application, as shown in figure 14, the end of the present embodiment
End can include determining that unit 1401 and detection unit 1402.Wherein it is determined that unit 1401, for determining for transmitting control letter
At least one Physical Resource Block pair in road, and according to the corresponding time of candidate's aggregation level Lk and the Lk of the control channel
The corresponding eREG of eCCE are selected, each Physical Resource Block centering is determined for mapping the eREG information of the control channel, it is described every
The eREG of individual Physical Resource Block centering is to be mapped to described each Physical Resource Block centering first using first mapping ruler
Mapping area, and it is mapped to each mapping area of Physical Resource Block centering second using second mapping ruler
EREG, first mapping area is made up of the Resource Unit of transmission data, and second mapping area is by described each physics
Resource block pair reference signal and/or the Resource Unit composition of other control channels mapping;Wherein, k is integer, and Lk is k time
Select any one in aggregation level;Detection unit 1402 is right for the eREG information determined according to the determining unit 1401
The corresponding eREG of the corresponding candidate eCCE of the Lk are detected, when detecting correct, are solved from the correct eREG of detection
Analysis obtains the control information that the control channel is carried, when detecting incorrect, in the k candidate aggregation level except institute
State the corresponding eREG of the corresponding candidate eCCE of other candidate's aggregation levels outside Lk and proceed detection.
Specifically, the eREG information that the determining unit 1401 determines can include that eREG numbers and eREG are identified.
In the present embodiment, terminal determines at least one Physical Resource Block for transmitting control channel by determining unit
It is right, and then according to the corresponding eREG of the corresponding candidate eCCE of candidate's aggregation level Lk and the Lk of the control channel, it is determined that
Each Physical Resource Block centering is used to map the eREG information of the control channel, the eREG of each Physical Resource Block centering
It is to be mapped to described each mapping area of Physical Resource Block centering first using first mapping ruler, and using described the
Two mapping rulers are mapped to the eREG of each mapping area of Physical Resource Block centering second, and first mapping area is by passing
Transmission of data Resource Unit composition, second mapping area by described each Physical Resource Block centering reference signal and/or its
The Resource Unit composition of his control channel mapping;Wherein, k is integer, and Lk is any one in k candidate's aggregation level, is made
The eREG information that can be determined according to the determining unit of detection unit, the corresponding eREG of candidate eCCE corresponding to the Lk
Detected, when detecting correct, parsing obtains the control letter that the control channel is carried from the detection correct eREG
Breath, when detecting incorrect, to other candidate's aggregation levels correspondence in the k candidate aggregation level in addition to the Lk
The corresponding eREG of candidate eCCE proceed detection, it is achieved thereby that in Physical Resource Block pair by eREG receive some control
The control information that channel processed such as ePDCCH is carried.
It is apparent to those skilled in the art that, for convenience and simplicity of description, the system of foregoing description,
The specific work process of device and unit, may be referred to the corresponding process in preceding method embodiment, will not be repeated here.
In several embodiments provided herein, it should be understood that disclosed system, apparatus and method can be with
Realize by another way.For example, device embodiment described above is only schematical, for example, the unit
Divide, only a kind of division of logic function there can be other dividing mode when actually realizing, for example multiple units or component
Can combine or be desirably integrated into another system, or some features can be ignored, or do not perform.It is another, it is shown or
The coupling each other for discussing or direct-coupling or communication connection can be the indirect couplings of device or unit by some interfaces
Close or communicate to connect, can be electrical, mechanical or other forms.
The unit that is illustrated as separating component can be or may not be it is physically separate, it is aobvious as unit
The part for showing can be or may not be physical location, you can with positioned at a place, or can also be distributed to multiple
On NE.Some or all of unit therein can be according to the actual needs selected to realize the mesh of this embodiment scheme
's.
In addition, during each functional unit in the application each embodiment can be integrated in a processing unit, it is also possible to
It is that unit is individually physically present, it is also possible to which two or more units are integrated in a unit.Above-mentioned integrated list
Unit can both be realized in the form of hardware, it would however also be possible to employ hardware adds the form of SFU software functional unit to realize.
The above-mentioned integrated unit realized in the form of SFU software functional unit, can store and be deposited in an embodied on computer readable
In storage media.Above-mentioned SFU software functional unit storage is in a storage medium, including some instructions are used to so that a computer
Equipment(Can be personal computer, server, or network equipment etc.)Or processor(processor)Perform the application each
The part steps of embodiment methods described.And foregoing storage medium includes:USB flash disk, mobile hard disk, read-only storage(Read-
Only Memory, abbreviation ROM), random access memory(Random Access Memory, abbreviation RAM), magnetic disc or light
Disk etc. is various can be with the medium of store program codes.
Finally it should be noted that:Above example is only used to illustrate the technical scheme of the application, rather than its limitations;Although
The application has been described in detail with reference to the foregoing embodiments, it will be understood by those within the art that:It still may be used
Modified with to the technical scheme described in foregoing embodiments, or equivalent is carried out to which part technical characteristic;
And these modification or replace, do not make appropriate technical solution essence depart from each embodiment technical scheme of the application spirit and
Scope.
Claims (20)
1. a kind of control channel transmission method, it is characterised in that including:
It is determined that at least one Physical Resource Block pair for transmitting control channel;
The corresponding eREG of corresponding each eCCE of aggregation level and the aggregation level according to the control channel, determine each
Physical Resource Block centering is used to map the eREG information of the control channel, the volume of the eREG of each Physical Resource Block centering
Number, using the corresponding Resource Unit in the center of each Physical Resource Block pair as Base Serial Number, sequentially to marginal position
Corresponding Resource Unit cycle arrangement;
EREG information according to the determination, the control channel is mapped to the corresponding eREG of eREG information of the determination
On;
On the position of eREG for mapping the control channel, the control information that the control channel is carried is sent.
2. method according to claim 1, it is characterised in that the numbering of the eREG of each Physical Resource Block centering,
Using the corresponding Resource Unit in the center of each Physical Resource Block pair as Base Serial Number, sequentially to marginal position correspondence
Resource Unit cycle arrangement, including:
The numbering of the eREG of each Physical Resource Block centering, it is corresponding with the center of each Physical Resource Block pair
Resource Unit as Base Serial Number, in the shape of a spiral sequentially to the corresponding Resource Unit cycle arrangement of marginal position;Or
The numbering of the eREG of each Physical Resource Block centering, it is corresponding with the center of each Physical Resource Block pair
Resource Unit as Base Serial Number, annularly sequentially to the corresponding Resource Unit cycle arrangement of marginal position.
3. method according to claim 1, it is characterised in that the center of each Physical Resource Block pair, including:
The center of the Resource Unit of each Physical Resource Block centering;Or
The centre bit of each other Resource Units of the Physical Resource Block centering in addition to the Resource Unit that PDCCH maps
Put.
4. the method according to claims 1 to 3 any claim, it is characterised in that
The eREG of each Physical Resource Block centering by described each Physical Resource Block at least one of resource unit group
Into;Or
The eREG of each Physical Resource Block centering by described each Physical Resource Block centering except reference signal and/or other
At least one of other Resource Units outside the Resource Unit of control channel mapping Resource Unit composition.
5. the method according to claim 4 claim, it is characterised in that if each Physical Resource Block centering
The numbering of eREG, using the corresponding Resource Unit in the center of each Physical Resource Block pair as Base Serial Number, helically
Shape is sequentially to the corresponding Resource Unit cycle arrangement of marginal position;The eREG information according to the determination, by the control
Before channel is mapped on the corresponding eREG of eREG information of the determination, also include:
According to (x-n) %N=0, the Resource Unit numbering in the M Resource Unit that n-th eREG includes is determined;Wherein, M is every
The number of the Resource Unit of individual Physical Resource Block centering, wherein, n is the eREG numberings of the eREG of each Physical Resource Block centering,
Span is 1 to the integer between N, and N is the number of the eREG of each Physical Resource Block centering;X is numbered for Resource Unit, is taken
Value scope is 1 to the integer between M;
According to 1Under n+1N is right+2On n+2N is left+3Under n+3N is right+4On n+4N is left+……+knx=x-1 or 1N is right+1Under n+2N is left+2On n+3N is right+3Under n+4N is left+
4On n+……+knx=x-1, determines n-th position of eREG;Wherein, under n, n is right, n is upper and n left representations are with the center
Corresponding Resource Unit as original position, in the shape of a spiral with counterclockwise or clockwise sequentially to the corresponding money of marginal position
Source unit arranges unit resource unit, and nx is satisfaction 1Under n+1N is right+2On n+2N is left+3Under n+3N is right+4On n+4N is left+……+knx=x-1 or 1N is right
+1Under n+2N is left+2On n+3N is right+3Under n+4N is left+4On n+……+knxUnder n determined by the k of=x-1, n is right, n is upper and n is left one;
1 will be metUnder n+1N is right+2On n+2N is left+3Under n+3N is right+4On n+4N is left+……+knx=x-1 or 1N is right+1Under n+2N is left+2On n+3N is right+3Under n+
4N is left+4On n+……+knxThe 1 of=x-1Under n、1N is right、2On n、2N is left、3Under n、3N is right、4On n、4N is left... and knxSue for peace in each direction,
Resource Units of n-th eREG relative to Centre position deviation is determined, to determine n-th position of eREG.
6. a kind of control channel transmission method, it is characterised in that including:
It is determined that at least one Physical Resource Block pair for transmitting control channel;
The corresponding eREG of the corresponding candidate eCCE of candidate's aggregation level Lk and the Lk according to the control channel, determine each
Physical Resource Block centering is used to map the eREG information of the control channel, the volume of the eREG of each Physical Resource Block centering
Number, using the corresponding Resource Unit in the center of each Physical Resource Block pair as Base Serial Number, sequentially to marginal position
Corresponding Resource Unit cycle arrangement;Wherein, k is integer, and Lk is any one in k candidate's aggregation level;
EREG information according to the determination, the corresponding eREG of candidate eCCE corresponding to the Lk detects, when detection just
When really, parsing obtains the control information that the control channel is carried from the detection correct eREG, when detecting incorrect,
It is corresponding to the corresponding candidate eCCE of other candidate's aggregation levels in the k candidate aggregation level in addition to the Lk
EREG proceeds detection.
7. method according to claim 6, it is characterised in that the numbering of the eREG of each Physical Resource Block centering,
Using the corresponding Resource Unit in the center of each Physical Resource Block pair as Base Serial Number, sequentially to marginal position correspondence
Resource Unit cycle arrangement, including:
The numbering of the eREG of each Physical Resource Block centering, it is corresponding with the center of each Physical Resource Block pair
Resource Unit as Base Serial Number, in the shape of a spiral sequentially to the corresponding Resource Unit cycle arrangement of marginal position;Or
The numbering of the eREG of each Physical Resource Block centering, it is corresponding with the center of each Physical Resource Block pair
Resource Unit as Base Serial Number, annularly sequentially to the corresponding Resource Unit cycle arrangement of marginal position.
8. method according to claim 6, it is characterised in that the center of each Physical Resource Block pair, including:
The center of the Resource Unit of each Physical Resource Block centering;Or
The centre bit of each other Resource Units of the Physical Resource Block centering in addition to the Resource Unit that PDCCH maps
Put.
9. the method according to claim 6~8 any claim, it is characterised in that
The eREG of each Physical Resource Block centering by described each Physical Resource Block at least one of resource unit group
Into;Or
The eREG of each Physical Resource Block centering by described each Physical Resource Block centering except reference signal and/or other
At least one of other Resource Units outside the Resource Unit of control channel mapping Resource Unit composition.
10. the method according to claim 9 claim, it is characterised in that if described each Physical Resource Block centering
EREG numbering, using the corresponding Resource Unit in the center of each Physical Resource Block pair as Base Serial Number, in spiral shell
Rotation shape is sequentially to the corresponding Resource Unit cycle arrangement of marginal position;The eREG information according to the determination, by the control
Before channel processed is mapped on the corresponding eREG of eREG information of the determination, also include:
According to (x-n) %N=0, the Resource Unit numbering of the M Resource Unit that n-th eREG includes is determined;Wherein, M is each
The number of the Resource Unit of Physical Resource Block centering, wherein, n is the eREG numberings of the eREG of each Physical Resource Block centering, is taken
Value scope is 1 to the integer between N, and N is the number of the eREG of each Physical Resource Block centering;X is numbered for Resource Unit, value
Scope is 1 to the integer between M;
According to 1Under n+1N is right+2On n+2N is left+3Under n+3N is right+4On n+4N is left+……+knx=x-1 or 1N is right+1Under n+2N is left+2On n+3N is right+3Under n+4N is left+
4On n+……+knx=x-1, determines n-th position of eREG;Wherein, under n, n is right, n is upper and n left representations are with the center
Corresponding Resource Unit as original position, in the shape of a spiral with counterclockwise or clockwise sequentially to the corresponding money of marginal position
Source unit arranges unit resource unit, and nx is satisfaction 1Under n+1N is right+2On n+2N is left+3Under n+3N is right+4On n+4N is left+……+knx=x-1 or 1N is right
+1Under n+2N is left+2On n+3N is right+3Under n+4N is left+4On n+……+knxUnder n determined by the k of=x-1, n is right, n is upper and n is left one;
1 will be metUnder n+1N is right+2On n+2N is left+3Under n+3N is right+4On n+4N is left+……+knx=x-1 or 1N is right+1Under n+2N is left+2On n+3N is right+3Under n+
4N is left+4On n+……+knxThe 1 of=x-1Under n、1N is right、2On n、2N is left、3Under n、3N is right、4On n、4N is left... and knxSue for peace in each direction,
Resource Units of n-th eREG relative to Centre position deviation is determined, to determine n-th position of eREG.
A kind of 11. base stations, it is characterised in that including:
Determining unit, for determining at least one Physical Resource Block pair for transmitting control channel, and according to the control
The aggregation level of channel and the corresponding eREG of corresponding each eCCE of the aggregation level, determine that each Physical Resource Block centering is used
In the eREG information for mapping the control channel, the numbering of the eREG of each Physical Resource Block centering, with described each thing
The corresponding Resource Unit in center of Resource Block pair is managed as Base Serial Number, is sequentially followed to the corresponding Resource Unit of marginal position
Circle permutation;
Map unit, for the eREG information determined according to the determining unit, the determination is mapped to by the control channel
The corresponding eREG of eREG information on;
Transmitting element, the position of the eREG for mapping the control channel in the map unit sends the control letter
The control information that road is carried.
12. base stations according to claim 11, it is characterised in that the volume of the eREG of each Physical Resource Block centering
Number, using the corresponding Resource Unit in the center of each Physical Resource Block pair as Base Serial Number, sequentially to marginal position
Corresponding Resource Unit cycle arrangement, including:
The numbering of the eREG of each Physical Resource Block centering, it is corresponding with the center of each Physical Resource Block pair
Resource Unit as Base Serial Number, in the shape of a spiral sequentially to the corresponding Resource Unit cycle arrangement of marginal position;Or
The numbering of the eREG of each Physical Resource Block centering, it is corresponding with the center of each Physical Resource Block pair
Resource Unit as Base Serial Number, annularly sequentially to the corresponding Resource Unit cycle arrangement of marginal position.
13. base stations according to claim 11, it is characterised in that the center of each Physical Resource Block pair, bag
Include:
The center of the Resource Unit of each Physical Resource Block centering;Or
The centre bit of each other Resource Units of the Physical Resource Block centering in addition to the Resource Unit that PDCCH maps
Put.
14. base station according to claim 11~13 any claim, it is characterised in that
The eREG of each Physical Resource Block centering by described each Physical Resource Block at least one of resource unit group
Into;Or
The eREG of each Physical Resource Block centering by described each Physical Resource Block centering except reference signal and/or other
At least one of other Resource Units outside the Resource Unit of control channel mapping Resource Unit composition.
15. base station according to claim 14 claim, it is characterised in that if described each Physical Resource Block centering
EREG numbering, using the corresponding Resource Unit in the center of each Physical Resource Block pair as Base Serial Number, in spiral shell
Rotation shape is sequentially to the corresponding Resource Unit cycle arrangement of marginal position;The map unit is additionally operable to
According to (x-n) %N=0, the Resource Unit numbering of the M Resource Unit that n-th eREG includes is determined;Wherein, M is each
The number of the Resource Unit of Physical Resource Block centering, wherein, n is the eREG numberings of the eREG of each Physical Resource Block centering, is taken
Value scope is 1 to the integer between N, and N is the number of the eREG of each Physical Resource Block centering;X is numbered for Resource Unit, value
Scope is 1 to the integer between M;
According to 1Under n+1N is right+2On n+2N is left+3Under n+3N is right+4On n+4N is left+……+knx=x-1 or 1N is right+1Under n+2N is left+2On n+3N is right+3Under n+4N is left+
4On n+……+knx=x-1, determines n-th position of eREG;Wherein, under n, n is right, n is upper and n left representations are with the center
Corresponding Resource Unit as original position, in the shape of a spiral with counterclockwise or clockwise sequentially to the corresponding money of marginal position
Source unit arranges unit resource unit, and nx is satisfaction 1Under n+1N is right+2On n+2N is left+3Under n+3N is right+4On n+4N is left+……+knx=x-1 or 1N is right
+1Under n+2N is left+2On n+3N is right+3Under n+4N is left+4On n+……+knxUnder n determined by the k of=x-1, n is right, n is upper and n is left one;
1 will be metUnder n+1N is right+2On n+2N is left+3Under n+3N is right+4On n+4N is left+……+knx=x-1 or 1N is right+1Under n+2N is left+2On n+3N is right+3Under n+
4N is left+4On n+……+knxThe 1 of=x-1Under n、1N is right、2On n、2N is left、3Under n、3N is right、4On n、4N is left... and knxSue for peace in each direction,
Resource Units of n-th eREG relative to Centre position deviation is determined, to determine n-th position of eREG.
A kind of 16. terminals, it is characterised in that including:
Determining unit, it is determined that at least one Physical Resource Block pair for transmitting control channel, and according to the control channel
Candidate's aggregation level Lk and the corresponding eREG of the corresponding candidate eCCE of the Lk, determine each Physical Resource Block centering for reflecting
The eREG information of the control channel is penetrated, the numbering of the eREG of each Physical Resource Block centering is provided with described each physics
The corresponding Resource Unit in center of source block pair is sequentially arranged as Base Serial Number to the corresponding Resource Unit circulation of marginal position
Row;Wherein, k is integer, and Lk is any one in k candidate's aggregation level;
Detection unit, for the eREG information determined according to the determining unit, candidate eCCE corresponding to the Lk is corresponding
EREG is detected, when detecting correct, parsing obtains the control that the control channel is carried from the detection correct eREG
Information processed, when detecting incorrect, to other candidate's aggregation levels in the k candidate aggregation level in addition to the Lk
The corresponding eREG of corresponding candidate eCCE proceeds detection.
17. terminals according to claim 16, it is characterised in that the volume of the eREG of each Physical Resource Block centering
Number, using the corresponding Resource Unit in the center of each Physical Resource Block pair as Base Serial Number, sequentially to marginal position
Corresponding Resource Unit cycle arrangement, including:
The numbering of the eREG of each Physical Resource Block centering, it is corresponding with the center of each Physical Resource Block pair
Resource Unit as Base Serial Number, in the shape of a spiral sequentially to the corresponding Resource Unit cycle arrangement of marginal position;Or
The numbering of the eREG of each Physical Resource Block centering, it is corresponding with the center of each Physical Resource Block pair
Resource Unit as Base Serial Number, annularly sequentially to the corresponding Resource Unit cycle arrangement of marginal position.
18. terminals according to claim 16, it is characterised in that the center of each Physical Resource Block pair, bag
Include:
The center of the Resource Unit of each Physical Resource Block centering;Or
The centre bit of each other Resource Units of the Physical Resource Block centering in addition to the Resource Unit that PDCCH maps
Put.
19. terminal according to claim 16~18 any claim, it is characterised in that
The eREG of each Physical Resource Block centering by described each Physical Resource Block at least one of resource unit group
Into;Or
The eREG of each Physical Resource Block centering by described each Physical Resource Block centering except reference signal and/or other
At least one of other Resource Units outside the Resource Unit of control channel mapping Resource Unit composition.
20. terminal according to claim 19 claim, it is characterised in that if described each Physical Resource Block centering
EREG numbering, using the corresponding Resource Unit in the center of each Physical Resource Block pair as Base Serial Number, in spiral shell
Rotation shape is sequentially to the corresponding Resource Unit cycle arrangement of marginal position;The base station also includes map unit, is used for
According to (x-n) %N=0, the Resource Unit numbering of the M Resource Unit that n-th eREG includes is determined;Wherein, M is each
The number of the Resource Unit of Physical Resource Block centering, wherein, n is the eREG numberings of the eREG of each Physical Resource Block centering, is taken
Value scope is 1 to the integer between N, and N is the number of the eREG of each Physical Resource Block centering;X is numbered for Resource Unit, value
Scope is 1 to the integer between M;
According to 1Under n+1N is right+2On n+2N is left+3Under n+3N is right+4On n+4N is left+……+knx=x-1 or 1N is right+1Under n+2N is left+2On n+3N is right+3Under n+4N is left+
4On n+……+knx=x-1, determines n-th position of eREG;Wherein, under n, n is right, n is upper and n left representations are with the center
Corresponding Resource Unit as original position, in the shape of a spiral with counterclockwise or clockwise sequentially to the corresponding money of marginal position
Source unit arranges unit resource unit, and nx is satisfaction 1Under n+1N is right+2On n+2N is left+3Under n+3N is right+4On n+4N is left+……+knx=x-1 or 1N is right
+1Under n+2N is left+2On n+3N is right+3Under n+4N is left+4On n+……+knxUnder n determined by the k of=x-1, n is right, n is upper and n is left one;
1 will be metUnder n+1N is right+2On n+2N is left+3Under n+3N is right+4On n+4N is left+……+knx=x-1 or 1N is right+1Under n+2N is left+2On n+3N is right+3Under n+
4N is left+4On n+……+knxThe 1 of=x-1Under n、1N is right、2On n、2N is left、3Under n、3N is right、4On n、4N is left... and knxSue for peace in each direction,
Resource Units of n-th eREG relative to Centre position deviation is determined, to determine n-th position of eREG.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/CN2012/079444 WO2014019146A1 (en) | 2012-07-31 | 2012-07-31 | Transmission method for control channel, base station, and terminal |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103748849A CN103748849A (en) | 2014-04-23 |
CN103748849B true CN103748849B (en) | 2017-06-06 |
Family
ID=50027076
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201280007843.3A Active CN103748849B (en) | 2012-07-31 | 2012-07-31 | Control channel transmission method and base station, terminal |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN103748849B (en) |
WO (1) | WO2014019146A1 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2017132955A1 (en) | 2016-02-04 | 2017-08-10 | 华为技术有限公司 | Control information transmission method, base station, and terminal |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102395206A (en) * | 2011-11-08 | 2012-03-28 | 电信科学技术研究院 | Transmission method and equipment for downside control information |
CN102420685A (en) * | 2011-11-07 | 2012-04-18 | 电信科学技术研究院 | Method and device for transmitting control information |
CN102611524A (en) * | 2011-12-19 | 2012-07-25 | 电信科学技术研究院 | Method, system and equipment for information transmission |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101605023B (en) * | 2008-06-10 | 2013-01-16 | 中兴通讯股份有限公司 | Method and device for mapping control channel sources |
JP5162416B2 (en) * | 2008-11-07 | 2013-03-13 | 株式会社エヌ・ティ・ティ・ドコモ | Wireless base station |
CN102118864B (en) * | 2010-01-05 | 2013-11-06 | 电信科学技术研究院 | Method and equipment for mapping and numbering resource element groups (REG) of backhaul link control channel of relay system |
US8854994B2 (en) * | 2010-04-10 | 2014-10-07 | Alcatel Lucent | Method for mitigating outages in heterogeneous networks |
-
2012
- 2012-07-31 WO PCT/CN2012/079444 patent/WO2014019146A1/en active Application Filing
- 2012-07-31 CN CN201280007843.3A patent/CN103748849B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102420685A (en) * | 2011-11-07 | 2012-04-18 | 电信科学技术研究院 | Method and device for transmitting control information |
CN102395206A (en) * | 2011-11-08 | 2012-03-28 | 电信科学技术研究院 | Transmission method and equipment for downside control information |
CN102611524A (en) * | 2011-12-19 | 2012-07-25 | 电信科学技术研究院 | Method, system and equipment for information transmission |
Non-Patent Citations (2)
Title |
---|
Definition of eCCE and eREG;Renesas Mobile Europe Ltd.;《3GPP TSG-RAN WG1 Meeting #69 R1-122360》;20120525;第1-3页 * |
eREG and eCCE definitions;Qualcomm Incorporated;《3GPP TSG RAN WG1 #69 R1-122795》;20120525;第1-2页 * |
Also Published As
Publication number | Publication date |
---|---|
WO2014019146A1 (en) | 2014-02-06 |
CN103748849A (en) | 2014-04-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11553476B2 (en) | Enhanced physical downlink control channel transmission method and apparatus | |
EP2840825B1 (en) | Method and device for transmitting information on enhanced physical downlink control channel | |
CN102395206B (en) | Transmission method and equipment for downside control information | |
EP2871894B1 (en) | Control channel transmission method and device | |
CN104412678B (en) | Detection method, user equipment and the base station of control channel | |
CN104054378A (en) | DMRS association and signaling for enhanced PDCCH in LTE systems | |
BR112012033717B1 (en) | ACCESS NETWORK DEVICE, USER EQUIPMENT AND RESPECTIVE METHODS FOR CONFIGURING DEMODULATION REFERENCE SIGNAL RESOURCES | |
KR101583580B1 (en) | Control channel transmission method and device | |
CN103378885B (en) | The sending, receiving method of downlink data and device | |
CN107027177A (en) | A kind of transmission of Downlink Control Information, detection method and device | |
CN103313273A (en) | Channel sending method, detection method, base station and terminal | |
CN103312447A (en) | Transmission method and device for demodulation reference signal of physical uplink control channel | |
CN103795514B (en) | EPDCCH sending, receiving methods and base station, user equipment | |
CN103748849B (en) | Control channel transmission method and base station, terminal | |
CN104137463B (en) | Control channel transmission method and base station, terminal | |
US9445401B2 (en) | Method and device for transmitting a control channel mapped to one or more control channel elements | |
CN108282308B (en) | Method, device and equipment for processing reference signal | |
CN107409005A (en) | PBCH repeats method and the base station of transmission | |
CN104135356B (en) | Control channel transmission method and apparatus | |
JP5548309B2 (en) | A kind of signal reception method and equipment | |
CN106656894A (en) | Method and apparatus for sending an enhanced physical downlink control channel (EPDCCH) | |
US9444608B2 (en) | Control channel transmission method and apparatus to implement transmission of ePDCCHs through an eREG in a unit physical resource block | |
CN103988562A (en) | Enhanced downlink control channel sending method, detection method, and device | |
CN103037407A (en) | Transmission method and device for enhanced physical downlink control channel (E-PDCCH) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |