CN103745411B CN201310676881.4A CN201310676881A CN103745411B CN 103745411 B CN103745411 B CN 103745411B CN 201310676881 A CN201310676881 A CN 201310676881A CN 103745411 B CN103745411 B CN 103745411B
Authority
CN
China
Prior art keywords
end processor
model data
data
main website
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310676881.4A
Other languages
Chinese (zh)
Other versions
CN103745411A (en
Inventor
丁梁
杨才明
章立宗
陈俊长
张�杰
张锋明
吴凌燕
张心心
谢栋
刘永新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANJING HUARUIJIE AUTOMATIC EQUIPMENT Co Ltd
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
Shaoxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
NANJING HUARUIJIE AUTOMATIC EQUIPMENT Co Ltd
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
Shaoxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANJING HUARUIJIE AUTOMATIC EQUIPMENT Co Ltd, State Grid Corp of China SGCC, State Grid Zhejiang Electric Power Co Ltd, Shaoxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical NANJING HUARUIJIE AUTOMATIC EQUIPMENT Co Ltd
Priority to CN201310676881.4A priority Critical patent/CN103745411B/en
Publication of CN103745411A publication Critical patent/CN103745411A/en
Application granted granted Critical
Publication of CN103745411B publication Critical patent/CN103745411B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Computer And Data Communications (AREA)

Abstract

The present invention relates to electric power management system, a kind of method of the automatic modeling based on CIM is refered in particular to, is comprised the following steps:S1:The model data generation model data file for the equipment that end side editor is connected with terminal;S2:Terminal sends model data document to server;S3:Server receives model data document;S4:Topological relation and stoichiometric point that server is set up between device node, device node according to model data document;S5:Server locking equipment simultaneously tests real data;S6:If step S5 tests pass through, server preserves the topological relation and stoichiometric point parameter between device node, device node.After the above method, construction management flow is simplified.

Description

A kind of method of the automatic modeling based on CIM
Technical field
The present invention relates to electric power management system, a kind of method of the automatic modeling based on CIM is refered in particular to.
Background technology
CIM, i.e. Common Information Model, are the architectures of modern power network monitoring system.Common Information Model, which is similar to, matches somebody with somebody Database is put, saves that the device node and facility information, stoichiometric point, geographical topology of grid monitoring system etc. are substantial amounts of to match somebody with somebody Confidence ceases.Grid monitoring system collects the real time data that power system monitor equipment in network is sent based on Common Information Model, And preserve, then according to these real-time data analysis power grid operation situations.Therefore the data in CIM are the realities of grid monitoring system When data receiver basis, storage basis and data secondary analysis basis.
Under prior art, the CIM of grid monitoring system, typically by being filled in main website by special CIM editor Put direct editing CIM database realizing.Under the method for this modeling, there are problems that following four:
1st, when equipment changing, it is necessary to CIM data in maintenance variation main website in time
Storehouse, and actual situation is, this become is even more normality, that is, is frequently necessary to change, so as to change each time During equipment, the CIM database of main website is frequently necessary to safeguard, workload is very big.
2nd, after equipment changing, or during main website CIM databases comparison, often exist
The problem of main website and inconsistent physical device, the consistency check workload of CIM data is big.
3rd, it is necessary to edit implementation change by main website after equipment changing, main website is changed often
Delayed, equipment changing can not be reflected into main website, poor real in time.
4th, after equipment changing, it is necessary to realize the change of main website data by management process, from
And the construction management flow problem of complexity is generated, construction process complex management.
Practical problem to be solved by this invention is:
1st, main website CIM data and physical device consistency problem are solved;
2nd, solve main website and safeguard the problem of CIM workload data is big;
3rd, solve after equipment changing, the problem of main website CIM data are changed not in time;
4th, the problem of solving the construction process complex management produced during equipment changing in power grid maintenance construction.
To solve the above problems, the present inventor makes further research to this, a kind of automatic modeling based on CIM is developed Thus method, this case produces.
The content of the invention
To achieve these goals, technical scheme is as follows:
A kind of method of the automatic modeling based on CIM, comprises the following steps:
S1:The model data generation model data file for the equipment that end side editor is connected with terminal;
S2:Terminal sends model data document to server;
S3:Server receives model data document;
S4:Topological relation and stoichiometric point that server is set up between device node, device node according to model data document;
S5:Server locking equipment simultaneously tests real data;
S6:If step S5 tests pass through, server preserves the topological relation and stoichiometric point between device node, device node Parameter.
After such scheme, the present invention compared with prior art, with advantages below:
Compared with prior art, the work for safeguarding CIM data by main website originally is transferred in terminal by the present invention, is had End side operates the change for realizing final CIM data.So as to eliminate main website(Server)CIM data maintenance Work., can be directly by terminal by the equipment content of change because terminal is arranged on after equipment end, therefore equipment changing Main website is reached, it is achieved thereby that the purpose of scene change, simplifies construction management flow, while it also avoid main website CIM Data change is not in time and the problem of main website CIM data and inconsistent physical device.
Brief description of the drawings
Fig. 1 is system structure diagram of the present invention
Main website 110, front end processor 120, monitoring device 130, Ethernet 112, data wire 123.
Embodiment
The present invention is further illustrated with specific embodiment below in conjunction with the accompanying drawings.
The system architecture of the present invention is as shown in figure 1, including main website 110, front end processor 120 and monitoring device 130.Wherein main website 110 be the signified server of the present invention, and front end processor 120 is the signified terminal of the present invention, and monitoring device 130 is the present invention Signified equipment.Main website 110 is connected by Ethernet with front end processor 120, and front end processor 120 passes through data wire 123 and monitoring device 130.Connection between front end processor 120 and monitoring device 130 can be realized by RS485 or Ethernet even wireless network.Before Put machine 120 and monitoring device 130 is closely located.Such as, monitoring device 130 is the monitoring device in a certain transformer station, such as electric Press table, power meter, intelligent capacitor, reactor etc..And front end processor 120 is placed in a certain controlling machine box of the transformer station. Each monitoring device of the transformer station connects main website 110 by front end processor 120.Method for automatic modeling of the invention based on CIM is such as Under:
S1:The model data generation model data text for the monitoring device being connected with front end processor 120 is edited on front end processor 120 Shelves;
S2:Front end processor 120 sends model data document to main website 110;
S3:Main website 110 receives model data document;
S4:Topological relation and stoichiometric point that main website 110 is set up between device node, device node according to model data document;
S5:Main website 110 mounts monitoring device and tests real data;
S6:If step S5 tests pass through, main website 110 preserves the topological relation and metering between device node, device node The parameters such as point.
The model data that the monitoring device 130 being connected with front end processor 120 is edited on front end processor 120 passes through on front end processor 120 Equipment editor application program is realized.After workmen completes equipment installation or safeguarded, by operating the equipment on front end processor 120 to compile Application program is collected to input the facility information for the equipment installed or safeguarded to the application program.Facility information includes:Device id, set Positional information that standby title, equipment manufacturer, model, equipment stoichiometric point, equipment communication stipulations and equipment are installed etc..Front end processor Equipment editor application program on 120 receives workmen(Or operating personnel)Input facility information after, by facility information Generate a model data document.The model data document is usually XML file format.Following is the implementation of a model data document Example:
<xml version=”1.0” encoding=”utf-8”>
<device>
<id>deviceid</ id >
<name>devicename</name>
<type>devicetype</type>
<tuopo>devicetuopo</ tuopo >
<measure>
<id>devicemeasureid</id>
<span>measure_timespan</span>
….
</measure>
</device>
It will be appreciated by those skilled in the art that there is automatic device discovery function in false equipment editor's application program as the aforementioned, then The operation of workmen, the change of the automatic discovering device of equipment editor's application program, and automatic slave unit can even not needed Middle reading device information, you can Auto-generation Model data file.
Workmen will can compile after the work of equipment editor is completed according to the operating function of equipment editor's application program The model data document for collecting generation is uploaded to main website 110.Certainly, it will be appreciated by those skilled in the art that to avoid other people from carrying out illegally Operation can carry out Authority Verification to ensure security in workmen's edit model data file or upload model data document Operation, or even upload model data document when transmission is encrypted.
Main website 110 receives model data document post analysis model data document structure tree its corresponding device node, equipment Topological relation and stoichiometric point between node.According to the model data document of foregoing XML format, it will be appreciated by those skilled in the art that root According to the record of model data document, the topological relation and stoichiometric point generated between its corresponding device node, device node is not stranded It is difficult.It should be noted that the device node of this step generation, the topological relation between device node and stoichiometric point and directly preserve to In CIM database.Because main website 110 needs to confirm the legal sex chromosome mosaicism of these equipment.In the present invention, main website 110 confirms The legal sex chromosome mosaicism of equipment is realized by data test in model data document(That is step S5).Main website 110 mounts monitoring device 130 and test the step of real data is implemented may be referred to it is as follows:
S501:Main website 110 transmits tested monitoring device 130ID to front end processor 120, and request front end processor 120 is sent out Send the real-time monitoring data of tested monitoring device 130;
S502:Front end processor 120 receives the real-time monitoring data of tested monitoring device 130, forwards it to main website 110;
S503:Main website 110 receives the real-time monitoring data of tested monitoring device 130, and com-parison and analysis whether and model Data format defined in data is consistent, if there is a certain tested monitoring device 130 real-time monitoring data data format not Unanimously, then validity checking fails, and fails to the report model data uploading detection of front end processor 120;Otherwise test passes through, and to The success of the report model data uploading detection of front end processor 120.
In practical operation, workmen needs to wait the testing result of main website 110.If main website 110 is reported to front end processor 120 The failure of model data uploading detection is accused, front end processor 120 can show the result, point out workmen modification model data document.One As for, the most long-press interval of 5 minutes of monitoring device 130 upload real-time monitoring data.Therefore, in practical operation, legitimacy inspection The step of looking into(That is the test real data in step S5)At least need to complete within 5 minutes.
Show that model data has no problem after step S503 tests pass through, main website 110 preserves setting after newly-built or change The parameters such as topological relation and stoichiometric point between slave node, device node, i.e. step S6, so as to complete final CIM automatic modelings Process.
The specific embodiment of the present invention is above are only, but the design concept of the present invention is not limited thereto, it is all to utilize this structure Think the change to present invention progress unsubstantiality, the behavior for invading the scope of the present invention all should be belonged to.

Claims (1)

1. a kind of method of the automatic modeling based on CIM, comprises the following steps:
S1:The model data generation model data file for the equipment that end side editor is connected with terminal;
S2:Terminal sends model data document to server;
S3:Server receives model data document;
S4:Topological relation and stoichiometric point that server is set up between device node, device node according to model data document;
S5:Server locking equipment simultaneously tests real data;
S6:If step S5 tests pass through, server preserves the topological relation and stoichiometric point ginseng between device node, device node Number;
The system includes main website, front end processor and monitoring device, and wherein main website is the server, and front end processor is the end End, monitoring device is the equipment, and main website is connected by Ethernet with front end processor, and front end processor is set by data wire with monitoring Standby, the connection between front end processor and monitoring device can be realized by RS485 or Ethernet even wireless network;Compiled on front end processor The model data for collecting the monitoring device being connected with front end processor realizes that workmen is complete by preposition airborne equipment editor application program After forming apparatus is installed or safeguarded, by operating the equipment editor application program on front end processor by the equipment for the equipment installed or safeguarded Information is inputted to the application program, and workmen is after the work of equipment editor is completed, according to the behaviour of equipment editor's application program The model data document for editing generation can be uploaded to main website by making function, and main website mounting monitoring device simultaneously tests real data tool The step of body is realized may be referred to as follows:
S501:Main website transmits tested monitoring device ID to front end processor, and request front end processor sends tested monitoring device Real-time monitoring data;
S502:Front end processor receives the real-time monitoring data of tested monitoring device, forwards it to main website;
S503:Main website receives the real-time monitoring data of tested monitoring device, and com-parison and analysis whether with defined in model data Data format it is consistent, the real-time monitoring data data format if there is a certain tested monitoring device is inconsistent, then legitimacy Failure is checked, and is failed to front end processor report model data uploading detection;Otherwise test passes through, and to front end processor report model number According to uploading detection success.
CN201310676881.4A 2013-12-12 2013-12-12 A kind of method of the automatic modeling based on CIM Active CN103745411B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310676881.4A CN103745411B (en) 2013-12-12 2013-12-12 A kind of method of the automatic modeling based on CIM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310676881.4A CN103745411B (en) 2013-12-12 2013-12-12 A kind of method of the automatic modeling based on CIM

Publications (2)

Publication Number Publication Date
CN103745411A CN103745411A (en) 2014-04-23
CN103745411B true CN103745411B (en) 2017-09-26

Family

ID=50502426

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310676881.4A Active CN103745411B (en) 2013-12-12 2013-12-12 A kind of method of the automatic modeling based on CIM

Country Status (1)

Country Link
CN (1) CN103745411B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104392398B (en) * 2014-12-09 2017-06-09 国家电网公司 Power distribution automation CIM imports and exports function test system and its method

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005338988A (en) * 2004-05-25 2005-12-08 Hitachi Software Eng Co Ltd Name card information management system and method with ic card

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005338988A (en) * 2004-05-25 2005-12-08 Hitachi Software Eng Co Ltd Name card information management system and method with ic card

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《基于CIM的电网建模若干问题研究》;谢淑菁,王浩,张志伟;《电网与清洁能源》;20110228;第27卷(第2期);参见1 CIM建模系统设计,2 系统建模中的若干问题 *

Also Published As

Publication number Publication date
CN103745411A (en) 2014-04-23

Similar Documents

Publication Publication Date Title
CN111262346B (en) Integrated automatic acceptance system and method for transformer substation
CN103176084B (en) Intelligent substation simulation system in panoramic replace mode and integration testing method for intelligent substation simulation system
CN104483842B (en) One kind regulation and control one automation main website comparison method
CN105978152B (en) A kind of intelligent substation telemechanical apparatus and the method for regulating and controlling main website automated closed-loop joint debugging
WO2015106605A1 (en) Method for testing station level of intelligent substation
CN105389166B (en) A kind of method that self-described plug and play distribution terminal automatically accesses
CN103326465B (en) A kind of power distribution network terminal cut-in method based on IEC61850 standard
CN105978159B (en) A kind of substation&#39;s remote control test is online to exempt to execute checking method
CN103441570A (en) One-button type sequential control operation control method based on integrated information platform
CN106329720B (en) Detection and debugging method for secondary system of reconstruction and extension project of intelligent substation
CN108923953A (en) A kind of virtual main station system of power remote machine debugging
CN104394020A (en) Automatic fault processing and safety control system and method for power information collection device
CN106570781B (en) Intelligent substation monitoring information step-by-step acceptance method based on three-layer two-network structure
CN103730894B (en) EMS image checking mehtod and device
CN104391244A (en) Closed loop test method of relay protection apparatus and system thereof
CN109495290A (en) A kind of operational system boss stands exchange method and system
CN104750095B (en) Regulation and control center inspection pilot system and method
CN104300675A (en) Power distribution room remote monitoring method and system based on integrated substation system
CN105207366A (en) IEC61850-based power distribution terminal, namely plug and play model configuration tool and realization method of IEC61850-based power distribution terminal
CN105186697A (en) Remote diagnosis system of IED operating conditions of IEC61850 intelligent substation
CN103631245A (en) Power distribution terminal defect diagnostic system and method
CN104579784B (en) Power industry Control System NetWork management method based on multidimensional virtual link
CN109962529B (en) On-line monitoring and operation and maintenance device of electrical secondary equipment
CN105759150A (en) Test system and method for transformer substation secondary device prefabricated cabin
CN103745411B (en) A kind of method of the automatic modeling based on CIM

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant