CN103711320B - A kind of high level builds a house the installation method of room modular metal curtain wallboard unit soon - Google Patents
A kind of high level builds a house the installation method of room modular metal curtain wallboard unit soon Download PDFInfo
- Publication number
- CN103711320B CN103711320B CN201310752928.0A CN201310752928A CN103711320B CN 103711320 B CN103711320 B CN 103711320B CN 201310752928 A CN201310752928 A CN 201310752928A CN 103711320 B CN103711320 B CN 103711320B
- Authority
- CN
- China
- Prior art keywords
- curtain wallboard
- metal curtain
- wallboard unit
- modular metal
- hook
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses a kind of high level to build a house soon the installation method of room modular metal curtain wallboard unit.The method comprises the following steps: high level build a house soon room carcase at least part of floor layer skeleton every first floor layer skeleton outside be respectively mounted the most several supporting seat;The most several modular metal curtain wallboard unit with hook is provided;Respectively described most modular metal curtain wallboard unit are sling, and move at a bearing of correspondence;The modular metal curtain wallboard unit sling is hooked in a bearing of correspondence.The method is simple to operation and the time is short, in industrialization production process, can effectively shorten the construction period, to meet the demand of the room industrialization that builds a house soon.Hook is arranged on the operation on floor skeleton to carry out in indoor, it is not necessary to carry out outdoor work, is conducive to the potential safety hazard avoiding high-altitude outdoor working to bring, and its process is without using too much aid.
Description
Technical field
The present invention relates to building curtain wall mounting process, particularly relate to a kind of high level and build a house soon room modular metal
The installation method of face curtain wall panel unit.
Background technology
Along with the superiority of light-weight structure residence is increasingly recognized by people, day by day become residence technology
New focus, and rely on light steel building systems industrialized house industry the most known, become
The industry that current national is given special assistance to.At present, light steel building systems is classified as country's health by Minstry of Housing and Urban-Rural Development of People Republic of China (MOHURD)
Occupy engineering mimoir building system, its with the mode of production of intense industrialization, efficient in-site installation level,
Excellent serviceability, healthy product philosophy at home, accepted by increasing people.
Compared with, steel and concrete structure mixed with traditional brick, light steel structure house system has antidetonation, hurricane resistant, ring
Protect, energy-conservation, dead load light, foundation bearing capacity requires that low, component produces industrialization, assembled in situ
Construction, short construction period, the interior space separate usable floor area advantages of higher flexible, effective, will become
One of important form of China's building structure from now on.
At present, light steel structure house construction speed causes the concern of the domestic and international common people soon, as construction area is
The long-range shop of Shanghai World Expo of more than 2700 square metre 6 layers, only installed with 1 day time;Hunan Xiangyin County
The construction area of the 30 layers tower hotel of T30A of totally 1.7 ten thousand square metres built up in 15 days, and these are quick
The reason that the building built can realize in a short time is that whole building, will for modularity full steel structure
Bed rearrangement building is divided into some space modules, and each space module has all manufactured in factory, and last needs
It is transported to job site lift.
In the evolution of housing industrialization, being used for of coordinating with lightweight steel construction is arranged on outside lightweight steel construction
The industrialized development of the retaining wall with insulation, heat insulation, fire protecting performance enclosed and the development of lightweight steel construction
Speed is not mated, and will restrict housing industrialization development largely.Existing as retaining wall
When metal surface composite board is installed, first need to fixedly mount purlin on lightweight steel construction, then by Pork-pieces gold
Being placed on exterior wall purlin of genus face composite plate block-by-block, and use bolt or other securing members to fasten.
The installation process of this metal surface composite board having the disadvantage that, (1) Pork-pieces composite laminboard is pacified
Process of assembling complexity and long construction period, it is impossible to the mounting process quickly spliced with lightweight steel construction mates, from whole
Construction period is extended on body;(2) this installation process relates to high-altitude outdoor mounted operation, there is bigger peace
Full hidden danger, and its installation process many aids of needs, arrange as built the installations such as outdoor construction foot hands
Arrange standby;(3) purlin being fixed on lightweight steel construction is fixed by this installation process with each nugget genus battenboard
Connecting, be unsuitable for the technology requirement of skyscraper, its reason is the metal clip central layer being arranged on high level
Easily it is subjected to displacement deformation in extraneous using, fixes with purlin and do not have between the metal clip central layer being connected
Movably space, easily loosens and comes off, having the biggest potential safety hazard, the most current monolithic
The metal surface composite board connected is installed and is not suitable for skyscraper.Market demand one is suitable for high level and builds a house soon
The metal curtain wallboard unit of the modular in room, is prefabricated in the factory into one by Pork-pieces metal clip central layer
Unit module, plug-in on the body construction by effective mechanism arrangement at the scene, to reach Fast Installation
Purpose.
Summary of the invention
The technical problem to be solved in the present invention is, for the defect of prior art, it is provided that a kind of high-rise fast
Build a house the installation method of room modular metal curtain wallboard unit.
The technical solution adopted for the present invention to solve the technical problems is: a kind of high level builds a house room modular soon
The installation method of metal curtain wallboard unit, comprises the following steps:
S1: every first floor layer bone of at least part of floor layer skeleton of carcase in the room that builds a house soon at high level
The most several supporting seat it is respectively mounted outside frame;
S2: the most several modular metal curtain wallboard unit with hook is provided;
S3: respectively described most modular metal curtain wallboard unit are sling, and move to propping up of correspondence
At bearing;
S4: the modular metal curtain wallboard unit sling is hooked in a bearing of correspondence.
Preferably, described step S1 includes:
S10: every first floor layer bone of at least part of floor layer skeleton of carcase in the room that builds a house soon at high level
The most several first supporting member it is respectively mounted outside frame;
S11: place on described first supporting member coordinate with described first supporting member can be relative to described the
Second supporting member of one supporting member front, rear, left and right displacement;
S12: use locking part to be connected fixing to described first supporting member and described second supporting member.
Preferably, described first supporting member includes horizontally arranged the first diapire, is vertically provided at institute
State first be fixedly linked on front side of the first diapire and with described carcase and be connected wall and respectively with described
One connects the first left side wall being oppositely arranged and the first right side wall that wall and the first diapire both sides are connected;Described
First diapire is provided with the first chute that some and described carcase is parallel or vertical;
Described second supporting member includes horizontally arranged the second diapire, is vertically provided at described second end
Be connected on rear side of wall and with described first that wall is oppositely arranged second is connected in order to coordinate with described hook hook
Wall and be connected the second left side wall being oppositely arranged that wall and the second diapire both sides are connected respectively with described second
With the second right side wall;Some second vertical with described first chute it is correspondingly provided with sliding on described second diapire
Groove;
First chute and the second chute overlapping use locking part to connect.
Preferably, the height of described modular metal curtain wallboard unit is suitable with the height of corresponding floor;
Described modular metal curtain wallboard unit includes metal surface composite board, is fixedly connected on described metal covering again
Being used on plywood medial surface supports the bracing frame of described metal surface composite board and is arranged on described support
Hanging in order at least two that described metal curtain wallboard unit is installed to described carcase of frame top
Hook.
Preferably, support frame as described above includes that longitudinal purlin of two parallel interval settings and two ends are fixed on
Horizontal by the spaced at least two of the width parallel of metal surface composite board on said two longitudinal direction purlin
Purlin;Described longitudinal purlin is square tubulose, its lower ending opening, and its upper end is connected with hook;Described
The horizontal purlin on support top is provided with some through holes.
Preferably, described step S3 comprises the following steps:
S30: modular metal curtain wallboard unit to be sling is moved to lifting station;
S31: on the through hole of the horizontal purlin on the top of modular metal curtain wallboard unit to be sling
Fixed installation suspension ring;
S32: the opening part in longitudinal purlin lower end of modular metal curtain wallboard unit to be sling is placed
Auxiliary guide mechanism, described auxiliary guide mechanism includes an inserted link being inserted into longitudinal purlin and with fixing
Castor on described inserted link;
S33: by the hook suspension ring of lifting rope, the modular metal curtain wallboard list up slinging to be sling
Unit also moves in a bearing of correspondence.
Preferably, described hook include hook portion and with described hook portion be connected for being connected described longitudinal purlin
The connecting portion of bar;Described hook portion is provided with the height adjustment assembly for regulating height;After step s4
Also include step S5: use the modular that described height adjustment assembly adjustable hook is suspended in a bearing of correspondence
Metal curtain wallboard unit is relative to the upper and lower position relation of carcase.
Preferably, described hook portion is provided with female thread, and described height adjustment assembly includes and described female thread
Coordinate bolt and be set on the screw rod of described bolt in order to spacing nut, described nut is arranged on
Between head and the described hook portion of described bolt.
Preferably, after described step S5, step S6 is also included: by next modular metal covering curtain each
Wall panel element is connected with a modular metal curtain wallboard unit on it.
Preferably, described step S6 includes:
S60: the first L-type steel bar is fixed on the horizontal stroke on next modular metal curtain wallboard unit top described
On purlin;
S61: the second L-type steel bar is placed on the first L-type steel bar, a wall of described second L-type steel bar
Contact with described first L-type steel bar, another wall and a described upper modular metal curtain wallboard unit bottom
Horizontal purlin contact;
S62: make described second L-type steel bar golden with described first L-type steel bar and a described upper modular respectively
The horizontal purlin of curtain wall panel unit bottom, genus face uses the fixing connection of bolt.
The present invention compared with prior art has the advantage that enforcement high level provided by the present invention builds a house soon
During room curtain wall installation method, only need to by modular metal curtain wallboard unit with hook hook to solid
Bearing outside the floor skeleton being scheduled on carcase, its operating process is simple and convenient and the time
Short, in industrialization production process, can effectively shorten the construction period, to meet the room industrialization that builds a house soon
Demand.Hook is arranged on the operation on floor skeleton to carry out in indoor, it is not necessary to carry out outdoor work,
Be conducive to the potential safety hazard avoiding high-altitude outdoor working to bring, and its process is without using too much auxiliary work
Tool.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the invention will be further described, in accompanying drawing:
Fig. 1 is the stream of one embodiment of the invention room metal curtain wallboard unit installation method that builds a house soon on the middle and senior level
Cheng Tu.
Fig. 2 is the peace of one embodiment of the invention room metal curtain wallboard unit installation method that builds a house soon on the middle and senior level
Dress state stereogram.
Fig. 3 is the use state stereogram of a bearing in one embodiment of the invention.
Fig. 4 is the exploded view of a bearing in one embodiment of the invention.
Fig. 5 is the structural representation of modular metal curtain wallboard unit in one embodiment of the invention.
Fig. 6 is the structural representation of hook in one embodiment of the invention.
1, metal curtain wallboard unit;10, metal surface composite board;11, bracing frame;111, longitudinal purlin
Bar;111a, handle hole;112, horizontal purlin;112a, through hole;12, hook;121, hook portion;
122, connecting portion;123, height adjustment assembly;123a, bolt;123b, nut;2, carcase;
20, floor skeleton;21, column;3, bearing is propped up;30, the first supporting member;301, the first diapire;
301a, the first chute;302, first connects wall;303, the first left side wall;304, the first right side wall;
305, sidewall in first;31, the second supporting member;311, the second diapire;311a, the second chute;312、
Second connects wall;313, the second left side wall;314, the second right side wall;32, locking part;4, metal gasket
Sheet;5, the first rubber blanket;6, the second rubber blanket.
Detailed description of the invention
In order to the technical characteristic of the present invention, purpose and effect are more clearly understood from, now compare accompanying drawing
Describe the detailed description of the invention of the present invention in detail.
Fig. 1 illustrates the flow chart of high-rise room curtain wall installation method one embodiment that builds a house soon of the present invention.This high level
The room curtain wall installation method that builds a house soon comprises the following steps:
S1: as in figure 2 it is shown, at least part of floor layer skeleton of carcase 2 in the room that builds a house soon at high level
It is respectively mounted the most several supporting seat 3 outside every first floor layer skeleton 20 of 20.It is to be appreciated that carcase
2 can be the skeleton of lightweight steel construction, it is also possible to be the skeleton of other building structure;Carcase 2 includes building
Layer skeleton 20 and the floor skeleton 20 in order to support each floor that is arranged between floor skeleton 20 vertical
Post 21.Prop up bearing 3 to be fixed on floor skeleton 20, it is possible to understand that ground, at every first floor layer skeleton 20
On multiple bearings 3 can be installed, the mounting distance between bearing 3 can be with modular metal curtain wallboard list
Hook 12 spacing of unit 1 is suitable, in order to the modular metal curtain wallboard list with hook 12
Unit 1 is hooked in a bearing 3.
Specifically, step S1 includes:
S10: each layer of at least part of floor layer skeleton 20 of carcase 2 in the room that builds a house soon at high level
The most several first supporting member 30 it is respectively mounted outside floor skeleton 20.
As shown in Figure 3, Figure 4, the first supporting member 30 include horizontally arranged the first diapire 301,
Be vertically provided at first be fixedly linked on front side of the first diapire 301 and with carcase 2 be connected wall 302 with
And being oppositely arranged of being connected that wall 302 and the first diapire 301 both sides are connected respectively with first in order to strengthen the
First left side wall 303 and the first right side wall 304 of the structural rigidity of one supporting member 30.In the present embodiment,
It is additionally provided with and the first left side wall 303 and the first right side wall 304 on first connection wall 302 and the first diapire 301
Sidewall 305 in first be oppositely arranged, in order to strengthen the structural rigidity of the first supporting member 30 and by first
Bearing member 30 is distinguished into can be with two supporting areas of two the second supporting member 31 relative engagement.
S11: what placement coordinated with the first supporting member 30 on the first supporting member 30 can be relative to the first supporting
Second supporting member 31 of part 30 front, rear, left and right displacement.
As shown in Figure 3, Figure 4, the second supporting member 31 include horizontally arranged the second diapire 311,
Be vertically provided on rear side of the second diapire 311 and be connected with first that wall 302 is oppositely arranged in order to hook 12
The second of hook cooperation connects wall 312 and is connected wall 312 and the second diapire 311 both sides respectively with second
The second left side wall 313 and the second right side wall 314 being oppositely arranged being connected.It is to be appreciated that each second
Supporting member 31 is placed on the first supporting member 30 on two supporting areas formed, so that being hooked on second
Hook 12 on the metal curtain wallboard unit 1 being fixedly mounted on modular in bearing member 31 is connected to
On one supporting member 30, thus realize the metal curtain wallboard unit 1 of modular and the connection of carcase 2.
S12: use locking part 32 to be connected fixing with the second supporting member 31 for the first supporting member 30.
As shown in Figure 3, Figure 4, to be provided with at least one parallel with carcase 2 or vertical for the first diapire 301
The first straight chute 301a, and it is correspondingly provided with vertical at least with the first chute 301a on the second diapire 311
One the second chute 311a, and use locking part at the first chute 301a and the second chute 311a overlapping
32 connect, so that the second diapire 311 can occur front, rear, left and right side relative to the first diapire 301
To displacement, thus drive be vertically provided on the second diapire 311 second connection wall 312 on by hang
Hook 12 connect modular metal curtain wallboard unit 1 relative to carcase 2 occur forward and backward, left,
Right displacement, under the influence of offsetting skyscraper or other external environments, is arranged on the mould on carcase 2
The displacement that the metal curtain wallboard unit 1 of block formula occurs in front, rear, left and right mode, and then avoid gold
Genus face curtain wall panel unit 1 come off cause potential safety hazard.It is to be appreciated that locking part 32 can use spiral shell
Bolt (not shown) coordinates with nut (not shown) to realize locking, it would however also be possible to employ other
Constracture unit is to realize locking.
As shown in Figure 4, in the installation process of a bearing 3, also can be provided with one by the second connection wall 312
It is hooked on the metallic gasket 4 on the second connection wall 312, in order to increase the first connection wall 302 and hook 12
Between contact area so that it is hook 12 cooperation tightr.Specifically, metallic gasket 4 is connected with second
Wall 312 junction is provided with first rubber blanket 5 consistent with metallic gasket 4 shape;Above metallic gasket 4 with
Hook 12 contact is externally provided with the second rubber blanket 6, in order to isolating metal pad 4 be connected with second wall 312 and
Metal contact between hook 12, it is to avoid isolating metal pad 4 is connected wall 312 and hook 12 with second
When using different metal material to make, there is electrochemical reaction between metal, affect the stability of metal.
S2: the most several modular metal curtain wallboard unit 1 with hook 12 is provided.It is to be appreciated that
The height of modular metal curtain wallboard unit 1 is suitable with the height of corresponding floor, to avoid installing one
Need during floor to use multiple modular metal curtain wallboard unit 1 to splice, operation complicated and
There is bigger potential safety hazard.
The metal curtain wallboard unit 1 of modular includes metal surface composite board 10, is fixedly connected on metal covering
On composite plate 10 medial surface for supporting the bracing frame 11 of metal surface composite board 10 and being arranged on
Hanging in order at least two metal curtain wallboard unit 1 installed to carcase 2 of support 11 top
Hook 12.In the present embodiment, bracing frame 11 is fixedly connected on the medial surface of metal surface composite board 10, and
Hook 12 is set on bracing frame 11 top, so that the operation of its hook can when metal curtain wallboard unit 1 is installed
To carry out in indoor, with the potential safety hazard avoiding high-altitude outdoor working to bring, and its process was without using
Many aids.Utilize metal surface composite board 10, support member and the metal covering curtain wall of hook 12 integrations
Slab element 1, is arranged on metal curtain wallboard unit 1 on carcase 2, only need to carry out propping up being arranged on
Hook 12 on support 11 is arranged on the operation on carcase 2, its operating process simple and convenient and time
Between short, in industrialization production process, can effectively shorten the construction period, to meet lightweight steel construction generationization
Demand.
Bracing frame 11 include the longitudinal purlin 111 acting primarily as supporting role that two parallel interval arrange and
The width parallel by metal surface composite board 10 that two ends are fixed on two longitudinal purlins 111 is spaced
In order to the horizontal purlin of at least two of reinforcement structure intensity 112.In the present embodiment, longitudinal purlin 111 is in side
Shape tubulose, in order to fix with metal surface composite board 10 and be connected, it is possible to understand that ground, horizontal purlin 112 can
With the tubulose that is square, it is also possible to be other shapes, in the present embodiment, horizontal purlin 112 is square tubulose.
Laterally on purlin 112, some through hole 112a for installing suspension ring are set, in order at modular metal
When face curtain wall panel unit 1 is installed, to fixedly mount suspension ring (not shown) on through hole 112a, with
Just coordinate realization to be hung up by modular metal curtain wallboard unit 1 with suspension hook.
Specifically, the lower ending opening of each longitudinal purlin 111, to install for service hoisting in its lower end
The castor of movement, in order to the metal curtain wallboard unit 1 of horizontal positioned is gradually hung up, it is to avoid
Wear and tear in suspension process metal curtain wallboard unit 1 bottom;And be easy to shoot self-tapping screw in its lower end
With fixing metal surface composite board 10.The upper end of longitudinal purlin 111 is connected with hook 12, in the present embodiment,
Its upper end also is provided with opening.The upper end of each longitudinal purlin 111 is fixedly connected with hook 12.Specifically,
Medial wall, each longitudinal purlin 111 upper end is provided with and is placed through through hole therein for connector (in figure not
Illustrate) so that connector is connected with corresponding hook 12;Relatively set on the lateral wall of longitudinal purlin 111
The handle hole 111a put.Wherein, the quantity of through hole and handle hole 111a can be one and can also be provided with many
Individual.
S3: respectively majority modular metal curtain wallboard unit 1 is sling, and move to the supporting of correspondence
At seat 3.Specifically include following steps:
S30: modular metal curtain wallboard unit 1 to be sling is moved to lifting station (figure does not shows
Go out), it is possible to understand that ground, this lifting station is arranged on floor skeleton 20, between two columns 21,
And the modular metal curtain wallboard unit 1 to be sling being placed on this lifting station is installed to this
In the bearing 3 on floor skeleton 20 near lifting station, to save modular metal to be sling
Face curtain wall panel unit 1 moves to the time in a bearing 3 of correspondence.
S31: passing through of the horizontal purlin 112 on the top of modular metal curtain wallboard unit 1 to be sling
Suspension ring are fixedly mounted, in the present embodiment, by the screw end of hanging ring screw through through hole on perforation 112a
112a, re-uses bolt and is fixed, to complete the installation of suspension ring.
S32: at the opening of longitudinal purlin 111 lower end of modular metal curtain wallboard unit 1 to be sling
Auxiliary guide mechanism (not shown) is placed at place, in order to by the metal curtain wallboard unit of horizontal positioned
1 gradually hangs up, it is to avoid hangs process metal curtain wallboard unit 1 bottom and weares and teares.This auxiliary is led
Draw mechanism include an inserted link being inserted into longitudinal purlin 111 and with the castor being fixed on inserted link, make
During with, inserted link only need to be inserted the opening part of longitudinal purlin 111, at modular to be sling
In metal curtain wallboard unit 1 hoisting process, automatically disengage under gravity, metal can be effectively improved
The installation effectiveness of face curtain wall panel unit 1, and simple in construction low cost, easy to operate.
S33: the suspension hook (not shown) of lifting rope is hooked suspension ring, modular to be sling of up slinging
Metal curtain wallboard unit 1 also moves in a bearing 3 of correspondence, it is possible to understand that ground, at the work of gravity
Under with, the modular metal curtain wallboard unit 1 sling is moved to lifts by crane station floor below ratio and moves
Move the floor above lifting station to be easier to.
S4: the modular metal curtain wallboard unit 1 sling is hooked in a bearing 3 of correspondence.
Specifically, the hook 12 on longitudinal purlin 111 of modular metal curtain wallboard unit 1 it is fixed on
Including hook portion 121 and the connecting portion 122 for be connected longitudinal purlin 111 connected with hook portion 121.Tool
Body ground, connecting portion 122 is plate-shaped, and the through hole which is provided with some and longitudinal purlin 111 medial walls is relative
The hole answered, in order on the medial wall being connected to longitudinal purlin 111 that is fixed.Connecting portion 122 is with vertical
The block rubber basically identical with connecting portion 122 shape it is provided with (in figure to the junction of purlin 111 medial wall
Not shown), contact with the metal of longitudinal purlin 111 medial wall in order to isolate connecting portion 122, it is to avoid connect
When portion 122 uses different metal material to make with longitudinal purlin 111, between metal, there is electrochemical reaction,
Affect the stability of metal.The hook portion 121 of hook 12 is in П shape, in order to be hooked on carcase 2.
Hook portion 121 is provided with the height adjustment assembly 123 for regulating height.Specifically, in hook portion 121
Being provided with female thread, height adjustment assembly 123 includes the bolt 123a with screw-internal thread fit and is set in spiral shell
In order to spacing nut 123b on the screw rod of bolt 123a, nut 123b be arranged on the head of bolt 123a with
Between hook portion 121.
It is to be appreciated that in the present embodiment the order of step S1 and step S2 is in no particular order.
S5: use the modular metal that height adjustment assembly 123 adjustable hook is suspended in a bearing 3 of correspondence
Face curtain wall panel unit 1 is relative to the upper and lower position relation of carcase 2.
Specifically, use height adjustment assembly 123 regulation height time, due to screw rod end be fixed on
Supporting member contact on carcase 2, by coordinating of bolt 123a and hook portion 121 female thread, adjustment
Screw rod end is to hook portion 121 fore-and-aft distance, and uses nut 123b to be fixed with spacing.Utilize height
Adjusting part 123 makes, between metal curtain wallboard unit 1 plate, relative displacement to occur, to offset high level
Ambient temperature changes the displacement deformation caused.
S6: by each next modular metal curtain wallboard unit 1 with its on a modular metal covering curtain wall
Slab element 1 connects.Specifically include following steps:
S60: use screw the just first L-type steel bar to be fixed on next modular metal curtain wallboard unit 1
On the horizontal purlin 112 on top.
S61: the second L-type steel bar is placed on the first L-type steel bar, a wall of the second L-type steel bar and
One L-type steel bar contact, another wall and the horizontal purlin of upper modular metal curtain wallboard unit 1 bottom
112 contacts;
S62: use screw to make the second L-type steel bar golden with the first L-type steel bar and a upper modular respectively respectively
The horizontal purlin 112 of curtain wall panel unit 1 bottom, genus face is fixing to be connected, to realize next modular metal
Face curtain wall panel unit 1 uses with a upper modular metal curtain wallboard unit 1 that bolt is fixing to be connected.
Implement high level provided by the present invention build a house soon room curtain wall installation method time, only need to be by modular metal
On face curtain wall panel unit 1 with hook 12 hook to the floor skeleton 20 being fixed on carcase 2
A bearing 3 in outside, its operating process is simple and convenient and the time is short, is equivalent to the most Pork-pieces
Metal surface composite board 10 installs the efficiency of 10 times, in industrialization production process, can effectively shorten construction
Duration, to meet the demand of the room industrialization that builds a house soon.Hook 12 is arranged on the behaviour on floor skeleton 20
Work can be carried out in indoor, it is not necessary to carries out outdoor work, is conducive to the peace avoiding high-altitude outdoor working to bring
Full hidden danger, and its process is without using too much aid.
The present invention is illustrated by a specific embodiment, it will be appreciated by those skilled in the art that,
Without departing from the present invention, it is also possible to the present invention is carried out various conversion and equivalent substitutes.
It addition, for particular condition or concrete condition, the present invention can be made various amendment, without deviating from this
Bright scope.Therefore, the present invention is not limited to disclosed specific embodiment, and should include falling into this
Whole embodiments in invention right.
Claims (7)
1. a high level builds a house the installation method of room modular metal curtain wallboard unit soon, it is characterised in that:
Comprise the following steps:
S1: at least part of floor layer skeleton (20) every of carcase (2) in the room that builds a house soon at high level
First floor layer skeleton (20) outside is respectively mounted the most several supporting seat;Described step S1 includes:
S10: at least part of floor layer skeleton (20) every of carcase (2) in the room that builds a house soon at high level
First floor layer skeleton (20) outside is respectively mounted the most several first supporting member (30);
S11: what placement coordinated with described first supporting member (30) on described first supporting member (30) can
The second supporting member (31) relative to the front, rear, left and right displacement of described first supporting member (30);
S12: use locking part (32) by described first supporting member (30) and described second supporting member (31)
Fixing connection;
Wherein, described first supporting member (30) includes horizontally arranged the first diapire (301), vertical
It is arranged on described first diapire (301) front side and first being connected of being fixedly linked with described carcase (2)
Wall (302) and be connected what wall (302) and the first diapire (301) both sides were connected respectively with described first
The first left side wall (303) being oppositely arranged and the first right side wall (304);On described first diapire (301)
It is provided with the first chute (301a) that some and described carcase (2) is parallel or vertical;
Described second supporting member (31) includes horizontally arranged the second diapire (311), is vertically provided at
Described second diapire (311) rear side and be connected with described first that wall (302) is oppositely arranged in order to hook
(12) the second of hook cooperation connects wall (312) and is connected wall (312) and second end with described second respectively
Wall (311) both sides be connected the second left side wall (313) being oppositely arranged and the second right side wall (314);Described
Some second chutes vertical with described first chute (301a) it are correspondingly provided with on second diapire (311)
(311a);
First chute (301a) uses locking part (32) to be connected with the second chute (311a) overlapping;
S2: the most several modular metal curtain wallboard unit (1) with hook (12) is provided;
The height of described modular metal curtain wallboard unit (1) is suitable with the height of corresponding floor;Described
Modular metal curtain wallboard unit (1) includes metal surface composite board (10), is fixedly connected on described metal
Being used on face composite plate (10) medial surface support described metal surface composite board (10) bracing frame (11),
And be arranged on support frame as described above (11) top in order to by described modular metal curtain wallboard unit (1)
At least two hook (12) installed to described carcase (2);
S3: respectively most described modulars metal curtain wallboard unit (1) are sling, and move to correspondence
Bearing at;
S4: modular metal curtain wallboard unit (1) sling is hooked in a bearing of correspondence.
The installation side of the high-rise room modular metal curtain wallboard unit that builds a house soon the most according to claim 1
Method, it is characterised in that: support frame as described above (11) includes longitudinal purlin (111) that two parallel interval are arranged
And two ends are fixed on the width by metal surface composite board (10) on two described longitudinal purlins (111)
The horizontal purlin of at least two (112) that parallel interval is arranged;Described longitudinal purlin (111) is square tubulose,
Its lower ending opening, its upper end is connected with hook (12);The horizontal purlin (112) on support frame as described above (11) top
It is provided with some through holes (112a).
The installation side of the high-rise room modular metal curtain wallboard unit that builds a house soon the most according to claim 2
Method, it is characterised in that: described step S3 comprises the following steps:
S30: by mobile for modular metal curtain wallboard unit (1) to be sling to lifting by crane station;
S31: at the horizontal purlin (112) on the top of modular metal curtain wallboard unit (1) to be sling
Through hole (112a) on fixedly mount suspension ring;
S32: in longitudinal purlin (111) lower end of modular metal curtain wallboard unit (1) to be sling
Opening part place auxiliary guide mechanism, described auxiliary guide mechanism includes that one is inserted into longitudinal purlin (111)
Inserted link and with the castor being fixed on described inserted link;
S33: by the hook suspension ring of lifting rope, the modular metal curtain wallboard list up slinging to be sling
Unit (1) also moves in a bearing of correspondence.
The installation side of the high-rise room modular metal curtain wallboard unit that builds a house soon the most according to claim 2
Method, it is characterised in that: described hook (12) include hook portion (121) and with described hook portion (121) phase
Connect is used for connecting the connecting portion (122) of described longitudinal purlin (111);Described hook portion (121) is provided with
For regulating the height adjustment assembly (123) of height;The most also include step S5: use institute
State the modular metal curtain wallboard list that height adjustment assembly (123) adjustable hook is suspended in a bearing of correspondence
Unit (1) is relative to the upper and lower position relation of carcase (2).
The installation side of the high-rise room modular metal curtain wallboard unit that builds a house soon the most according to claim 4
Method, it is characterised in that: described hook portion (121) is provided with female thread, described height adjustment assembly (123)
Including with the bolt of described screw-internal thread fit (123a) and be set on the screw rod of described bolt (123a) use
With spacing nut (123b), described nut (123b) is arranged on head and the institute of described bolt (123a)
State between hook portion (121).
The installation side of the high-rise room modular metal curtain wallboard unit that builds a house soon the most according to claim 4
Method, it is characterised in that: after described step S5, also include step S6: by next modular metal each
Face curtain wall panel unit (1) is connected with modular metal curtain wallboard unit (1) on it.
The installation side of the high-rise room modular metal curtain wallboard unit that builds a house soon the most according to claim 6
Method, it is characterised in that: described step S6 includes:
S60: the first L-type steel bar is fixed on next modular metal curtain wallboard unit (1) top described
Horizontal purlin (112) on;
S61: the second L-type steel bar is placed on the first L-type steel bar, a wall of described second L-type steel bar
Contact with described first L-type steel bar, another wall and described upper modular metal curtain wallboard unit (1)
Horizontal purlin (112) contact of bottom;
S62: make described second L-type steel bar golden with described first L-type steel bar and a described upper modular respectively
The horizontal purlin (112) of curtain wall panel unit (1) bottom, genus face uses the fixing connection of bolt.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310752928.0A CN103711320B (en) | 2013-12-31 | 2013-12-31 | A kind of high level builds a house the installation method of room modular metal curtain wallboard unit soon |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310752928.0A CN103711320B (en) | 2013-12-31 | 2013-12-31 | A kind of high level builds a house the installation method of room modular metal curtain wallboard unit soon |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103711320A CN103711320A (en) | 2014-04-09 |
CN103711320B true CN103711320B (en) | 2016-08-17 |
Family
ID=50404633
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310752928.0A Active CN103711320B (en) | 2013-12-31 | 2013-12-31 | A kind of high level builds a house the installation method of room modular metal curtain wallboard unit soon |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103711320B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106930448B (en) * | 2017-04-25 | 2022-11-22 | 沈阳远大铝业工程有限公司 | Indoor side mounting structure of angle-adjustable unit curtain wall |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000282691A (en) * | 1999-03-30 | 2000-10-10 | Sumitomo Heavy Ind Ltd | Construction method for mounting member on inner wall of high-rise, tower structure, and scaffold device |
CN2893033Y (en) * | 2006-06-14 | 2007-04-25 | 北京建工一建工程建设有限公司 | Unit type curtain wall beam plate end hanging pieces |
CN2893032Y (en) * | 2006-06-14 | 2007-04-25 | 北京建工一建工程建设有限公司 | Unit type curtain wall vertical hanging pieces |
CN1670323B (en) * | 2004-03-15 | 2010-06-30 | 王广武 | Bi-fixation planking curtain |
WO2010148587A1 (en) * | 2009-06-23 | 2010-12-29 | 深圳市富诚科技发展有限公司 | Double-layer curtain wall of building structure and construction method thereof |
CN103225359A (en) * | 2013-04-15 | 2013-07-31 | 广东金刚幕墙工程有限公司 | High-rise energy-saving unit stone curtain wall |
-
2013
- 2013-12-31 CN CN201310752928.0A patent/CN103711320B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000282691A (en) * | 1999-03-30 | 2000-10-10 | Sumitomo Heavy Ind Ltd | Construction method for mounting member on inner wall of high-rise, tower structure, and scaffold device |
CN1670323B (en) * | 2004-03-15 | 2010-06-30 | 王广武 | Bi-fixation planking curtain |
CN2893033Y (en) * | 2006-06-14 | 2007-04-25 | 北京建工一建工程建设有限公司 | Unit type curtain wall beam plate end hanging pieces |
CN2893032Y (en) * | 2006-06-14 | 2007-04-25 | 北京建工一建工程建设有限公司 | Unit type curtain wall vertical hanging pieces |
WO2010148587A1 (en) * | 2009-06-23 | 2010-12-29 | 深圳市富诚科技发展有限公司 | Double-layer curtain wall of building structure and construction method thereof |
CN103225359A (en) * | 2013-04-15 | 2013-07-31 | 广东金刚幕墙工程有限公司 | High-rise energy-saving unit stone curtain wall |
Also Published As
Publication number | Publication date |
---|---|
CN103711320A (en) | 2014-04-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101672102B (en) | Steel structural overhead ceiling construction platform | |
CN202945823U (en) | Box-type house | |
CN204804298U (en) | Building material hoist and mount construction scaffold | |
CN105544984A (en) | Large-span steel structure jig frame integrity slip construction process | |
CN212001800U (en) | Connecting assembly and connecting structure of external wall panel | |
CN103711320B (en) | A kind of high level builds a house the installation method of room modular metal curtain wallboard unit soon | |
CN203701360U (en) | Fast house-building modular metal surface curtain wallboard unit and composite wall | |
CN202441045U (en) | Rail-type electric attached lifting scaffold | |
CN103255837B (en) | A kind of removable modular combination room | |
CN209293173U (en) | Module-type steel structure trestle external verandahs | |
CN204609087U (en) | A kind of furred ceiling mounts keel | |
CN115162531A (en) | Easy-to-assemble movable board house | |
CN212129961U (en) | Curtain wall keel hoisting device | |
CN211873507U (en) | Net rack bolt ball support connecting system | |
CN203701359U (en) | Connection mechanism of modular metal face curtain wall plate units and external wall body of rapidly built house | |
CN203878957U (en) | Protective screen module unit | |
CN113323368A (en) | Lifting construction method for external protection hanging frame of assembled building | |
CN208604911U (en) | A kind of novel suspention beam bracket | |
CN102587633B (en) | Space truss type attached lifting scaffold | |
CN112627487A (en) | Climbing frame attachment structure suitable for decorative constructional column | |
KR100427751B1 (en) | An installation beam of tower-crane for an outer wall | |
CN206126696U (en) | A detachable indoor hoist for buckling restrained brace | |
CN109267645A (en) | Module-type steel structure trestle external verandahs | |
CN104675001B (en) | A kind of furred ceiling mounts Os Draconis | |
CN109098453B (en) | Outer wall surface installation and construction process of sandwich board of steel structure factory building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |