Detailed description of the invention
When solar array receives the irradiation from the sun after night, the open-circuit voltage of plate is opened
Begin to rise.When open-circuit voltage exceedes and starts, for morning, the ultimate value set, after a time delay
The operation of starter-generator system (i.e. one or more changer).Postpone TstartLength and
Voltage limit VdcFor starting the parameter set for morning.In the present invention, when the change starting system
During parallel operation, determine actual power P obtained from plate arrayac,k.Preferably, according to from plate array
The measured value of electric current and voltage determines power.Need not come really according to electric current and the voltage directly from plate
Determine power.Power can be determined according to the electric current measured in the converter and voltage.Replace electric current and
Both voltage is measured value, and one of these values can also be by a certain control circuit in transformer configuration
The reference value exported.Additionally, when output voltage has fixed value, it is also possible to according to by changer
The electric current of system output determines power.
When determining system power P after startup momentac,kTime, by itself and ultimate value Pac,opt
Compare.This ultimate value represents for keeping the optimum required for power converter system reliability service
Start power level.The changer system of PV electricity generation system needs the power for system operation.This
Mean that a part of power obtained from plate array is used by power converter system, and a part of power
It is dissipated in systems as power attenuation.Somewhat know that these are lost, in order to can grasp in system
For system estimation ultimate value P before workac,opt.This limit is must be over from the power of plate array output
Value, in order to the operation of changer system and the output of power become possibility.This ultimate value can comprise peace
Full allowance so that the slightly below value of this limit be enough to operational transformation device system.
If actual power P of systemac,kClose to ultimate value Pac,opt, it is determined that need not change for
The start-up parameter that start in the morning.But, if actual power Pac,kCertain higher or lower than ultimate value
Amount, then make a change start-up parameter.In the embodiment of the method, determine certain delayed change
Change the limit, and when actual power is outside the scope of these limit, this startup is not optimum.
In embodiments, thus check whether and meet following formula:
Pac,opt–Ph<=Pac,k<=Pac,opt+Ph (1)
Wherein, PhHysteresis limits for definition.As previously discussed, if meeting the condition of (1),
The most do not change start-up parameter.
If actual power Pac,kHysteresis limits (that is, P is added higher than ultimate valueac,k>Pac,opt+Ph),
The power exported the most on startup exceedes required minimum power, and can more early start power plant.
This relatively early startup is performed by changing one or more parameter in start-up parameter.
As it has been described above, startup standard includes starting voltage VdcWith time delay Tstart.The present invention's
In embodiment, when actual power Pac,kWhen adding hysteresis limits higher than ultimate value, determine startup voltage
Whether start voltage V higher than minimumdc,min.The minimum voltage that starts obtains from plate, can successfully open
Dynamic magnitude of voltage.If it is determined that startup voltage start voltage, then fall low start voltage higher than minimum
Value.Preferably, by deducting fixed voltage value V from previous startup voltagestepPerform startup
Voltage VdcReduction.In the embodiment of the method, magnitude of voltage VstepCan also be for passing through function
The variable calculated.This function may be relevant with such as historical data, i.e. causes opening when starting continuously
Bigger step-size is selected when galvanic electricity pressure drop is low.This function is also possible to be had with the currency starting voltage
Close, i.e. select less step-size when starting voltage close to minimum startup voltage.
If starting voltage not higher than minimum to start voltage, the most do not change startup voltage.Therefore, start
Voltage is endowed this minimum and starts the value of voltage.
In another embodiment of the present invention, one or more start-up parameter to be changed is the time
Postpone TstartValue.Actual power P determined by whenac,kHigher than ultimate value and hysteresis limits and time,
Unless time delay TstartValue be in minimum level, otherwise come relatively early by reducing this time delay
Ground carries out the startup of PV electricity generation system.Therefore, in the method, if it is determined that time delay Tstart
Value higher than minimum acceptable value Tstart,min, then parameter T is reducedstartValue.As combined startup voltage,
Preferably, by from the T usedstartValue in deduct constant TstepWhen progressively reducing startup
Between postpone.If TstartNot higher than Tstart,minValue, then by Tstart,minValue give parameter Tstart。
According to another embodiment, according to may be with historical data (that is, previous morning starts) or Tstart
Currency and minimum acceptable value Tstart,minBetween the relevant function of difference, changing the startup time prolongs
Late.
According to embodiment, when starting the power scope higher than the optimal value of power (that is, higher than the limit
Value with hysteresis limits and) time, according to above procedure change the startup time and startup both voltage.
If actual power Pac,kLess than ultimate value (that is, the P having deducted hysteresis limits from whichac,k<
Pac,opt–Ph), then when starting, the power of output is insufficient and should change start-up parameter.Excellent
Selection of land, sets hysteresis limits: in this approach as follows, even if slightly below should in actual power
During scope, remain able to start changer system.When starting power less than this scope, it should be ensured that
Increase for one or more in the parameter set by startup.
It is contrary for increasing the process of start-up parameter with the above-mentioned step for reducing parameter.According to
Embodiment, when actual power Pac,kDuring less than allowable range, check and start voltage VdcThe lowest
In starting the maximum V set by voltagedc,max.If starting voltage to be less than this maximum, then increase
Start greatly voltage.Preferably, by being currently up voltage increase steady state value VstepIncrease startup
Voltage.As reduced in the case of parameter, it is also possible to based on historical data or start the current of voltage
Difference between value with the maximum starting voltage calculates and starts the value that voltage is added.
If starting voltage to be not less than maximum Vdc,max, then voltage V is starteddcObtain maximum voltage value
Vdc,max。
According to another embodiment, by increasing time delay TstartIncrease in start-up parameter
Individual or more start-up parameter.Therefore, according to embodiment, determine time delay TstartThe lowest
Time delay T is started in maximumstart,max.If so, then the value of time delay is increased
Big time step Tstep.If time delay TstartBe not less than the maximum time delay that starts, then will be
The value of big time delay gives time delay Tstart.As above, for changing the time rank of time delay
Jump TstepValue be preferably constant, or it can be that utilization considers historical data or Tstart
Currency and the maximum of start delay between the variable that calculates of the function of allowance.
According to the embodiment of the present invention, when starting power less than optimal power, according to above procedure
Change time delay and start both voltage.
By above-mentioned parameter (that is, time delay T determined for startupstartWith startup voltage Vdc) deposit
Storage is in systems so that use these parameters in the startup in next morning.Additionally, according to enforcement
Mode, the value of storage time delay and/or startup voltage is to gather historical data.These data are used for
Determine that system becomes defective the most lentamente.Such as, if time delay TstartAnd startup
Voltage VdcIncrease to maximum limit or Rapid Variable Design at short notice, then system may experience fault.
Therefore, it is possible to use the parameter of change generates alarm to attendant so that can lose completely in system
System possible repair system is checked before effect.Similarly, the method for the present invention can be given covering
The expression of snowy plate.
When solar plant is equipped with when including the system of method of the present invention, and the terminal use of power plant is not
Start-up parameter must be set.Furthermore, it is not necessary that know the attribute of PV plate, this is because the method can be certainly
Oneself adapts to.If some PV plates being added in system or replacing old PV plate, then start-up parameter
To automatically adapt to and without any effort of staff.Similarly, wear when the plate of system and
When the power of plate output is just slowly decreased, the method makes the output level that parameter adaptation changes.
Additionally, the method and system are by the most faulty also to one group of plate array of observation or direct current (DC) fuse
Change start-up parameter.
The method and system the most automatically observe the change of atmospheric condition in start-up parameter.These changes
Situation includes the change of the rise angle of annual variations in temperature and the sun.Plate array temperature impact with
Start the open-circuit voltage that compares of voltage limit, and the length of the rise angle of the sun and time delay has
Close.Consider the two factor the most independently and automatically.The open-circuit voltage of plate array is relatively low
At a temperature of higher.But, when plate being loaded (i.e. connection) to changer, if the irradiation to plate
Inadequate, then voltage declines.Therefore, start-up parameter is contemplated that variations in temperature.In the present invention
In, automatically consider temperature.Similarly, in the period that the sun rotates every year, the sun is annual spy
Fix time and comparatively fast rise.The time delay used when starting changer system considers lifting speeds or liter
Play angle.In embodiments of the present invention, time delay automatically adapts to so that examine in parameter
Consider the rise time of the sun.
Such as, when shortening daytime, morning, temperature tended to reducing.The reduction of temperature increases opening of plate
Road voltage.If not changing start-up parameter, then the voltage caused because of lower temperature increases makes changer system
System is to cross the generation energetic start up of low amounts.Voltage is started, it is considered to because lower temperature causes by increasing
The open-circuit voltage increased.
Similarly, when the rise time of the sun is elongated, it should extend and made when starting changer system
Time delay so that the irradiation of the plate of system is sufficiently great to initiate changer system.
Below, Fig. 1, Fig. 2 and Fig. 3 of flow chart of embodiment it are shown in conjunction with to describe the present invention
Operation.In FIG, when exceeding from the voltage of plate or reaching limit V setdcAnd more
Time T after overvoltage limit valuestartTime at the expiration, start PV electricity generation system 1.Therefore, when from plate
Voltage reach set limit VdcTime, start intervalometer with computing relay Tstart.In time delay
Afterwards, start changer system, and determine the power P obtained from plate arrayac,k2。
After starting changer and determining power, also determine that whether this startup is to start 3 morning.Example
As, this can realize by using real-time clock.If it is determined that this startup is not to start, then morning
Start-up parameter is not made a change, and former state keeps VdcAnd TstartValue 4.
If this startup is to start morning, it is determined that whether actually determined power is in optimized scope
5.As set forth above, it is possible to the power limit that the optimized scope starting power is defined as in hysteresis limits.
Actual power upon start up within the range time, determine need not change start-up parameter 6.If opened
Kinetic power the most within the range, then checks that whether this power is higher than optimized scope 7.Determined by if
Actual power is higher than limited range, then reduce start-up parameter 8, and if this power is not higher than institute
The scope limited, then increase start-up parameter 9, this is because have determined that this power is outside optimized scope.
Show reduction the most in more detailed manner and increase start-up parameter (block 8 and block 9).
Fig. 2 shows the embodiment reducing start-up parameter, the i.e. block 8 of Fig. 1.When determining that power is high
When optimized scope, reduce start-up parameter.In the process reducing parameter, check and start voltage Vdc
Whether higher than for starting minima V that voltage setsdc,min81.If starting voltage to be higher than lower limit,
The value 82 of low start voltage then drops.In the embodiment of Fig. 2, by opening of using in time starting
Galvanic electricity pressure deducts steady state value VstepLow start voltage drops.Therefore, in starting next morning,
Changer system is started with the relatively low virtual voltage of plate array.
If starting voltage VdcNot higher than minimum starts voltage Vdc,min, then start voltage and receive minimum
Start the value 83 of voltage.In other words, start voltage and can not be entered one already at actual lower limit
Step reduces.
The reduction of the start-up parameter of Fig. 2 is it is disclosed that by start delay TstartWith minimum start delay
Tstart,minCompare 84.If the start delay used is more than minima, then start delay is made to subtract
Little by 83.In the embodiment of Fig. 2, by from TstartCurrency in deduct constant TstepSubtract
Little start delay.If start delay TstartIt is not more than the minima postponed, then TstartObtain minimum
The value 86 postponed.
Fig. 3 shows owing to startup power increases the embodiment party of start-up parameter 9 less than optimized scope
Formula.In figure 3, the startup voltage V used is checkeddcWhether less than for starting what voltage set
Upper limit Vdc,max91.If starting voltage to be less than the upper limit, then by by increment VstepBe currently up
Voltage VdcPhase Calais increases this voltage 92, with obtain next morning start in use and should be total
It is less than the startup voltage of open-circuit voltage.If starting voltage to be not less than the upper limit, then provide the upper limit
Vdc,maxValue as start voltage VdcValue.
The most in figure 3, by by start delay TstartMaximum of T with the time of startupstart,max
Compare 94 and increase start delay when the value of the start delay used is less than maximum
95, increase start-up parameter.By by constant TstepPerform with the currency phase Calais of time delay
This increase.If the start delay used is not less than maximum, then maximum is set as that the time prolongs
T latestart。
In the embodiment of Fig. 2 and Fig. 3, use constant VstepAnd TstepPerform to start voltage
Increase with both time delays and reduction.As it has been described above, these values can also be variable.Additionally,
Increasing and reduce the value used can be different from each other.It is to say, VstepAnd TstepCan be with not
Increase parameter with value and reduce parameter.
The method of the present invention is preferably implemented in the changer system be connectable to solar array.Should
Changer system also includes that the power feed for transformation into itself's device system in future is to AC network or DC
The adapter of system.DC system can include DC memory unit or DC network.
Known there is the multiple changer being combined with solar energy and carrying out operating.The system of the present invention is not limited to
The topology of this system, thus this system can include heterogeneous output and multiple transducer-level.Fig. 4 illustrates
The simplification structure of the system of the present invention, wherein, solar array 41 is connected to transformer configuration
42.Transformer configuration 42 is additionally coupled to exchange (AC) electrical network 43.
In order to implement the method, this system includes arithmetic element and each for store used in operation
Plant the memory unit of parameter.Additionally, this system includes the parts of the various comparisons for realizing the method.
Those skilled in that art are it is apparent that as technological progress, this inventive concept can be with respectively
The mode of kind is implemented.The present invention and embodiment thereof are not limited to example described above, and can be in power
Profit is changed in the range of requiring.