CN103722355B - A kind of assembly method of seamless steel pipe cold-rolling mill roll duplicate gear - Google Patents

A kind of assembly method of seamless steel pipe cold-rolling mill roll duplicate gear Download PDF

Info

Publication number
CN103722355B
CN103722355B CN201310740329.7A CN201310740329A CN103722355B CN 103722355 B CN103722355 B CN 103722355B CN 201310740329 A CN201310740329 A CN 201310740329A CN 103722355 B CN103722355 B CN 103722355B
Authority
CN
China
Prior art keywords
gear
length bar
verification
duplicate
duplicate gear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310740329.7A
Other languages
Chinese (zh)
Other versions
CN103722355A (en
Inventor
陈涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baosteel Special Steel Co Ltd
Original Assignee
Baosteel Special Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baosteel Special Steel Co Ltd filed Critical Baosteel Special Steel Co Ltd
Priority to CN201310740329.7A priority Critical patent/CN103722355B/en
Publication of CN103722355A publication Critical patent/CN103722355A/en
Application granted granted Critical
Publication of CN103722355B publication Critical patent/CN103722355B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P11/00Connecting or disconnecting metal parts or objects by metal-working techniques not otherwise provided for 
    • B23P11/02Connecting or disconnecting metal parts or objects by metal-working techniques not otherwise provided for  by first expanding and then shrinking or vice versa, e.g. by using pressure fluids; by making force fits
    • B23P11/025Connecting or disconnecting metal parts or objects by metal-working techniques not otherwise provided for  by first expanding and then shrinking or vice versa, e.g. by using pressure fluids; by making force fits by using heat or cold

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Gears, Cams (AREA)

Abstract

The assembly method of a kind of seamless steel pipe cold-rolling mill roll duplicate gear, comprises the steps of: 1) gear preparation: clean, wiping bore also repaiies burr with profile of tooth, reconditioning keyway;Inspection: prototype gear endoporus, the axle journal of long handle gear, width of keyway, profile angle data respectively;2) assembling prepares: gear heats, and the gear of z=26 is put into electric furnace heating, time 30~45 minutes;To be teethed end faces wiped clean bottom long handle gear, be vertically disposed on verification flat board, operating personnel is placed by i.e. flank profil outside, starting point tooth-formation of gear involute two sides;3) gear assembling: 4) gear checking: 5) manufacture positioning key;6) warehouse-in.The inventive method rational technology, easy and simple to handle, safe and reliable, practicality and high efficiency, round-off error precision is high, can effectively improve the assembly precision of duplicate gear, reduces the activity duration, overlaps ETL estimated time of loading≤3 minute, and precision can be to 0.01 0.03mm, and rework rate is 0.

Description

A kind of assembly method of seamless steel pipe cold-rolling mill roll duplicate gear
Technical field
The present invention relates to the cold rolling production equipment of seamless steel pipe, refer in particular to a kind of seamless steel pipe cold-rolling mill The assembly method of roll duplicate gear, it is adaptable to the essence of the duplex spur gear wheel used by roll device Really adjust.
Background technology
Gear is common machine components, engaged continuously by the profile of tooth on wheel rim realize transmitting movement and The function of power, is generally used for motion (or power) transmission of relatively short distance, and common gear has circle Post spur gear, cylindric spiral gear, helical gear, straight bevel gear, spiral bevel gear, tooth bar, snail Wheel etc., gear can make single gear, it is possible to so that the gear train being made up of multiple gears, according to Different use occasions and needs, select corresponding gear, and seamless steel pipe cold-rolling mill roll device uses Duplicate gear be spur gear wheel.
Seamless steel pipe is common metallurgical metal goods, and cold rolling is the main of seamless steel pipe cold deformation processing Mode, two roller cold pilgered pipe machines are widely used seamless steel pipe cold rolling production equipment, by rolling Mechanism, main drive gear, feeding slew gear, Shou Liao mechanism, hydraulic mechanism, lubricating structure, in Between the unit such as bindiny mechanism, plug slew gear, electric control system composition;Wherein rolling mechanism by Support (containing slideway, tooth bar, slide plate, lathe bed), work housing (containing skate apparatus), roll etc. Device forms, for seamless steel pipe is carried out cold deformation processing.
The support lathe bed of rolling mechanism is arranged in concrete foundation, and slideway is arranged on bottom lathe bed, tooth Bar is arranged on lathe bed both sides, and it is 90 degree that slide plate is separately mounted to the both sides of lathe bed;Work housing is installed On support slideway, fitted with support slideway by skate apparatus, frame underside shirt rim and support slide plate Laminating;Roll device is divided into topping roll, bottom roll two to overlap relatively independent constructional device, wherein on roll Roller is by elements such as roll shaft, bearing block, gear, rolling bearing, locating ring, adjustment packing ring, positioning keys Composition, bottom roll by roll shaft, bearing block, gear train (duplicate gear), rolling bearing, locating ring, Adjust the element such as packing ring, positioning key composition;Upper and lower roll composition kit is arranged on work housing In;During rolling, main drive gear transmits and exports power, and work housing is at main drive gear driven axle Under connecting rod drives, doing reciprocating horizontal motion, now bottom roll is as drive roll, by roll shaft two end tooth Wheels (duplicate gear) outboard gears (long handle gear) engages, by level with support driving rack Convert reciprocating motion becomes the rotary motion of roll, and by roll shaft two ends gear train (duplicate gear) Internal gear engages with topping roll gear, is exported by rotary power, drives topping roll to do synchronous rotary fortune Dynamic, it is achieved the rolling deformation of seamless steel tube blank is processed, therefore, improve the assembling essence of roller gear Degree, in the service life to prolongation roll device, the rolling quality improving seamless steel pipe plays a key effect.
Due to structure and the operating characteristic of roll device, determine roll device assembly precision requirement high; The gear that current two roller cold pilgered pipe machine roll devices are used, is straight spur gear, its The middle difference according to driving structure, drive roll has plenty of bottom roll (russian Х П Т series rolling mill), Has plenty of topping roll (domestic LG series rolling mill);Driven roll uses two pinions, drive roll Device uses two pinion groups (duplicate gear);Gear and gear train are separately mounted to roller The two ends of axle, wherein gear train (duplicate gear) serves both functions, on the one hand by outside profile of tooth With engaging of support tooth bar, the horizontal movement of work housing is converted to the rotary motion of drive roll, separately On the one hand engaging by inner side profile of tooth and driven roll gear, drives driven roll to do synchronous rotary and moves, Therefore the assembly precision of duplex-gear wheels, directly influences the kinematic accuracy of a whole set of roll device, and with The rolling accuracy of seamless steel pipe, quality are closely related.
As a example by Х П Т-55 cold pilger mill, drive roll is bottom roll, and driven roll is topping roll;Its The straight spur gear that the duplicate gear that bottom roll device uses is different by the two pieces number of teeth, modulus is identical, Wherein outside (long handle gear) modulus m=15, number of teeth z=25, inboard gear modulus m=15, tooth Number z=26, is formed by temperature differential method assembled orientation, uses interference fit, and flat key positions;Constitute duplex The two pieces gear of gear, the number of teeth differs 1, therefore reference diameter all differs with the outside diameter of gear, and Starting point tooth-formation of gear involute two sides (flank profil) must guarantee to overlap, the most just when assembling Can ensure that duplicate gear and support tooth bar, the Synchronous Transmission precision symbol of topping roll gear of bottom roll both sides The technology requirement of conjunction equipment;The generally assembly precision of duplicate gear checks starting point tooth-formation of gear exactly The registration of involute two sides (flank profil), error amount D is 0~0.06mm, therefore assembles at roll In, the assembling of duplicate gear is a difficult point, is also a crucial operation control point.
The assembling mode of the duplicate gear that bottom roll device uses is temperature differential method assembled orientation and 90 at present Degree angle square is measured and is adjusted, it may be assumed that utilize firing equipment that the gear of z=26 is heated to certain temperature, After bore expanded by heating, direct it on the axle journal of the long handle gear being assemblied in z=25;Utilize 90 ° of angle squares, overlap by measuring the tooth top plane vertical line of two pieces gear, and rotary fine adjustment in time, real The precision assembling of existing duplicate gear, its operation technique is:
1. assembling prepares:
Cleaning gear: cleaning, wiping bore and profile of tooth, repaiies burr, reconditioning keyway etc.;Inspection: The data such as difference prototype gear endoporus, the axle journal of long handle gear, width of keyway, profile angle;
2. gear assembling:
A) gear heating: the gear of z=26 is put into electric furnace heating, and the time is 30~45 minutes;
B) Work tool prepares: high-ranking officers' surface plate is placed on inspection job platform, wiped clean, 90 degree Angle square is standby;
C) holding gears: by (teethed end faces) wiped clean bottom long handle gear, be vertically disposed in school On surface plate, starting point tooth-formation of gear involute two sides (flank profil) is placed outwardly;
D) assembling gear: be transported to verify above platform by the gear after heating, after wiping endoporus, will The endoporus assembled orientation of z=26 gear is on the long handle gear axle journal of z=25;
E) registration is adjusted: use an angle of 90 degrees chi, by measuring the tooth top plane vertical line weight of two pieces gear Close, and rotary fine adjustment in time, until meeting technology requirement;
F) counterweight is placed: place counterweight (preventing from cooling down backgear to shift up) at z=26 gear top;
3. gear checking: after duplicate gear cooling, use an angle of 90 degrees chi, by measuring the tooth of two pieces gear Top plane vertical line registration, checks assembly precision, and the needs not meeting precision are done over again, and (top is torn open double Connection gear, ressembles);
4. manufacture positioning key: according to the practical situation of duplicate gear positioning spline, manufacture positioning key (general Because of the reason such as mismachining tolerance, rigging error, keyway can offset) and install;
5. warehouse-in: according to actual needs, selects warehouse-in place or be fit directly on roll use.
There is some problems in above-mentioned assembly technology:
1. assembly precision is the highest: due to reference for assembling (tooth top plane vertical line) and the measurement of duplicate gear Calibration reference (tooth top plane vertical line), use benchmark (engagement of flank profil involute) disunity, therefore, The assembly precision of duplicate gear is the highest, and generally between 0.08~0.12mm, therefore rework rate is higher, One time assembly yield is few, and because assembly precision is the highest, in causing machine to be installed and used, duplex-gear The inner side z=26 gear of wheel and the Z=26 gear meshing wear of topping roll are relatively big, service life relatively low (one As≤4 months);
2. technical ability skill requirement is high: owing to constituting two kinds of outside diameter of gear differences of duplex-gear wheels, respectively It is 392mm, 378mm, therefore uses the miter square face of an angle of 90 degrees chi, measure two pieces different-diameter The tooth top plane vertical line registration of gear is the most difficult, needs spatially extended, the technical ability to operating personnel Skill requirement is higher, and below usual senior work, personnel typically cannot operate;
3. the activity duration is short: owing to using temperature differential method assembled orientation, duplicate gear contact surface after heating Gap is 0.03mm, and disappearing along with temperature reduces gap, (bore cooling is shunk, and axle journal is heated Expand), especially winter, historical facts or anecdotes border stay adjust the time measured less (typically at 3~5 minutes, Winter is shorter is usually no more than 3 minutes), once gap disappear just cannot adjustment assembly, can only be again Top is torn open, then luggage is joined.
In sum, the assembly method of existing roll device duplicate gear also exists certain not Foot, according to the method for overall processing duplicate gear, needs to revise technical data, selectes processor, Gear Processing cost increase, is difficult to implement;Therefore implement to be correspondingly improved in existing assembly method, On the basis of guaranteeing the assembly precision of duplicate gear, it is achieved the operation fast and efficiently of scene, meet The needs produced.
Summary of the invention
It is an object of the invention to provide the assembling of a kind of seamless steel pipe cold-rolling mill roll duplicate gear Method, it is achieved roll device duplicate gear quick precision assembled orientation, meets and produces needs;
For reaching above-mentioned purpose, the technical scheme is that
The present invention utilize the flank profil involute surface of duplicate gear as measuring basis, make measuring basis, Reference for assembling, use benchmark three are unified, eliminate the rigging error problem caused because of benchmark difference;Pass through Verification length bar inserts in flank profil involute surface (two gear recesses), according to the perpendicularity of verification length bar Deviation, determines gear synchronous sex differernce, adjusts spur gear correction centering by rotating, when verification length bar When perpendicularity meets the requirements, the synchronization accuracy of duplicate gear also reaches technology requirement, it is achieved quickly precision Assembling and adjustment.
The inventive method rational technology, easy and simple to handle, safe and reliable, practicality and high efficiency, round-off error essence Degree height, can effectively improve the assembly precision of duplicate gear, reduces the activity duration, and set ETL estimated time of loading is (no Containing heat time heating time)≤3 minutes, precision can arrive 0.01-0.03mm, and rework rate is 0.
Specifically, the assembly method of a kind of seamless steel pipe cold-rolling mill roll duplicate gear of the present invention, Comprise the steps of:
1) gear prepares:
Cleaning, wiping bore and profile of tooth also repair burr, reconditioning keyway;Inspection: measure respectively Spur gear endoporus, the axle journal of long handle gear, width of keyway, profile angle data;
2) assembling prepares:
Gear heats, and spur gear is put into electric furnace heating, and the time is about 30~45 minutes;
To be teethed end faces wiped clean bottom long handle gear, be vertically disposed on verification flat board, will Operating personnel is placed by i.e. flank profil outside, starting point tooth-formation of gear involute two sides;
3) gear assembling:
A) assembled orientation: be transported to verify above platform by the gear after heating, after wiping endoporus, will The endoporus assembled orientation of spur gear on long handle gear axle journal, the keyway on bore and length Keyway on handle gear axle journal is substantially corresponding to be overlapped;
B) registration is adjusted: insert in flank profil involute surface that is two gear recesses by verification length bar, amount Fitting with dressing plate bottom rod, rock length bar, the spur gear after heating can be rectified a deviation voluntarily, Firmly length bar is advanced in two gear recesses subsequently, and according to offset direction and quantity, logical Cross hand hammer and tap rotation adjustment spur gear correction centering, when verification length bar perpendicularity meets the requirements Time, the synchronization accuracy of duplicate gear now also reaches technology requirement;
C) hot inspection: use 0.02mm patch, inserts verification length bar respectively and contacts with duplicate gear Four lines, all cannot insert or gap width equal i.e. regarding as in left and right meets the requirements;
D) place counterweight: place counterweight at spur gear top, prevent cooling down backgear and shift up;
4) gear checking:
A) inspection prepares: after duplicate gear cooling, verification length bar is pushed flank profil involute surface that is two In gear recesses, fit with dressing plate bottom length bar;
B) clearance gauge detection: use clearance gauge to measure the gap of four lines that verification length bar contacts with duplicate gear Value also records data, owing to z=25 long handle gear is standard, therefore verification length bar big footpath size Processing with reference to its teeth groove, therefore two side clearances are usually 0;
C) computational accuracy error: the gap width data measured according to clearance gauge, calculates assembly precision error Direction and numerical value, with spur gear clockwise on the occasion of, be counterclockwise negative value, count Calculation formula is: D=│ d1-d2 │/2;D1, d2 are verification length bar circumferential surface and both sides phase The gap width of adjacent profile of tooth involute;Error amount D between 0~0.06mm for meet technology want Ask;
D) assembly precision is confirmed: measured and calculating assembly precision is given, all does not meets precision Needs do over again, top tear duplicate gear open, ressemble;
5) manufacture positioning key: according to the practical situation of duplicate gear positioning spline, manufacture positioning key and install;
6) warehouse-in: according to actual needs, selects warehouse-in place or be fit directly on roll use.
Beneficial effects of the present invention:
1. rational technology, safe and reliable, easy to implement, practicality and high efficiency;
2. use verification lining bar detection, adjust, easy and simple to handle, low to operation skill set requirements;
3. measuring basis, reference for assembling, use benchmark three unification, improve installation accuracy;
4. be effectively reduced duplicate gear rigging error and rework rate, improve working performance;
5. the assembly precision of duplicate gear is guaranteed, and increases the service life, and reduces production cost;
6. highly versatile, has one to the Standard of the duplicate gear of existing employing temperature differential method assembled orientation Fixed reference, using value.
Accompanying drawing explanation
Fig. 1 is the assembling schematic diagram of duplicate gear of the present invention;
Fig. 2 is the top view of Fig. 1.
Fig. 3 is the sectional view of duplicate gear of the present invention.
Fig. 4 is the part drawing of long handle gear in duplicate gear of the present invention.
Fig. 5 is the top view of Fig. 4.
Fig. 6 is the part drawing of spur gear in duplicate gear of the present invention.
Fig. 7 is the top view of Fig. 6.
Fig. 8 is the assembling detection schematic diagram of duplicate gear of the present invention.
Fig. 9 is the top view of Fig. 8.
Figure 10 is the A portion enlarged diagram of Fig. 9.
Figure 11~Figure 13 is clearance gauge verification schematic diagram in duplicate gear of the present invention assembling detection embodiment.
Detailed description of the invention
The assembly method of a kind of seamless steel pipe cold-rolling mill roll duplicate gear of the present invention, for domestic LG series and device duplex cylindrical straight gear under the external roll introducing XNT series seamless steel pipe cold-rolling mill The assembling of gear, is formed assembling detection by dressing plate, verification length bar, top counterweight, hand hammer etc. and adjusts Whole utensil, wherein dressing plate is as measuring basis platform, and verification length bar is assembling detection instrument, profit With the flank profil involute surface of duplicate gear as measuring basis, make measuring basis, reference for assembling, make Unified with benchmark three.
Dressing plate has a pair, for GB 1000*600mm dressing plate;Verification length bar has a pair, Being a stepped cylindrical body, material is Q235, and surfacing is processed, and roughness value is 0.02, at two Coaxiality error≤the 0.02mm of stepped cylindrical body;Top counterweight has one secondary, be a material be Q235 Cylinder;Hand hammer has a pair, is the hands copper hammer of GB 3P;Clearance gauge has a set of, is GB 100mm Clearance gauge.
During onsite application, dressing plate is as measuring basis platform, and verification length bar is assembling detection instrument, Utilize the flank profil involute surface of duplicate gear as measuring basis, make measuring basis, reference for assembling, Use benchmark three unified;During assembled orientation, verification length bar is inserted flank profil involute surface (two gears Groove) in, according to the perpendicularity deviation of verification length bar, determine gear synchronous sex differernce, pass through hand hammer Tap to rotate and adjust spur gear realization correction centering, measure verification length bar and upper and lower two pieces by clearance gauge The gap width of gear-profile contact surface, detects assembly precision data;When verification length bar perpendicularity conforms to When asking, the synchronization accuracy of duplicate gear also reaches technology requirement, it is achieved the assembling of quick precision and adjustment;
See Fig. 1~Figure 10, the assembling of the present invention a kind of seamless steel pipe cold-rolling mill roll duplicate gear Method, comprises the steps of:
1, gear prepares:
The gear loose mail that duplicate gear is formed, cleans, wiping bore and profile of tooth also repair burr, Reconditioning keyway etc.;Measure spur gear 2 endoporus, the axle journal of long handle gear 1, width of keyway, tooth respectively The data such as shape angle;
2, assembling prepares:
1) Work tool prepares: is placed on by dressing plate 3 on inspection job platform 100, wipes Only, verification length bar, clearance gauge, hand hammer, top counterweight etc. are placed on job platform, and surface wipes is done Only;
2) gear heating: the spur gear 2 of z=26 is put into electric furnace heating, and the time is 30~45 points Clock;
3) holding gears: by (teethed end faces) wiped clean bottom long handle gear 1, be disposed vertically Verification flat board 3 on, by starting point tooth-formation of gear involute two sides (flank profil) outwardly (faced by Operating personnel) place;
3, gear assembling:
1) assembled orientation: close electric furnace, is transported to verify above platform by the gear after heating, wipes After wiping endoporus, by the endoporus assembled orientation of z=26 spur gear 2 on long handle gear 1 axle journal of z=25 (keyway on bore is the most corresponding with the keyway on long handle gear axle journal to be overlapped);
2) registration is adjusted: verification length bar 4 is inserted flank profil involute surface (two gear recesses) In, fit with dressing plate 3 bottom verification length bar, rock verification length bar 4, the z=26 tooth after heating Wheel can be rectified a deviation voluntarily, is firmly advanced in two gear recesses by verification length bar subsequently, and according to deviation side To with quantity, tapped by hand hammer to rotate and adjust z=26 spur gear 2 and rectify a deviation centering, when verification length bar When perpendicularity meets the requirements, the synchronization accuracy of duplicate gear now also reaches technology requirement,
3) hot inspection: use the 0.02mm patch of clearance gauge, insert verification length bar and duplex-gear respectively Four lines of wheel contact, all cannot insert or gap width equal i.e. regarding as in left and right meets the requirements;
4) counterweight is placed: place counterweight at z=26 spur gear 2 top and (prevent from cooling down backgear upwards Displacement);
4, gear checking:
1) inspection prepares: after duplicate gear cooling, verification length bar 4 is pushed flank profil involute surface (fit with dressing plate 3 bottom verification length bar 4) in (two gear recesses);
2) clearance gauge detection: use clearance gauge 5 to measure four lines that verification length bar 4 contacts with duplicate gear Gap width and record data (owing to z=25 long handle gear 1 is standard, thus verification length bar 4 big Footpath size is processed with reference to its teeth groove, and therefore two side clearances are usually 0);
3) computational accuracy error: the gap width data measured according to clearance gauge, calculates assembly precision error Direction and numerical value, with z=26 spur gear 2 clockwise on the occasion of, counter clockwise direction is negative value, Computing formula is: D=│ d1-d2 │/2;D1, d2 are verification length bar circumferential surface and both sides adjacent teeth The gap width of shape involute, refers to Figure 11~Figure 13.
4) assembly precision is confirmed: measured and calculating assembly precision is added their confirmation, all is not inconsistent The needs closing precision do over again (duplicate gear is torn on top open, ressembles);
5, manufacture positioning key: according to the practical situation of duplicate gear positioning spline, manufacture positioning key ( As can offset because of the reason such as mismachining tolerance, rigging error, keyway) and install;
6, warehouse-in: according to actual needs, selects warehouse-in place or be fit directly on roll use.
According to above-mentioned processing step, so that it may the duplex-gear that seamless steel pipe cold-rolling mill bottom roll device is used Wheel carries out equally accurate assembled orientation quick, efficient.
A kind of assembly method for seamless steel pipe cold-rolling mill roll duplicate gear of the present invention, it is achieved Duplicate gear the assembled orientation of quick precision, meet and produce needs;Use verification length bar as inspection Survey instrument, utilizes the flank profil involute surface of duplicate gear as measuring basis, makes measuring basis, dress Aglucon is accurate, use benchmark three unified, eliminates the rigging error problem caused because of benchmark difference, it is achieved fast The assembling of speed precision and adjustment, improve the service life of roll device, can reduce correlative charges 15 every year More than ten thousand yuan;The method rational technology, easy and simple to handle, safe and reliable, practicality and high efficiency, round-off error Precision is high, can effectively improve the assembly precision of duplicate gear, reduces the activity duration, and set ETL estimated time of loading is (no Containing heat time heating time)≤5 minutes, precision can arrive 0.01-0.03mm, and rework rate is 0;Highly versatile, The Standard of the duplicate gear of existing employing temperature differential method assembled orientation is had certain reference, application It is worth.
Embodiment
With Х П Т-55 cold pilger mill drive roll (bottom roll device) duplicate gear (m=15, Z1=25, Z2=26), as a example by, its assembly technology is as follows:
1, gear prepares:
1) gear is received: according to job ticket requirement, in storehouse, receive the tooth that duplicate gear is formed Wheel loose mail;
2) cleaning gear: clean, wiping bore and profile of tooth, file repaiies burr, reconditioning keyway, Pre-assembled etc.;
3) inspection: prototype gear endoporus (diameter 260,180mm), the axle journal of long handle gear respectively (260mm), the data such as width of keyway (45mm), profile angle (top width 21.63mm);
2, assembling prepares:
1) Work tool prepares: be placed on by dressing plate on inspection job platform, wiped clean, school Testing length bar, clearance gauge, hand hammer, top counterweight etc. to be placed on job platform, surface wipes is clean;
2) gear heating: by the spur gear of z=26, after using iron wire to tie up, uses driving handling, Putting into electric furnace heating, temperature is at 320~370 degree, and the time is about 30~45 minutes;
3) holding gears: by (teethed end faces) wiped clean bottom long handle gear, be vertically disposed in On verification flat board, by starting point tooth-formation of gear involute two sides (flank profil) outwardly (in the face of operation Personnel) place;
3, gear assembling:
1) assembled orientation: close electric furnace, the gear after heating is transported to verify platform by driving handling Top, after wiping endoporus, by the endoporus assembled orientation of z=26 spur gear at the long handle gear shaft of z=25 On neck (keyway on bore is the most corresponding with the keyway on long handle gear axle journal to be overlapped);
2) registration is adjusted: insert in flank profil involute surface (two gear recesses) by verification length bar, Fitting with dressing plate bottom length bar, rock length bar, the z=26 spur gear after heating can be rectified a deviation voluntarily, Firmly length bar is advanced in two gear recesses subsequently, and according to offset direction and quantity, pass through hand hammer Tap to rotate and adjust z=26 spur gear correction centering, when verifying length bar perpendicularity and meeting the requirements, this Time the synchronization accuracy of duplicate gear also reach technology requirement,
3) hot inspection: use the 0.02mm patch of clearance gauge, insert verification length bar and duplex-gear respectively Four lines of wheel contact, wherein d1 (under) and d2 (under) all slotting do not enter, gap width≤0.02mm is described, D1 (on) gap be 0.03mm, d2 (on) gap is 0.04mm, left and right error amount be │ d1 (on) -d2 (on) │/2=0.005mm, meet technology requirement, do not adjusting;
4) counterweight is placed: place counterweight at z=26 spur gear top and (prevent from cooling down backgear to upper Move);
4, gear checking:
1) inspection prepares: after duplicate gear cooling, verification length bar is pushed flank profil involute surface (two Gear recesses) interior (fitting with dressing plate bottom length bar);
2) clearance gauge detection: use clearance gauge to measure between four lines that verification length bar contacts with duplicate gear Gap value also records data (owing to z=25 long handle gear is standard, therefore verification length bar big footpath size ginseng Processing according to its teeth groove, therefore two side clearances are usually 0);
3) computational accuracy error: the gap width data measured according to clearance gauge, calculates assembly precision error Direction and numerical value, with z=26 spur gear clockwise on the occasion of, counter clockwise direction is negative value, At actual measurement duplicate gear 4, the gap width of side line (point) is d1 (on)=0.02mm, d2 (on) respectively =0.03mm, d1 (under)=0.01mm, d2 (under)=0.00mm, according to computing formula, error Value D=│ d1-d2 │/2=│ d1 (under)-d1 (on)-d2 (under)-d2 (on) │/2=│ (0.01-0.02) -(0-0.01) │/2=0.01mm;
4) assembly precision is confirmed: through calculating the error amount of lower gear assembling on the duplicate gear obtained It is 0.01mm, meets technology requirement;
5, positioning key is manufactured: according to the practical situation of duplicate gear positioning spline, manufacture positioning key. Because rigging error value is 0.01mm, manufacture 45*22.5*80mm positioning key the most convenient, and install;
6, warehouse-in: according to actual needs, selects warehouse-in place or be fit directly on roll use.

Claims (1)

1. an assembly method for seamless steel pipe cold-rolling mill roll duplicate gear, comprises the steps of:
1) gear prepares:
Cleaning, wiping bore and profile of tooth also repair burr, reconditioning keyway;Inspection: measure respectively Spur gear endoporus, the axle journal of long handle gear, width of keyway, profile angle data;
2) assembling prepares:
Gear heats, and spur gear is put into electric furnace heating, and the time is 30~45 minutes;
To be teethed end faces wiped clean bottom long handle gear, be vertically disposed on verification flat board, will Operating personnel is placed by i.e. flank profil outside, starting point tooth-formation of gear involute two sides;
3) gear assembling:
A) assembled orientation: be transported to verify above platform by the gear after heating, after wiping endoporus, By the endoporus assembled orientation of spur gear on long handle gear axle journal, the keyway on bore Coincidence the most corresponding with the keyway on long handle gear axle journal;
B) registration is adjusted: insert in flank profil involute surface that is two gear recesses by verification length bar, Fit with dressing plate bottom verification length bar, rock verification length bar, the spur gear after heating Can rectify a deviation voluntarily, firmly verification length bar be advanced in two gear recesses subsequently, and according to Offset direction and quantity, tapped by hand hammer and rotate adjustment gear correction centering, work as verification When length bar perpendicularity meets the requirements, the synchronization accuracy of duplicate gear now also reaches technology Requirement;
C) hot inspection: use 0.02mm patch, inserts verification length bar respectively and connects with duplicate gear Four lines touched, all cannot insert or gap width equal i.e. regarding as in left and right meets the requirements;
D) place counterweight: place counterweight at spur gear top, prevent cooling down backgear and shift up;
4) gear checking:
A) inspection prepares: after duplicate gear cooling, verification length bar pushes flank profil involute surface i.e. In two gear recesses, fit with dressing plate bottom verification length bar;
B) clearance gauge detection: use clearance gauge to measure between four lines that verification length bar contacts with duplicate gear Gap value also records data, owing to long handle gear is standard, therefore verification length bar big footpath size Processing with reference to its teeth groove, therefore two side clearances are usually 0;
C) computational accuracy error: the gap width data measured according to clearance gauge, calculates assembly precision error Direction and numerical value, with spur gear clockwise on the occasion of, counter clockwise direction is negative value, Computing formula: error amount D=│ d1-d2 │/2;D1, d2 are verification length bar circumferential surfaces The gap width of profile of tooth involute adjacent with both sides;Error amount D is between 0~0.06mm Meet technology requirement;
D) assembly precision is confirmed: measured and calculating assembly precision is added their confirmation, all is not inconsistent The needs closing precision are done over again, and duplicate gear is torn on top open, ressembles;
5) manufacture positioning key: according to the practical situation of duplicate gear positioning spline, manufacture positioning key and pacify Dress;
6) warehouse-in: according to actual needs, selects warehouse-in place or be fit directly on roll use.
CN201310740329.7A 2013-12-27 2013-12-27 A kind of assembly method of seamless steel pipe cold-rolling mill roll duplicate gear Expired - Fee Related CN103722355B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310740329.7A CN103722355B (en) 2013-12-27 2013-12-27 A kind of assembly method of seamless steel pipe cold-rolling mill roll duplicate gear

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310740329.7A CN103722355B (en) 2013-12-27 2013-12-27 A kind of assembly method of seamless steel pipe cold-rolling mill roll duplicate gear

Publications (2)

Publication Number Publication Date
CN103722355A CN103722355A (en) 2014-04-16
CN103722355B true CN103722355B (en) 2016-08-24

Family

ID=50446779

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310740329.7A Expired - Fee Related CN103722355B (en) 2013-12-27 2013-12-27 A kind of assembly method of seamless steel pipe cold-rolling mill roll duplicate gear

Country Status (1)

Country Link
CN (1) CN103722355B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105171335B (en) * 2014-06-18 2017-09-22 宝钢特钢有限公司 The assembly method of seamless steel pipe cold-rolling mill support driving rack
JP7191457B2 (en) * 2018-07-05 2022-12-19 株式会社Subaru Master gear, dent inspection device equipped with the master gear, and dent inspection method using the master gear
CN108857281B (en) * 2018-07-06 2020-08-11 中建钢构有限公司 High-precision positioning and mounting method for large-space heavy machinery column and building steel structure
CN110039270B (en) * 2019-04-11 2021-02-26 苏州科峰英诺传动技术有限公司 Method for manufacturing combined duplicate gear
CN111940514B (en) * 2019-05-17 2022-09-20 宝武特种冶金有限公司 Online adjusting method for transmission precision of roller of seamless steel tube cold rolling mill
CN111515859A (en) * 2020-06-08 2020-08-11 贵州航锐航空精密零部件制造有限公司 Method for quickly adjusting main shaft runout of grinding head

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0548888A2 (en) * 1991-12-24 1993-06-30 Sumitomo Heavy Industries, Ltd. Internally meshing planetary gear structure
CN102705476A (en) * 2012-06-13 2012-10-03 常州奥立思特电子有限公司 Dual gear and machining process for same
CN202780988U (en) * 2012-07-17 2013-03-13 泛威(苏州)科技材料有限公司 Tooth aligning tooling of duplicate gear

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080041661A1 (en) * 2006-08-08 2008-02-21 D B Industries, Inc. Retractable horizontal lifeline assembly

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0548888A2 (en) * 1991-12-24 1993-06-30 Sumitomo Heavy Industries, Ltd. Internally meshing planetary gear structure
CN102705476A (en) * 2012-06-13 2012-10-03 常州奥立思特电子有限公司 Dual gear and machining process for same
CN202780988U (en) * 2012-07-17 2013-03-13 泛威(苏州)科技材料有限公司 Tooth aligning tooling of duplicate gear

Also Published As

Publication number Publication date
CN103722355A (en) 2014-04-16

Similar Documents

Publication Publication Date Title
CN103722355B (en) A kind of assembly method of seamless steel pipe cold-rolling mill roll duplicate gear
CN103722018B (en) The method of adjustment of seamless steel pipe cold-rolling mill roll device rolling bearing working gap
CN203599285U (en) Variable roll pitch straightening machine
CN100525977C (en) Processing method of high-accuracy herringbone gear without withdrawing groove hard tooth surface
CN101219489B (en) Cut edge circle shear overlying quantity adjusting device
CN104500660A (en) Zero-return-difference cycloid reducer of industrial robot
CN101862938B (en) Manufacturing method and assembling process of trimming rotary shear overlap adjusting device
CN201862665U (en) Bending machine with mechanism capable of adjusting eccentricity of synchronizing shaft
CN103363922B (en) A kind of shape dimension measurement device of shaped roll
CN206399344U (en) A kind of involute helicoid worm pressure angle special measuring tool
CN202510664U (en) Backlash adjusting device for gear pair
CN103990936A (en) Method for assembling flying shear cutter shafts and helical gears
CN111940514B (en) Online adjusting method for transmission precision of roller of seamless steel tube cold rolling mill
CN104209337A (en) Rolling wheel pressure regulating device for strip rolling mill
CN202507110U (en) Anti-backlash mechanism for hydraulic motor gear of cutting machine rotating table
CN111055091B (en) High-position machining method for duplicate gear
CN105171335B (en) The assembly method of seamless steel pipe cold-rolling mill support driving rack
CN202937760U (en) Herringbone wheel shaft
CN103836159B (en) The adjusting method between centers phase angle during a kind of helical gear engagement
CN105710405B (en) A kind of boring auxiliary mould
CN101709729B (en) Cycloidal engagement pair with uniform-gap engagement of full hydraulic steering gear and processing method thereof
CN103358137A (en) Hydraulic motor gear backlash eliminating mechanism of rotary machine of cutting machine
CN201735604U (en) Worm gear for adjusting rolling guide and guard device
CN205628918U (en) Screw -down device of short stress line rolling mill
CN104858237A (en) Method for assembling sizing roller frame

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160824

Termination date: 20211227

CF01 Termination of patent right due to non-payment of annual fee