CN103726445A - Tower beam consolidation cable-stayed bridge 0# block support cast-in-place and movable suspended scaffolding suspension pouring combined construction method - Google Patents

Tower beam consolidation cable-stayed bridge 0# block support cast-in-place and movable suspended scaffolding suspension pouring combined construction method Download PDF

Info

Publication number
CN103726445A
CN103726445A CN201310651665.4A CN201310651665A CN103726445A CN 103726445 A CN103726445 A CN 103726445A CN 201310651665 A CN201310651665 A CN 201310651665A CN 103726445 A CN103726445 A CN 103726445A
Authority
CN
China
Prior art keywords
construction
hanging basket
cable
section
place
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310651665.4A
Other languages
Chinese (zh)
Other versions
CN103726445B (en
Inventor
李文
靳志强
陈胜亮
孙国一
刘方华
李庆华
郑德荣
易达
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd of Highway Engineering Bureau of CCCC
No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Original Assignee
No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd filed Critical No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority to CN201310651665.4A priority Critical patent/CN103726445B/en
Publication of CN103726445A publication Critical patent/CN103726445A/en
Application granted granted Critical
Publication of CN103726445B publication Critical patent/CN103726445B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a tower beam consolidation cable-stayed bridge 0# block support cast-in-place and movable suspended scaffolding suspension pouring combined construction method and belongs to the field of bridge construction. Support method construction is adopted in all 0# block cast-in-place box beam construction in the prior art, security risks existing in actual application are large, construction quality is difficult to control, construction progress is slow, cost is high, and manpower and machine utilization efficiency is low. In order to reduce construction security risks and construction cost, 0# block construction is divided into construction of two parts, wherein conventional support method construction is adopted in the first part (TO-1 segment), movable suspended scaffolding construction is adopted in the second part (TO-2 segment), and a movable suspended scaffolding to be used for construction of a 1# block and follow-up blocks is installed and constructed before the former half segment (the second part of a 0# block) is to be constructed, in this way, material input of about half of a support can be saved, cost is saved, construction is accelerated, the safety factor is improved, and the tower beam consolidation cable-stayed bridge 0# block support cast-in-place and movable suspended scaffolding suspension pouring combined construction method is achieved.

Description

The construction method that a kind of cable-stayed bridge with tower beam consolidation 0# piece support cast-in-place combines with Hanging Basket cantilever
Technical field
Type of the present invention relates to the construction method that a kind of cable-stayed bridge with tower beam consolidation 0# piece support cast-in-place combines with Hanging Basket cantilever.
Background technology
In the work progress of large-scale Tower Column of A Cable Stayed Bridge beam consolidation section 0# piece, in especially large-scale high trestle construction of cast-in-situ box-beam, there is larger safety, hidden danger of quality, material has high input, and construction cost is high.
0# piece construction of cast-in-situ box-beam all adopted construction with brackets in the past, and the security risk existing is in actual applications large, quality control on construction difficulty, and progress is slow, and cost is high, and personnel's machinery service efficiency reduces.Therefore for reducing construction safety risk, reduce construction cost, hereby the construction of 0# piece section is divided into two part constructions, Part I (TO-1 section) adopts large-scale superelevation steel pipe support method construction, steel pipe support is supported on king-tower lower king-post strut root, Part II (TO-2 section) adopts cradle construction, is about to Hanging Basket half sections (being the Part II (TO-2 section) of 0# piece) installation in advance, construction for 1# piece and the construction of subsequent block section.Can reduce like this input of approximately 1/2 timbering material, save cost, accelerating construction progress, safety assurance coefficient is improved, and forms the construction method that a kind of brand-new tower beam consolidation section 0# piece support cast-in-place combines with Hanging Basket cantilever for this reason.
Summary of the invention
Fully, on the basis of cradle construction principle, guaranteeing on safe basis, in advance Hanging Basket is being used for to the construction of 0# piece part section box girder, thereby realization has reduced the large-scale support of 0# piece 50% and has obtained input amount, increase construction safety assurance coefficient, accelerated construction speed, guaranteed construction quality.By the alternative high trestle construction technology of Hanging Basket, broken conventional bracket method construction concept, reduced cost input, safety factor is improved, and accelerated progress, guaranteed construction quality, formed the construction method that a kind of tower beam consolidation section 0# piece support combines with Hanging Basket cantilever.On basis in conjunction with existing execution conditions, strengthened safety factor, convenient operation.In construction, monitoring measurement indices all meets the requirements.
The construction method that a kind of cable-stayed bridge with tower beam consolidation 0# piece support cast-in-place combines with Hanging Basket cantilever, it is characterized in that: 0# piece vertical bridge at twice construction, first adopting girder part on crossbeam below large-scale superelevation steel pipe support system construction case beam base plate and crossbeam is TO-1 section, stretch-draw transverse prestress Shu Houzai arranges Hanging Basket at the TO-1 section top of having built, utilize the support system of Hanging Basket as box beam concrete structure, build remaining TO-2 section, described TO-2 section is two sections, lays respectively at the both sides of TO-1 section;
Described Hanging Basket comprises girder, vertical rod, main truss, running gear, anchor system, hanging anchor point, suspension system, soffit formwork, collet hangar system and safety barrier;
Described main truss, vertical rod, girder adopt bearing pin anchorage style to be fixed on above running gear, running gear is fixed on above main beam concrete girder construction by anchor system, soffit formwork is hung by collet or suspension system system is anchored on girder, and safety barrier is anchored at soffit formwork week lateral location.
The feature of type of the present invention is: construction method technique is simple, structure stress is clear and definite, easy to assembly, safe and reliable, make to construct more convenient, quick, reliable, break the inertial thinking theory that conventional 0# piece must adopt construction with brackets, saved a large amount of supporting structure materials, reached safety, efficient, quick, saving target.
Description process operations step is:
First carry out the assembling construction of concrete beam support;
Further, carry out that support is linear, the adjustment of absolute altitude;
Further, carry out the part 0# block concrete construction of crossbeam and first construction;
Further, after stretch-draw transverse prestress bundle, in the 0# section of having built, carry out the assembling construction of Hanging Basket;
Further, carry out that Hanging Basket is linear, the adjustment of absolute altitude;
Further, install after accurate adjustment, i.e. lockable Hanging Basket fastening devices, guarantees that safety is firmly cemented on the first demisection beam of 0# piece body;
Further, carry out reinforcing bar, prestressing tendon installation;
Further, carry out 0# piece Part II concrete pouring construction;
Further, concrete strength meets after standard-required, removes Hanging Basket locking device, carries out the reach of Hanging Basket, and assembled Hanging Basket residue system, starts subsequently the construction of other standard beam sections body;
Further, until cradle construction all completes, bridge closes up.
The construction method that described a kind of cable-stayed bridge with tower beam consolidation 0# piece support cast-in-place combines with Hanging Basket cantilever, it is characterized in that: in described Cable-stayed Bridge Pylon construction, tower beam consolidation 0# piece girder is divided into two part constructions, first half (TO-1 section) adopts construction with brackets, latter half (TO-2 section) adopts cradle cantilever construction, the i.e. assembled and anchored platform as Hanging Basket at completed 0# piece first half beam body, utilize subsequently the support system of Hanging Basket as box beam concrete structure, carry out the structure construction of 0# piece latter half beam body.
The construction method of utilizing the tower beam consolidation 0# piece support cast-in-place of type of the present invention to combine with Hanging Basket cantilever, tool has the following advantages:
One, adopt support to combine with Hanging Basket and carry out the construction of 0# piece sections, significantly reduced the consumption of 0# piece high trestle system, shortened construction period, improved safety factor, reduced security risk, and for follow-up Hanging Basket carries out the standard segmental construction condition of providing convenience, and make complicated procedures of forming have more simplification.
Two,, entirety has been accelerated 12% construction speed.
Three, reduced approximately 16% construction cost.
Accompanying drawing explanation
Fig. 1 girder 0# piece schematic diagram one
Fig. 2 girder 0# piece schematic diagram one
Fig. 3 installs braced structures figure along bridge to 0# piece Hanging Basket
Fig. 4 along bridge to the Hanging Basket anchoring of 0# piece and template system figure
Stressed and the template system figure of Fig. 5 direction across bridge 0# piece Hanging Basket supporting structure
Figure 60 # piece hanging basket main truss plan view
In figure 1---girder, 2---vertical rod, 3---main truss, 4---running gear, 5---anchor system, 6---hanging anchor point, 7---suspension system, 8---template system, 9---collet hangar system, 10---safety barrier, 11---hydraulic pressure electric fixtures, 12---crossbeam.
The specific embodiment
Its technology contents is as follows:
The construction method that a kind of cable-stayed bridge with tower beam consolidation 0# piece support cast-in-place combines with Hanging Basket cantilever, Hanging Basket comprises girder 1, vertical rod 2, main truss 3, running gear 4, anchor system 5, hanging anchor point 6, suspension system 7, template system 8, collet hangar system 9, safety barrier 10, hydraulic pressure electric fixtures 11, crossbeam 12 is at described main truss, vertical rod, girder adopts bearing pin anchorage style to be fixed on running gear (track) above, running gear is fixed on above main beam concrete girder construction by anchor system, template system is hung by collet, suspention, hanging anchor system system is anchored on girder, security protection is anchored at soffit formwork week lateral location.
Below in conjunction with accompanying drawing, illustrate:
As shown in Figure 1, the type tower beam consolidation 0# piece support cast-in-place of the present invention construction method that combines with Hanging Basket cantilever, Specific construction flow process step order is:
First carry out the assembling construction of concrete beam support;
Further, carry out that support is linear, the adjustment of absolute altitude;
Further, carry out the part 0# block concrete construction of crossbeam and first construction;
Further, after stretch-draw transverse prestress bundle, in the 0# section of having built, carry out the assembling construction of Hanging Basket;
Further, carry out that Hanging Basket is linear, the adjustment of absolute altitude;
Further, install after accurate adjustment, i.e. lockable Hanging Basket fastening devices, guarantees that safety is firmly cemented on the first demisection beam of 0# piece body;
Further, carry out reinforcing bar, prestressing tendon installation;
Further, carry out 0# piece Part II concrete pouring construction;
Further, concrete strength meets after standard-required, removes Hanging Basket locking device, carries out the reach of Hanging Basket, and assembled Hanging Basket residue system, starts subsequently the construction of other standard beam sections body;
Further, until cradle construction all completes, bridge closes up.
Construction technology process:
The construction method technological process that a kind of cable-stayed bridge with tower beam consolidation 0# piece support cast-in-place combines with Hanging Basket cantilever is as follows:
1, the assembling construction of concrete beam support;
2, carry out that support is linear, the adjustment of absolute altitude;
3, carry out the part 0# block concrete construction of crossbeam and first construction;
4,, after stretch-draw transverse prestress bundle, in the 0# section of having built, carry out the assembling construction of Hanging Basket;
5, carry out that Hanging Basket is linear, the adjustment of absolute altitude;
6, install after accurate adjustment, i.e. lockable Hanging Basket fastening devices, guarantees that safety is firmly cemented on the first demisection beam of 0# piece body;
7, carry out reinforcing bar, prestressing tendon installation;
8, carry out 0# piece Part II concrete pouring construction;
9, concrete strength meets after standard-required, removes Hanging Basket locking device, carries out the reach of Hanging Basket, and assembled Hanging Basket residue system, starts subsequently the construction of other standard beam sections body;
10 until cradle construction all completes, bridge closes up.And the safety of Hanging Basket is removed.
The construction method of using a kind of cable-stayed bridge with tower beam consolidation 0# of type of the present invention piece support cast-in-place to combine with Hanging Basket cantilever, note strictly controlling working load and evenly distributed load, avoids larger unbalance loading phenomenon, to guarantee Hanging Basket installation security as far as possible.
A kind of cable-stayed bridge with tower beam consolidation 0# of above type of the present invention piece support cast-in-place and the construction method that Hanging Basket cantilever combines, be applicable to the construction of large scale structure bridge 0# piece part cast-in-place box beam, is widely used, and saves construction.

Claims (1)

1. the construction method that cable-stayed bridge with tower beam consolidation 0# piece support cast-in-place combines with Hanging Basket cantilever, it is characterized in that: 0# piece vertical bridge at twice construction, first adopting girder part on crossbeam below large-scale superelevation steel pipe support system construction case beam base plate and crossbeam is TO-1 section, stretch-draw transverse prestress Shu Houzai arranges Hanging Basket at the TO-1 section top of having built, utilize the support system of Hanging Basket as box beam concrete structure, build remaining TO-2 section, described TO-2 section is two sections, lays respectively at the both sides of TO-1 section;
Described Hanging Basket comprises girder, vertical rod, main truss, running gear, anchor system, hanging anchor point, suspension system, soffit formwork, collet hangar system and safety barrier;
Described main truss, vertical rod, girder adopt bearing pin anchorage style to be fixed on above running gear, running gear is fixed on above main beam concrete girder construction by anchor system, soffit formwork is hung by collet or suspension system system is anchored on girder, and safety barrier is anchored at soffit formwork week lateral location.
CN201310651665.4A 2013-12-05 2013-12-05 The construction method that a kind of cable-stayed bridge with tower beam consolidation 0# block support cast-in-place combines with Hanging Basket cantilever Expired - Fee Related CN103726445B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310651665.4A CN103726445B (en) 2013-12-05 2013-12-05 The construction method that a kind of cable-stayed bridge with tower beam consolidation 0# block support cast-in-place combines with Hanging Basket cantilever

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310651665.4A CN103726445B (en) 2013-12-05 2013-12-05 The construction method that a kind of cable-stayed bridge with tower beam consolidation 0# block support cast-in-place combines with Hanging Basket cantilever

Publications (2)

Publication Number Publication Date
CN103726445A true CN103726445A (en) 2014-04-16
CN103726445B CN103726445B (en) 2015-09-09

Family

ID=50450716

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310651665.4A Expired - Fee Related CN103726445B (en) 2013-12-05 2013-12-05 The construction method that a kind of cable-stayed bridge with tower beam consolidation 0# block support cast-in-place combines with Hanging Basket cantilever

Country Status (1)

Country Link
CN (1) CN103726445B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105069193A (en) * 2015-07-20 2015-11-18 南宁市政工程集团有限公司 Method for constructing triangular hanging basket in combination with finite element analysis software
CN106149566A (en) * 2016-08-17 2016-11-23 王文龙 Rail rope traction supporting opening/closing system
CN107386131A (en) * 2017-07-26 2017-11-24 中交公局第二工程有限公司 A kind of wide box girder cradle construction device with bottom joist
CN108867345A (en) * 2018-09-11 2018-11-23 中建五局土木工程有限公司 A kind of Steel Bridge stealth bent cap structure and its construction method for saving Urban Bridge down space

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101446076A (en) * 2008-12-29 2009-06-03 中铁八局集团第一工程有限公司 Cast-in-place support for long cantilever No. 0 block of cable-stayed bridge with tower beam consolidation and putting up method
CN102330414A (en) * 2011-08-09 2012-01-25 中铁十二局集团第二工程有限公司 Hanging basket cantilever method construction method of large-span continuous rigid beam sidespan cast-in-place beam section
CN103132460A (en) * 2011-11-28 2013-06-05 上海市基础工程有限公司 Concrete filled steel tubular temporary consolidation system of cast-in-cantilever beam
CN103243658A (en) * 2013-05-16 2013-08-14 中交路桥华南工程有限公司 Guyed traveler for cable-stayed bridge and assembly method for guyed traveler

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101446076A (en) * 2008-12-29 2009-06-03 中铁八局集团第一工程有限公司 Cast-in-place support for long cantilever No. 0 block of cable-stayed bridge with tower beam consolidation and putting up method
CN102330414A (en) * 2011-08-09 2012-01-25 中铁十二局集团第二工程有限公司 Hanging basket cantilever method construction method of large-span continuous rigid beam sidespan cast-in-place beam section
CN103132460A (en) * 2011-11-28 2013-06-05 上海市基础工程有限公司 Concrete filled steel tubular temporary consolidation system of cast-in-cantilever beam
CN103243658A (en) * 2013-05-16 2013-08-14 中交路桥华南工程有限公司 Guyed traveler for cable-stayed bridge and assembly method for guyed traveler

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
邵联银,杨卫红: "矮塔斜拉桥塔梁固结施工技术", 《黑龙江交通科技》, no. 1, 31 January 2013 (2013-01-31) *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105069193A (en) * 2015-07-20 2015-11-18 南宁市政工程集团有限公司 Method for constructing triangular hanging basket in combination with finite element analysis software
CN105069193B (en) * 2015-07-20 2020-04-07 南宁市政工程集团有限公司 Construction method for matching finite element analysis software with triangular hanging basket
CN106149566A (en) * 2016-08-17 2016-11-23 王文龙 Rail rope traction supporting opening/closing system
CN107386131A (en) * 2017-07-26 2017-11-24 中交公局第二工程有限公司 A kind of wide box girder cradle construction device with bottom joist
CN108867345A (en) * 2018-09-11 2018-11-23 中建五局土木工程有限公司 A kind of Steel Bridge stealth bent cap structure and its construction method for saving Urban Bridge down space
CN108867345B (en) * 2018-09-11 2023-12-29 中建五局土木工程有限公司 Steel bridge invisible bent cap structure capable of saving space under urban bridge and construction method thereof

Also Published As

Publication number Publication date
CN103726445B (en) 2015-09-09

Similar Documents

Publication Publication Date Title
CN104695337B (en) Self-lifting sliding and turnover construction system and construction method
CN103726445B (en) The construction method that a kind of cable-stayed bridge with tower beam consolidation 0# block support cast-in-place combines with Hanging Basket cantilever
CN105839536A (en) Construction method of cable-stayed bridge pylon
CN103291076A (en) Multilayer steel truss fragmented reverse hoisting construction method in arc-shaped frame
CN105648926A (en) Swivel construction method for large span continuous beam which spans existing station
CN103437299A (en) Construction method for one-time turning of large-span T-shaped single pier
CN201506952U (en) Temporary cable matched hanging basket building concrete cable stayed bridge without supporting frame
CN104213508A (en) Method for controlling displacement of tower columns through cross braces and external cables
CN203530855U (en) Device for bridge capping beam construction by using steel bars through simple supporting method
CN102154990B (en) Electing method for side span overhang-middle span cable-stayed three-tower self-anchored type combination suspension bridge
CN203961238U (en) Bolt anchor slab adjustable tool formula builder's jack
CN103184721B (en) Method for performing block-by-block suspension, glue splicing and linear control on precast segments to assemble polycarbonate (PC) continuous box girder
CN103774560A (en) Suspension type cast-in-place template curved bridge construction method
CN203947421U (en) Compound beam cable stayed bridge direction across bridge prestress application device
CN103993739B (en) The construction method of granulation tower spraying layer stiff beam
CN203129025U (en) Suspension fixing device for hanging basket
CN102561188A (en) Suspension balance beam of mobile formwork bridge fabrication machine
CN102635070B (en) Mutual-pulling type vertical turning construction method for steel towers of cable-stayed bridge
CN104453228A (en) Construction method of large-span super-large-section steel plate wall beam
CN103806375A (en) Construction method for avoiding regulating cable force during construction and pouring of girder of concrete cable stayed bridge
CN203065967U (en) Stress structure of cast-in-place concrete of bent cap of bridge
CN203729211U (en) Suspension type curved bridge panel cast-in-situ formwork
CN203393619U (en) Multifunctional construction platform for constructing cross beams between twin-deck bridges through cast-in-place
CN202936737U (en) Continuous beam cradle hoisting structure for corrugated steel webs
CN102287050B (en) Construction method for long-span steel reinforced concrete roof truss

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150909

Termination date: 20191205