CN103726515B - 岩土基面液体储存池hdpe膜防渗结构 - Google Patents
岩土基面液体储存池hdpe膜防渗结构 Download PDFInfo
- Publication number
- CN103726515B CN103726515B CN201410030051.9A CN201410030051A CN103726515B CN 103726515 B CN103726515 B CN 103726515B CN 201410030051 A CN201410030051 A CN 201410030051A CN 103726515 B CN103726515 B CN 103726515B
- Authority
- CN
- China
- Prior art keywords
- pore
- basal plane
- hdpe
- film
- liquid reservoirs
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Revetment (AREA)
Abstract
岩土基面液体储存池HDPE膜防渗结构,用于岩土基面液体储存池防渗,池体和边坡防渗结构从上至下为HDPE土工膜(1)、土工布(2)、塑料透水盲沟(3)和地下水导排管(4)组成的地下水导排系统。HDPE土工膜(1)厚度为2mm,土工布(2)规格为200g/m2长丝无纺土工布,塑料透水盲沟(3)规格为宽10cm厚3cm。每个池壁在最高液位以上、边坡顶部(7)以下土工膜上设置直径为10cm的气孔(5),气孔圆心距边坡顶部(7)30cm。气孔(5)表面均覆盖长20cm、宽25cm的土工膜盖,土工膜盖靠近边坡顶部(7)的水平边缘采用挤压焊接(6)密封,相邻的两个垂直边缘的1/2采用挤压焊接(6)密封,防止膜上液体通过气孔(5)渗漏至膜下,同时用于排出气体。
Description
技术领域
本发明涉及一种HDPE膜防渗结构,尤其是用于岩土基面液体储存池的HDPE膜防渗结构。
背景技术
在液体储池中采用HDPE土工膜的防渗方法,与混凝土防渗相比适用于各种不规则池体,施工周期短、施工难度较低且防渗效果好,因此应用越来越广泛。目前液体储存池的HDPE膜防渗结构大多建立在岩土夯实的地基上,受防渗结构设计、土工膜下基面岩土地下水位和气体的影响,施工完毕注水后,经常出现铺设焊接的HDPE膜产生鼓起来的凸起现象,称为气包。气包问题影响池体容量,降低使用价值,而且膜下气体汇集时存在安全隐患。
发明内容
为了导出土工膜地下地基产生的气体,避免产生气包现象,本发明提供一种岩土基面液体储存池HDPE膜防渗结构,该结构包括地下水导排结构,同时兼顾导排膜下气体。
本发明解决其技术问题所采用的技术方案是:岩土地基液体储存池的池体和边坡防渗结构从上至下为HDPE土工膜(1)、土工布(2)、塑料透水盲沟(3)和地下水导排管(4)组成的地下水导排系统。
HDPE土工膜(1)厚度为2mm,土工布(2)规格为200g/m2长丝无纺土工布,塑料透水盲沟(3)规格为宽10em厚3cm。
每个池壁在最高液位以上、边坡顶部(7)以下土工膜上设置直径为10em的气孔(5),气孔圆心距边坡顶部(7)30em。
气孔(5)表面均覆盖长20em、宽25cm的土工膜盖,土工膜盖靠近边坡顶部(7)的水平边缘采用挤压焊接(6)密封,相邻的两个垂直边缘的1/2采用挤压焊接(6)密封,防止膜上液体通过气孔(5)渗漏至膜下,同时用于排出气体。
本发明的有益效果是:一种用于岩土基面液体储存池的HDPE膜防渗结构,可有效导排膜下水和气体,避免土工膜产生气包问题。
附图说明
下面结合附图和实施例对本发明进一步说明。
图1是本发明岩土基面液体储存池HDPE膜防渗结构的剖视示意图。
图2是本发明岩土基面液体储存池HDPE膜防渗结构的平面示意图。
图3是本发明岩土基面液体储存池HDPE膜防渗结构的气孔立体示意图。
图中1.HDPE土工膜,2.土工布,3.塑料透水盲沟,4.地下水导排管,5.气孔,6.挤压焊接,7.边坡顶部。
具体实施方式
池底地下沟槽内放置地下水导排管(4),用于收集池底和边坡的塑料透水盲沟(3)导排的液体,和塑料透水盲沟(3)形成液体储存池地下水导排系统。
岩土基面的地下水导排系统上设置50cm压实粘土后,铺设塑料透水盲沟(3)、土工布(2)和HDPE土工膜(1)。塑料透水盲沟(3)之间设置1m到3m的间隔,铺到边坡顶部(7)即可,采用锚固钉进行固定处理。
在每侧池壁的HDPE土工膜(1)上开直径为10cm的气孔(5),和塑料透水盲沟(3)构成膜下气体通道,用于排出膜下气体。气孔(5)边缘距最高液面以上至少20cm,圆心距边坡顶部(7)30em。
气孔(5)上方覆盖长20em、宽25cm的土工膜盖,土工膜盖中心遮住气孔后,靠近边坡顶部(7)的水平边缘采用挤压焊接(6)全部密封,相邻两个垂直边缘采用挤压焊接(6)密封1/2,其他边缘不做处理。密封的土工膜盖边缘用于防止膜上雨水等液体通过气孔(5)渗漏至膜下,不做处理的土工膜盖边缘使膜下气体可通过空隙排出至大气中。
Claims (2)
1.岩土基面液体储存池HDPE膜防渗结构,用于岩土基面液体储存池防渗,其特征是:岩土地基液体储存池的池体和边坡防渗结构从上至下为HDPE土工膜(1)、土工布(2)、塑料透水盲沟(3)和地下水导排管(4)组成的地下水导排系统;HDPE土工膜(1)厚度为2mm,土工布(2)规格为200g/m2长丝无纺土工布,塑料透水盲沟(3)规格为宽10cm厚3cm;每个池壁在最高液位以上、边坡顶部(7)以下土工膜上设置直径为10cm的气孔(5),气孔圆心距边坡顶部(7)30cm。
2.根据权利要求1所述的岩土基面液体储存池HDPE膜防渗结构,其特征是:气孔(5)表面均覆盖长20cm、宽25cm的土工膜盖,土工膜盖靠近边坡顶部(7)的水平边缘采用挤压焊接(6)密封,相邻的两个垂直边缘的1/2采用挤压焊接(6)密封,防止膜上液体通过气孔(5)渗漏至膜下,同时用于排出气体。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410030051.9A CN103726515B (zh) | 2014-01-23 | 2014-01-23 | 岩土基面液体储存池hdpe膜防渗结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410030051.9A CN103726515B (zh) | 2014-01-23 | 2014-01-23 | 岩土基面液体储存池hdpe膜防渗结构 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103726515A CN103726515A (zh) | 2014-04-16 |
CN103726515B true CN103726515B (zh) | 2015-09-09 |
Family
ID=50450786
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410030051.9A Expired - Fee Related CN103726515B (zh) | 2014-01-23 | 2014-01-23 | 岩土基面液体储存池hdpe膜防渗结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103726515B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106801442A (zh) * | 2017-03-10 | 2017-06-06 | 中国电建集团北京勘测设计研究院有限公司 | 用于石质文物保护的高透气性水平防渗排水复合材料 |
CN111074952B (zh) * | 2020-01-03 | 2024-07-30 | 北京高能时代环境技术股份有限公司 | Hdpe土工膜与不规则杆件之间的连接结构及施工方法 |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4430021A (en) * | 1981-11-23 | 1984-02-07 | Ecological Professional Industries, Inc. | Secure chemical waste landfill |
CN101148887B (zh) * | 2007-11-13 | 2010-05-19 | 中冶长天国际工程有限责任公司 | 已运行填埋场边坡地下水的疏排处理结构 |
CN101914918B (zh) * | 2010-07-12 | 2012-06-06 | 无锡市政设计研究院有限公司 | 高陡边坡、强风化基岩固废填埋场防渗结构及处理方法 |
CN102383490B (zh) * | 2011-08-24 | 2013-12-18 | 中国水电顾问集团华东勘测设计研究院 | 垃圾填埋场地漏式防渗导排结构及其施工方法 |
CN202767031U (zh) * | 2012-03-16 | 2013-03-06 | 中国水电顾问集团华东勘测设计研究院 | 库盆粘土铺盖防渗结构 |
CN203821457U (zh) * | 2014-01-23 | 2014-09-10 | 北京锄禾环保技术有限公司 | 岩土基面液体储存池hdpe膜防渗结构 |
-
2014
- 2014-01-23 CN CN201410030051.9A patent/CN103726515B/zh not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN103726515A (zh) | 2014-04-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106284277A (zh) | 一种气囊挤压排水联合真空预压地基加固方法 | |
CN103924576A (zh) | 一种细粒尾矿加筋堆积坝智能控制立体排渗真空预压法 | |
CN104878739A (zh) | 可横向连接塑料排水板的排水体组件及其施工方法 | |
CN103015401B (zh) | 一种加固吹填淤泥土的真空电渗排水方法及装置 | |
CN102051875B (zh) | 一种加固深层淤泥地基的方法 | |
CN202390860U (zh) | 垃圾卫生填埋场渗滤液垂直导排防渗系统 | |
CN103726515B (zh) | 岩土基面液体储存池hdpe膜防渗结构 | |
CN203729348U (zh) | 蓄水构筑物抗浮装置 | |
CN105453748A (zh) | 一种立体全封闭绿化真空排碱装置及其使用方法 | |
CN202767100U (zh) | 挡土墙排水结构 | |
CN104278686A (zh) | 高含水率疏浚泥堆场围堰空间排水防渗系统 | |
CN203821457U (zh) | 岩土基面液体储存池hdpe膜防渗结构 | |
CN105484229B (zh) | 适用于水域软基的上覆泥层密封真空预压方法 | |
CN104652595B (zh) | 一种城市防洪和洪水资源化的半支撑蓄水型绿地结构 | |
CN205917685U (zh) | 一体式井点塑排真空系统 | |
CN102116019A (zh) | 快速“高真空击密”软地基处理方法 | |
CN205917709U (zh) | 一体式井点塑排真空系统总管 | |
CN202530438U (zh) | 一种加固深层淤泥地基的排水系统 | |
CN101328003A (zh) | 一种带有强制排水功能的干法赤泥堆场排水方法及装置 | |
CN203320514U (zh) | 大面积深厚污泥处理中的刚性井点管网真空排水系统 | |
CN210049221U (zh) | 一种深淤泥的地基处理构造 | |
CN105862714A (zh) | 软土地基覆水型一体式井点塑排真空系统 | |
CN103993595B (zh) | 高含水率疏浚泥堆场围堰空间排水防渗方法 | |
CN105970910A (zh) | 井点塑排覆膜真空预压联合降水预压动力固结法 | |
CN203546706U (zh) | 用于加固软土地基的电渗复合真空预压系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150909 Termination date: 20220123 |
|
CF01 | Termination of patent right due to non-payment of annual fee |