CN103711284B - Suspension floor and disjunctor integrated, mat formation and method for dismounting - Google Patents

Suspension floor and disjunctor integrated, mat formation and method for dismounting Download PDF

Info

Publication number
CN103711284B
CN103711284B CN201410025733.0A CN201410025733A CN103711284B CN 103711284 B CN103711284 B CN 103711284B CN 201410025733 A CN201410025733 A CN 201410025733A CN 103711284 B CN103711284 B CN 103711284B
Authority
CN
China
Prior art keywords
floor
tenon
balance
height
limit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410025733.0A
Other languages
Chinese (zh)
Other versions
CN103711284A (en
Inventor
刘泳涞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410025733.0A priority Critical patent/CN103711284B/en
Publication of CN103711284A publication Critical patent/CN103711284A/en
Application granted granted Critical
Publication of CN103711284B publication Critical patent/CN103711284B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Floor Finish (AREA)

Abstract

The present invention relates to a kind of floor, particularly one suspension floor and assembling thereof, to mat formation and method for dismounting.Mainly solve conventional suspension floor waste timber, to be not easy under dismounting, floor the technical problems such as hollow area air circulation difference.Technical scheme is: a kind of suspension floor, spliced by upper floor and joist assembled unit and form, it is characterized in that being processed with on one side of upper floor of splicing and one end the height and balance tenon in spheroid evagination, thereunder for spheroid afterbody and upper floor end vertical face form the locking fourth of the twelve Earthly Branches, height and balance four limit of cavity volume, another block splice with it upper floor on one side and one end be processed with the height and balance fourth of the twelve Earthly Branches, the height and balance four limit locking tenon of form fit, be Tenon locking floor assembly by after two pieces of upper floor splicings.The spill fourth of the twelve Earthly Branches groove buckled with joist hook-type tenon and mate is processed with below the height and balance four limit locking tenon and the locking fourth of the twelve Earthly Branches, height and balance four limit at the longitudinal two ends of upper floor, arrange at interval, upper floor bottom surface and to struggle secretly groove less than the spill on limit, be provided with on joist surface the convex concealed arch tenon matched.

Description

Suspension floor and disjunctor integrated, mat formation and method for dismounting
Technical field
The present invention relates to a kind of floor, particularly one suspension floor and disjunctor integrated, mat formation and method for dismounting.
Background technology
Suspension floor is a kind of traditional floor with a long history, for a long time, in order to obtain effect of better mating formation, people successively devise a variety of docking structure on four limits on floor, such as: square limit shovel mouth, shovel mouth tape, tongue and groove, rabbet, detachable tenon etc., by various sleeper as sleeper, floor supports, X supports, solid wood supports, joist, joist holder, to be commissioned joist, thick joist, joist stirrup (selecting from " timber scieintific and technical dictionary " Science Press 1985), floor is held up, be suspended from the ground formation hollow, reach ventilated, reduce the moist impact on floor.As shown in figure 16, wood joist 19 is embedded in joist holder 20, then on wood joist 19 floor, limit, the side of mating formation 18.In modern age, reducing costs to save timber, having carried out simplifying improvement to suspension floor, usually adopt tongue and groove to be main docking structure, as shown in figure 17, joist is reduced to the wooden square stock arrangement of individual layer, is commonly called as keel 23, although saved cost, construct very loaded down with trivial details, time-consumingly to have taken a lot of work.When it is mated formation, need specialized team's operation, first will plan the spacing of keel 23, then fill out lining face with cement 24 and fix keel and levelling, with homalocephalus unit nail 22, grooved and tongued floor 21 is fixed on keel again, needs to measure after theing cement solidifies, then carry out later stage smooth process.Above-mentioned fixation makes air can only circle round in the horizontal limited spacing of keel, causes airflow obstruction, and As time goes on, the hollow area under floor very easily grows goes mouldy and ant trouble, and administers difficulty.In addition because floor material is subject to the impact of temperature, humidity, can produce and must shrink and diastole, above-mentioned fixation, make floor not cushion surplus, along with the extension of time, can cause floor produce in various degree watt, curved, stick up, encircle, the physics variation phenomenon such as crack.When floor after long-term use needs local replacing, under the interlocking of the concavo-convex Tenon of glue, cement, nail and tongue and groove, dismantle very difficult.The cost of mating formation on above-mentioned suspension floor is also higher, and the expense of mating formation of domestic every square metre is about 60 yuans, and external expense of mating formation is about every square metre of 40 U.S. dollars.
Chinese patent 200920074558.9 discloses " certainly spreading movable terrace ", and its buckle is that carrier two surrounding edge is longitudinally straight-through uninterrupted, and when the injection moulding of reality, do not conform to Shooting Technique, causing cannot injection moulding.Its location rib is longitudinally continuously lead directly to two ends in addition, laterally straight-through two edges, sawing certainly will be wanted like this to go out a lot of straight-through detent, thus cause floor strength to reduce, and affect outward appearance in bottom surface, floor.
Chinese patent 201220338325.7 discloses " floor Tenon locking mechanism ", its height and balance tenon and the height and balance fourth of the twelve Earthly Branches are the matching structure of the hook-shaped evagination of arc and indent, during combination docking, can only tilt upward, another side is aimed at and is down pressed by flooring.This structure has following defect: the first, and the hook-shaped position of arc is thinner, is used in longitudinally long limit, when along string direction, very easily breaks and defect.The second, upwarp the combination docking mode pressed down, be only suitable for longitudinally monolateral, termination need adopt simple and easy mortise and tenon, otherwise cannot split lay, and simple and easy mortise and tenon does not possess locking function, can only locate up and down.Height and balance four limit locking tenon and the locking fourth of the twelve Earthly Branches, the height and balance four limit outer arc of this patent lead directly at the bottom of plate, and wall thickness is less, and horizontal both-end does not hinder, but easy rhegma is moved towards along material fibers in longitudinal both sides.
The present invention is the modified invention on above-mentioned patent basis.
Summary of the invention
The object of the present invention is to provide a kind of be convenient to mat formation and dismantle one suspension floor and disjunctor integrated, mat formation and method for dismounting.Mainly solve conventional suspension floor waste timber, to be not easy under dismounting, floor the technical problems such as hollow area air circulation difference.Technical scheme of the present invention is: a kind of suspension floor, disjunctor unit assembly is spliced into by upper floor and joist assembled unit, it is characterized in that being processed with on one side of upper floor of splicing and one end cross section be oval evagination height and balance tenon, thereunder for height and balance tenon afterbody and upper floor end vertical face form the locking fourth of the twelve Earthly Branches, height and balance four limit of cavity volume, another block splice with it upper floor on one side and one end be processed with the height and balance fourth of the twelve Earthly Branches, the height and balance four limit locking tenon of form fit, be floor Tenon locking mechanism by after two pieces of upper floor splicings.Height and balance four limit locking tenon is positioned in the middle part of upper floor end face, and the locking fourth of the twelve Earthly Branches, height and balance four limit is positioned at upper floor end face top.The spill fourth of the twelve Earthly Branches groove buckled with joist hook-type tenon and mate is processed with below the height and balance four limit locking tenon and the locking fourth of the twelve Earthly Branches, height and balance four limit on the longitudinal both sides of upper floor, described hook-type tenon button is disposed on the longitudinal edge of joist, is positioned in the middle part of square cell limit that horizontal rib and lengthways of rod formed.Arrange at interval, upper floor bottom surface and to struggle secretly groove less than the spill on limit, be provided with on joist surface the convex concealed arch tenon matched, carry out longitudinal direction when upper floor and joist are assembled and intercept location.On four limits of joist periphery, be interval with the female tenon of caulking groove and the male tenon of buckle, locate for the spacing strengthening secondary locking between suspension floor unit assembly and floor parquets pattern.
Described upper floor is ortho states type floor, facing type floor, heating-type floor, wood are moulded or the one on bamboo plastic section floor.
Described ortho states type floor is timber or bamboo wood, and surface is coated with coating rubbing-layer, bottom surface compound damp-proof course.
Described facing type floor is made up of facing and base material, base material bottom surface compound damp-proof course, and facing is coated with coating rubbing-layer.Described wearing layer is UV paint, PU paint or di-aluminium trioxide film, and described facing is the various plastic relief texture of veneer, thin bamboo plate, leather and roll-in.Described base material is defective timber, defective bamboo wood, hard board, cement formwork material, wood are moulded or bamboo plastic, or other inorganic material.
Described heating-type floor is made up of facing, heater and base material compound, and described heater is the one in Far infrared carbon crystal, electrothermal carbon fibre membrane, electric heating cloth or electric heating piece, and all the other are identical with facing type floor.
Described wood is moulded or bamboo-plastic floorboard is extrudability section bar, the various plastic relief texture of surperficial hot pressing.
The invention has the beneficial effects as follows: avoid the technological deficiency that Chinese patent 200920074558.9 exists, because struggle secretly groove and convex concealed arch tenon of spill does not lead to both sides in center, add the intensity on floor, assemble also convenient, and optimize flooring look.The height and balance tenon of spheroid shape of the present invention and the height and balance fourth of the twelve Earthly Branches and height and balance four limit locking tenon and the locking fourth of the twelve Earthly Branches, height and balance four limit matching structure solve the technological deficiency that Chinese patent 201220338325.7 exists, the joinery and its construction of elliposoidal can cut down tolerance effectively, by sticking up formula or parallel combination assembling, longitudinally bilateral and horizontal both-end can adopt same Tenon technology, four limits are firmly locked, and elliposoidal mortise and tenon intensity is better, experiment shows, repeatedly assembles over thousands of time without damaged.Height and balance four limit of the present invention locking tenon is positioned in the middle part of upper floor end face, and the locking fourth of the twelve Earthly Branches, height and balance four limit is positioned at upper floor end face top, has good strength structure, and vertical plane laminating is more easily assembled.Solve the hook-shaped position of former arc preferably thinner, be used in longitudinally long limit, when along string direction, very easily break and the technical problem of defect.Upper floor of the present invention and joist integrated, be separated, mat formation and remove, four programs are all without the need for the specialized engineering team of qualification, do not need nail, glue, electricity, instrument and equipment etc. auxiliary, rely on ten kinds of Tenons matched and sets of brackets on top of the columns structure to get final product operation readiness, complete rapidly yet.3 minutes about consuming time of each program of ordinary person every square metre, upper floor and joist integrated and mating formation, two procedures can save about 85 yuan of every square metre of comprehensive costs, owing to adopting pure hand assembled, electric energy can save 500 watts every square metre, owing to have employed injection moulding joist, also can save lumber consumption in a large number, every square meter saves about 0.0125 cubic metre, keel timber.Heating floor of the present invention, finish coat thickness is about 2-5 millimeter, and be close to heater, heat conduction is fast, and the thermal efficiency is high, decays little, test 1, after tested (the bamboo decoration panels of 5 millimeters thick), floor is in normal temperature 8 degrees Celsius of power-on, and the surface temperature on 5 minutes floors can rise to 25 degrees Celsius, within 10 minutes, 30 degrees Celsius can be risen to, within 15 minutes, rise to 35 degrees Celsius, if by constant for floor surface temperature at 28 degrees Celsius, every square metre of floor power consumption per hour 120 watts, other heating floors on year-on-year basis, heat-transfer rate can promote 3 times, power saving about 40%, and cost-saving more than 50%.Test 2, (bamboo of 2 millimeters thick or wood veneer), floor is 6 degrees Celsius of power-on, and after 3 minutes, the surface temperature on floor rises to 26 degrees Celsius, after 10 minutes, the surface temperature on floor can reach 35 degrees Celsius, if by constant for floor surface temperature at 28 degrees Celsius, and every square metre of floor power consumption per hour 80 watts, other heating floors on year-on-year basis, fast 5 times of heat-transfer rate, power saving about 60%, cost-saving more than 50%.Heater can reach more than 100,000 hours application life.Floor of the present invention, can length collocation, colour match, the collocation of different facing, can be laid to: the various mosaics such as wall brick style type, tiltedly basket type, positive basket type, just chevron shaped, single font, double font, square, dislocation square, rhombus, vertical sliver paratype, longitudinal dislocation type.It is little that joist of the present invention supports volume, is crisscross arranged again, is conducive to ground air unobstructed, thoroughly can stop worm, bacterium, go mouldy, mouse suffers from and ant suffers from.Because dismounting is convenient, lossless, the four seas " can be wandered about " with the resettlement of user in floor of the present invention.Because the floor base material on facing type floor and heating-type floor is selected defectiveness or regenerates timber or inorganic, can the available protecting forest reserves.
Accompanying drawing explanation
Fig. 1 is upper floor of the present invention and joist assembly structure schematic diagram.
Fig. 2 is the present invention's block construction schematic diagram.
Fig. 3 is upper floor plan structure schematic diagram of the present invention.
Fig. 4 is joist plan structure schematic diagram of the present invention.
Fig. 5 is the embodiment of the present invention 1 upper floor cross section compound schematic diagram.
Fig. 6 is the embodiment of the present invention 2 upper floor cross section compound schematic diagram.
Fig. 7 is the embodiment of the present invention 3 upper floor cross section compound schematic diagram.
Fig. 8 is the embodiment of the present invention 4 upper floor cross section compound schematic diagram.
Fig. 9 is the embodiment of the present invention 3 circuit connection diagram.
Figure 10 is that the present invention suspends floor unit packaged pairing position schematic diagram.
Figure 11 is that the present invention suspends that floor unit is packaged joins pressing schematic diagram.
Figure 12 is that the present invention's floor unit block that suspends is seated schematic diagram.
Figure 13 is that the present invention's floor unit block that suspends removes step 1 schematic diagram.
Figure 14 is that the present invention's floor unit block that suspends removes step 2 schematic diagram.
Figure 15 is that the present invention's floor unit block that suspends has removed schematic diagram.
Figure 16 is early stage suspension flooring structure schematic diagram.
Figure 17 is recent suspension flooring structure schematic diagram.
In figure: 1-height and balance tenon, the 2-height and balance fourth of the twelve Earthly Branches, 3-height and balance four limit locking tenon, the locking fourth of the twelve Earthly Branches, 4-height and balance four limit, 5-spill fourth of the twelve Earthly Branches groove, 6-spill is struggled secretly groove, 7-convex concealed arch tenon, 8-hook-type tenon button, the female tenon of 9-caulking groove, the public tenon of 10-buckle, 11-joist supports, 12-wearing layer, 13-base material, 14-damp-proof course, 15-facing, 16-heater, 17-wire, floor, limit, 18-side, 19-wood joist, the holder of 20-joist, 21-grooved and tongued floor, 22-homalocephalus unit nail, 23-keel, 24-cement, 25-joist, 26-upper floor.
Detailed description of the invention
Embodiment 1, with reference to Fig. 1-5, Figure 10-15, a kind of suspension floor, is spliced into disjunctor unit assembly by upper floor 26 and joist 25 assembled unit, joist 25 is moulding, upper floor 26 is ortho states type floor, and described ortho states type floor is timber or bamboo wood, and surface is coated with coating rubbing-layer 12, described wearing layer is UV paint, bottom surface compound damp-proof course 14.Cross section is processed with in oval evagination height and balance tenon 1, thereunder for height and balance tenon afterbody and upper floor end vertical face form the locking fourth of the twelve Earthly Branches, height and balance four limit 4 of cavity volume on one side of the upper floor of splicing and one end, another block splice with it upper floor on one side and one end be processed with the height and balance fourth of the twelve Earthly Branches 2, the height and balance four limit locking tenon 3 of form fit, be floor Tenon locking mechanism by after two pieces of upper floor splicings.Height and balance four limit locking tenon 3 is positioned in the middle part of upper floor end face, and the locking fourth of the twelve Earthly Branches, height and balance four limit 4 is positioned at upper floor end face top.Be processed with below the height and balance four limit locking tenon 3 and the locking fourth of the twelve Earthly Branches, height and balance four limit 4 on the longitudinal both sides of upper floor and buckle the 8 spill fourth of the twelve Earthly Branches grooves 5 mated with joist hook-type tenon, described hook-type tenon button 8 is disposed on the longitudinal edge of joist 25, is positioned in the middle part of square cell limit that horizontal rib and lengthways of rod formed.Arrange at interval, upper floor 26 bottom surface and to struggle secretly groove 6 less than the spill on limit, be provided with the convex concealed arch tenon 7 matched on joist 25 surface, carry out longitudinal direction when upper floor 26 is assembled with joist 25 and intercept location.On four limits of joist 25 periphery, be interval with the female tenon 9 of caulking groove and the male tenon 10 of buckle, locate for the spacing strengthening secondary locking between suspension floor unit assembly and floor parquets pattern.
When disjunctor is integrated, first joist 25 is put into preset repeatedly used framework pattern work stake inner position, again the spill fourth of the twelve Earthly Branches groove 5 hook-type tenon aimed on joist of upper floor is buckled 8 to push, then upper floor surface is pressed, the spill fourth of the twelve Earthly Branches groove 5 that 8 snap in upper floor buckled by the hook-type tenon of joist another side, meanwhile, the convex concealed arch tenon 7 on joist 25 and the spill of upper floor bottom surface groove 6 of struggling secretly docks, and upper floor is firmly locked integrated suspension floor unit assembly by Tenons and the sets of brackets on top of the columns structure of four kinds of couplings.The disjunctor integrated time of every square metre of upper floor and joist is about 2 minutes.In the Long-Time Service on suspension floor, as keeped in repair suspension floor and change, only need utilize flat socket instrument, insert the hook-type tenon button 8 on any one side, floor, pry open one by one gently, the hook-type tenon button 8 of another side is also just automatic to be separated with spill fourth of the twelve Earthly Branches groove 5, and the disengaging time of every square metre of upper floor and joist is about 4 minutes.Mating formation after suspension floor is integrated can be installed voluntarily by terminal use, first first piece of location is provided with the height and balance fourth of the twelve Earthly Branches 2 by paving suspension floor, this end of one side of height and balance four limit locking tenon 3 is inside, lie in corner, the place end, flooring will be needed again, be provided with the height and balance tenon 1 in spheroid evagination, that end face of one side at the locking fourth of the twelve Earthly Branches, height and balance four limit 4 is to being subject to flooring, when after the female tenon 9 of the caulking groove in joist periphery sides and the basic contraposition of the male tenon about 10 of buckle, namely flooring surface is needed with palm pressing, elliposoidal height and balance tenon 1 is along camber line, receiving the assisting of outer tension force of the female tenon 9 of caulking groove and the male tenon of buckle 10, round and smoothly rapidly snap in the height and balance fourth of the twelve Earthly Branches 2, now, height and balance four limit locking tenon 3 and the locking fourth of the twelve Earthly Branches, height and balance four limit 4, the female tenon 9 of caulking groove and the male tenon 10 of buckle are also seated in succession, the Tenon of six kinds of couplings, suspension floor unit assembly is firmly locked by sets of brackets on top of the columns structure, height and balance, the every square metre of 2-4 minute consuming time that mats formation.When needs carry out the maintenance of suspension floor and change, removing floor can from corner, also can " blooming in center ", only need from the end face of the suspension floor end, two pieces of suspension floor unit assembly joints are raised 2 cm, elliposoidal height and balance tenon 1 is just deviate from, height and balance four limit locking tenon 3 and the locking fourth of the twelve Earthly Branches, height and balance four limit 4 are also just cushioned ramp along corresponding semilune and are skidded off and be separated, again by two pieces of reverse applying slight of suspension floor unit assembly, the female tenon 9 of caulking groove and the male tenon 10 of buckle also depart from mutually, and every square metre of time of removing is about 3-5 minute.
Embodiment 2, with reference to Fig. 1-4, Fig. 6, Figure 10-15, a kind of suspension floor, disjunctor unit assembly is spliced into by upper floor 26 and joist 25 assembled unit, joist 25 is moulding, and upper floor 26 is facing floor, and described facing type floor is made up of facing 15 and base material 13, base material bottom surface compound damp-proof course 14, facing is coated with coating rubbing-layer 12.Described wearing layer 12 is UV paint, PU paints or di-aluminium trioxide film, and described facing 15 is the various plastic relief texture of veneer, thin bamboo plate, leather and roll-in.Described base material 13 is defective timber, defective bamboo wood, hard board, cement formwork material, wood are moulded or bamboo plastic, or other inorganic material.Other are identical with embodiment 1.
Embodiment 3, with reference to Fig. 1-4, Fig. 7, Fig. 9, Figure 10-15, a kind of suspension floor, disjunctor unit assembly is spliced into by upper floor 26 and joist 25 assembled unit, joist 25 is moulding, upper floor 26 is heating-type floor, described heating-type floor is by facing 15, heater 16 and base material 13 compound composition, described heater 16 is Far infrared carbon crystal, electrothermal carbon fibre membrane, one in electric heating cloth or electric heating piece, heater 16 is in parallel by wire 17, lead-out wire supports the infall space of 11 via joist, docking is inserted with totally-enclosed plastic cement micro-diameter pipe, all the other are identical with 2 with embodiment 1.
Embodiment 4, with reference to Fig. 1-4, Fig. 8, Figure 10-15, a kind of suspension floor, is spliced into disjunctor unit assembly by upper floor 26 and joist 25 assembled unit, joist 25 is moulding, upper floor 26 is moulded or bamboo plastic section floor for wood, and described wood is moulded or bamboo-plastic floorboard is extrudability section bar, the various plastic relief texture of surperficial hot pressing.All the other are identical with embodiment 1.

Claims (7)

1. a suspension floor, disjunctor unit assembly is spliced into by upper floor and joist assembled unit, it is characterized in that being processed with cross section on one side of the upper floor of splicing and one end in oval evagination height and balance tenon, thereunder for height and balance tenon afterbody and upper floor end vertical face form the locking fourth of the twelve Earthly Branches, height and balance four limit of cavity volume, another block splice with it upper floor on one side and one end be processed with the height and balance fourth of the twelve Earthly Branches, the height and balance four limit locking tenon of form fit, be floor Tenon locking mechanism by after two pieces of upper floor splicings; Height and balance four limit locking tenon is positioned in the middle part of upper floor end face, and the locking fourth of the twelve Earthly Branches, height and balance four limit is positioned at upper floor end face top; The spill fourth of the twelve Earthly Branches groove buckled with joist hook-type tenon and mate is processed with below the height and balance four limit locking tenon and the locking fourth of the twelve Earthly Branches, height and balance four limit at the longitudinal two ends of upper floor, described hook-type tenon button is disposed on the longitudinal edge of joist, is positioned in the middle part of square cell limit that horizontal rib and lengthways of rod formed; Arrange at interval, upper floor bottom surface and to struggle secretly groove less than the spill on limit, be provided with on joist surface the convex concealed arch tenon matched; The female tenon of the caulking groove matched and the male tenon of buckle is interval with on the limit, periphery four of joist.
2. a kind of suspension floor according to claim 1, is characterized in that described upper floor is ortho states type floor, facing type floor, heating-type floor, wood moulds or the one on bamboo plastic section floor.
3. a kind of suspension floor according to claim 2, is characterized in that described ortho states type floor is timber or bamboo wood, and surface is coated with coating rubbing-layer, bottom surface compound damp-proof course.
4. a kind of suspension floor according to claim 2, is characterized in that described facing type floor is made up of facing and base material, base material bottom surface compound damp-proof course, and facing is coated with coating rubbing-layer; Described wearing layer is UV paint, PU paint or di-aluminium trioxide film, and described facing is the various plastic relief texture of veneer, thin bamboo plate, leather and roll-in; Described base material is defective timber, defective bamboo wood, hard board, cement formwork material, wood are moulded or bamboo plastic, or other inorganic material.
5. a kind of suspension floor according to claim 2, it is characterized in that described heating-type floor is made up of facing, heater and base material compound, described heater is the one in Far infrared carbon crystal, electrothermal carbon fibre membrane, electric heating cloth or electric heating piece.
6. a kind of suspension floor according to claim 2, is characterized in that described wood is moulded or bamboo-plastic floorboard is extrudability section bar, the various plastic relief texture of surperficial hot pressing.
7. the disjunctor on floor of suspending described in claim 1 is integrated, mat formation and method for dismounting, it is characterized in that comprising the following steps, when disjunctor is integrated, first joist is put into preset repeatedly used framework pattern work stake inner position, again the spill fourth of the twelve Earthly Branches groove hook-type tenon aimed on joist of upper floor is buckled and push, then upper floor surface is pressed, the hook-type tenon buckle of joist another side enters the spill fourth of the twelve Earthly Branches groove of upper floor, simultaneously, convex concealed arch tenon on joist and the spill of upper floor bottom surface groove of struggling secretly docks, upper floor is firmly locked, upper floor and joist are spliced into disjunctor unit assembly by four kinds of Tenons matched and sets of brackets on top of the columns structure, in the Long-Time Service on suspension floor, as keeped in repair suspension floor and change, only need utilize flat socket instrument, insert the hook-type tenon button on any one side, floor, pry open one by one gently, the hook-type tenon button of another side is also just automatic to be separated with spill fourth of the twelve Earthly Branches groove,
When mating formation, first first piece of location is provided with the height and balance fourth of the twelve Earthly Branches by paving suspension floor, this end of one side of height and balance four limit locking tenon is inside, lie in corner, the place end, flooring will be needed again, be provided with the height and balance tenon in spheroid evagination, that end face of one side at the locking fourth of the twelve Earthly Branches, height and balance four limit is to being subject to flooring, when after the female tenon of the caulking groove in joist periphery sides and the male tenon of buckle up and down basic contraposition, namely pressing needs flooring surface, elliposoidal height and balance tenon is along camber line, be subject to the assisting of outer tension force of the female tenon of caulking groove and the male tenon of buckle, round and smoothly rapidly snap in the height and balance fourth of the twelve Earthly Branches, now, height and balance four limit locking tenon and the locking fourth of the twelve Earthly Branches, height and balance four limit, the female tenon of caulking groove and the male tenon of buckle are also seated in succession, the Tenon of six kinds of couplings, suspension floor unit assembly is firmly locked by sets of brackets on top of the columns structure, height and balance,
During dismounting, remove floor from corner or middle part, only need from the end face of the suspension floor end, two pieces of suspension floor unit assembly joints are raised, elliposoidal height and balance tenon is just deviate from, and height and balance four limit locking tenon and the locking fourth of the twelve Earthly Branches, height and balance four limit are also just cushioned ramp along corresponding semilune and skidded off and be separated, are more oppositely exerted a force by two pieces of suspension floor unit assemblies, the female tenon of caulking groove and the male tenon of buckle also depart from mutually, and two pieces of suspension floor unit assemblies are just separated completely.
CN201410025733.0A 2014-01-20 2014-01-20 Suspension floor and disjunctor integrated, mat formation and method for dismounting Expired - Fee Related CN103711284B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410025733.0A CN103711284B (en) 2014-01-20 2014-01-20 Suspension floor and disjunctor integrated, mat formation and method for dismounting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410025733.0A CN103711284B (en) 2014-01-20 2014-01-20 Suspension floor and disjunctor integrated, mat formation and method for dismounting

Publications (2)

Publication Number Publication Date
CN103711284A CN103711284A (en) 2014-04-09
CN103711284B true CN103711284B (en) 2015-09-09

Family

ID=50404599

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410025733.0A Expired - Fee Related CN103711284B (en) 2014-01-20 2014-01-20 Suspension floor and disjunctor integrated, mat formation and method for dismounting

Country Status (1)

Country Link
CN (1) CN103711284B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015109780A1 (en) * 2014-01-25 2015-07-30 惠东美新塑木型材制品有限公司 Floor underlay used for a base frame
CN106284909B (en) * 2015-06-05 2018-11-06 山西九德力暖通科技有限公司 A kind of electric heating floor
CN107558690B (en) * 2017-10-16 2023-11-28 四川中塑高分子材料有限公司 Parquet suspension spliced floor
CN108908642B (en) * 2018-08-20 2020-08-11 池家丰 Heat-conducting fiber board and processing method thereof

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5138807A (en) * 1990-02-01 1992-08-18 Daw Technologies, Inc. Floor panel for industrial cleanroom
US8028486B2 (en) * 2001-07-27 2011-10-04 Valinge Innovation Ab Floor panel with sealing means
JP2003239509A (en) * 2002-02-18 2003-08-27 Inax Corp Laying material
CN101424120B (en) * 2008-11-26 2011-07-27 刘夷 Cyan and yellow balancing bamboo floor
US8782989B2 (en) * 2009-06-11 2014-07-22 Comc, Llc Narrow lined modular flooring assemblies
CN201495725U (en) * 2009-09-27 2010-06-02 刘夷 Self-laying movable terrace
CN101718142B (en) * 2009-12-23 2012-04-18 黄焕文 Convenient-to-lay flooring
CA2866109C (en) * 2011-03-18 2017-07-25 Inotec International Pty Ltd Vertical joint system and associated surface covering system
CN202644923U (en) * 2012-07-13 2013-01-02 刘夷 Floor mortise-and-tenon joint locking structure
CN203145403U (en) * 2013-01-30 2013-08-21 常州市华一防静电活动地板有限公司 Ventilation floor
CN103266743B (en) * 2013-06-03 2015-05-13 德尔国际家居股份有限公司 Inserted type locking and buckling floor
CN203701509U (en) * 2014-01-20 2014-07-09 刘夷 Suspension floor

Also Published As

Publication number Publication date
CN103711284A (en) 2014-04-09

Similar Documents

Publication Publication Date Title
CN103711284B (en) Suspension floor and disjunctor integrated, mat formation and method for dismounting
CN201588380U (en) Plastic-wood geothermal floor
CN203701509U (en) Suspension floor
CN205664476U (en) Heating floor
CN203571851U (en) Energy-saving instantly-hot electrically-heated ceramic floor heating brick
CN106836713A (en) A kind of substrate on spontaneous heating environment-friendly type floor, floor, metal composite floor and installation method
CN103216877A (en) Freely moved, assembled and disassembled floor heater
CN100535355C (en) Rock-imitated heat-preserving decorating wall and manufacturing method thereof
CN201250496Y (en) A plastic floor
CN205224522U (en) Spontaneous heating floor
CN102877623A (en) Floor laying method for ground heating device house
CN206737338U (en) A kind of substrate, floor and the metal composite floor on spontaneous heating environment-friendly type floor
CN205552727U (en) Log wood makeup structure and electricity generates heat log wood makeup physically thereof
CN201843307U (en) Floor with weatherproof structure grooves
CN203834879U (en) Quick assembling and disassembling type circulating floor keel structure
CN211396441U (en) Novel geothermal floor
CN211177015U (en) Aluminum plate heat preservation module that carbon fiber generates heat
CN209179407U (en) Stone moulds carbon fiber heating floor
CN210217022U (en) Floor splicing structure and floor thereof
CN210999207U (en) Log environmental protection face frame hasp structure
CN201620556U (en) Composite recycled floorboard
CN206669851U (en) A kind of high heating floor of efficiency of utilization
CN208610224U (en) A kind of cavity aluminum alloy pattern plate of band heating
CN200975085Y (en) Water resistant plastic wooden floor
CN220580399U (en) Wall decorative board mosaic structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150909