CN103715725B - Charging system of electric powercar and method - Google Patents
Charging system of electric powercar and method Download PDFInfo
- Publication number
- CN103715725B CN103715725B CN201210376088.8A CN201210376088A CN103715725B CN 103715725 B CN103715725 B CN 103715725B CN 201210376088 A CN201210376088 A CN 201210376088A CN 103715725 B CN103715725 B CN 103715725B
- Authority
- CN
- China
- Prior art keywords
- charging
- travel
- plan
- scheme
- trip
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
Abstract
Provide a kind of charging system for electric motor car, including:Plan of travel creating unit, is configured to create plan of travel based on travel time and trip distance;Charging scheme computing unit, is configured to calculate charging scheme based on plan of travel;Monitoring unit, is configured to monitor whether actual trip occurs deviation with plan of travel;And analytic unit, it is configured to:If actual trip and plan of travel occur deviation, analyze whether this deviation affects nearest charge point in charging scheme;If nearest charge point in this deviation effects charging scheme, make plan of travel creating unit re-create plan of travel, and make charging scheme computing unit recalculate charging scheme based on the plan of travel re-creating.Additionally provide a kind of corresponding charging method.The application simplifies plan of travel, and charging scheme can be made more personalized, and it can be avoided that frequently data update, thus saving computing resource.
Description
Technical field
The application is related to field of traffic and in particular to a kind of charging system for electric motor car and method.
Background technology
Along with the progress of new energy technology, the technology relevant with electric motor car is continually developed.Charging problems are electricity
One key problem of motor-car.Prior art common practice is:Remind user to charge when the battery electric quantity of electric motor car is not enough,
And help user to search neighbouring charging station;Or whether calculate electricity before travel in user sufficient, fill if necessary in way
Electricity, then the charging route calculating some optimizations (is for example told in user's trip way relatively save time to which charging station charge ratio, is arrived
Which charging station is fewer around row distance, etc.).However, these prior arts are all only to consider the current information gone on a journey to determine
Determine how to charge, and be all to charge in trip way, the time of staying not making full use of vehicle in destination is charged.
In addition, some existing charging techniques need to know the detailed plan of travel of user, including the starting point of each trip,
Terminal and corresponding time.Then, charging scheme is obtained based on this plan of travel.During user's trip, need reality
When monitoring user actual trip whether consistent with initial plan.If it find that the actual trip of user changes and (for example rises
Point, terminal or time etc. are not inconsistent with original plan), then need to update plan of travel and charging scheme.
It can be seen that, existing charging technique needs detailed plan of travel and strictly monitors the actual trip of vehicle, so needing
Continually to interact with user to determine related data.Further, since formulating plan of travel to need accurate beginning and end, but
(such as user After Hours can first go to restaurant to have a meal daily, but meal to be sometimes difficult to provide in advance specific place for a user
The place in shop is not fixed while and often just determines gone to which restaurant before setting out).In addition, the prison in existing charging technique
During control, as long as the plan of travel of discovery user and original plan are not inconsistent being necessary for updating charging scheme, this leads to the frequency of data
Numerous renewal.However, in practice, the change of some behaviors can't affect charging scheme, so charging side in fact need not be updated
Case.
Additionally, the whole process that charging room topic can use with electric motor car.If it is following long-term to consider user
Travel behaviour, thus determine each charging interval, charging modes etc., it will bring the income of global optimum to user.For example,
In the face of time-of-use tariffs policy, consider the trip of following a period of time, then can be arranged in trough-electricity the charging interval as far as possible
During valency.And it may be considered that only filling part electricity in peak electricity tariff and when must charge, the charging of user so will be substantially reduced
Expense.In addition, the charging interval of electric motor car is longer.Using existing charging technique, trickle charge will spend about eight hours, fills soon
Half an hour to be spent.For a lot of users, the electric motor car most of the time be at dead ship condition if it is possible to according to
The plan of travel at family, will greatly reduce the charging time during trip charging schedules within the time of staying of destination as far as possible
Number, this will save the substantial amounts of unnecessary charging waiting time for user.
Accordingly, it would be desirable to a kind of charging system of electric powercar and method, can solve the problem that at least a portion problem in problem above.
Content of the invention
According to the application, firstly generate the plan of travel of user, its content includes the departure time gone on a journey every time and trip
Distance.Charging scheme is generated based on this plan.Charging scheme gives each charging opportunity that vehicle should charge in future, that is,
Charge point.The trip of monitoring user, has deviation and has influence on nearest filling in the agenda finding user and given plan
Update plan of travel and recalculate charging scheme during electricity point.In this application, charge point refers to that what electric motor car was charged fills
Electric opportunity.Particularly, when electric motor car charges in travelling way, charging opportunity can be the remaining travel distance when electric motor car
Charge less than or equal to during charge threshold.When electric motor car charges in destination's (or destination's periphery), charging opportunity can be
Charge when meeting duration needed for charging in the time of staying of this destination and (that is, start to charge up the time and the time leaving this ground
Difference be more than charging required time).The information relevant with charge point can include:Time needed for charge point charges, charging
Mode, charge price, etc..
According to an aspect of the invention, it is provided a kind of charging system for electric motor car, including:Plan of travel creates
Unit, is configured to create plan of travel based on travel time and trip distance;Charging scheme computing unit, is configured to base
To calculate charging scheme in plan of travel, described charging scheme includes the information relevant with charge point;Monitoring unit, is configured to
Whether the actual trip of monitoring there is deviation with plan of travel;And analytic unit, it is configured to:If actual trip and trip meter
Draw and deviation occurs, analyze whether described deviation affects nearest charge point in charging scheme;If described deviation effects charging side
Nearest charge point in case, then make described plan of travel creating unit re-create plan of travel, and make described charging scheme meter
Calculate unit and charging scheme is recalculated based on the plan of travel re-creating.
Preferably, described plan of travel creating unit is configured to:Based on history travel time and trip distance or be based on
The travel time of user input and trip distance are creating plan of travel.
Preferably, described charging scheme computing unit is configured to calculate optimum charging scheme, institute based on plan of travel
State optimum charging scheme meet following at least one:In way, the charging interval is the shortest, preferably and charging price is minimum for charging quality.
Preferably, described analytic unit is configured to:If predetermined in actual trip distance or time and plan of travel
The deviation of trip distance or time is more than threshold value, then make described plan of travel creating unit re-create plan of travel, and make institute
State charging scheme computing unit and charging scheme is recalculated based on the plan of travel re-creating.
Preferably, described analytic unit is configured to:If the nearest charge point specified in different from charging scheme
Other charge point are charged, then make described plan of travel creating unit re-create plan of travel, and make described charging scheme
Computing unit recalculates charging scheme based on the plan of travel re-creating.
Preferably, described charging scheme computing unit is configured to:Based on plan of travel, for each cost meter of going on a journey
Calculate optimum charging scheme accordingly, described trip cost includes charging waiting time, charging quality and charging price in way.
Preferably, described analytic unit is configured to:If the nearest charging specified in different from multiple charging schemes
Other charge point of point are charged, then make described plan of travel creating unit re-create plan of travel, and make described charging
Computation schemes unit recalculates multiple optimum charging schemes accordingly based on the plan of travel re-creating.
Preferably, described analytic unit is configured to:If actual trip is with plan of travel generation deviation and described inclined
Difference affects nearest charge point in all charging schemes, then make described plan of travel creating unit re-create plan of travel, and
Described charging scheme computing unit is made to recalculate multiple optimum charging schemes accordingly based on the plan of travel re-creating.
Preferably, described charging system also includes:User selects receiving unit, is configured to receive user to for calculating
The selection of the trip cost of charging scheme;Wherein, described charging scheme computing unit is configured to:Based on plan of travel and user
The trip cost selecting is calculating charging scheme.
Preferably, described user selects receiving unit to be additionally configured to:Receive user is to one of multiple charging schemes
Or the selection of more charging schemes;And described monitoring unit is additionally configured to:It is one or more that monitoring user selects
Charging scheme.
According to a further aspect in the invention, there is provided a kind of charging method for electric motor car, including:Based on the travel time
To create plan of travel with trip distance;Charging scheme is calculated based on plan of travel, described charging scheme includes and charge point
Relevant information;Whether the actual trip of monitoring there is deviation with plan of travel;And if actual trip and plan of travel occur
Deviation, analyzes whether described deviation affects nearest charge point in charging scheme;If in described deviation effects charging scheme
Near charge point, then re-create plan of travel, and recalculate charging scheme based on the plan of travel re-creating.
Be preferably based on history travel time and trip distance or the travel time based on user input and trip distance Lai
Create plan of travel.
It is preferably based on plan of travel to calculate optimum charging scheme, described optimum charging scheme satisfaction following at least
?:In way, the charging interval is the shortest, preferably and charging price is minimum for charging quality.
Preferably, if the predetermined trip distance in actual trip distance or time and plan of travel or the deviation of time are big
In threshold value, then re-create plan of travel, and charging scheme is recalculated based on the plan of travel re-creating.
Preferably, if other charge point of the nearest charge point specified in different from charging scheme are charged,
Re-create plan of travel, and charging scheme is recalculated based on the plan of travel re-creating.
It is preferably based on plan of travel, calculate optimum charging scheme accordingly, described trip for each trip cost
Cost includes charging waiting time, charging quality and charging price in way.
Preferably, if other charge point of the nearest charge point specified in different from multiple charging schemes are filled
Electricity, then re-create plan of travel, and recalculates multiple optimum charging schemes accordingly based on the plan of travel re-creating.
Preferably, if actual trip and plan of travel occur in deviation and all charging schemes of described deviation effects
Near charge point, then re-create plan of travel, and recalculates multiple optimums accordingly based on the plan of travel re-creating
Charging scheme.
Preferably, described charging method also includes:The selection to the trip cost for calculating charging scheme for the receive user;
And charging scheme is calculated based on the trip cost that plan of travel and user select.
Preferably, described charging method also includes:Receive user charges to one or more of multiple charging schemes
The selection of scheme;And one or more charging schemes that monitoring user selects.
According to the application, when formulating plan of travel it is only necessary to the departure time in future and distance, need not know specific
Beginning and end, so that plan of travel becomes simple.(for example every by the Multiple factors that consider relevant with plan of travel
The distance of secondary trip, the time of staying put at each, the electricity price in corresponding moment, charging modes, charging interval etc.), to obtain
Charging scheme, so that charging scheme is more personalized.Additionally, only when actual trip changes and affects nearest charging
Plan of travel and charging scheme is just updated, it is to avoid frequently data renewal during point.
Brief description
By the detailed description below in conjunction with accompanying drawing, above and other feature of the present invention will become more apparent, its
In:
Fig. 1 shows the block diagram of charging system according to an embodiment of the invention.
Fig. 2 shows the block diagram of charging system in accordance with another embodiment of the present invention.
The flow chart that Fig. 3 shows charging method according to an embodiment of the invention.
Fig. 4 shows the schematic diagram of application scenarios according to an embodiment of the invention.
Specific embodiment
Below, by combining the description of the specific embodiment to the present invention for the accompanying drawing, the principle of the present invention and realization will become
Obtain substantially.It should be noted that the present invention should not be limited to specific embodiments described below.In addition, for simplicity province
Omit the detailed description of known technology unrelated to the invention.
First embodiment
Fig. 1 shows the block diagram of charging system according to an embodiment of the invention.As shown in figure 1, in the present embodiment
Charging system 10 to include plan of travel creating unit 110, charging scheme computing unit 120, monitoring unit 130 and analysis single
Unit 140.
Plan of travel creating unit 110 is based on travel time and distance and creates plan of travel.Plan of travel can be used
In following one day or the even more plan of travel for a long time of some skies, it can comprise the time of following each trip of user at family
And distance.
Table 1 below gives an example of the plan of travel being created by plan of travel creating unit 110:
Table 1
Table 1 is made up of a series of row, each row include departure time and this trip once gone on a journey starting point it
Between trip distance.Additionally, each row also include the time of advent and the time of staying, the wherein time of advent and the time of staying can be with base
Pass through to be calculated in departure time and trip distance.For example, the time of staying can calculate according to the example below method:
Assume the time of staying of the destination that Stop_Time (n) represents that user goes on a journey in n-th:
Stop_Time (n)=TimDiff (End_Time (n), Start_Time (n+1))
Wherein, TimeDiff (T, T ') represented from time T to T ' time difference, the End_Time time of advent (n) is to be based on
Departure time Start_Time (n) estimation obtains, and n+1 represents the trip next time of n-th trip.
Plan of travel creating unit 110 can history trip data based on user, to be created that by way of prediction
Row plan.For example, within a period of time in past, user morning 7 on every Mondays are found:00 about will drive from the home to company, away from
From for 15km.Then dock to afternoon 6 near Che company:00 drives body-building shop again, etc..So according to this history number
According to can predict that the trip of next Monday user is likely to is also so, i.e. morning 7:00 about will drive from the home to company, distance
For 15km....
In addition, plan of travel creating unit 110 can also create plan of travel based on manually entering of user.Alternatively
Ground, plan of travel creating unit 110 may also provide the plan of travel predicted, is then confirmed by user and changes partial content.
For example, when user knows starting point title but do not know track pitch from when, specific starting point can be inputted, created by plan of travel single
First 110 automatic calculating trip distances.In addition, when user only knows trip distance, but when also not knowing specific starting point, also may be used
To directly input trip distance.
Charging scheme computing unit 120 calculates charging based on the plan of travel that plan of travel creating unit 110 is created
Scheme.Specifically, charging scheme computing unit 120 can look to the future trip distance, each destination the time of staying
And the factor such as electricity price, in conjunction with the demand to charging cost for the user, from overall situation consideration be given optimal charge point, charge hundred
The time divided than and spent and price etc., thus calculate the optimum charging scheme (optimum charging scheme) of charging cost.
For example, this optimum charging scheme meet following at least one:In way, the charging interval is the shortest, charging quality preferably and charging price
Minimum.In this application, charging quality is best is meant that most beneficial for the service life extending battery.For example, once by electricity
Pond is full of and be continually that battery charges but is more beneficial for life-span of prolongation battery compared with not all being full of.Additionally, charging modes
Including filling soon and trickle charge:Generally, trickle charge will about 8 hours can be fully charged, and fill half an hour soon and can be charged to battery electric quantity
80%.It will be understood to those skilled in the art that ratio is more beneficial for extending battery by the way of filling soon by the way of trickle charge
Life-span.
Different charging schemes can be obtained according to different optimisation strategy.According to an embodiment it is desirable to as far as possible
By the use of vehicle in the time of staying as the charging interval of destination, thus reducing the time spending because of charging.When vehicle is at certain
When the time of staying of individual destination is more than the required minimum charging interval, it is possible to use charge in the time of staying of destination
(that is, charge point is in the destination of trip).When the distance that certain is gone on a journey is more than fully charged course continuation mileage, then need in trip
Charge in way (that is, charge point is not in the destination of trip).
Table 2 below gives by an example of the calculated charging scheme of charging scheme computing unit 120:
Table 2
Monitoring unit 130 monitors whether actual trip occurs deviation with plan of travel.For example, monitoring unit 130 can be real
When ground obtain travel time of actual trip of user's vehicle and position, compare the actual trip of user in real time whether and trip
Plan is consistent.If consistent, monitoring unit 130 continues monitoring;If it is inconsistent, the actual trip of explanation user and trip
Plan has deviation.
If there is deviation, then analytic unit 140 analyzes whether this deviation affects nearest charge point in charging scheme.As
Fruit does not affect this charge point, then monitoring unit 130 continues the trip of monitoring user.Otherwise, if having influence on this charge point, divide
Analysis unit 140 makes plan of travel creating unit 110 re-create plan of travel, and makes charging scheme computing unit 120 be based on weight
Charging scheme is recalculated in the new plan of travel creating.
According to an embodiment, analytic unit 140 to analyze whether this deviation affects in charging scheme the most as follows
Near charge point:
(1) when the actual trip distance of user has deviation with plan of travel
If the deviation of the predetermined trip distance in actual trip distance and plan of travel is more than threshold value (Thd), then will
Nearest charge point can be affected.Otherwise although trip distance is varied from, but as long as the stop of the destination at this charge point place
Time is unaffected then it is assumed that this deviation does not affect nearest charge point.
According to an example it is assumed that CurDrealRepresent current actual trip distance of going on a journey, CurDplanRepresent plan of travel
In this trip predetermined trip distance.If CurDreal=CurDplan, illustrate predetermined in actual trip distance and plan of travel
Trip distance zero deflection.Otherwise, illustrate that actual trip distance has deviation with the predetermined trip distance in plan of travel.If this is inclined
The absolute value of difference | CurDreal-CurDplan| more than threshold value Thd, illustrate that this deviation will affect nearest charge point.Wherein, threshold
The value of value Thd can be:
(1) work as CurDreal> CurDplanWhen, Thd=RemDplan.Wherein, RemDplanRepresent and travel in plan of travel
To remaining travel distance during nearest charge point.This condition represents that actual trip distance is more than predetermined trip distance, and this difference
The remaining travel distance making vehicle is not enough to reach nearest charge point.
(2) work as CurDreal< CurDplanWhen, Thd=(RemDplan+NextDplan).Wherein, NextDplanRepresent and fill recently
The plan trip distance of the first time trip after electricity point.This condition represents that actual trip distance is less than predetermined trip distance, and should
Difference enable to nearest charge point move backward to next time trip after.
For example, it is assumed that the beginning and end of certain trip travel 1 is L1 and L2 respectively, nearest charge point A is another
The once terminal of trip travel 2.It is further assumed that the actual range of travel1 is 30km, and in plan of travel from L1 to L2
Trip distance be 20km and the trip distance from L2 to L3 be 18km, the remaining travel distance to nearest charge point A is 5km.
Because the actual trip distance of travel1 is more than plan trip distance, and deviation is 30-20=10km, and this deviates more than threshold value
5km.Therefore analytic unit 140 judges that the change of this travel behaviour is bound to affect nearest charge point A.
(2) when the actual travel time of user having deviation with plan of travel
If the deviation of the predetermined travel time in actual travel time and plan of travel is more than threshold value (Thd), then will
Nearest charge point can be affected.Otherwise, although going out on the premise of the actual trip distance of user is without departing from maximum course continuation mileage
The row time is varied from, but thinks that this deviation does not affect nearest charge point.
According to an example it is assumed that CurTrealRepresent the actual time that this trip arrives at, CurTplanRepresent
The row predetermined travel time that this trip arrives in the works.If CurTreal=CurTplan, the actual travel time is described
With the predetermined travel time zero deflection in plan of travel.Otherwise, the predetermined trip in actual travel time and plan of travel is described
There is deviation time.Based on CurTrealPrediction user reaches time (the i.e. NCPT of nearest charge pointreal).NCPTplanRepresent
The time of nearest charge point is reached in plan of travel.Work as NCPTrealEarly than NCPTplanWhen, stopping in this charge point will not be caused
The time is stayed to reduce, so not affecting this charge point.Work as NCPTrealIt is later than NCPTplanWhen, can cause in the stop of this charge point
Between reduce, then judge this deviation (NCPTreal-NCPTplan) whether it is more than threshold value (Thd), wherein Thd=NCPSTime-
NCPChTime, NCPSTime represent the plan time of staying in nearest charge point, and NCPChTime represents in nearest charging
Point charges the required time.If (NCPTreal-NCPTplan) > Thd, illustrate that the charging interval in nearest charge point will not
Foot, so this deviation can affect nearest charge point.Otherwise although can reduce in the time of staying of charge point, but do not affect to fill
Electricity, i.e. this deviation does not affect nearest charge point.
For example, it is assumed that the beginning and end of certain trip is L4, L5 respectively, nearest charge point B is located at this trip
Terminal.It is further assumed that being 12 in the actual time of departure of L4:00, and the departure time in plan of travel is 12:40 and reach
Time is 14:00.Based on vehicle in the actual time of departure of L4, vehicle can be predicted in conjunction with operating range and transport information etc.
It is 13 in the time of advent of L5:00.Because the estimated time of advent of L5 is early than the time of advent in plan of travel, this shows car
Can arrive at L5 in advance, so analytic unit 140 judges that this time change does not interfere with nearest charge point B.
(3) no matter whether the actual trip distance of user and time have change, as long as user's vehicle does not fill in specified
Electricity point charges then it is assumed that nearest charge point can be affected.
When nearest charge point is affected, analytic unit 140 makes plan of travel creating unit 110 re-create trip
Plan, and make charging scheme computing unit 120 recalculate charging scheme based on the plan of travel re-creating.
According to the present embodiment, only need to departure time and the distance in future when formulating plan of travel, need not know concrete
Beginning and end so that the formulation of plan of travel becomes simple.By considering the Multiple factors (example in plan of travel
Time of staying of as the distance of each trip, putting at each, the electricity price in corresponding moment, charging modes, charging interval etc.) obtaining
Obtain charging scheme so that charging scheme is more personalized.Additionally, only when actual trip changes and affects nearest charging
Plan of travel and charging scheme is just updated, it is to avoid frequently data renewal during point.
Second embodiment
Fig. 2 shows the block diagram of charging system in accordance with another embodiment of the present invention.As shown in Fig. 2 the present embodiment
In charging system 20 to include plan of travel creating unit 210, charging scheme computing unit 220, monitoring unit 230, analysis single
Unit 240 and user select receiving unit 250.
Similar to the plan of travel creating unit 110 in first embodiment, the plan of travel creating unit in the present embodiment
210 can history trip data based on user, to create plan of travel by way of prediction.In addition, plan of travel creates
Unit 210 can also create plan of travel based on manually entering of user.Alternatively, plan of travel creating unit 210 also may be used
To provide the plan of travel of prediction, then confirmed by user and change partial content.
Charging scheme computing unit 220 can be based on plan of travel, calculate optimum accordingly for each trip cost
Charging scheme.Preferably, trip cost includes charging waiting time, charging modes and charging price in way, etc..
Different from first embodiment, charging scheme computing unit 220 is also based on what plan of travel and user selected
Trip cost is calculating charging scheme.Specifically, user's selection receiving unit 250 can be with receive user to for calculating charging side
The selection of the trip cost (for example charge in way waiting time, charging modes or charging price) of case, is then based on selected
The trip cost that plan of travel and user select is calculating corresponding charging scheme.
Correspondingly, user's selection receiving unit 250 can be with receive user to one or more of multiple charging schemes
The selection of charging scheme, thus monitoring unit 230 can monitor the actual trip of user simultaneously and user selects one or
Multiple charging schemes.Monitoring multiple charging schemes means that user has multiple alternative fill in current course continuation mileage
Electric, different charge point can make different charging cost optimizations, and user can on the way determine to select specifically to charge
Point.
Additionally, in the trip of user, analytic unit 240 can be reminded and used based on the charge point in multiple charging schemes
The nearest charge point in family and last charge point in current course continuation mileage, and the corresponding cost of these charge point.When
Last charge point in front course continuation mileage means that this is that user can make certain charging cost optimized last
Charger meeting.
When finding that user is charged in certain charge point, then analytic unit 240 makes plan of travel creating unit 210 weight
New establishment plan of travel, and it is many accordingly so that charging scheme computing unit 220 is recalculated based on the plan of travel re-creating
Individual charging scheme.
For example, table 3 below gives an example of multiple charging schemes that charging scheme computing unit 220 is calculated.
Table 3
If but user is not charged the distance of actual trip or time and original trip in other charge point
Plan has deviation, then analytic unit 240 judges whether this deviation affects all charge point in current course continuation mileage.If these
Charge point is all affected, then update plan of travel and charging scheme, otherwise reminds which charge point of user becomes unavailable, and
Continue to monitor remaining charge point.
For example, it is assumed that monitoring unit 230 monitors 3 charging scheme 1-3 shown in table 3 simultaneously.With the traveling of vehicle,
Analytic unit 240 may remind the user that last charging in the next charge point and current course continuation mileage that will reach
Point.Assume that charge point C is last charge point in current course continuation mileage in this example.
If the user while being charged when charge point A, then need to update charging scheme, otherwise continuing monitoring and using
The trip at family.In the case of the trip distance that actual trip distance is more than in plan of travel:
If -- impact charge point B, but do not affect charge point C, then remind user's charge point B unavailable, continue prison
Control charge point C.
If -- impact charge point B and C, then charging system can re-create plan of travel and calculate new charging side
Case.
In the present embodiment, such as cheapest can be filled according to the different multiple charging schemes of trip cost creation
Electric scheme, the best charging scheme of charging quality, etc..User can select wherein one or more to fill according to the hobby of oneself
Electric scheme.When user selects multiple charging scheme, user can determine which to select from multiple schemes in actual trip
Charge point.
The flow chart that Fig. 3 shows charging method according to an embodiment of the invention.As shown in figure 3, method 30 exists
Start at step S310 to execute.
At step S320, plan of travel is created based on travel time and trip distance.Plan of travel can be user
In following one day or the even more plan of travel for a long time of some skies, it can comprise user's following time of each trip and
Distance.Can history trip data based on user create plan of travel by way of prediction it is also possible to be based on user
Manually enter to create plan of travel.Alternatively, may also provide the plan of travel predicted, then confirmed by user and repair
Change.One example of the trip planning generating is as shown in table 1 above.
At step S330, charging scheme is calculated based on plan of travel, this charging scheme includes relevant with charge point
Information.For example, it is possible to the factor such as the distance of the trip that looks to the future, the time of staying in each destination and electricity price, in conjunction with
The demand to charging cost for the user, provides optimal charge point, the percentage ratio charging and the time being spent from overall situation consideration
With price etc., thus calculating the optimum charging scheme (optimum charging scheme) of charging cost.Preferably, optimum charging scheme is full
Enough to lower at least one:In way, the charging interval is the shortest, preferably and charging price is minimum for charging quality.The charging scheme generating
One example is as shown in table 2 above.
At step S340, whether the actual trip of monitoring there is deviation with plan of travel.For example, it is possible to obtain in real time use
The travel time of actual trip of family vehicle and position, whether the actual trip comparing user in real time is consistent with plan of travel.
If there is not deviation ("No" at step S340), method 30 proceeds to monitor.
If actual trip and plan of travel occur deviation ("Yes" at step S340), analysis at step S350 should
Whether deviation affects nearest charge point in charging scheme.As described above, can by determine course continuation mileage, the time of advent or
Whether carry out charging carrying out this analysis in charge point.
If not affecting nearest charge point ("No" at step S350) in charging scheme, method 30 returns to step
Monitoring is continued executing with S340.
If having influence on nearest charge point ("Yes" at step S350) in charging scheme, at step S360 again
Create plan of travel, and charging scheme is recalculated based on the plan of travel re-creating.
Finally, method 30 terminates at step S370.
Alternatively, method 30 is also based on plan of travel, calculates optimum accordingly charging for each trip cost
Scheme, and monitor multiple charging schemes simultaneously.Further, it is also possible to be calculated based on the trip cost that plan of travel and user select
Charging scheme.Specifically, method 30 can receive user (for example be filled in way to the trip cost for calculating charging scheme first
Electric waiting time, charging modes or charging price) selection, be then based on the trip that selected plan of travel and user select
Cost is calculating corresponding charging scheme (in step S330).Correspondingly, can monitor simultaneously user actual trip and
One or more charging schemes (in step S340) that user selects.Monitoring multiple charging schemes means user current
Multiple alternative charge point are had, different charge point can make different charging cost optimizations, and uses in course continuation mileage
Family can on the way determine to select specific charge point.One example of multiple charging schemes is as shown in table 2 above.
Fig. 4 shows the schematic diagram of application scenarios according to an embodiment of the invention.For illustration purposes, exist
Three users 401-1,401-2 and 401-3, network 402 and charging system 403 is shown in Fig. 4 example.However, art technology
Personnel are appreciated that after the teaching having read description the number of user is not limited to three, but can be less than three or big
In three.
In actual trip, user each of 401-1,401-2 and 401-3 can be by car-mounted device to networks
402 transmission datas.Specifically, these data can include the data relevant with plan of travel, such as travel time, the rising of trip
Point or terminal, trip distance etc..Additionally, car-mounted device can also gather with user's trip (current location of such as user and when
Between) relevant data transmitting to network 402.Preferably, car-mounted device be also equipped with for user select charging scheme unit and
The unit of display charging scheme.
Network 402 can be wireless network, such as the Internet or satellite communication network.Those skilled in the art can manage
Solution, network 402 not limited to this, can also be other multiple wireless networks being suitable for transmission data between user and charging system
Network.
Charging system 403 can be real by the charging system 10 for example shown in Fig. 1 or the charging system shown in Fig. 2 20
Existing.In actual applications, charging system 403 receives the trip meter from user 401-1,401-2 and 401-3 via network 402
Draw data and real-time monitoring data, thus to calculate suitable charging scheme and the trip to each user and corresponding charging side
Case is monitored.Additionally, it will be understood by those skilled in the art that the function of charging system 403 can also by multiple entities (for example
Server) realizing.
By using the charging system of the application and method, the formulation process of plan of travel can be simplified, makes charging scheme
More personalized, and it can be avoided that frequently data update, thus saving computing resource.
It should be understood that the above embodiment of the present invention can be by software, hardware or the combination both software and hardware
To realize.For example, the various assemblies of the charging system in above-described embodiment and its inside can be realized by multiple devices, this
A little devices include but is not limited to:Analog circuit, digital circuit, general processor, Digital Signal Processing (DSP) circuit, programmable
Processor, special IC (ASIC), field programmable gate array (FPGA), PLD (CPLD), etc..
In addition, it will be understood to those skilled in the art that having with travel time and distance described in the embodiment of the present invention
The data closed can store in the local database.Additionally, this data can also be stored in distributed data base or permissible
It is stored in remote data base.
Additionally, embodiments of the invention disclosed herein can be realized on computer program.More specifically, should
Computer program is a kind of following product:There is computer-readable medium, on computer-readable medium, coding has calculating
Machine program logic, when executing on the computing device, this computer program logic provides related operation to realize the present invention's
Technique scheme.When executing at least one processor of computing system, computer program logic makes processor hold
Operation (method) described in the row embodiment of the present invention.This set of the present invention is typically provided as arranging or encoding in such as light
Software on the computer-readable medium of medium (such as CD-ROM), floppy disk or hard disk etc., code and/or other data structures,
Or other media of the firmware on such as one or more ROM or RAM or PROM chip or microcode or one or more mould
Downloadable software image in block, shared data bank etc..Software or firmware or this configuration may be installed in computing device, with
Make the technical scheme described by one or more of computing device computing device embodiment of the present invention.
Although above show the present invention already in connection with the preferred embodiments of the present invention, those skilled in the art will
It will be appreciated that without departing from the spirit and scope of the present invention, the present invention can be carried out with various modifications, replace and change
Become.Therefore, the present invention should not be limited by above-described embodiment, and should be limited by claims and its equivalent.
Claims (16)
1. a kind of charging system for electric motor car, including:
Plan of travel creating unit, is configured to create plan of travel based on travel time and trip distance;
Charging scheme computing unit, is configured to calculate charging scheme based on plan of travel, and described charging scheme includes and fills
The relevant information of electricity point, described charge point represents the charging opportunity that electric motor car is charged;
Monitoring unit, is configured to monitor whether actual trip occurs deviation with plan of travel;
Analytic unit, is configured to:If actual trip and plan of travel occur deviation, analyze whether described deviation affects to charge
Nearest charge point in scheme;If nearest charge point in described deviation effects charging scheme, make described plan of travel wound
Build unit and re-create plan of travel, and so that described charging scheme computing unit is recalculated based on the plan of travel re-creating
Charging scheme;And
User selects receiving unit, is configured to the selection to the trip cost for calculating charging scheme for the receive user;
Wherein, described charging scheme computing unit is configured to:Calculated based on the trip cost that plan of travel and user select
Charging scheme, described trip cost includes charging waiting time, charging quality and charging price in way.
2. charging system according to claim 1, wherein, described plan of travel creating unit is configured to:Based on history
Travel time and trip distance or the travel time based on user input and trip distance are creating plan of travel.
3. charging system according to claim 1, wherein, described charging scheme computing unit is configured to calculating optimum and fills
Electric scheme, described optimum charging scheme meet following at least one:In way, the charging interval is the shortest, charging quality is best and charges
Price is minimum.
4. charging system according to claim 1, wherein, described analytic unit is configured to:If actual trip distance
Or the predetermined trip distance in time and plan of travel or the deviation of time are more than threshold value, then make described plan of travel creating unit
Re-create plan of travel, and make described charging scheme computing unit recalculate charging side based on the plan of travel re-creating
Case.
5. charging system according to claim 1, wherein, described analytic unit is configured to:If different from charging
Other charge point of the nearest charge point specified in scheme are charged, then so that described plan of travel creating unit is re-created out
Row plan, and make described charging scheme computing unit recalculate charging scheme based on the plan of travel re-creating.
6. charging system according to claim 1, wherein, described analytic unit is configured to:If different from multiple
Other charge point of the nearest charge point specified in charging scheme are charged, then so that described plan of travel creating unit is again created
Build plan of travel, and make described charging scheme computing unit based on the plan of travel re-creating recalculate multiple accordingly
Excellent charging scheme.
7. charging system according to claim 1, wherein, described analytic unit is configured to:If actual go on a journey and go out
There is nearest charge point in deviation and all charging schemes of described deviation effects in row plan, then so that described plan of travel is created
Unit re-creates plan of travel, and makes described charging scheme computing unit recalculate phase based on the plan of travel re-creating
The multiple optimum charging schemes answered.
8. charging system according to claim 1, wherein,
Described user selects receiving unit to be additionally configured to:Receive user charges to one or more of multiple charging schemes
The selection of scheme;And
Described monitoring unit is additionally configured to:One or more charging schemes that monitoring user selects.
9. a kind of charging method for electric motor car, including:
Plan of travel is created based on travel time and trip distance;
Calculate charging scheme based on plan of travel, described charging scheme includes the information relevant with charge point, described charge point
Represent the charging opportunity that electric motor car is charged;
Whether the actual trip of monitoring there is deviation with plan of travel;
If actual trip and plan of travel occur deviation, analyze whether described deviation affects nearest charging in charging scheme
Point;
If nearest charge point, re-creates plan of travel in described deviation effects charging scheme, and based on re-creating
Plan of travel recalculate charging scheme;
The selection to the trip cost for calculating charging scheme for the receive user;And
Charging scheme is calculated based on the trip cost that plan of travel and user select, described trip cost includes charging etc. in way
Treat time, charging quality and charging price.
10. charging method according to claim 9, wherein, based on history travel time and trip distance or be based on user
The travel time of input and trip distance are creating plan of travel.
11. charging methods according to claim 9, wherein, calculate optimum charging scheme, described optimum charging scheme meets
Below at least one:In way, the charging interval is the shortest, preferably and charging price is minimum for charging quality.
12. charging methods according to claim 9, wherein, if in actual trip distance or time and plan of travel
The deviation of predetermined trip distance or time is more than threshold value, then re-create plan of travel, and based on the plan of travel re-creating
Recalculate charging scheme.
13. charging methods according to claim 9, wherein, if the nearest charging specified in different from charging scheme
Other charge point of point are charged, then re-create plan of travel, and are recalculated based on the plan of travel re-creating and fill
Electric scheme.
14. charging methods according to claim 9, wherein, if that specifies in different from multiple charging schemes is nearest
Other charge point of charge point are charged, then re-create plan of travel, and again counted based on the plan of travel re-creating
Calculate multiple optimum charging schemes accordingly.
15. charging methods according to claim 9, wherein, if there is deviation and institute in actual trip and plan of travel
State nearest charge point in all charging schemes of deviation effects, then re-create plan of travel, and based on the trip re-creating
Multiple optimum charging schemes accordingly are recalculated in plan.
16. charging methods according to claim 9, also include:
The selection to one or more of multiple charging schemes charging scheme for the receive user;And
One or more charging schemes that monitoring user selects.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210376088.8A CN103715725B (en) | 2012-09-29 | 2012-09-29 | Charging system of electric powercar and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210376088.8A CN103715725B (en) | 2012-09-29 | 2012-09-29 | Charging system of electric powercar and method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103715725A CN103715725A (en) | 2014-04-09 |
CN103715725B true CN103715725B (en) | 2017-03-01 |
Family
ID=50408458
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210376088.8A Active CN103715725B (en) | 2012-09-29 | 2012-09-29 | Charging system of electric powercar and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103715725B (en) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106548246B (en) * | 2015-11-30 | 2020-05-26 | 深圳北斗应用技术研究院有限公司 | Real-time charging recommendation method and system for electric vehicle |
DE102016202001A1 (en) * | 2016-02-10 | 2017-08-10 | Bayerische Motoren Werke Aktiengesellschaft | Recognition of setting deviations on an energy management device |
CN106679683B (en) * | 2016-11-26 | 2018-06-29 | 深圳壹账通智能科技有限公司 | Obtain the method and device of trip information |
CN107342606B (en) * | 2017-06-09 | 2019-10-15 | 宁德时代新能源科技股份有限公司 | Battery pack charging control system and method |
CN109383322B (en) * | 2017-08-10 | 2022-05-17 | 上汽通用汽车有限公司 | Electric vehicle charging scheme determination method |
JP2019163983A (en) * | 2018-03-19 | 2019-09-26 | 本田技研工業株式会社 | Notification system, notification method, and program |
CN109447766B (en) * | 2018-11-20 | 2022-04-08 | 安徽天鹏电子科技有限公司 | Charging pile system for balanced charging and method thereof |
CN111251928B (en) | 2018-11-30 | 2021-11-23 | 宁德时代新能源科技股份有限公司 | Charging method, charging device, charging equipment, charging medium, battery management system and charging pile |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7515431B1 (en) * | 2004-07-02 | 2009-04-07 | Apple Inc. | Handheld computing device |
JP5017398B2 (en) * | 2010-03-09 | 2012-09-05 | 日立オートモティブシステムズ株式会社 | Route planning apparatus and route planning system |
JP5304699B2 (en) * | 2010-03-24 | 2013-10-02 | アイシン・エィ・ダブリュ株式会社 | Vehicle charging facility guidance device and computer program |
US8615355B2 (en) * | 2010-05-17 | 2013-12-24 | General Motors Llc | Multifactor charging for electric vehicles |
JP5589650B2 (en) * | 2010-07-30 | 2014-09-17 | 日産自動車株式会社 | Information providing apparatus and information providing method |
JP2012060834A (en) * | 2010-09-10 | 2012-03-22 | Panasonic Electric Works Co Ltd | Charge control device |
-
2012
- 2012-09-29 CN CN201210376088.8A patent/CN103715725B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN103715725A (en) | 2014-04-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103715725B (en) | Charging system of electric powercar and method | |
US9851213B2 (en) | System and method for recommending charging station for electric vehicle | |
CN107144286B (en) | Navigation method and device | |
US10192448B2 (en) | Method to control vehicle fleets to deliver on-demand transportation services | |
US9744873B2 (en) | Method and control device for charging a battery of a vehicle | |
EP3702202B1 (en) | Method and system to optimize distributed charging station efficiency and user experience | |
US20190160958A1 (en) | Electric vehicle charging infrastructure | |
US20140303826A1 (en) | Reachable range calculation apparatus, method, and program | |
US20170043671A1 (en) | Control system for electric vehicle service network | |
JP5158183B2 (en) | Vehicle required power prediction device | |
KR101768223B1 (en) | Method, Server and Terminal of Electric Vehicle for Managing Electric Vehicle Charging System | |
KR20180084285A (en) | Apparatus and method for providing charging equipment information to vehicle | |
GB2572962A (en) | Vehicle Routing | |
US20150345972A1 (en) | Vehicle information providing device | |
CN109612488B (en) | Big data micro-service-based mixed travel mode path planning system and method | |
KR20140078623A (en) | Estimation and management of loads in electric vehicle networks | |
CN110491158A (en) | A kind of bus arrival time prediction technique and system based on multivariate data fusion | |
CN110118567A (en) | Trip mode recommended method and device | |
US20150294228A1 (en) | System and method of predicting future demand of a charging station | |
CN106156084A (en) | Route inquiry methods, devices and systems | |
EP3556601A1 (en) | Vehicle routing | |
CN110400177A (en) | Bus passenger trip information matching process, medium, equipment and device | |
CN112734134A (en) | Vehicle data processing method and device, electronic equipment and storage medium | |
CN102297698B (en) | Planning method and device of real-time road conditions and routes | |
CN113175939A (en) | Pure electric vehicle travel planning method and system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |