CN103745408B - The acquisition methods and device of resource below-construction amount - Google Patents

The acquisition methods and device of resource below-construction amount Download PDF

Info

Publication number
CN103745408B
CN103745408B CN201410007048.5A CN201410007048A CN103745408B CN 103745408 B CN103745408 B CN 103745408B CN 201410007048 A CN201410007048 A CN 201410007048A CN 103745408 B CN103745408 B CN 103745408B
Authority
CN
China
Prior art keywords
resource
guard
bandwidth
spot
along
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410007048.5A
Other languages
Chinese (zh)
Other versions
CN103745408A (en
Inventor
李晓琴
孟淑英
赵磊
肖金榜
李红玲
张敦芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Shenhua Energy Co Ltd
Shenhua Geological Exploration Co Ltd
Original Assignee
China Shenhua Energy Co Ltd
Shenhua Geological Exploration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Shenhua Energy Co Ltd, Shenhua Geological Exploration Co Ltd filed Critical China Shenhua Energy Co Ltd
Priority to CN201410007048.5A priority Critical patent/CN103745408B/en
Publication of CN103745408A publication Critical patent/CN103745408A/en
Application granted granted Critical
Publication of CN103745408B publication Critical patent/CN103745408B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Or Calibration Of Command Recording Devices (AREA)

Abstract

The invention discloses the acquisition methods and device of a kind of resource below-construction amount.Wherein, the method includes:Resource below-construction information interpretation is carried out to remote sensing image and obtains resource below-construction region;Determine that first goes along with sb. to guard him bandwidth using the geotechnical boring data being collected into, wherein, first goes along with sb. to guard him bandwidth goes along with sb. to guard him bandwidth for topsoil and rock stratum;Bandwidth and second is gone along with sb. to guard him according to first to go along with sb. to guard him bandwidth and carry out resource below-construction region buffer zone analysis and obtain covering resource figure spot, wherein, second goes along with sb. to guard him bandwidth goes along with sb. to guard him bandwidth for default;Determine resource thickness corresponding with resource figure spot is covered using geotechnical boring data;Stock number is covered using what resource THICKNESS CALCULATION covered resource figure spot.Using the present invention, so as to solve the problems, such as to obtain resource below-construction situation in mining area in the prior art, time-consuming, accuracy rate is low and efficiency is low, realizes the effect for rapidly and accurately obtaining and covering stock number.

Description

The acquisition methods and device of resource below-construction amount
Technical field
The present invention relates to geological exploration field, in particular to the acquisition methods and device of a kind of resource below-construction amount.
Background technology
It refers to the situation that caused mineral resources can not be developed after implementing because of construction project to cover mineral resources.
Coalfield reserves are to instruct coal exploration, exploitation, determine the important evidence of scale of investment.One construction in colliery and rule Draw, should take into full account and assessment railway, highway, the natural gas well, gas gathering station, gas pipeline, water supply line, natural lake, reservoir Coal resources reserves are covered with various buildings or groups of building.The determination for covering coal resources reserves is directly connected to The development and utilization of state coal resource, is more related to development of resources and the Utilizing question of some Coal Resource Development enterprise groups And ERM continues planning problem.It will be that owner's expropriation of land addressing and government department's decision-making are carried to do well to cover coal resources assessment For foundation, for project construction be smoothed out play vital effect with making full use of for state coal resource.
In the prior art in the assessment for covering coal resource of pit mining, construction land scope is assessment basis and master Will foundation, flex point coordinate typically according to construction land is obtained, but the cycle that flex point coordinate is obtained is long, and cannot be real-time Update, so that the resource below-construction situation that coal mining enterprise quickly, accurately cannot be found out in the range of mining area, it is impossible to carry out the totality in mining area Development project.
For resource below-construction situation in mining area is obtained in the prior art, time-consuming, accuracy rate is low and the low problem of efficiency, mesh It is preceding not yet to propose effective solution.
The content of the invention
For resource below-construction situation in mining area is obtained in correlation technique, time-consuming, accuracy rate is low and the low problem of efficiency, mesh It is preceding not yet to propose effective solution, therefore, it is a primary object of the present invention to provide a kind of acquisition side of resource below-construction amount Method and device, to solve the above problems.
To achieve these goals, according to an aspect of the invention, there is provided a kind of acquisition methods of resource below-construction amount, The method includes:Resource below-construction information interpretation is carried out to remote sensing image and obtains resource below-construction region;Bored using the geology being collected into Hole data determines that first goes along with sb. to guard him bandwidth, wherein, first goes along with sb. to guard him bandwidth goes along with sb. to guard him bandwidth for topsoil and rock stratum;According to One goes along with sb. to guard him bandwidth and second goes along with sb. to guard him bandwidth buffer zone analysis is carried out to resource below-construction region and obtain covering resource figure spot, its In, second goes along with sb. to guard him bandwidth goes along with sb. to guard him bandwidth for default;Determined using geotechnical boring data corresponding with resource figure spot is covered Resource thickness;Stock number is covered using what resource THICKNESS CALCULATION covered resource figure spot.
Further, bandwidth and second is gone along with sb. to guard him according to first to go along with sb. to guard him bandwidth and enter resource below-construction region row buffer point Analysis obtains the step of covering resource figure spot to be included:Determine the protection object in resource below-construction region;The protection object that will be read Corresponding default earth's surface goes along with sb. to guard him parameter and goes along with sb. to guard him bandwidth as second;Parameter is gone along with sb. to guard him using default earth's surface to enter resource below-construction region Row buffer analysis is initially covered resource figure spot;Carried out to initially covering resource figure spot using the first safety berm width data Buffer zone analysis obtain covering resource figure spot.
Further, using the geotechnical boring data being collected into determine first go along with sb. to guard him bandwidth the step of include:To geology Borehole data carries out interpolation calculation generation TIN models;Extracted from TIN models corresponding with resource below-construction region resource inclination angle, Thickness of surface soil and the vertical buried depth of resource;Resource inclination angle, thickness of surface soil, the vertical buried depth of resource and rock moving parameter are enclosed Protecting band width calculation obtains first and goes along with sb. to guard him bandwidth.
Further, the step of determining resource thickness using geotechnical boring data includes:According to the seat for covering resource figure spot Mark extracts resource thickness from TIN models.
Further, including the step of covering stock number for resource figure spot is covered using resource THICKNESS CALCULATION:Acquisition is covered The apparent density of the resource of resource figure spot;The product of area, resource thickness and apparent density that calculating covers resource figure spot is covered Stock number.
Further, carrying out the step of resource below-construction information interpretation obtains resource below-construction region to remote sensing image includes:Obtain Take default construction land feature;The image data with construction land feature is extracted from remote sensing image and obtains resource below-construction area Domain.
Further, remote sensing image is being carried out before resource below-construction information interpretation obtains resource below-construction region, acquisition side Method includes:Obtain initial remote sensing image;Initial remote sensing image is carried out registration, correct, merge, inlaying and even color treatment obtain Remote sensing image.
To achieve these goals, according to another aspect of the present invention, there is provided a kind of acquisition device of resource below-construction amount, The device includes:Interpretation module, resource below-construction region is obtained for carrying out resource below-construction information interpretation to remote sensing image;First is true Cover half block, for determining that first goes along with sb. to guard him bandwidth using the geotechnical boring data being collected into, wherein, first goes along with sb. to guard him bandwidth for table Bandwidth is gone along with sb. to guard him in soil layer and rock stratum;Analysis module, bandwidth is gone along with sb. to guard him to resource for going along with sb. to guard him bandwidth and second according to first Cover region and carry out buffer zone analysis and obtain covering resource figure spot, wherein, second goes along with sb. to guard him bandwidth goes along with sb. to guard him bandwidth for default; Second determining module, for determining resource thickness corresponding with resource figure spot is covered using geotechnical boring data;Computing module, uses Stock number is covered in resource figure spot is covered using resource THICKNESS CALCULATION.
Further, analysis module includes:Object determining module, for determining the protection object in resource below-construction region; Read module, the corresponding default earth's surface of protection object for that will read goes along with sb. to guard him parameter and goes along with sb. to guard him bandwidth as second;First Analysis submodule, buffer zone analysis is carried out to resource below-construction region for going along with sb. to guard him parameter using default earth's surface and obtains initially covering money Source figure spot;Second analysis submodule, for covering resource figure spot and carrying out buffering area to initial using the first safety berm width data Analysis obtains covering resource figure spot.
Further, the first determining module includes:Model generation module, for carrying out interpolation calculation to geology borehole data Generation TIN models;First extraction module, for extracting resource inclination angle corresponding with resource below-construction region, table soil from TIN models Thickness degree and the vertical buried depth of resource;First calculating sub module, for resource inclination angle, thickness of surface soil, the vertical buried depth of resource with And rock moving parameter carries out safety berm width calculation and obtains first going along with sb. to guard him bandwidth.
Further, the second determining module includes:Second extraction module, for according to cover the coordinate of resource figure spot from Resource thickness is extracted in TIN models.
Further, computing module includes:Acquisition module, the apparent density for obtaining the resource for covering resource figure spot;The Two calculating sub modules, the product for calculating the area, resource thickness and apparent density that cover resource figure spot obtains covering stock number.
Further, interpretation module includes:Feature acquisition module, for obtaining default construction land feature;3rd carries Modulus block, resource below-construction region is obtained for extracting the image data with construction land feature from remote sensing image.
Further, acquisition device also includes:Image acquiring module, for obtaining initial remote sensing image;Image procossing mould Block, for initial remote sensing image is carried out registration, correct, merge, inlay and even color treatment obtain remote sensing image.
Using the present invention, resource below-construction information interpretation is carried out to remote sensing image by interpretation module and obtains resource below-construction area Domain, and bandwidth is gone along with sb. to guard him using what the geotechnical boring data being collected into determined topsoil and rock stratum by the first determining module, so Post analysis module goes along with sb. to guard him bandwidth and second and goes along with sb. to guard him bandwidth and carry out buffer zone analysis to resource below-construction region and obtain according to first Cover resource figure spot, the second determining module covered using resource THICKNESS CALCULATION resource figure spot cover stock number after, calculate Module covers stock number using what resource THICKNESS CALCULATION covered resource figure spot.Such scheme is used with remote sensing image, geotechnical boring Can be just calculated without flex point coordinate based on data and cover stock number, and it is distant using such scheme of the invention Sense image can be obtained in real time, and geotechnical boring data can be the data being stored in database, so such scheme is fallen into a trap Calculation covers the data of stock number can be with quick obtaining, and resource thickness, the inclination data determined by geotechnical boring data The degree of accuracy is higher, and so as to solve resource below-construction situation in acquisition mining area in the prior art, time-consuming, accuracy rate is low and efficiency is low Problem, realize rapidly and accurately obtain cover stock number.
Brief description of the drawings
Accompanying drawing described herein is used for providing a further understanding of the present invention, constitutes the part of the application, this hair Bright schematic description and description does not constitute inappropriate limitation of the present invention for explaining the present invention.In the accompanying drawings:
Fig. 1 is the structural representation of the acquisition device of resource below-construction amount according to embodiments of the present invention;
Fig. 2 is the flow chart of the acquisition methods of resource below-construction amount according to embodiments of the present invention;And
Fig. 3 is the flow chart of the acquisition methods of a kind of optional resource below-construction amount according to embodiments of the present invention.
Specific embodiment
First, the part noun or term for occurring during being described to the embodiment of the present invention are applied to following solution Release:
TIN models:That is TIN, is to be fitted reaction earth's surface according to the elevation information on volume of data point Relief feature, and the elevation information that interpolation goes out on specified point.The shapes and sizes of the triangulation network depend on the measuring point being randomly distributed Position and density.X, Y, the discrete point (data point) of Z coordinate as known to one group are referred mainly in digital mapping and carrys out interpolating digital Elevation model, this data point can be contour, along Latitudinal section or one group of irregular discrete point.Further, it is also possible to The point for consider some characteristic points, Height figure, being distributed along geomorphological structure line and boundary line.
Figure spot:Whole image image is divided into several small regions, the small region after division is generally referred to as figure spot.
In order that those skilled in the art more fully understand the present invention program, below in conjunction with the embodiment of the present invention Accompanying drawing, is clearly and completely described to the technical scheme in the embodiment of the present invention, it is clear that described embodiment is only The embodiment of a part of the invention, rather than whole embodiments.Based on the embodiment in the present invention, ordinary skill people The every other embodiment that member is obtained under the premise of creative work is not made, should all belong to the model of present invention protection Enclose.
It should be noted that term " first ", " in description and claims of this specification and above-mentioned accompanying drawing Two " it is etc. for distinguishing similar object, without for describing specific order or precedence.It should be appreciated that so using Data can exchange in the appropriate case, so as to embodiments of the invention described herein can with except illustrating herein or Order beyond those of description is implemented.Additionally, term " comprising " and " having " and their any deformation, it is intended that cover Lid is non-exclusive to be included, for example, the process, method, system, product or the equipment that contain series of steps or unit are not necessarily limited to Those steps or unit clearly listed, but may include not list clearly or for these processes, method, product Or other intrinsic steps of equipment or unit.
It should be noted that in the case where not conflicting, the feature in embodiment and embodiment in the application can phase Mutually combination.Describe the present invention in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
Fig. 1 is the structural representation of the acquisition device of resource below-construction amount according to embodiments of the present invention.As shown in figure 1, should Device can include:Interpretation module 10, resource below-construction region is obtained for carrying out resource below-construction information interpretation to remote sensing image;The One determining module 30, for determining that first goes along with sb. to guard him bandwidth using the geotechnical boring data being collected into, wherein, first goes along with sb. to guard him bandwidth Spend and go along with sb. to guard him bandwidth for topsoil and rock stratum;Analysis module 50, bandwidth is gone along with sb. to guard him for going along with sb. to guard him bandwidth and second according to first Degree carries out buffer zone analysis to resource below-construction region and obtains covering resource figure spot, wherein, second goes along with sb. to guard him bandwidth encloses for default Protecting band width;Second determining module 70, for determining resource thickness corresponding with resource figure spot is covered using geotechnical boring data; Computing module 90, stock number is covered for being covered in resource figure spot using resource THICKNESS CALCULATION.
Using the present invention, resource below-construction information interpretation is carried out to remote sensing image by interpretation module and obtains resource below-construction area Domain, and bandwidth is gone along with sb. to guard him using what the geotechnical boring data being collected into determined topsoil and rock stratum by the first determining module, so Post analysis module goes along with sb. to guard him bandwidth and second and goes along with sb. to guard him bandwidth and carry out buffer zone analysis to resource below-construction region and obtain according to first Cover resource figure spot, the second determining module covered using resource THICKNESS CALCULATION resource figure spot cover stock number after, calculate Module covers stock number using what resource THICKNESS CALCULATION covered resource figure spot.Such scheme is used with remote sensing image, geotechnical boring Can be just calculated without flex point coordinate based on data and cover stock number, and it is distant using such scheme of the invention Sense image can be obtained in real time, and geotechnical boring data can be the data being stored in database, so such scheme is fallen into a trap Calculation covers the data of stock number can be with quick obtaining, and resource thickness, the inclination data determined by geotechnical boring data The degree of accuracy is higher, and so as to solve resource below-construction situation in acquisition mining area in the prior art, time-consuming, accuracy rate is low and efficiency is low Problem, realize rapidly and accurately obtain cover stock number.
In the above embodiment of the present invention, analysis module can include:Object determining module, for determining resource below-construction Protection object in region;Read module, the corresponding default earth's surface of protection object for that will read goes along with sb. to guard him parameter as Two go along with sb. to guard him bandwidth;First analysis submodule, row buffer is entered for going along with sb. to guard him parameter using default earth's surface to resource below-construction region Analysis is initially covered resource figure spot;Second analysis submodule, for using the first safety berm width data to initially covering Resource figure spot carries out buffer zone analysis and obtains covering resource figure spot.
Wherein, protection object can be building, such as:Road, building etc. build the building on building site;It is above-mentioned Default earth's surface in embodiment goes along with sb. to guard him the data during parameter can be stored in database, can be that staff is rule of thumb pre- The earth's surface of the protection object for first setting goes along with sb. to guard him parameter.For example:Protection object be Class I highway, then its default earth's surface go along with sb. to guard him parameter can Think:With 15 meters of buffering area, namely 15 meters are extended out in the Class I highway width.There are multiple protection objects in mining area In the case of, default earth's surface can be gone along with sb. to guard him the form that parameter makes list, in the list it is in store protection object with it is corresponding Default earth's surface goes along with sb. to guard him the corresponding relation of parameter.
In the above-described embodiments, interpolation calculation generation TIN models can be carried out to geology borehole data, then according to resource The coordinate for covering region extracts the data such as resource inclination angle, thickness of surface soil and the vertical buried depth of resource from TIN models, and to resource Inclination angle, thickness of surface soil, the vertical buried depth of resource and rock moving parameter carry out safety berm width calculation and obtain first going along with sb. to guard him bandwidth. Wherein, rock moving parameter can be the data for collecting in advance, and rock moving parameter includes:Topsoil traveling angle, move towards traveling angle, go up a hill The data of traveling angle and traveling angle of going down the hill.
The remote sensing image obtained using remote sensing in above-described embodiment has scope wide, quick, real-time, dynamic, accurate Advantage.On the other hand, when covering resource and calculating, given birth to using the geotechnical boring data machine plotting in region to pit mining Into TIN models, can more accurately computing resource (such as coal seam) thickness, inclination angle, safeguarded so as to obtain more accurate first The data of bandwidth, to obtain more practical and accurately cover resource figure spot, and then make the calculating for covering stock number more accurate.
According to the abovementioned embodiments of the present invention, the first determining module can include:Model generation module, for being bored to geology Hole data carries out interpolation calculation generation TIN models;First extraction module, for being extracted and resource below-construction region from TIN models Corresponding resource inclination angle, thickness of surface soil and the vertical buried depth of resource;First calculating sub module, for resource inclination angle, topsoil The vertical buried depth of thickness, resource and rock moving parameter carry out safety berm width calculation and obtain first going along with sb. to guard him bandwidth.
Wherein, default earth's surface is gone along with sb. to guard him parameter and is:In order to protect buildings or structures, railway, water body and main roadway etc. no By the adverse effect of underground mining, and be these protection objects set go along with sb. to guard him bandwidth.Bandwidth is gone along with sb. to guard him according to protection object Protection class (by importance, purposes be classified) depending on, generally 5~20m.Specifically, it is possible to use vertical sectional method, vertical line Method or digital projection with heights method obtain going along with sb. to guard him bandwidth.First of topsoil and rock stratum in above-described embodiment goes along with sb. to guard him bandwidth Data can also (the resource inclination angle, topsoil in such as above-mentioned embodiment be thick to the corresponding topsoil and rock stratum data that extract Degree and the vertical buried depth of resource) obtained using vertical sectional method, normal line method or digital projection with heights method.
Specifically, buffer zone analysis can be carried out based on GIS software to obtain covering resource figure spot, to determine to cover border.
In the above embodiment of the present invention, the second determining module can include:Second extraction module, for according to covering The coordinate of resource figure spot extracts resource thickness from TIN models.
In the above embodiment of the present invention, computing module can include:Acquisition module, resource figure spot is covered for obtaining Resource apparent density;Second calculating sub module, area, resource thickness and the apparent density that resource figure spot is covered for calculating multiplies Product obtains covering stock number.
Specifically, the calculating and three-dimensional display software that stock number is covered in above-described embodiment are mainly based upon three-dimension GIS Data acquisition technology, administrative skill and visualization technique realize, the main all kinds of buildings including colliery, stratum (containing coal seam with Reference lamina), the threedimensional model (protecting object) of the entity such as surface water body, it is possible to realize that three-dimensional data connects based on three-dimensional platform Enter, three-dimensional modeling, three-dimensional cutting, the amount of covering are calculated and its function such as result is derived.
Wherein, apparent density is apparent density, is an index of the physical features for characterizing resource, can be to resource (coal in such as above-mentioned embodiment) is sampled the data being calculated.
According to the abovementioned embodiments of the present invention, interpretation module can include:Feature acquisition module, for obtaining default building If land used feature;3rd extraction module, is provided for extracting the image data with construction land feature from remote sensing image Source covers region.
Specifically, default construction land feature can be read from tables of data, the tables of data can be by staff It is pre-stored in tables of data.The image data with construction land feature is extracted from remote sensing image and obtains resource below-construction region (i.e. construction land scope).
In the above embodiment of the present invention, acquisition device can include:Image acquiring module, for obtaining initial remote sensing Image;Image processing module, for initial remote sensing image is carried out registration, correct, merge, inlay and even color treatment obtain distant Sense image.
Specifically, after newest high-resolution initial remote sensing image is obtained, initial remote sensing image is carried out registration, Correct, merge, inlaying, the treatment such as even color obtains remote sensing image.
Can be with resource below-construction information such as quick obtaining mining area buildings or structures, railways using newest remote sensing image data Coordinate, based on three-dimension GIS technology, with reference to TIN models and mineral resources occurrence status that mine geology borehole data machine plotting is generated The achievable extensive area such as data covers quick calculating, three-dimensional display and the result of calculation output of coal resources, and then Human error can be avoided, operating efficiency is improved, is Enterprises Leader provided auxiliary decision-making in the utilization of resources and development project.
The acquisition methods for covering coal resources that the present invention is provided, step is simple, accuracy is high, efficiency high, and risk is thrown Money is small.
Fig. 2 is the flow chart of the acquisition methods of resource below-construction amount according to embodiments of the present invention, the method bag as shown in Figure 2 Include following steps:
Step S102, carries out resource below-construction information interpretation and obtains resource below-construction region to remote sensing image.
Step S104, determines that first goes along with sb. to guard him bandwidth using the geotechnical boring data being collected into, wherein, first goes along with sb. to guard him bandwidth Spend and go along with sb. to guard him bandwidth for topsoil and rock stratum.
Step S106, goes along with sb. to guard him bandwidth and second and goes along with sb. to guard him bandwidth and enter row buffer point to resource below-construction region according to first Analysis obtains covering resource figure spot, wherein, second goes along with sb. to guard him bandwidth goes along with sb. to guard him bandwidth for default.
Step S108, resource thickness corresponding with resource figure spot is covered is determined using geotechnical boring data.
Step S110:Stock number is covered using what resource THICKNESS CALCULATION covered resource figure spot.
Using the present invention, resource below-construction region is obtained by carrying out resource below-construction information interpretation to remote sensing image, and use What the geotechnical boring data being collected into determined topsoil and rock stratum goes along with sb. to guard him bandwidth, then goes along with sb. to guard him bandwidth and second according to first Go along with sb. to guard him bandwidth buffer zone analysis are carried out to resource below-construction region and obtain covering resource figure spot, covered using resource THICKNESS CALCULATION Resource figure spot cover stock number after, cover stock number using what resource THICKNESS CALCULATION covered resource figure spot.Using above-mentioned side Case can be just calculated without flex point coordinate based on remote sensing image, geotechnical boring data and cover stock number, and Can be obtained in real time using such scheme remote sensing image of the invention, and geotechnical boring data can be to be stored in database Data, thus calculated in such scheme cover the data of stock number can be with quick obtaining and true by geotechnical boring data Fixed resource thickness, the inclination data degree of accuracy are higher, obtain in the prior art resource below-construction situation consumption in mining area so as to solve The problem that duration, accuracy rate are low and efficiency is low, realizes rapidly and accurately acquisition and covers stock number.
In the above embodiment of the present invention, go along with sb. to guard him bandwidth and second according to first and go along with sb. to guard him bandwidth to resource below-construction area Domain carries out buffer zone analysis and obtains the step of covering resource figure spot including:Determine the protection object in resource below-construction region; The corresponding default earth's surface of protection object that will be read goes along with sb. to guard him parameter and goes along with sb. to guard him bandwidth as second;Ginseng is gone along with sb. to guard him using default earth's surface It is several buffer zone analysis are carried out to resource below-construction region initially to be covered resource figure spot;Using the first safety berm width data to first Beginning covers resource figure spot and carries out buffer zone analysis and obtains covering resource figure spot.
Wherein, protection object can be building, such as:Road, building etc. build the building on building site;It is above-mentioned Default earth's surface in embodiment goes along with sb. to guard him the data during parameter can be stored in database, can be that staff is rule of thumb pre- The earth's surface of the protection object for first setting goes along with sb. to guard him parameter.For example:Protection object be Class I highway, then its default earth's surface go along with sb. to guard him parameter can Think:With 15 meters of buffering area, namely 15 meters are extended out in the Class I highway width.There are multiple protection objects in mining area In the case of, default earth's surface can be gone along with sb. to guard him the form that parameter makes list, in the list it is in store protection object with it is corresponding Default earth's surface goes along with sb. to guard him the corresponding relation of parameter.
Specifically, using the geotechnical boring data being collected into determine first go along with sb. to guard him bandwidth the step of can include:Over the ground Matter borehole data carries out interpolation calculation generation TIN models;Resource corresponding with resource below-construction region is extracted from TIN models to incline Angle, thickness of surface soil and the vertical buried depth of resource;Resource inclination angle, thickness of surface soil, the vertical buried depth of resource and rock moving parameter are entered Row safety berm width calculation obtains first and goes along with sb. to guard him bandwidth.
In the above-described embodiments, interpolation calculation generation TIN models can be carried out to geology borehole data, then according to resource The coordinate for covering region extracts the data such as resource inclination angle, thickness of surface soil and the vertical buried depth of resource from TIN models, and to money Source inclination angle, thickness of surface soil, the vertical buried depth of resource and rock moving parameter carry out safety berm width calculation and obtain first going along with sb. to guard him bandwidth Degree.Wherein, rock moving parameter can be the data for collecting in advance, and rock moving parameter includes:Topsoil traveling angle, move towards traveling angle, Go up a hill the data of traveling angle and traveling angle of going down the hill.
The remote sensing image obtained using remote sensing in above-described embodiment has scope wide, quick, real-time, dynamic, accurate Advantage.On the other hand, when covering resource and calculating, given birth to using the geotechnical boring data machine plotting in region to pit mining Into TIN models, can more accurately computing resource (such as coal seam) thickness, inclination angle, safeguarded so as to obtain more accurate first The data of bandwidth, more accurately cover resource figure spot, and then make the calculating for covering stock number more accurate to obtain.
Wherein, default earth's surface is gone along with sb. to guard him parameter and is:In order to protect buildings or structures, railway, water body and main roadway etc. no By the adverse effect of underground mining, and be these protection objects set go along with sb. to guard him bandwidth.Bandwidth is gone along with sb. to guard him according to protection object Protection class (by importance, purposes be classified) depending on, generally 5~20m.Specifically, it is possible to use vertical sectional method, vertical line Method or digital projection with heights method obtain going along with sb. to guard him bandwidth.First of topsoil and rock stratum in above-described embodiment goes along with sb. to guard him bandwidth Data can also (the resource inclination angle, topsoil in such as above-mentioned embodiment be thick to the corresponding topsoil and rock stratum data that extract Degree and the vertical buried depth of resource) obtained using vertical sectional method, normal line method or digital projection with heights method.
Specifically, buffer zone analysis can be carried out based on GIS software to obtain covering resource figure spot, to determine to cover border.
Can include in the above embodiment of the present invention, the step of determine resource thickness using geotechnical boring data:Press Resource thickness is extracted from TIN models according to the coordinate for covering resource figure spot.
According to the abovementioned embodiments of the present invention, the step of covering stock number of resource figure spot is covered using resource THICKNESS CALCULATION Can include:Acquisition covers the apparent density of the resource of resource figure spot;Calculating covers the area of resource figure spot, resource thickness and regarding close The product of degree obtains covering stock number.
Specifically, the calculating and three-dimensional display software that stock number is covered in above-described embodiment are mainly based upon three-dimension GIS Data acquisition technology, administrative skill and visualization technique realize, the main all kinds of buildings including colliery, stratum (containing coal seam with Reference lamina), the threedimensional model (protecting object) of the entity such as surface water body, it is possible to realize that three-dimensional data connects based on three-dimensional platform Enter, three-dimensional modeling, three-dimensional cutting, the amount of covering are calculated and its function such as result is derived.
Resource in the above-described embodiments can be coal, can be built (structure) with quick obtaining mining area using newest remote sensing image The coordinate of the resource below-construction information such as thing, railway is built, the geotechnical boring data machine plotting generation based on three-dimension GIS technology combination mining area TIN models can realize that extensive area covers quick calculating, three-dimensional display and the result of calculation output of coal resources, and then Can avoid obtaining the problem for covering that the resource area scope time is long and renewal is delayed, improve operating efficiency, be that Enterprises Leader exists The utilization of resources and provided auxiliary decision-making in development project.
Wherein, apparent density is apparent density, is an index of the physical features for characterizing resource, can be to resource (coal in such as above-mentioned embodiment) is sampled the data being calculated.
In the above embodiment of the present invention, resource below-construction information interpretation is carried out to remote sensing image and obtains resource below-construction region The step of can include:Obtain default construction land feature;The image with construction land feature is extracted from remote sensing image Data obtain resource below-construction region.
Specifically, default construction land feature can be read from tables of data, the tables of data can be by staff It is pre-stored in tables of data.The image data with construction land feature is extracted from remote sensing image and obtains resource below-construction region (i.e. construction land scope).
According to the abovementioned embodiments of the present invention, resource below-construction area is obtained carrying out resource below-construction information interpretation to remote sensing image Before domain, acquisition methods can include:Obtain initial remote sensing image;Registration is carried out to initial remote sensing image, corrected, merged, inlaying Embedding and even color treatment obtains remote sensing image.
Specifically, after newest high-resolution initial remote sensing image is obtained, initial remote sensing image is carried out registration, Correct, merge, inlaying, the treatment such as even color obtains remote sensing image.
The acquisition methods for covering coal resources that the present invention is provided, step is simple, accuracy is high, efficiency high, and risk is thrown Money is small.
The present invention is discussed in detail by taking certain mining area as an example below.
The Mine area geologic structure is simple, and rich coal resources, ature of coal is excellent, and minable coal seam includes 15 coal seams, and preservation Relatively stablize, stock number estimation vertical depth is 519~919 meters, stock number estimation absolute altitude is 340~740 meters.
0.5 meter of U.S. WorldView satellite remote-sensing image of resolution ratio (i.e. initial remote sensing image) is obtained first, to first Beginning remote sensing image carries out registration, geometric correction, merges, inlays, after a series for the treatment of such as even color, extracting resource below-construction region, obtains Take the scope of construction land.The earth's surface that acquisition earth's surface covers resource figure spot goes along with sb. to guard him scope, coal seam depth and topsoil and rock stratum Bandwidth is gone along with sb. to guard him, resource figure spot staying on 15 coal seams is initially covered by the buffer zone analysis function in GIS software If total size (covers resource figure spot) i.e. in above-described embodiment, then using the parameter of the coal seam thickness in TIN models, ask for Classifying type, cover stock number by coal seam, each mine.
As shown in Fig. 2 the embodiment can be achieved by the steps of:
Step S201:Obtain initial remote sensing image.
Step S202:Image procossing is carried out to initial remote sensing image and obtains remote sensing image.
Specifically, can based on the control datas such as topographic map, altitude data, by just penetrate correction, registration, fusion and Damascene process step, obtains the remote sensing image in mining area.
Step S203:Resource below-construction region is extracted from remote sensing image.
Specifically, resource below-construction information interpretation is carried out to remote sensing image, resource below-construction region is extracted.
Step S204:Determine that different resource covers the earth's surface in region and goes along with sb. to guard him range parameter.
Specifically, it is determined that the protection object being related in resource below-construction region, reading earth's surface is gone along with sb. to guard him from default tables of data Range parameter (the default earth's surface i.e. in above-described embodiment goes along with sb. to guard him parameter).
More specifically, according to《Building, water body, railway and main roadway --- coal column are stayed and set and mining pressed coal code》Really That determines to protect in resource below-construction region object goes along with sb. to guard him bandwidth (the default earth's surface i.e. in above-described embodiment goes along with sb. to guard him parameter).
Step S205:Collect geotechnical boring data and rock moving parameter.
Step S206:Interpolation calculation is carried out to geology borehole data and obtains TIN models.
Step S207:Seam inclination, thickness, the vertical buried depth of thickness of surface soil and coal seam are obtained from TIN models.
Determine the of topsoil and rock stratum using seam inclination, thickness of surface soil, the vertical buried depth in coal seam and rock moving parameter One-dimensional protecting band width.
Step S208:Buffer zone analysis are carried out based on GIS software to obtain covering resource figure spot.
Specifically, go along with sb. to guard him parameter using default earth's surface first time buffer zone analysis are carried out to resource below-construction region and obtain initially Cover resource figure spot;Using first go along with sb. to guard him bandwidth to it is initial cover resource figure spot and carry out second buffer zone analysis covered Resource figure spot.
More specifically, using the data acquisition technology of three-dimension GIS, based on TIN models, remote sensing image and geotechnical boring data Block mold superposition is carried out Deng graph data, then bandwidth and second is gone along with sb. to guard him using first and is gone along with sb. to guard him bandwidth (i.e. default earth's surface Go along with sb. to guard him parameter) buffer zone analysis are carried out to the model after superposition obtain covering resource figure spot.
Step S209:Calculating covers stock number.
Based on GIS software, calculating covers figure spot always staying on 15 coal seams and sets scope (i.e. covering in above-described embodiment The scope of resource figure spot, the scope can be represented with usable floor area) cover stock number, and be also based on mine border, Ask for classifying type, stock number covered by coal seam and resource below-construction total amount.
Resource below-construction computational methods in the above embodiment of the present invention be mainly based upon three-dimension GIS data acquisition technology, Administrative skill and visualization technique realization, the main all kinds of buildings including colliery, stratum (containing coal seam and reference lamina), surface water The threedimensional model of the entities such as body, it is possible to three-dimensional data access, three-dimensional modeling are realized based on three-dimensional platform, three-dimensional cutting, is covered The function such as amount calculating and its result derivation.
It should be noted that can be in such as one group computer executable instructions the step of the flow of accompanying drawing is illustrated Performed in computer system, and, although logical order is shown in flow charts, but in some cases, can be with not The order being same as herein performs shown or described step.
As can be seen from the above description, the present invention realizes following technique effect:Using the present invention, by distant Sense image carries out resource below-construction information interpretation and obtains resource below-construction region, and determines table soil using the geotechnical boring data being collected into Bandwidth is gone along with sb. to guard him in layer and rock stratum, then goes along with sb. to guard him bandwidth and second according to first and goes along with sb. to guard him bandwidth resource below-construction region is carried out Buffer zone analysis obtain covering resource figure spot, covered using resource THICKNESS CALCULATION resource figure spot cover stock number after, make Stock number is covered with what resource THICKNESS CALCULATION covered resource figure spot.The such scheme is used to be with remote sensing image, geotechnical boring data Basis can just be calculated without flex point coordinate and cover stock number, and use such scheme remote sensing image of the invention Can obtain in real time, and geotechnical boring data can be the data being stored in database, so calculated in such scheme covering The data of stock number can be with quick obtaining, and resource thickness, the inclination data degree of accuracy determined by geotechnical boring data It is higher, so as to solve the problems, such as in the prior art obtain mining area in resource below-construction situation time-consuming, accuracy rate is low and efficiency is low, Realize rapidly and accurately to obtain and cover stock number.
Obviously, those skilled in the art should be understood that above-mentioned of the invention each module or each step can be with general Computing device realize that they can be concentrated on single computing device, or be distributed in multiple computing devices and constituted Network on, alternatively, the program code that they can be can perform with computing device be realized, it is thus possible to they are stored Performed by computing device in the storage device, or they be fabricated to each integrated circuit modules respectively, or by they In multiple modules or step single integrated circuit module is fabricated to realize.So, the present invention is not restricted to any specific Hardware and software is combined.
The preferred embodiments of the present invention are the foregoing is only, is not intended to limit the invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.It is all within the spirit and principles in the present invention, made any repair Change, equivalent, improvement etc., should be included within the scope of the present invention.

Claims (12)

1. a kind of acquisition methods of resource below-construction amount, it is characterised in that including:
Resource below-construction information interpretation is carried out to remote sensing image and obtains resource below-construction region;
Determine that first goes along with sb. to guard him bandwidth using the geotechnical boring data being collected into, wherein, described first goes along with sb. to guard him bandwidth for table is native Layer goes along with sb. to guard him bandwidth with rock stratum;
Bandwidth and second is gone along with sb. to guard him according to described first to go along with sb. to guard him bandwidth and carry out buffer zone analysis to the resource below-construction region and obtain To covering resource figure spot, wherein, described second goes along with sb. to guard him bandwidth goes along with sb. to guard him bandwidth for default;
Determine to cover the corresponding resource thickness of resource figure spot with described using the geotechnical boring data;
Stock number is covered using cover resource figure spot described in the resource THICKNESS CALCULATION,
Wherein, bandwidth and second is gone along with sb. to guard him according to described first to go along with sb. to guard him bandwidth and enter the resource below-construction region row buffer point Analysis obtains the step of covering resource figure spot to be included:
Determine the protection object in the resource below-construction region;
The corresponding default earth's surface of the protection object that will be read goes along with sb. to guard him parameter and goes along with sb. to guard him bandwidth as described second;
Parameter is gone along with sb. to guard him using the default earth's surface buffer zone analysis are carried out to the resource below-construction region initially covered resource Figure spot;
Using the first safety berm width data to it is described it is initial cover resource figure spot and carry out buffer zone analysis obtain the pressure Resource figure spot is covered,
Wherein, the protection object is building, the default earth's surface go along with sb. to guard him the data that parameter is stored in database or The earth's surface of the protection object for rule of thumb pre-setting goes along with sb. to guard him parameter, in the case of with multiple protection objects, will be default Table goes along with sb. to guard him the form that parameter makes list, and in store protection object goes along with sb. to guard him the right of parameter with corresponding default earth's surface in the list Should be related to.
2. acquisition methods according to claim 1, it is characterised in that determine first using the geotechnical boring data being collected into The step of going along with sb. to guard him bandwidth includes:
The geotechnical boring data are carried out with interpolation calculation generation TIN models;
Resource inclination angle corresponding with the resource below-construction region, thickness of surface soil and resource are extracted from the TIN models vertical Buried depth;
The resource inclination angle, the thickness of surface soil, the vertical buried depth of the resource and rock moving parameter are carried out going along with sb. to guard him bandwidth It is calculated described first and goes along with sb. to guard him bandwidth.
3. acquisition methods according to claim 2, it is characterised in that determine resource thickness using the geotechnical boring data The step of include:
The resource thickness is extracted from the TIN models according to the coordinate for covering resource figure spot.
4. acquisition methods according to claim 3, it is characterised in that cover resource using described in the resource THICKNESS CALCULATION Figure spot includes the step of covering stock number:
The apparent density of the resource of resource figure spot is covered described in obtaining;
The product of the area, the resource thickness and the apparent density that cover resource figure spot described in calculating covers resource described in obtaining Amount.
5. acquisition methods as claimed in any of claims 1 to 4, it is characterised in that resource is carried out to remote sensing image Covering the step of information interpretation obtains resource below-construction region includes:
Obtain default construction land feature;
The image data with the construction land feature is extracted from the remote sensing image and obtains the resource below-construction region.
6. acquisition methods as claimed in any of claims 1 to 4, it is characterised in that provided to remote sensing image Source is covered before information interpretation obtains resource below-construction region, and the acquisition methods include:
Obtain initial remote sensing image;
The initial remote sensing image is carried out registration, correct, merge, inlaying and even color treatment obtain the remote sensing image.
7. a kind of acquisition device of resource below-construction amount, it is characterised in that including:
Interpretation module, resource below-construction region is obtained for carrying out resource below-construction information interpretation to remote sensing image;
First determining module, for determining that first goes along with sb. to guard him bandwidth using the geotechnical boring data being collected into, wherein, described first Go along with sb. to guard him bandwidth and go along with sb. to guard him bandwidth for topsoil and rock stratum;
Analysis module, goes along with sb. to guard him bandwidth the resource below-construction region is carried out for going along with sb. to guard him bandwidth and second according to described first Buffer zone analysis obtain covering resource figure spot, wherein, described second goes along with sb. to guard him bandwidth goes along with sb. to guard him bandwidth for default;
Second determining module, for being determined with described to cover the corresponding resource of resource figure spot thick using the geotechnical boring data Degree;
Computing module, for covering stock number using being covered described in the resource THICKNESS CALCULATION in resource figure spot,
Wherein, the analysis module includes:
Object determining module, for determining the protection object in the resource below-construction region;
Read module, the corresponding default earth's surface of the protection object for that will read is gone along with sb. to guard him parameter and is gone along with sb. to guard him as described second Bandwidth;
First analysis submodule, row buffer point is entered to the resource below-construction region for going along with sb. to guard him parameter using the default earth's surface Analysis is initially covered resource figure spot;
Second analysis submodule, for initial covering resource figure spot and delaying to described using the first safety berm width data Rush area's analysis obtain it is described cover resource figure spot,
Wherein, the protection object is building, the default earth's surface go along with sb. to guard him the data that parameter is stored in database or The earth's surface of the protection object for rule of thumb pre-setting goes along with sb. to guard him parameter, in the case of with multiple protection objects, will be default Table goes along with sb. to guard him the form that parameter makes list, and in store protection object goes along with sb. to guard him the right of parameter with corresponding default earth's surface in the list Should be related to.
8. acquisition device according to claim 7, it is characterised in that first determining module includes:
Model generation module, for the geotechnical boring data to be carried out with interpolation calculation generation TIN models;
First extraction module, for extracting resource inclination angle corresponding with the resource below-construction region, table soil from the TIN models Thickness degree and the vertical buried depth of resource;
First calculating sub module, for being moved to the resource inclination angle, the thickness of surface soil, the vertical buried depth of the resource and rock Parameter carries out safety berm width calculation and obtains described first going along with sb. to guard him bandwidth.
9. acquisition device according to claim 8, it is characterised in that second determining module includes:
Second extraction module is thick for extracting the resource from the TIN models according to the coordinate for covering resource figure spot Degree.
10. acquisition device according to claim 9, it is characterised in that the computing module includes:
Acquisition module, the apparent density for obtaining the resource for covering resource figure spot;
Second calculating sub module, for calculating area, the resource thickness and the apparent density for covering resource figure spot Product covers stock number described in obtaining.
11. acquisition device according to any one in claim 7 to 10, it is characterised in that the interpretation module includes:
Feature acquisition module, for obtaining default construction land feature;
3rd extraction module, institute is obtained for extracting the image data with the construction land feature from the remote sensing image State resource below-construction region.
12. acquisition device according to any one in claim 7 to 10, it is characterised in that the acquisition device is also wrapped Include:
Image acquiring module, for obtaining initial remote sensing image;
Image processing module, for carrying out registration to the initial remote sensing image, correcting, merge, inlay and even color is processed To the remote sensing image.
CN201410007048.5A 2014-01-07 2014-01-07 The acquisition methods and device of resource below-construction amount Active CN103745408B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410007048.5A CN103745408B (en) 2014-01-07 2014-01-07 The acquisition methods and device of resource below-construction amount

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410007048.5A CN103745408B (en) 2014-01-07 2014-01-07 The acquisition methods and device of resource below-construction amount

Publications (2)

Publication Number Publication Date
CN103745408A CN103745408A (en) 2014-04-23
CN103745408B true CN103745408B (en) 2017-06-30

Family

ID=50502423

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410007048.5A Active CN103745408B (en) 2014-01-07 2014-01-07 The acquisition methods and device of resource below-construction amount

Country Status (1)

Country Link
CN (1) CN103745408B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109272227B (en) * 2018-09-11 2019-09-24 中国地质科学院矿产资源研究所 Green mine site selection method based on remote sensing data and geographic information system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004062651A (en) * 2002-07-30 2004-02-26 Canon Inc Image processor, image processing method, its recording medium and its program
WO2009088555A2 (en) * 2007-11-01 2009-07-16 Baker Hughes Incorporated Temperature and pressure sensor using four wave mixing technique
CN102176065A (en) * 2010-12-17 2011-09-07 神华集团有限责任公司 Method for detecting coal by virtue of satellite remote sensing
CN102505943A (en) * 2011-11-21 2012-06-20 西安科技大学 Water conservation coal cutting method for small and medium-sized coal mines in waterhead area
CN102520457A (en) * 2011-11-30 2012-06-27 中国神华能源股份有限公司 Coal finding method of satellite remote sensor in deep multilayer coverage area
CN102865081A (en) * 2012-04-28 2013-01-09 中国神华能源股份有限公司 Water-preserved mining method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004062651A (en) * 2002-07-30 2004-02-26 Canon Inc Image processor, image processing method, its recording medium and its program
WO2009088555A2 (en) * 2007-11-01 2009-07-16 Baker Hughes Incorporated Temperature and pressure sensor using four wave mixing technique
CN102176065A (en) * 2010-12-17 2011-09-07 神华集团有限责任公司 Method for detecting coal by virtue of satellite remote sensing
CN102505943A (en) * 2011-11-21 2012-06-20 西安科技大学 Water conservation coal cutting method for small and medium-sized coal mines in waterhead area
CN102520457A (en) * 2011-11-30 2012-06-27 中国神华能源股份有限公司 Coal finding method of satellite remote sensor in deep multilayer coverage area
CN102865081A (en) * 2012-04-28 2013-01-09 中国神华能源股份有限公司 Water-preserved mining method

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
土地利用规划的地质环境分析及应用研究;韦仕川;《中国博士学位论文全文数据库 经济与管理科学辑》;20081215(第12期);J149-4 *
地质空间三维动态建模关键技术研究;何珍文;《中国博士学位论文全文数据库 基础科学辑》;20091215(第12期);A008-5 *
基于遥感影像的矿区规划数据库的构建;李晓琴等;《煤炭工程》;20091031(第10期);第2节 *
建设项目压覆矿产资源储量技术方法研究——以南水北调中线一期工程总干渠为例;刘东华等;《河南科学》;20100930;第28卷(第9期);第2、3节,表1、4 *
生态脆弱区煤炭开采地质环境效应与评价技术研究;都平平;《中国博士学位论文全文数据库 工程科技I辑》;20121215(第12期);B021-1 *
面向地质勘查的三维可视化系统研制与开发;罗智勇;《中国博士学位论文全文数据库 信息科技辑》;20080930(第9期);第2.2,5.1.3,5.2.2节 *

Also Published As

Publication number Publication date
CN103745408A (en) 2014-04-23

Similar Documents

Publication Publication Date Title
Vivoni et al. Generation of triangulated irregular networks based on hydrological similarity
CN101221246B (en) Remote sensing and quantizing reconnaissance method of snowslide
CN102609986B (en) Ore body modeling system in digital mine and modeling and detecting method of ore body modeling system
CN102635059B (en) Bridge investigation method
CN101509382B (en) Tunnel surveying method
CN116152461B (en) Geological modeling method, device, computer equipment and computer readable storage medium
CN112862967B (en) Method and device for establishing three-dimensional geological model
CN106803281A (en) A kind of information extraction of excavation slope sillar and three-dimensional reconstruction method
CN106709987B (en) Dynamic construction method of three-dimensional geological profile model
CN106023311B (en) Improve the method that dimensional topography generates precision
Umili et al. An integrated multiscale approach for characterization of rock masses subjected to tunnel excavation
CN115690354A (en) Shallow tunnel construction dynamic control method based on three-dimensional live-action numerical analysis
Labant et al. Geodetic determining of stockpile volume of mineral excavated in open pit mine
CN117197377A (en) Three-dimensional dynamic visual modeling method for mining area
dos Santos et al. Geological-Geotechnical database from standard penetration test investigations using geographic information systems
Álvarez et al. Multi-temporal archaeological analyses of alluvial landscapes using the photogrammetric restitution of historical flights: a case study of Medellin (Badajoz, Spain)
CN103745408B (en) The acquisition methods and device of resource below-construction amount
CN104931015A (en) Cross section automatic plotting system and method based on DTM data models
Peterman Geographic information systems: Archaeology's latest tool
Tonini et al. Three-dimensional reconstruction of the Carrara Syncline (Apuane Alps, Italy): An approach to reconstruct and control a geological model using only field survey data
Al-Adamat et al. DSM derived stereo pair photogrammetry: Multitemporal morphometric analysis of a quarry in karst terrain
CN110379009A (en) A kind of parametrization geological model generation method based on BIM technology
Durmaz Creating digital elevation model using a mobile device
CN110992482B (en) Groundwater level funnel diagram generation method and device
Bridle et al. Near-surface layer model using first break arrivals applied to 3D blocks

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant