CN103714201B - 基于promis·e设计环境的变电站二次接线协同设计方法 - Google Patents
基于promis·e设计环境的变电站二次接线协同设计方法 Download PDFInfo
- Publication number
- CN103714201B CN103714201B CN201310703170.1A CN201310703170A CN103714201B CN 103714201 B CN103714201 B CN 103714201B CN 201310703170 A CN201310703170 A CN 201310703170A CN 103714201 B CN103714201 B CN 103714201B
- Authority
- CN
- China
- Prior art keywords
- design
- device model
- parts
- components
- model storehouse
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
本发明公开了一种基于PROMIS·E设计环境的变电站二次接线协同设计方法,包括:将变电站电气二次设计的各专业子系统进行划分;标准化构建各专业子系统的设备模型库;利用统一的设备模型库进行二次接线协同设计。本发明实现了在Promise设计环境中通过标准化设计,构建各专业的设备模型库,再利用统一的设备模型库进行二次接线协同设计,有效缩短设计周期,提高设计质量。
Description
技术领域
本发明涉及输变电工程设计领域,具体为一种基于PROMIS·E设计环境的变电站二次接线协同设计方法。
背景技术
输变电工程中变电站的电气设计包括一次主接线设计完成电能的传输和分配,二次接线设计是根据变电站主接线,设计功能和运行要求,把变电站中各操作机构、变压器、继电保护装置、计算机监控系统等各分离的电气装置、盘柜、子系统通过电缆和光缆连接起来,形成一个完整的变电站电气控制系统,实现变电站的继电保护、操作控制、计算机监控、调度等功能变电站二次接线设计涉及厂家产品多、电缆敷设量大。一个典型220kV变电站就有约600根各类动力和控制电缆,需完成约10000个端子的接线。
目前工程设计中通常采用3~4位设计人员按照操作机构、继电保护装置、测控系统、辅助控制系统等子系统功能不同进行分工,设计人员在CAD软件完成各自所承担的装置或机构端子接口制图后,设计人员间对每根电缆芯数进行人工分配比对,手工绘制端子接线图和编制电缆统计报表,校核人员需对所有图纸进行复核。但是,这种方式设计周期长、接线准确率不高,由于设计质量问题会造成系统施工调试期长,直接影响了工程质量和工程进度。
发明内容
本发明的目的是为了克服上述现有技术的不足之处,而提供一种基于PROMIS·E设计环境的变电站二次接线协同设计方法。
本发明的目的是通过如下措施来达到的:一种基于PROMIS·E设计环境的变电站二次接线协同设计方法,其特征在于,包括:
将变电站电气二次设计的各专业子系统进行划分;
标准化构建各专业子系统的设备模型库;
利用统一的设备模型库进行二次接线协同设计。
所述标准化构建各专业子系统的设备模型库的步骤包括:
浏览各子系统的设备模型;
获得设备模型类型,判断变电站电气二次设计中所用到的设备类型是否为功能模块型;如果所用到的设备为功能模块型,则定义功能模块的对外接口端子并标明模块内部的元器件;如果所用到的设备不是功能模块型,则判断元器件是否为标准型产品,如果元器件不是标准型产品,则在promise软件库中创建非标的元器件及其参数,如果元器件为标准型产品,则转下一步;
将功能模块添加到设备模型库,并与功能模块内部的元器件建立交互参考关系;
判断设备模型库是否完成,如果完成则标准化构建各专业子系统的设备模型库的过程结束;如果未完成,则重新转至于获得设备模型类型这一步骤。
所述利用统一的设备模型库进行二次接线协同设计的步骤包括:
项目负责人确定设计任务,标准化制定图纸目录;
编制电缆型号选择及编号规则;
确定电气引接线编号原则;
调用设备库的元器件或功能模块,完成原理图的绘制,并按统一的电气引接线编号原则和电缆型号及编号原则,完成各子系统之间的接线设计;
设计人员利用promise软件生成端子图;
利用promise软件生成电缆清册。
本发明实现了在Promise设计环境中通过标准化设计,构建各专业的设备模型库,再利用统一的设备模型库进行二次接线协同设计,有效缩短设计周期,提高设计质量。
附图说明
图1为本发明方法流程图。
图2为标准化构建各专业子系统的设备模型库流程图。
图3为利用统一的设备模型库进行二次接线协同设计流程图。
图4为功能模块型示意图。
图5为元器件型示意图。
具体实施方式
下面结合附图详细说明本发明的实施情况,但它们并不构成对本发明的限定,仅作举例而已,同时通过说明本发明的优点将变得更加清楚和容易理解。
参阅附图可知:一种基于PROMIS·E设计环境的变电站二次接线协同设计方法,包括:将变电站电气二次设计的各专业子系统进行划分,变电站电气二次设计是集保护、测量、控制、远动等功能为一体,专业子系统分为:保护、测控、录波、交直流电源、操作机构等系统。
标准化构建各专业子系统的设备模型库;所述标准化构建各专业子系统的设备模型库的步骤包括:浏览各子系统的设备模型;变电站电气二次设计中用到的设备类型一般分为两种,一种是功能模块型,另一种是元器件型,首先需要定义功能模块的对外接口端子,然后标明模块内部的元器件。如25、26、27、28号端子为对外接口,21-23,22-24为模块内部元器件。对于元器件类型的设备或者功能模块型的设备内部元器件,都是先判断元器件是否为标准产品。若为非标产品,需要在设备模型库中添加该产品,如图2所示,元器件-K86A为非标产品,需要标明其元器件名称,交互参考信息以及线圈节点号等。将功能模块添加到设备模型库,并于功能模块内部的元器件建立交互参考关系。
在施工设计阶段,可判断设备模型库是否完成,如果未完成,可随时向设备模型库中添加。
利用统一的设备模型库进行二次接线协同设计。所述利用统一的设备模型库进行二次接线协同设计的步骤包括:项目负责人确定设计任务,标准化制定图纸目录。图纸目录中包括图名、图号、设计人,图名中包含本图的高层号和位置号。图号中的项目代码和站名代码由项目负责人录入promise软件,设计人员将各自负责的图纸流水号填入系统,则可自动生成本图号设计文件,并保证设计文件名称的唯一性。编制电缆型号选择及编号规则。由项目负责人在软件库中录入,供设计人员使用。确定电气引接线编号原则。各子系统的设计人员根据同一个编号原则编写电气引接线,可以自动产生与其他子系统接线的信息。各功能子系统设计人员,可以调用设备库的元器件或功能模块,完成原理图的绘制。并按统一的电气引接线编号原则和电缆型号及编号原则,完成各子系统之间的接线设计。设计人员利用promise软件生成端子图。此接线图包含对外接线信息,电缆型号及芯数等参数。系统管理员利用软件生成电缆清册。
上述实施例为本发明较佳的实施方式,但本发明的实施方式并不受上述实施例的限制,其他的任何未背离本发明的精神实质与原理下所作的改变、修饰、替代、组合、简化,均应为等效的置换方式,都包含在本发明的保护范围之内。
其它未说明的部分均为现有技术。
Claims (1)
1.一种基于PROMIS·E设计环境的变电站二次接线协同设计方法,其特征在于,包括:
将变电站电气二次设计的各专业子系统进行划分;
标准化构建各专业子系统的设备模型库;
利用统一的设备模型库进行二次接线协同设计;
所述标准化构建各专业子系统的设备模型库的步骤包括:
浏览各子系统的设备模型;
获得设备模型类型,判断变电站电气二次设计中所用到的设备类型是否为功能模块型;如果所用到的设备为功能模块型,则定义功能模块的对外接口端子并标明模块内部的元器件;如果所用到的设备不是功能模块型,则判断元器件是否为标准型产品,如果元器件不是标准型产品,则在PROMIS·E软件库中创建非标的元器件及其参数,如果元器件为标准型产品,则转下一步;
将功能模块添加到设备模型库,并与功能模块内部的元器件建立交互参考关系;
判断设备模型库是否完成,如果完成则标准化构建各专业子系统的设备模型库的过程结束;如果未完成,则重新转至于获得设备模型类型这一步骤;
所述利用统一的设备模型库进行二次接线协同设计的步骤包括:
项目负责人确定设计任务,标准化制定图纸目录;
编制电缆型号选择及编号规则;
确定电气引接线编号原则;
调用设备库的元器件或功能模块,完成原理图的绘制,并按统一的电气引接线编号原则和电缆型号及编号原则,完成各子系统之间的接线设计;
设计人员利用PROMIS·E软件生成端子图;
利用PROMIS·E软件生成电缆清册。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310703170.1A CN103714201B (zh) | 2013-12-19 | 2013-12-19 | 基于promis·e设计环境的变电站二次接线协同设计方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310703170.1A CN103714201B (zh) | 2013-12-19 | 2013-12-19 | 基于promis·e设计环境的变电站二次接线协同设计方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103714201A CN103714201A (zh) | 2014-04-09 |
CN103714201B true CN103714201B (zh) | 2016-08-17 |
Family
ID=50407172
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310703170.1A Active CN103714201B (zh) | 2013-12-19 | 2013-12-19 | 基于promis·e设计环境的变电站二次接线协同设计方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103714201B (zh) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105373612B (zh) * | 2015-11-23 | 2018-09-18 | 苏州同元软控信息技术有限公司 | 一种航天器接地图自动生成系统及其方法 |
CN105528497A (zh) * | 2016-01-12 | 2016-04-27 | 国网上海市电力公司 | 一种三维变电站设计平台 |
CN107240150B (zh) * | 2017-06-26 | 2020-07-17 | 中冶焦耐(大连)工程技术有限公司 | 一种三维管道数字化出图方法 |
CN107729682B (zh) * | 2017-11-06 | 2021-02-02 | 四川电力设计咨询有限责任公司 | 用于火电工程电气厂的电气系统及设计方法 |
CN107971767B (zh) * | 2017-12-27 | 2023-08-29 | 圣辉(上海)能源科技有限公司 | 一种基于面向对象技术的数控机床辅助装置智能控制系统 |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101980418A (zh) * | 2010-11-11 | 2011-02-23 | 上海思源弘瑞自动化有限公司 | 变电站继电保护系统二次接线在线检测系统 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100908783B1 (ko) * | 2007-07-25 | 2009-07-22 | 한국전력공사 | 무정전 기능이 구비된 스위칭 장치 및 이를 이용한 변압기권수비 조절 방법 및 변압기 전압 조절 방법 |
-
2013
- 2013-12-19 CN CN201310703170.1A patent/CN103714201B/zh active Active
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101980418A (zh) * | 2010-11-11 | 2011-02-23 | 上海思源弘瑞自动化有限公司 | 变电站继电保护系统二次接线在线检测系统 |
Non-Patent Citations (1)
Title |
---|
智能变电站的三维协同设计;项玲等;《智能电网》;20121130(第11期);第454-459页,图1-2 * |
Also Published As
Publication number | Publication date |
---|---|
CN103714201A (zh) | 2014-04-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103714201B (zh) | 基于promis·e设计环境的变电站二次接线协同设计方法 | |
CN105373655B (zh) | 一种有机关联智能化变电站一二次系统连接图的方法 | |
KR101354627B1 (ko) | 디지털 변전소의 엔지니어링 토폴로지 생성방법 및 장치 | |
CN101436790B (zh) | 包含复杂t接线路的电网模型在线拼接与合并方法 | |
CN103366051B (zh) | 一次设备和二次设备建模的方法与系统 | |
CN102496930B (zh) | 一种保护装置内部动作逻辑远程反演方法 | |
CN104852473B (zh) | 一种基于变电站数字化模型的监视方法 | |
US20120239170A1 (en) | Method and system for engineering a substation automation system | |
CN105809260A (zh) | 一种调度自动化系统监控信息点表智能生成方法 | |
CN107784139B (zh) | 压缩机控制系统电气原理图自动生成方法 | |
CN101821750A (zh) | 自动生成ssd文件的方法 | |
CN102879662A (zh) | 一种智能变电站二次虚回路检测装置及检测方法 | |
CN103955789A (zh) | 一种基于调配用一体化模型的供电路径分析方法 | |
US20140297013A1 (en) | Method and automation system for processing information extractable from an engineering drawing file using information modeling and correlations to generate output data | |
CN104184621A (zh) | 智能变电站网络拓扑图的生成方法及系统 | |
CN102916489B (zh) | 基于区域电网一次系统结构的虚端子自动连线方法 | |
CN104361190B (zh) | 二次系统中虚端子自动化连接的方法及装置 | |
US20170063085A1 (en) | PRE-CONFIGURATION AND INTEGRATION OF IEDs IN SUBSTATION AUTOMATION SYSTEMS | |
CN103814501A (zh) | 用于goose通信的诊断 | |
CN102480172A (zh) | 远程修改继电保护定值的方法 | |
CN103632307A (zh) | 智能变电站scd与虚回路表一致性校验方法 | |
CN104698374A (zh) | 一种提高自动化继电保护测试仪测试效率和准确度的方法 | |
CN106910143A (zh) | 配电网图模多版本控制方法和系统 | |
CN102542122B (zh) | 一种停电区域渲染方法和装置 | |
CN103955870A (zh) | 一种智能变电站二次系统过程层光缆自动分配方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |