CN103726491B - Portable pile head repairing device - Google Patents

Portable pile head repairing device Download PDF

Info

Publication number
CN103726491B
CN103726491B CN201410003089.7A CN201410003089A CN103726491B CN 103726491 B CN103726491 B CN 103726491B CN 201410003089 A CN201410003089 A CN 201410003089A CN 103726491 B CN103726491 B CN 103726491B
Authority
CN
China
Prior art keywords
iron wire
pile head
wooden unit
template
portable pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410003089.7A
Other languages
Chinese (zh)
Other versions
CN103726491A (en
Inventor
漆占强
王良波
王刚
陈清平
张晓晓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Engineering Bureau Group Jiangsu Co ltd
China Construction Third Engineering Bureau Second Construction And Installation Co ltd
Second Construction Engineering Co Ltd of China Construction Third Engineering Division
China Construction Third Bureau Green Industry Investment Co Ltd
Original Assignee
Second Construction Engineering Co Ltd of China Construction Third Engineering Division
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Engineering Co Ltd of China Construction Third Engineering Division filed Critical Second Construction Engineering Co Ltd of China Construction Third Engineering Division
Priority to CN201410003089.7A priority Critical patent/CN103726491B/en
Publication of CN103726491A publication Critical patent/CN103726491A/en
Application granted granted Critical
Publication of CN103726491B publication Critical patent/CN103726491B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention relates to a portable pile head repairing device. The portable pile head repairing device is composed of an annular formwork, a wood block, an iron wire and two L-shaped plug pins. The portable pile head repairing device is characterized in that an opening is formed in the annular formwork, the wood block is clamped in the opening of the annular formwork, two three-way circular holes are formed in the wood block, small circular rings are wound at the two ends of the iron wire, the iron wire is tightly wound on the annular formwork along a groove in the outer wall of the annular formwork 1, the small circular rings at the two ends extend into the circular holes of the corresponding ends of the wood block, and the two L-shaped plug pins are inserted into the small circular rings from the circular hole in the upper end of the wood block to fix the iron wire. The portable pile head repairing device is reasonable in design, the iron wire can be conveniently and tightly pulled through a handle for the iron wire, the plug pins can be conveniently plugged in and pulled out through the L-shaped design of the plug pins, operation is more convenient, the inner wall of the annular formwork is flat and smooth, the iron wire is firmly fixed through the design of the groove in the outer wall, the pile head forming quality is effectively ensured, labor is saved, the construction cycle is shortened, the portable pile head repairing device is convenient to detach and can be repeatedly used, material waste is avoided, and cost is saved.

Description

Portable pile head repair apparatus
Technical field
The invention belongs to technical field of building construction, be specifically related to a kind of Portable pile head repair apparatus.
Background technology
Existing architectural engineering pile crown repairing method, adopt brick loose tool or loose spell plank sheathing, this repairing method complicated operation, labor intensive, pile crown Forming Quality is poor, the not reproducible use of mould material or not easily have enough to meet the need, long construction period, and construction cost is high.
Summary of the invention
The object of the invention is to overcome above-mentioned prior art Problems existing and shortcoming, provide a kind of Portable pile head repair apparatus, simplified operation, ensures the quality of products, and improves material turnover utilization rate, reaches shortening cycle, cost-saving effect.
Technical scheme of the present invention is:
A kind of Portable pile head repair apparatus, be made up of annular template, wooden unit, iron wire and two " L " type latches, it is characterized in that: annular template is provided with an opening, wooden unit is stuck in the opening part of annular template, offer two threeway circular holes in wooden unit, iron wire two ends respectively around a small circle ring, iron wire annularly template 1 outer wall groove banding annular template, annulus small in ends stretches in the circular hole of wooden unit corresponding end, and two " L " type latches insert in small circle ring from wooden unit upper end circular hole to be fixed iron wire.
The template cross section of described annular template is " B " type, and template inwall is burnishing surface, and outer wall is arc curved surface.
Described annular template is made up of PVC material.
Described wooden unit is cubic shaped, the threeway circular hole that the threeway circular hole offered in wooden unit is side, end face, bottom surface communicate.
The neighbouring iron wire of annulus of described iron wire one end is around a handle.
Described " L " type latch adopts waste steel bar head to make.
When utilizing the present invention to carry out pile crown repairing, first that circular die sleeve-board is peripheral at pile crown to be repaired, wooden unit is sticked into annular template opening part, template waled by iron wire annularly template unit with grooves in outer wall, first the small circle ring without handle one end is stretched in the wooden unit threeway circular hole of corresponding end, latch inserts this threeway circular hole from wooden unit upper end and inserts in iron wire small circle ring and is fixed, hold the handle of the iron wire other end again, tension iron wire, the small circle ring of this one end is inserted in the threeway circular hole of wooden unit respective side, equally another latch is inserted this threeway circular hole from wooden unit upper end and inserts in iron wire small circle ring and iron wire is fixed, after device installs, just can carry out that pile crown is concrete builds.
The present invention is reasonable in design, and the handle of iron wire is convenient to strain iron wire, and the plug of latch is convenient in " L " type design of latch, make operation more convenient, annular template inwall flat smooth, the groove design of outer wall makes iron wire fixed, effectively ensure that pile crown Forming Quality, save labour, shortening construction period, and this device convenient disassembly, can reuse, avoid the waste of material, save cost.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention.
Fig. 2 is annular template schematic diagram of the present invention.
Fig. 3 is wooden unit schematic diagram of the present invention.
Fig. 4 is iron wire schematic diagram of the present invention.
Fig. 5 is the schematic diagram that the present invention carries out pile crown repairing.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention will be described in detail:
As shown in Figure 1, the present invention is by annular template 1, wooden unit 2, iron wire 3 and two " L " type latches 4 form, annular template 1 is provided with an opening, wooden unit 2 is stuck in the opening part of annular template, two sides are offered in wooden unit 2, end face, the threeway circular hole that bottom surface communicates, iron wire 3 two ends are respectively around a small circle ring, wherein the neighbouring iron wire of the annulus of one end is around a handle, iron wire 3 annularly template 1 outer wall groove banding annular template 1, annulus small in ends stretches in the circular hole of wooden unit 2 corresponding end, two " L " type latches 4 insert in small circle ring from wooden unit upper end circular hole to be fixed iron wire 3.
Fig. 2 is the schematic diagram of the present invention's annular template, and annular template 1 is provided with an opening, and template cross section 11 is " B " type, and inwall 12 is burnishing surface, and outer wall 13 is arc curved surface.
Fig. 3 is the schematic diagram of wooden unit of the present invention, and wooden unit 2 is cubic shaped, opens the threeway circular hole (21,22) that two sides, end face, bottom surfaces communicate in wooden unit 2.
Fig. 4 is the schematic diagram of iron wire of the present invention, and iron wire 3 two ends are respectively around a small circle ring (31,32), and wherein the neighbouring iron wire of the annulus of one end is around a handle 33.
As shown in Figure 5, when utilizing the present invention to carry out pile crown repairing.First annular template 1 is enclosed within pile crown 5 to be repaired peripheral, wooden unit 2 is sticked into annular template 1 opening part, annular template 1 waled by iron wire 3 annularly template outer wall 13 groove, iron wire 3 is stretched in the threeway circular hole 21 of the wooden unit 2 of corresponding end without the small circle ring 31 of handle one end, " L " type latch 4 inserts this threeway circular hole 21 from wooden unit 2 upper end and inserts in iron wire small circle ring 31 and is fixed, hold the handle 33 of iron wire 3 other end again, tension iron wire 3, the small circle ring 32 of this one end is inserted in the threeway circular hole 22 of wooden unit 2 respective side, equally another " L " type latch 4 is inserted this threeway circular hole 22 from wooden unit 2 upper end and insert in iron wire small circle ring 32 and iron wire 3 is fixed, after device installs, just can carry out that pile crown is concrete builds.

Claims (6)

1. a Portable pile head repair apparatus, be made up of annular template, wooden unit, iron wire and two " L " type latches, it is characterized in that: annular template is provided with an opening, wooden unit is stuck in the opening part of annular template, offer two threeway circular holes in wooden unit, iron wire two ends respectively around a small circle ring, iron wire annularly template (1) outer wall groove banding annular template, annulus small in ends stretches in the circular hole of wooden unit corresponding end, and two " L " type latches insert in small circle ring from wooden unit upper end circular hole to be fixed iron wire.
2. Portable pile head repair apparatus according to claim 1, is characterized in that: the template cross section of described annular template is " B " type, and template inwall is burnishing surface, and outer wall is arc curved surface.
3. Portable pile head repair apparatus according to claim 1, is characterized in that: described annular template is made up of PVC material.
4. Portable pile head repair apparatus according to claim 1, is characterized in that: described wooden unit is cubic shaped, the threeway circular hole that the threeway circular hole offered in wooden unit is side, end face, bottom surface communicate.
5. Portable pile head repair apparatus according to claim 1, is characterized in that: the neighbouring iron wire of annulus of described iron wire one end is around a handle.
6. Portable pile head repair apparatus according to claim 1, is characterized in that: described " L " type latch adopts waste steel bar head to make.
CN201410003089.7A 2014-01-02 2014-01-02 Portable pile head repairing device Active CN103726491B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410003089.7A CN103726491B (en) 2014-01-02 2014-01-02 Portable pile head repairing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410003089.7A CN103726491B (en) 2014-01-02 2014-01-02 Portable pile head repairing device

Publications (2)

Publication Number Publication Date
CN103726491A CN103726491A (en) 2014-04-16
CN103726491B true CN103726491B (en) 2015-04-29

Family

ID=50450762

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410003089.7A Active CN103726491B (en) 2014-01-02 2014-01-02 Portable pile head repairing device

Country Status (1)

Country Link
CN (1) CN103726491B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2314111A (en) * 1996-06-11 1997-12-17 Slickbar Products Corp Pile wrapper closure assembly
CN202688991U (en) * 2012-07-25 2013-01-23 中国建筑第六工程局有限公司 Specially-made sleeve construction structure used for repairing head of reinforced concrete cast-in-situ pile
CN203654278U (en) * 2014-01-02 2014-06-18 中建三局第二建设工程有限责任公司 Convenient pile head repairing device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2314111A (en) * 1996-06-11 1997-12-17 Slickbar Products Corp Pile wrapper closure assembly
CN202688991U (en) * 2012-07-25 2013-01-23 中国建筑第六工程局有限公司 Specially-made sleeve construction structure used for repairing head of reinforced concrete cast-in-situ pile
CN203654278U (en) * 2014-01-02 2014-06-18 中建三局第二建设工程有限责任公司 Convenient pile head repairing device

Also Published As

Publication number Publication date
CN103726491A (en) 2014-04-16

Similar Documents

Publication Publication Date Title
CN203654278U (en) Convenient pile head repairing device
CN203441100U (en) Formwork structure of constructional column
CN103726491B (en) Portable pile head repairing device
CN102635230B (en) The formwork for placing of large methane tank body and casting method
CN204059953U (en) Hang mould prefab form
CN101832025B (en) Sealing up screw
CN203924102U (en) Building implements foundation bolt preformed hole construction mould
CN204343550U (en) Washroom water stopping thresholds jig
CN102514088B (en) Novel concrete formwork
CN202899613U (en) Novel floor pre-buried sleeve
CN203924694U (en) Biogas charging and discharging pond die special for concrete
CN209723596U (en) Deformation joint department wall body formwork device
CN201486140U (en) Wall bushing
CN204960320U (en) Concrete form is to drawing fastener
CN201671338U (en) Water-stop screw rod
CN203441105U (en) Hole template supporting tool
CN206279803U (en) It is a kind of can fast construction dismounting stage
CN203977862U (en) A kind of concrete cylindrical construction fastening devices
CN106760241A (en) A kind of specific purpose tool of the adjacent edge lap of color steel
CN204278218U (en) The mould of a kind of concurrent reinforced frame stretch-draw
CN206204797U (en) A kind of highway bridge concrete steel form
CN207131078U (en) A kind of post mould in construction
CN204126251U (en) With the solid template of back cord
CN203834935U (en) Construction device for house beam supporting column
CN204849752U (en) Template is repaired to regularization pile head

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221206

Address after: Room 2105, 21st Floor, Tongda Plaza, No. 111 Wenhua Avenue, Jiangxia District, Wuhan City, Hubei Province 430000

Patentee after: THE SECOND CONSTRUCTION Co.,Ltd. OF CHINA CONSTRUCTION THIRD ENGINEERING BUREAU

Patentee after: China Construction Third Engineering Bureau Group (Jiangsu) Co.,Ltd.

Patentee after: China Construction Third Engineering Bureau second construction and installation Co.,Ltd.

Patentee after: CHINA CONSTRUCTION THIRD ENGINEERING BUREAU GREEN INDUSTRY INVESTMENT Co.,Ltd.

Address before: 430074 No. 306 Lu Lu, Hongshan District, Hubei, Wuhan

Patentee before: THE SECOND CONSTRUCTION Co.,Ltd. OF CHINA CONSTRUCTION THIRD ENGINEERING BUREAU