CN103745413B - A kind of electric power operational system primary equipment on-Line Monitor Device model generating method - Google Patents

A kind of electric power operational system primary equipment on-Line Monitor Device model generating method Download PDF

Info

Publication number
CN103745413B
CN103745413B CN201310711104.9A CN201310711104A CN103745413B CN 103745413 B CN103745413 B CN 103745413B CN 201310711104 A CN201310711104 A CN 201310711104A CN 103745413 B CN103745413 B CN 103745413B
Authority
CN
China
Prior art keywords
line monitor
monitor device
data
primary equipment
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310711104.9A
Other languages
Chinese (zh)
Other versions
CN103745413A (en
Inventor
冯鸫
吕家圣
陈岳
王奇
周南菁
常夏勤
王永
张代新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NR Electric Co Ltd
Maintenance and Test Center of Extra High Voltage Power Transmission Co
Original Assignee
NR Electric Co Ltd
Maintenance and Test Center of Extra High Voltage Power Transmission Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NR Electric Co Ltd, Maintenance and Test Center of Extra High Voltage Power Transmission Co filed Critical NR Electric Co Ltd
Priority to CN201310711104.9A priority Critical patent/CN103745413B/en
Publication of CN103745413A publication Critical patent/CN103745413A/en
Application granted granted Critical
Publication of CN103745413B publication Critical patent/CN103745413B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The present invention relates to electric power operational system correlative technology field, particularly a kind of electric power operational system primary equipment on-Line Monitor Device model generating method, including: the measurement history multidimensional data of described primary equipment on-Line Monitor Device is extracted in timing from the professional system of source, and is saved in the history multidimensional data table of correspondence;Process each described history multidimensional data table, therefrom filter out renewal time up-to-date described measurement history multidimensional data, set up corresponding latest data view;From described latest data view, set up mounted cast and the observation point model of described primary equipment on-Line Monitor Device, and safeguard the relation between described mounted cast and described observation point model.The present invention realizes when professional system manufacturer cannot provide on-Line Monitor Device model, also can set up on-Line Monitor Device model.

Description

A kind of electric power operational system primary equipment on-Line Monitor Device model generating method
Technical field
The present invention relates to electric power operational system correlative technology field, particularly a kind of electric power operational system once sets Standby on-Line Monitor Device model generating method.
Background technology
Along with the continuous expansion of electrical network scale, electrical network monitors and operation maintenance workload increases day by day, power train Unified secondary device operational system can effectively improve electrical network and monitor and the level of informatization of operation maintenance, reduces The workload of operation maintenance personnel, but primary equipment operational system typically requires integrated other professional systems multiple On-Line Monitor Device data, as system-computed and the foundation of analysis.The most online for other professional systems Monitoring device data integrated, it is common that according to first setting up model, then the mode that extracted data updates carries out.
Current outer professional system on-Line Monitor Device data integrating method is to the interface requirement of source professional system relatively High, it is necessary to provide the model of on-Line Monitor Device to obtain interface, after first setting up model, just can carry out the collection of data Become.Be under normal circumstances this method be the purpose that can complete on-Line Monitor Device data integration.But Owing to needing integrated on-Line Monitor Device data source systems complexity various, different system manufacturer provides Data-interface and Data Source the most difference.When professional system manufacturer cannot provide on-line monitoring to fill When putting model acquisition interface, conventional first model, the mode of rear data just cannot meet this special circumstances Integrated needs, it is impossible to set up on-Line Monitor Device model.
Summary of the invention
Based on this, it is necessary to on-Line Monitor Device mould cannot be provided for prior art professional system manufacturer During type, it is impossible to set up the technical problem of on-Line Monitor Device model, it is provided that a kind of electric power operational system once sets Standby on-Line Monitor Device model generating method.
A kind of electric power operational system primary equipment on-Line Monitor Device model generating method, including:
Step 11, the measurement history that described primary equipment on-Line Monitor Device is extracted in timing from the professional system of source is many Dimension data, and it is saved in the history multidimensional data table of correspondence;
Step 12, processes each described history multidimensional data table, therefrom filters out the up-to-date described survey of renewal time Amount history multidimensional data, sets up the corresponding latest data view including device tables of data, described device data Table generates according to described measurement history multidimensional data;
Step 13, from described latest data view, sets up the device mould of described primary equipment on-Line Monitor Device Type and observation point model, and safeguard the relation between described mounted cast and described observation point model.
Further, the history multidimensional data table according to described source professional system of described history multidimensional data table divides Class builds table.
Further, described step 11 specifically includes: timing extracts upper one by ETL from the professional system of source The measurement history multidimensional data of the secondary described primary equipment on-Line Monitor Device being drawn into this extraction time period, And it is saved in the history multidimensional data table data of correspondence.
Further, described step 12 specifically includes: according to the measurement history multidimensional being drawn in step 11 The history multidimensional data list structure of data and correspondence, sets up corresponding latest data table view;Described tables of data View only preserves renewal time up-to-date data, and latest data view structure and described history multidimensional data Table is identical.
Further, wherein step 13 specifically includes: from described latest data view, according to primary equipment The reverse modeling rule of on-Line Monitor Device, sets up mounted cast and the survey of described primary equipment on-Line Monitor Device Point model, and safeguard the relation between described mounted cast and described observation point model.
Further, the described reverse modeling rule of primary equipment on-Line Monitor Device passes through ETL from source specialty system System extracts.
Further, the described reverse modeling rule of primary equipment on-Line Monitor Device specifically includes:
The monitoring device model of described mounted cast is generated according to the device tables of data in described latest data view Table and the monitoring device observation point model table of described observation point model.
Further, the device tables of data in described latest data view is generated the monitoring of described mounted cast Mounted cast table, specifically includes:
Described monitoring device model table is generated by device data table name REC_BS_ID Yu REC_SENSOR_ID Interior unique NID;
Described prison is generated with relevant information in SENSORINFO table by device tables of data REC_SENSOR_ID Survey NAME Yu the PHASE attribute in mounted cast table;
Generated with relevant information in MONITORPOSITIONINFO table by device tables of data REC_BS_ID LOCATION_NID attribute in described monitoring device model table;
Generated described monitoring device by device tables of data attribute-name REC_BS_ID with REC_SENSOR_ID to survey Unique NID in point model table;
Described prison is generated with relevant information in SENSORINFO table by device tables of data REC_SENSOR_ID Survey NAME Yu the GCCDLX attribute in mounted cast table;
DEVICEID is generated by device data table name REC_BS_ID Yu REC_SENSOR_ID, thus can To get in described monitoring device observation point model table the device ID associated by measuring point;
By device tables of data property value, generate CURVAL;
RES_UPDATE_TIME generates ACTIME;
Current time generates UPDATETIME.
Further, also include:
Use process scheduling instrument by interface bag, operating system command and the script of ETL by step 11~13 tissues Get up and form different scene;
Make the various sequence of operation on-demand according to the rule of different trigger conditions and definition by the scheduling of scene Trigger.
The present invention uses the reverse modeling approach by metric data to model and method, by from source professional system The measurement history multidimensional data of middle extraction described primary equipment on-Line Monitor Device, thus generate primary equipment and exist The mounted cast of line monitoring device and observation point model, thus realize to provide online professional system manufacturer During monitoring device model, also can set up on-Line Monitor Device model.
Accompanying drawing explanation
Fig. 1 is the work of the present invention a kind of electric power operational system primary equipment on-Line Monitor Device model generating method Make flow chart;
Fig. 2 is the schematic diagram of the reverse modeling rule of primary equipment on-Line Monitor Device of one example of the present invention.
Detailed description of the invention
The utility model is described in more detail with specific embodiment below in conjunction with the accompanying drawings.
It is illustrated in figure 1 one electric power operational system primary equipment on-Line Monitor Device model generating method of the present invention Workflow diagram, including:
Step 11, the measurement history that described primary equipment on-Line Monitor Device is extracted in timing from the professional system of source is many Dimension data, and it is saved in the history multidimensional data table of correspondence;
Step 12, processes each described history multidimensional data table, therefrom filters out the up-to-date described survey of renewal time Amount history multidimensional data, sets up the corresponding latest data view including device tables of data, described device data Table generates according to described measurement history multidimensional data;
Step 13, from described latest data view, sets up the device mould of described primary equipment on-Line Monitor Device Type and observation point model, and safeguard the relation between described mounted cast and described observation point model.
Wherein in an embodiment, the history according to described source professional system of described history multidimensional data table is many Dimension data table sort builds table.
Wherein in an embodiment, described step 11 specifically includes: timing passes through ETL from the professional system of source The measurement history of the described primary equipment on-Line Monitor Device that the extraction last time is drawn into this extraction time period is many Dimension data, and it is saved in the history multidimensional data table data of correspondence.
Wherein in an embodiment, described step 12 specifically includes: according to the survey being drawn in step 11 Amount history multidimensional data and the history multidimensional data list structure of correspondence, set up corresponding latest data table view; Described spreadsheet views only preserves renewal time up-to-date data, and latest data view structure is gone through with described History multidimensional data table is identical.
Wherein in an embodiment, wherein step 13 specifically includes: from described latest data view, root According to the reverse modeling rule of primary equipment on-Line Monitor Device, set up the dress of described primary equipment on-Line Monitor Device Put model and observation point model, and safeguard the relation between described mounted cast and described observation point model.
Wherein in an embodiment, the described reverse modeling rule of primary equipment on-Line Monitor Device by ETL from Source professional system extracts.
Wherein in an embodiment, the described reverse modeling rule of primary equipment on-Line Monitor Device specifically includes:
The monitoring device model of described mounted cast is generated according to the device tables of data in described latest data view Table and the monitoring device observation point model table of described observation point model.
Wherein in an embodiment, the device tables of data in described latest data view is generated described device mould The monitoring device model table of type, specifically includes:
Described monitoring device model table is generated by device data table name REC_BS_ID Yu REC_SENSOR_ID Interior unique NID;
Described prison is generated with relevant information in SENSORINFO table by device tables of data REC_SENSOR_ID Survey NAME Yu the PHASE attribute in mounted cast table;
Generated with relevant information in MONITORPOSITIONINFO table by device tables of data REC_BS_ID LOCATION_NID attribute in described monitoring device model table;
Generated described monitoring device by device tables of data attribute-name REC_BS_ID with REC_SENSOR_ID to survey Unique NID in point model table;
Described prison is generated with relevant information in SENSORINFO table by device tables of data REC_SENSOR_ID Survey NAME Yu the GCCDLX attribute in mounted cast table;
DEVICEID is generated by device data table name REC_BS_ID Yu REC_SENSOR_ID, thus can To get in described monitoring device observation point model table the device ID associated by measuring point;
By device tables of data property value, generate CURVAL;
RES_UPDATE_TIME generates ACTIME;
Current time generates UPDATETIME.
Wherein in an embodiment, also include:
Use process scheduling instrument by interface bag, operating system command and the script of ETL by step 11~13 tissues Get up and form different scene;
Make the various sequence of operation on-demand according to the rule of different trigger conditions and definition by the scheduling of scene Trigger.
As an example, it is provided that cross-platform ETL technology realizes disparate databases, different pieces of information is originated Primary equipment on-line equipment metric data access, coordinate modeling rule by the operation of commercial storehouse, automatically simultaneously Primary equipment on-line equipment model and observation point model is generated in the system commercialization storehouse of this example.
Wherein, ETL is the abbreviation of Extraction-Transformation-Loading, and Chinese is that data carry Take, change and load.ETL instrument has: OWB (Oracle Warehouse Builder), ODI (Oracle Data Integrator), Informatic PowerCenter, Trinity, AICloudETL, DataStage,
After electric power operational system gets primary equipment on-Line Monitor Device model and Monitoring Data, in system Each application just can obtain corresponding data by commercial bank interface and carry out calculating and the analysis of specialty.
It specifically comprises following step:
A) the primary equipment on-Line Monitor Device measurement history multidimensional data in the professional system of source is passed through by timing ETL is drawn in the historical data table that the system of this example is corresponding;Extraction algorithm ensures that each extraction is only extracted Historical data in previous extraction time interval;
B) process means by commercial storehouse internal data, set up latest data view: i.e. process each history Tables of data, filters out the historical data up-to-date time that updates, and sets up corresponding latest data view;
C) use the reverse modeling rule of primary equipment on-Line Monitor Device, from latest data view, set up one Between the mounted cast of secondary device on-Line Monitor Device and observation point model, and attending device model and observation point model Relation.
D) using special process scheduling instrument, above step management got up, the most orderly calls, Complete the renewal of model.
Wherein step a) farther includes: the primary equipment on-Line Monitor Device historical data of the system of this example The historical data table sort according to origin system of table builds table, and each extraction only extraction last time is drawn into this and takes out Take the data of time period, such as extraction in 5 minutes once, then only extract the historical data of first 5 minutes.Each Historical data table will be continuously increased the data record of latest update.
Wherein step b) farther includes: according to different historical data list structures, set up different up-to-date numbers According to table view;View only preserves renewal time up-to-date data.Latest data view structure and historical data Table is identical, but only retains renewal time up-to-date data for the record that device id is identical.
Wherein step c) farther includes: the reverse modeling rule of primary equipment on-Line Monitor Device, and this rule is led to Cross ETL extraction to realize, different for different types of data modeling rule, but it is all based on accompanying drawing 2 institute Show that fundamental rule carries out data modeling.
Wherein step c) farther includes: polytype device is different according to contained attribute, and modeling rule has A little different, but basic skills is consistent, as shown in Figure 2, and including: by A class device data table name, REC_BS_ID, REC_SENSOR_ID be unique NID in generating monitoring device model table;Filled by A class Put tables of data REC_SENSOR_ID and generate monitoring device model with relevant information in SENSORINFO table NAME in table, PHASE attribute;By A class device tables of data REC_BS_ID with In in MONITORPOSITIONINFO table, relevant information generates monitoring device model table LOCATION_NID attribute;By A class device tables of data attribute A(or B, C...) attribute-name, REC_BS_ID, REC_SENSOR_ID be unique NID in generating monitoring device observation point model table;By A Class device tables of data REC_SENSOR_ID generates monitoring device with relevant information in SENSORINFO table NAME in model table, GCCDLX attribute;By A class device data table name, REC_BS_ID, REC_SENSOR_ID generates DEVICEID, such that it is able to get the device ID associated by measuring point;By A class device tables of data attribute A(or B, C...) value, generate CURVAL;RES_UPDATE_TIME Generate ACTIME;Current time generates UPDATETIME.
Wherein step d) farther includes: process scheduling instrument can be by the interface bag of ETL, operating system Order, what script etc. was orderly organizes the different scene of formation;Various operation sequence is made by the scheduling of scene Row can according to different trigger conditions, and definition the on-demand triggering of rule;Make monitoring model online permissible On-demand holding, updates.
Embodiment described above only have expressed several embodiments of the present utility model, its describe more concrete and In detail, but therefore can not be interpreted as the restriction to this utility model the scope of the claims.It should be pointed out that, For the person of ordinary skill of the art, without departing from the concept of the premise utility, it is also possible to Making some deformation and improvement, these broadly fall into protection domain of the present utility model.Therefore, this utility model The protection domain of patent should be as the criterion with claims.

Claims (7)

1. an electric power operational system primary equipment on-Line Monitor Device model generating method, it is characterised in that Including:
Step (11), timing is extracted the measurement of described primary equipment on-Line Monitor Device from the professional system of source and is gone through History multidimensional data, and it is saved in the history multidimensional data table of correspondence;
Step (12), processes each described history multidimensional data table, therefrom filters out renewal time up-to-date institute State measurement history multidimensional data, set up the corresponding latest data view including device tables of data, described device Tables of data generates according to described measurement history multidimensional data;
Step (13), from described latest data view, sets up the dress of described primary equipment on-Line Monitor Device Put model and observation point model, and safeguard the relation between described mounted cast and described observation point model.
Electric power operational system primary equipment on-Line Monitor Device model generation side the most according to claim 1 Method, it is characterised in that described history multidimensional data table is according to the history multidimensional data table of described source professional system Table is built in classification.
Electric power operational system primary equipment on-Line Monitor Device model generation side the most according to claim 1 Method, it is characterised in that described step (11) specifically includes: timing is taken out by ETL from the professional system of source Taking the last time is drawn into the measurement history multidimensional of described primary equipment on-Line Monitor Device of this extraction time period Data, and it is saved in the history multidimensional data table of correspondence.
Electric power operational system primary equipment on-Line Monitor Device model generation side the most according to claim 1 Method, it is characterised in that described step (12) specifically includes: according to the survey being drawn in step (11) Amount history multidimensional data and the history multidimensional data list structure of correspondence, set up corresponding latest data table view; Described spreadsheet views only preserves renewal time up-to-date data, and latest data view structure is gone through with described History multidimensional data table is identical.
Electric power operational system primary equipment on-Line Monitor Device model generation side the most according to claim 1 Method, it is characterised in that wherein step (13) specifically includes: from described latest data view, according to one The reverse modeling rule of secondary device on-Line Monitor Device, sets up the device mould of described primary equipment on-Line Monitor Device Type and observation point model, and safeguard the relation between described mounted cast and described observation point model;Described once set The standby reverse modeling rule of on-Line Monitor Device specifically includes: according to the device data in described latest data view Table generates the monitoring device model table of described mounted cast and the monitoring device observation point model of described observation point model Table.
Electric power operational system primary equipment on-Line Monitor Device model generation side the most according to claim 5 Method, it is characterised in that the described reverse modeling rule of primary equipment on-Line Monitor Device is professional from source by ETL System extracts.
Electric power operational system primary equipment on-Line Monitor Device model generation side the most according to claim 1 Method, it is characterised in that also include:
Use process scheduling instrument by interface bag, operating system command and the script of ETL by step (11)~(13) Organize the different scene of formation;
Make the various sequence of operation on-demand according to the rule of different trigger conditions and definition by the scheduling of scene Trigger.
CN201310711104.9A 2013-12-19 2013-12-19 A kind of electric power operational system primary equipment on-Line Monitor Device model generating method Active CN103745413B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310711104.9A CN103745413B (en) 2013-12-19 2013-12-19 A kind of electric power operational system primary equipment on-Line Monitor Device model generating method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310711104.9A CN103745413B (en) 2013-12-19 2013-12-19 A kind of electric power operational system primary equipment on-Line Monitor Device model generating method

Publications (2)

Publication Number Publication Date
CN103745413A CN103745413A (en) 2014-04-23
CN103745413B true CN103745413B (en) 2016-11-23

Family

ID=50502428

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310711104.9A Active CN103745413B (en) 2013-12-19 2013-12-19 A kind of electric power operational system primary equipment on-Line Monitor Device model generating method

Country Status (1)

Country Link
CN (1) CN103745413B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110535701B (en) * 2019-08-30 2022-07-01 新华三大数据技术有限公司 Problem positioning method and device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102510127A (en) * 2011-10-21 2012-06-20 南京南瑞继保电气有限公司 Method for unifying models of on-line monitored first and secondary equipment of power grid
CN103150599A (en) * 2013-03-07 2013-06-12 江苏大学 Electric energy quality data monitoring and management system model
CN103207613A (en) * 2013-04-26 2013-07-17 武汉聪源科技有限责任公司 Data integration system for grid state detection, and implementation method of data integration system
CN103427489A (en) * 2013-08-20 2013-12-04 国家电网公司 Intelligent substation comprehensive monitoring system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100665268B1 (en) * 2004-10-29 2007-01-04 한국전력공사 Electronic watt meter with the intelligent agent

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102510127A (en) * 2011-10-21 2012-06-20 南京南瑞继保电气有限公司 Method for unifying models of on-line monitored first and secondary equipment of power grid
CN103150599A (en) * 2013-03-07 2013-06-12 江苏大学 Electric energy quality data monitoring and management system model
CN103207613A (en) * 2013-04-26 2013-07-17 武汉聪源科技有限责任公司 Data integration system for grid state detection, and implementation method of data integration system
CN103427489A (en) * 2013-08-20 2013-12-04 国家电网公司 Intelligent substation comprehensive monitoring system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
变电站在线监测系统的一体化建模与模型维护;王德文等;《电力系统自动化》;20131210;第37卷(第23期);全文 *

Also Published As

Publication number Publication date
CN103745413A (en) 2014-04-23

Similar Documents

Publication Publication Date Title
CN105278373A (en) Substation integrated information processing system realizing method
CN103337012B (en) Towards the multi-threaded intelligent comprehensive alert analysis method of grid equipment monitoring
CN102426525B (en) Panoramic modeling method of multi-application system
CN102455698B (en) Automatic control rate and stable rate monitoring system and monitoring method based on tree structure
CN113935562A (en) Intelligent rating and automatic early warning method for health condition of power equipment
CN105427041A (en) Standardized maintenance method for reconstruction and extension information point table of running substation
CN105528671B (en) A kind of power grid Multidimensional Awareness based on big data and safety estimation system and method
CN104063761A (en) SCADA data development system based on smart grid
CN105631597A (en) Construction method for transformer substation three-dimensional visual platform
CN104850635A (en) Auto check and centralized monitoring method for missing data in multi-data source environment
CN105989427A (en) Equipment status trend analysis and early warning method based on data mining
CN104954181A (en) Method for warning faults of distributed cluster devices
Hongxun et al. Data quality assessment for on-line monitoring and measuring system of power quality based on big data and data provenance theory
CN102542400B (en) The composition maintenance system and method for accurate Calculation cigarette production capacity
CN106229978A (en) The pre-judging method of platform district low-voltage problem and system
CN103699688B (en) A kind of terminal model of support terminal user's reliability management of power supply
CN103745413B (en) A kind of electric power operational system primary equipment on-Line Monitor Device model generating method
CN106157180A (en) The early warning system of platform district low-voltage problem
CN105335824B (en) Distribution network failure repairing command methods and system based on data center
CN108512217B (en) A kind of safe operation of electric network hidden danger intelligent identification Method
CN106127602A (en) A kind of stealing discrimination method based on yojan outlier algorithm and device
CN103413249A (en) Transformer substation equipment state assessment method based on computational formula
CN104933519A (en) Relay protection device condition-based maintenance aided decision making system
CN112330489A (en) Power supply station digital architecture design method based on TOGAF
Lin et al. Research on IoT perception technology of renewable energy based on edge computing

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant