CN103726849B - The outer stoping low coal seam technology of a kind of open coal mine hole end boundary - Google Patents

The outer stoping low coal seam technology of a kind of open coal mine hole end boundary Download PDF

Info

Publication number
CN103726849B
CN103726849B CN201210434423.5A CN201210434423A CN103726849B CN 103726849 B CN103726849 B CN 103726849B CN 201210434423 A CN201210434423 A CN 201210434423A CN 103726849 B CN103726849 B CN 103726849B
Authority
CN
China
Prior art keywords
coal
coal seam
seam
width
dass
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210434423.5A
Other languages
Chinese (zh)
Other versions
CN103726849A (en
Inventor
马力
李克民
张崇欣
丁小华
刘干
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201210434423.5A priority Critical patent/CN103726849B/en
Publication of CN103726849A publication Critical patent/CN103726849A/en
Application granted granted Critical
Publication of CN103726849B publication Critical patent/CN103726849B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The outer stoping low coal seam technology of a kind of open coal mine hole end boundary, under being particularly useful for overcasting technigue, the outer girdle of end boundary is cheated in back production.Fillet is adopted to stay pillar-and-panel work program in recovery process.When No. 1 coal seam is pushed ahead and stayed enough working spaces, along No. 2 coal seam covering layer pick ditches.No. 2 coal seam dass width are less than No. 1 coal seam dass width, stay width to be the coal petrography mixed column of the difference of No. 1 coal seam dass and No. 2 coal seam dass width in inner casting side.At No. 2 roof drawdown initial stages, overburden is transported to internal dumping, and adopt active line with choosing and advance, top board overburden is backfilled to No. 2 coal seam goafs.No. 1 coal seam transports through coal petrography mixed column, fortune coal main access, and No. 2 coal seams are transported by coal petrography mixed column, fortune coal main access through its ramp, goaf.Its method solves owing to exploiting the impact of No. 2 coal seams under former technique No. 1 coal seam transportation system, can reduce repetition overburden amount, reclaims the outer coal of boundary, increases economic benefit, have practicality widely.

Description

The outer stoping low coal seam technology of a kind of open coal mine hole end boundary
Technical field
The present invention relates to a kind of Opencut coal mine mining method, under being specially adapted to overcasting technigue, the outer girdle of end boundary is cheated in back production, can reduce repetition overburden amount, simplify fortune breeching road, reclaim coal outside boundary, increase economic benefit.
Background technology
Because pinpoint blasting-Pull shovel handling technique has higher requirement to goaf, therefore this technology is applied in the stripping of the main mining coal seam top board of large outdoors colliery foot usually.But, coal seam in open coal mine boundary is all that multiple seam tax is deposited, often because the reasons such as technology, economy, technique are by the extraction of a part of coal seam, coal seam is thinner or make some coal seam still with higher economic worth cannot extraction by production practice device-restrictive, causes the wasting of resources.Traditional strip mining transformation program is pick ditch, expands the process of side, as the girdle under the main mining coal seam of the pusher back production pinpoint blasting overcasting technigue of step traditionally and the outer coal seam of boundary, certainly will impact open coal mine pinpoint blasting and Pull shovel handling work.
Summary of the invention
In view of prior art Problems existing, the object of the invention is: provide one can reduce repetition overburden amount, simplify fortune breeching road, reclaim the outer stoping low coal seam method of open coal mine hole end boundary of the outer girdle of boundary.
The technical solution used in the present invention is: a kind of outer stoping low coal seam method of open coal mine hole end boundary, is characterized in that layout No. 2 coal seam dasses, stay and establish coal petrography mixed column, No. 2 roof overburden backfills, fortune coal line arrangement.
A., when No. 1 coal seam is pushed ahead and stops enough working spaces, arrange No. 2 coal seam dasses along No. 2 roof covering layer pick ditches, No. 2 coal seam dass width are less than No. 1 coal seam dass width.
B. coal petrography mixed column is arranged in No. 2 inner casting sides of roof covering layer, and its width is the difference of No. 1 coal seam dass width and No. 2 coal seam dass width.
C.2, after number coal seam back production regular period, its top board overburden can be backfilled to No. 2 coal seam goafs.
D. transport seam road and comprise No. 1 coal seam transportation route and No. 2 coal seam transportation routes, the coal in No. 1 coal seam transports by transporting coal main access from No. 1 seat earth level through coal petrography mixed column.The coal in No. 2 coal seams rises to No. 1 seat earth level through Nei Pai ramp, No. 2 coal seams, and transports through fortune coal main access.
During the backfill of No. 2 roof overburden stripping things, formed in easy flights in the Nei Pai ramp, No. 2 coal seams of 8% ~ 10%, using as transport routes, casting absolute altitude is no more than coal petrography mixed column height.
Belong to girdle due to No. 2 coal seams therefore do not divide step separately, being divided into same step with its top board.
The technique effect that the present invention reaches is: overcome tradition pick ditch, expand the deficiency of the strip mining transformation program of side, make to repeat to peel off during the end boundary girdle of exploitation hole to reduce, fortune breeching road simplifies greatly, and transportation route length reduces, overall economic efficiency significantly improves, and has practicality widely.
Accompanying drawing explanation
Accompanying drawing 1 is floor map of the present invention.
Accompanying drawing 2 is generalized sections of the present invention.
In figure: 1-pinpoint blasting-Pull shovel handling step, 2-1 coal seam, 3-2 roof covering layer, 4-2 coal seam, 5-2 coal seam goaf, 6-coal petrography mixed column, 7-In-pit dumping, 8-transports coal main access, Nei Pai ramp, 9-2 coal seam.
Detailed description of the invention
Below in conjunction with accompanying drawing, embodiments of the present invention are further described:
When No. 1 coal seam (2) is pushed ahead and stops enough working spaces, arrange dass along No. 2 roof covering layers (3), No. 2 coal seam (4) dass width are less than No. 1 coal seam (2) dass width.Stay width to be the coal petrography mixed column (6) of the difference of No. 1 coal seam dass and No. 2 coal seam dass width No. 2 roof covering layer (3) inner casting (7) sides simultaneously.No. 2 roof covering layer (3) drawdown initial stages, overburden is transported to internal dumping, adopt active line with choosing to advance, No. 2 coal seam goafs (5) expand gradually, top board overburden is backfilled to No. 2 coal seam goafs (5), and forms Nei Pai ramp, No. 2 coal seams (9) that the gradient is 8%-10%.Now, No. 1 coal seam (2) is transported by fortune coal main access (8) from 1 coal seam floor level through coal petrography mixed column (6), No. 2 coal seams (4) rise to No. 1 seat earth level through Nei Pai ramp, No. 2 coal seams (9), and transport through fortune coal main access (8).
Above-mentioned detailed description of the invention is used for explaining and the present invention is described, instead of limits the invention, and in the scope that spirit of the present invention and claim are protected, any amendment make the present invention and change, all fall into the scope of protection of the invention.

Claims (3)

1. the outer stoping low coal seam technology of open coal mine hole end boundary, is characterized in that: arranges No. 2 coal seam dasses, stay and establish coal petrography mixed column (6), No. 2 roof covering layer (3) overburdens backfills, transport coal line arrangement,
A. when No. 1 coal seam (2) is pushed ahead and stops enough working spaces, No. 2 coal seam (4) dasses are arranged along No. 2 roof covering layer (3) pick ditches, No. 2 coal seam (4) dass width are less than No. 1 coal seam (2) dass width
B. coal petrography mixed column (6) is arranged in No. 2 roof covering layer (3) inner casting (7) sides, and its width is the difference of No. 1 coal seam (2) dass width and No. 2 coal seam (4) dass width,
C.2, after number coal seam (4) the back production regular period, top board overburden can be backfilled to No. 2 coal seam goafs (5),
D. transport seam road and comprise No. 1 coal seam (2) transportation route and No. 2 coal seam (4) transportation routes, No. 1 coal seam (2) is transported by fortune coal main access (8) from No. 1 seat earth level through coal petrography mixed column (6), No. 2 coal seams (4) rise to No. 1 seat earth level through Nei Pai ramp, No. 2 coal seams (9), and transport through fortune coal main access (8).
2. the outer stoping low coal seam technology of open coal mine hole end boundary according to claim 1, it is characterized in that: during No. 2 roof covering layer (3) overburden backfills, formed in easy flights in Nei Pai ramp, No. 2 coal seams (9) of 8% ~ 10%, using as transport routes, casting absolute altitude is no more than coal petrography mixed column (6) highly.
3. the outer stoping low coal seam technology of open coal mine hole end boundary according to claim 1, is characterized in that: No. 2 coal seams (4) belong to girdle therefore do not divide step separately, are divided into same step with its top board covering layer (3).
CN201210434423.5A 2012-10-10 2012-10-10 The outer stoping low coal seam technology of a kind of open coal mine hole end boundary Expired - Fee Related CN103726849B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210434423.5A CN103726849B (en) 2012-10-10 2012-10-10 The outer stoping low coal seam technology of a kind of open coal mine hole end boundary

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210434423.5A CN103726849B (en) 2012-10-10 2012-10-10 The outer stoping low coal seam technology of a kind of open coal mine hole end boundary

Publications (2)

Publication Number Publication Date
CN103726849A CN103726849A (en) 2014-04-16
CN103726849B true CN103726849B (en) 2016-01-20

Family

ID=50451116

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210434423.5A Expired - Fee Related CN103726849B (en) 2012-10-10 2012-10-10 The outer stoping low coal seam technology of a kind of open coal mine hole end boundary

Country Status (1)

Country Link
CN (1) CN103726849B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106368706A (en) * 2016-08-27 2017-02-01 肖双双 Casting blast and pull shovel handling mining procedure
CN115726785B (en) * 2022-10-28 2023-07-21 国能经济技术研究院有限责任公司 Operation method for reserving walking channel in dragline mining process

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2039280C1 (en) * 1991-07-08 1995-07-09 Красноярский институт цветных металлов им.М.И.Калинина Excavating and loading complex for opencast mining
CN102278115A (en) * 2011-06-27 2011-12-14 汉通建设集团有限公司 High-efficiency safe environment-friendly mining method for rare shallow-buried ore layer in irregular strip-shaped distribution
CN102505962A (en) * 2011-10-09 2012-06-20 中煤张家口煤矿机械有限责任公司 Stripping, backfilling and conveying system for open-pit mines
CN102644464A (en) * 2012-04-12 2012-08-22 东北大学 Constructing method for mining embedded artificial boundary ore pillar from open-pit to underground mine

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2039280C1 (en) * 1991-07-08 1995-07-09 Красноярский институт цветных металлов им.М.И.Калинина Excavating and loading complex for opencast mining
CN102278115A (en) * 2011-06-27 2011-12-14 汉通建设集团有限公司 High-efficiency safe environment-friendly mining method for rare shallow-buried ore layer in irregular strip-shaped distribution
CN102505962A (en) * 2011-10-09 2012-06-20 中煤张家口煤矿机械有限责任公司 Stripping, backfilling and conveying system for open-pit mines
CN102644464A (en) * 2012-04-12 2012-08-22 东北大学 Constructing method for mining embedded artificial boundary ore pillar from open-pit to underground mine

Also Published As

Publication number Publication date
CN103726849A (en) 2014-04-16

Similar Documents

Publication Publication Date Title
CN106121648B (en) Sublevel open stoping chassis route ore drawing subsequent filling mining method
US9494037B2 (en) Inclined layered solid-filling mining method in ultrathick coal layer
AU2014344670B2 (en) Solid cementation backfill roadway type mining method for ultra-thick seam
CN103742148B (en) The soft coal-mining method covering the descending waste filling of supporting of a kind of half-edge coal seam
CN104018837B (en) A kind of interval filling gob-side entry retaining method processing planted agent's spoil
CN103470262A (en) Mining method of nearly horizontal mineral deposit of opencast coal field by casting and internally dumping
CN103603665B (en) Upper dish side ore body stoping method in the scope of adopting of mine
CN103821515B (en) A kind of double face filling coal mining technique
CN104806247B (en) Longitudinal combination bridge transportation resources is built in the middle of open-pit mine stope
US20180195386A1 (en) Parallel digging, mining and filling operation coal mining method for controlling overlaying strata fracture and surface subsidence
CN102966355A (en) Method for creating internal dumping conditions of strip mine
CN104358574B (en) The horizontal room-and-pillar stoping of gently inclined orebody
CN100535396C (en) Method for extracting released-gas of protected coal-bedding under unstabilized thin coal bedding set condition
CN110359914B (en) Safe and low-cost combined sublevel mining method for gently inclined medium-thickness ore body
CN104358573B (en) The stage open stope of big thick ore body and stage avalanche combined mining method
CN104405396A (en) Mining method for passing open-pit coal mine of coal barren area through leaving island to build bridges
WO2017101634A1 (en) Fully mechanized mining-filling mixed mining working face filling section length determination method
CN103206215A (en) Precontrol top upward access cut-and-filling stopping method
CN105332733A (en) Strip filling method of conventional mining face goaf pumping cementing materials
CN103557001B (en) A kind of low section high oper cylinler shrink afterwards filling mining method
CN103726849B (en) The outer stoping low coal seam technology of a kind of open coal mine hole end boundary
CN102425431B (en) Ultra-close coal layer mining roadway distributing method
CN110388210B (en) Stope structure arrangement mode suitable for combined sectional mining of slowly-inclined medium-thickness ore body
CN106939788A (en) Truck cooperates with ore removal sublevel drilling block chambering method
CN104481538B (en) Method for treating interlayer in steeply inclined multi-layer ore body of non-coal mine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20151203

Address after: 221116 Jiangsu city of Xuzhou province university Quanshan District Road No. 1 South Lake Campus of China University of Mining and Technology

Applicant after: China University of Mining & Technology

Address before: 221116 School of mining engineering, China University of Mining and Technology, Jiangsu, Xuzhou B504

Applicant before: Ma Li

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160120

Termination date: 20161010