CN103711112A - Combined type bailey frame load-bearing shelving used for pouring large-span concrete beam - Google Patents
Combined type bailey frame load-bearing shelving used for pouring large-span concrete beam Download PDFInfo
- Publication number
- CN103711112A CN103711112A CN201210379226.8A CN201210379226A CN103711112A CN 103711112 A CN103711112 A CN 103711112A CN 201210379226 A CN201210379226 A CN 201210379226A CN 103711112 A CN103711112 A CN 103711112A
- Authority
- CN
- China
- Prior art keywords
- combined type
- bearing
- steel
- type bailey
- steel pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Abstract
Disclosed is a combined type bailey frame load-bearing shelving used for pouring a large-span concrete beam. The combined type bailey frame load-bearing shelving comprises combined type bailey frame beams, a steel pipe shelving and supporting base systems. The two ends of each of the bailey frame beams are respectively arranged on a steel box beam. The steel box beams are fixed on the two parallel supporting base systems of a concrete erect wall body. A plurality of I-shaped parallel steel bases are arranged on the bailey frame beams. The steel pipe shelving is arranged on the steel bases in a lapping mode. Concrete beam moldboards are arranged on the upper portion of the steel pipe shelving. A plurality of steel corbels fixed on the concrete wall surfaces at two sides are used to support the combined type bailey frame load-bearing shelving. Shortages of a conventional construction method that falling shelving erecting moldboards are set up normally are overcome. The combined type bailey frame load-bearing shelving is large in load-bearing amount and high in safety and stability. Bearing requirements of an upper air beam and construction of plate concrete are guaranteed. The combined type bailey frame load-bearing shelving is convenient and quick to erect and dismantle, and is capable of saving the engineering cost, accelerating a construction schedule and guaranteeing the construction quality. The combined type bailey frame load-bearing shelving is particularly suitable for a working condition of pouring a concrete beam and a plate structure.
Description
Technical field
The present invention relates to steel work technical field, particularly a kind of large-span concrete beam combined type Bailey bracket bearing bent frame device of building.
Background technology
In the construction of power station ship elevator engineering, usually run into the cast-in-situ concrete beam designing on two adjacent upright bodies of wall of concrete, plated construction, for example ship lift top cross beam and platform (as Fig. 1), it is large that this structural concrete has span conventionally, the features such as weight is large, and also large apart from the height on ground, therefore take conventional setting up to land the construction method of framed bent frame shuttering, not only be difficult to meet the requirement that supporting power is large, also there is larger potential safety hazard, and the setting up of framed bent, remove very difficult, need to expend lot of materials simultaneously, cause cost to have high input, construction speed is slow, be difficult to guarantee the problems such as construction quality.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of combined type Bailey bracket bearing bent frame for large-span concrete beam of building, can overcome and adopt conventional setting up to land the shortcomings of construction method of framed bent frame shuttering, there is supporting power large, security and stability is strong, can guarantee the load bearing requirements of high-altitude beam, board concrete construction, and framed bent set up, remove convenient and swift, be conducive to save engineering cost, accelerating construction progress, guarantees construction quality.
For solving the problems of the technologies described above, the technical solution adopted in the present invention is: a kind of large-span concrete beam combined type Bailey bracket bearing bent frame of building, comprise combined type Bailey bracket beam, steel pipe framed bent, support system, at least two combined type Bailey bracket beam two ends that are parallel to each other are arranged on respectively on the steel case beam of support system, on combined type Bailey bracket beam, evenly, be vertically provided with the many i iron bases that are parallel to each other, on i iron base, be erected with steel pipe framed bent.
Described support system is comprised of a plurality of load-bearing steel corbels and steel case beam, and load-bearing steel corbel is fixedly connected with many embedded anchor cones that arrange on the upright body of wall of concrete, and steel box beam erection is on the end face of load-bearing steel corbel.
Described combined type Bailey bracket girder system is the compound beam of square or rectangle by the vertical assembled section of a plurality of Bailey brackets.
Many described i iron bases are fixedly connected on the upper chord of combined type Bailey bracket back portion by many channel-section steel pressing plates and bolt, are welded with many reinforcing bar suspension columns on i iron base.
Described steel pipe framed bent is combined by steel pipe post and level connection joint steel pipe, is provided with oblique bridging between steel pipe post, between level connection joint steel pipe, is provided with horizontal cross brace.
The top of described steel pipe framed bent is provided with concrete beam mould board.
A kind of combined type Bailey bracket bearing bent frame for large-span concrete beam of building provided by the present invention, by being fixed on a plurality of steel corbel load-bearing on the concrete wall wall of both sides, there is very strong security and stability, can overcome and adopt conventional setting up to land the shortcomings of construction method of framed bent frame shuttering, there is supporting power large, security and stability is strong, can guarantee the load bearing requirements of high-altitude beam, board concrete construction, and setting up, removing of framed bent is convenient and swift, be conducive to save engineering cost, accelerating construction progress, guarantees construction quality.Be specially adapted to as the operating mode of construct in power station ship lift top cross beam and the larger upright walls of platform equal altitudes cast-in-situ concrete beam, plated construction.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the invention will be further described:
Fig. 1 is large-span concrete beam design arrangement schematic diagram;
Fig. 2 is combined type Bailey bracket bearing bent frame structure top view;
Fig. 3 is that the A-A of Fig. 2 is to view;
Fig. 4 is that the B-B of Fig. 2 is to view;
Fig. 5 is a place drawing of Fig. 4;
Fig. 6 is the b place drawing of Fig. 4.
The specific embodiment
As shown in Fig. 2~6, a kind of large-span concrete beam combined type Bailey bracket bearing bent frame of building, comprise combined type Bailey bracket beam 3, steel pipe framed bent 4, support system 5, at least two combined type Bailey bracket beam 3 two ends that are parallel to each other are seated respectively on the steel case beam 52 of the support system 5 that is fixed on the upright body of wall 1 of concrete that twice are parallel to each other, on combined type Bailey bracket beam 3, evenly, be vertically provided with many i iron bases 6 different in size, to be parallel to each other, on i iron base 6, be erected with steel pipe framed bent 4.
Described support system 5 is comprised of a plurality of load-bearing steel corbels 51 and steel case beam 52, and load-bearing steel corbel 51 is fixedly connected with the many embedded anchor cones 53 that arrange on the upright body of wall 1 of concrete, and steel case beam 52 is erected on the end face of load-bearing steel corbel 51.
Described combined type Bailey bracket beam 3 is to be the compound beam of square or rectangle by the vertical assembled section of a plurality of Bailey brackets.
Many described i iron bases 6 are fixedly connected on the upper chord at combined type Bailey bracket beam 3 tops by many channel-section steel pressing plates 7 and bolt 8, are welded with many reinforcing bar suspension columns 9 on i iron base 6.
Described steel pipe framed bent 4 is combined by steel pipe post 41 and level connection joint steel pipe 42, is provided with oblique bridging 43 between steel pipe post 41, is provided with horizontal cross brace 44 between level connection joint steel pipe 42.
The top of described steel pipe framed bent 4 is provided with concrete beam mould board 21.
Making of the present invention and installation process are as follows:
1) the present invention mainly relies on a plurality of load-bearing steel corbel 51 load-bearing that are fixed on the upright body of wall 1 of both sides concrete, its supporting power comprises the load such as the template deadweight on invention own wt, its top and weight concrete, constructor's weight, and the quantity of the load-bearing steel corbel 51 of therefore arranging must guarantee to meet the requirement of total supporting power.In the present embodiment, the about 30t of the supporting power of single load-bearing steel corbel 51, can be used as the reference of executing man-hour determination steel corbel 51 usage quantities, but must after control test, can come into operation.
2) combined type Bailey bracket beam 3 is to be the compound beam of square or rectangle by the vertical assembled section of a plurality of Bailey brackets, and its spandrel girder also must can come into operation after control test.
3) while installing, first by the embedded anchor cone 53(anchor cone model M36 on all load-bearing steel corbels 51 and the upright body of wall 1 of concrete) be connected firmly, then 53, steel case beam is stood on it, and use bolt to connect.
4) adopt large-scale lifting facility that combined type Bailey bracket beam 3 is erected on steel case beam 53, and use bolt to interconnect firmly.
5) i iron base 6 is fixedly connected on the upper chord at combined type Bailey bracket beam 3 tops by many channel-section steel pressing plates 7 and bolt 8, on i iron base 6, one of the reinforcing bar suspension column 9 of welding faces up.
6) on i iron base 6, set up steel pipe framed bent 4, while setting up, note the lower end of steel pipe post 41 to be enclosed within on reinforcing bar suspension column 9.
7) finally in the upper shelf of steel pipe framed bent 4, found concrete beam mould board 21, acceptance(check) after-pouring concrete.
8) after concrete reaches solidifying phase intensity, can be with reference to aforementioned installation steps reverse operating dismounting apparatus of the present invention.
Claims (6)
1. build combined type Bailey bracket bearing bent frame for large-span concrete beam for one kind, comprise combined type Bailey bracket beam (3), steel pipe framed bent (4), support system (5), it is characterized in that: at least two combined type Bailey bracket beam (3) two ends that are parallel to each other are arranged on respectively on the steel case beam (52) of support system (5), on combined type Bailey bracket beam (3), evenly, be vertically provided with the many i iron bases (6) that are parallel to each other, on i iron base (6), be erected with steel pipe framed bent (4).
2. a kind of combined type Bailey bracket bearing bent frame for large-span concrete beam of building according to claim 1, it is characterized in that: described support system (5) is comprised of a plurality of load-bearing steel corbels (51) and steel case beam (52), load-bearing steel corbel (51) is fixedly connected with the upper many embedded anchor cones (53) that arrange of the upright body of wall of concrete (1), and steel case beam (52) is erected on the end face of load-bearing steel corbel (51).
3. a kind of combined type Bailey bracket bearing bent frame for large-span concrete beam of building according to claim 1, is characterized in that: described combined type Bailey bracket beam (3) is to be the compound beam of square or rectangle by the vertical assembled section of a plurality of Bailey brackets.
4. a kind of combined type Bailey bracket bearing bent frame for large-span concrete beam of building according to claim 1, it is characterized in that: described many i iron bases (6) are fixedly connected on the upper chord at combined type Bailey bracket beam (3) top by many channel-section steel pressing plates (7) and bolt (8), on i iron base (6), be welded with many reinforcing bar suspension columns (9).
5. a kind of large-span concrete beam combined type Bailey bracket bearing bent frame of building of stating according to claim 1, it is characterized in that: described steel pipe framed bent (4) is combined by steel pipe post (41) and level connection joint steel pipe (42), between steel pipe post (41), be provided with oblique bridging (43), between level connection joint steel pipe (42), be provided with horizontal cross brace (44).
6. a kind ofly according to claim 1 or 5 build combined type Bailey bracket bearing bent frame for large-span concrete beam, it is characterized in that: the top of described steel pipe framed bent (4) is provided with concrete beam mould board (21).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210379226.8A CN103711112B (en) | 2012-10-09 | 2012-10-09 | Build large-span concrete beam combined type Bailey bracket bearing bent frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210379226.8A CN103711112B (en) | 2012-10-09 | 2012-10-09 | Build large-span concrete beam combined type Bailey bracket bearing bent frame |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103711112A true CN103711112A (en) | 2014-04-09 |
CN103711112B CN103711112B (en) | 2015-09-02 |
Family
ID=50404432
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210379226.8A Active CN103711112B (en) | 2012-10-09 | 2012-10-09 | Build large-span concrete beam combined type Bailey bracket bearing bent frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103711112B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109750830A (en) * | 2017-11-08 | 2019-05-14 | 上海宝冶集团有限公司 | The load bearing support structure of high-altitude long-span beam slab concrete blinding |
CN110005193A (en) * | 2019-03-27 | 2019-07-12 | 中建三局集团有限公司 | A kind of shuttering supporting mechanism of high-precision concrete roof |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101100902A (en) * | 2007-07-31 | 2008-01-09 | 龙信建设集团有限公司 | Inclined drawing steel truss high-supported formwork structure system and construction method thereof |
JP4040447B2 (en) * | 2002-12-13 | 2008-01-30 | オリエンタル白石株式会社 | Wagen formwork device for strut box girder, strut support device, and method for constructing strut box girder |
CN101205763A (en) * | 2007-07-31 | 2008-06-25 | 广厦建设集团有限责任公司 | Construction method for building formwork platform with bailey truss |
CN101701493A (en) * | 2009-10-22 | 2010-05-05 | 浙江大学 | Template support system of box type girder cast-in-place concrete floor plate of steel frame construction |
CN202831628U (en) * | 2012-10-09 | 2013-03-27 | 中国葛洲坝集团股份有限公司 | Combined type bailey frame load-bearing shelving for pouring large span concrete beam |
-
2012
- 2012-10-09 CN CN201210379226.8A patent/CN103711112B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4040447B2 (en) * | 2002-12-13 | 2008-01-30 | オリエンタル白石株式会社 | Wagen formwork device for strut box girder, strut support device, and method for constructing strut box girder |
CN101100902A (en) * | 2007-07-31 | 2008-01-09 | 龙信建设集团有限公司 | Inclined drawing steel truss high-supported formwork structure system and construction method thereof |
CN101205763A (en) * | 2007-07-31 | 2008-06-25 | 广厦建设集团有限责任公司 | Construction method for building formwork platform with bailey truss |
CN101701493A (en) * | 2009-10-22 | 2010-05-05 | 浙江大学 | Template support system of box type girder cast-in-place concrete floor plate of steel frame construction |
CN202831628U (en) * | 2012-10-09 | 2013-03-27 | 中国葛洲坝集团股份有限公司 | Combined type bailey frame load-bearing shelving for pouring large span concrete beam |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109750830A (en) * | 2017-11-08 | 2019-05-14 | 上海宝冶集团有限公司 | The load bearing support structure of high-altitude long-span beam slab concrete blinding |
CN110005193A (en) * | 2019-03-27 | 2019-07-12 | 中建三局集团有限公司 | A kind of shuttering supporting mechanism of high-precision concrete roof |
Also Published As
Publication number | Publication date |
---|---|
CN103711112B (en) | 2015-09-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102817484B (en) | Heavy multifunctional combined supporting frame | |
CN102535845A (en) | Construction method of bearing frame of corridor structure | |
CN202627506U (en) | Formwork for cast-in-place concrete connecting beams | |
CN109914244B (en) | Weak bracket system suitable for high-tower reinforced concrete combined beam steel structure installation and bottom and top plate concrete pouring and operation method thereof | |
CN103352428A (en) | Suspension bridge cable bent tower beam non-support construction method | |
CN109779272A (en) | A kind of high-altitude steel structure corridor construction method | |
CN103321155B (en) | Viaduct pier operation platform system and build this system and pour into a mould the method for bridge pier | |
CN203223003U (en) | Detachable triangular jig frame for steel truss assembling | |
CN114059758A (en) | Assembled double-layer integral elevator shaft platform | |
CN103266778A (en) | Detachable triangular scaffold and steel truss assembly construction method | |
CN209941511U (en) | Supporting device for high-altitude folding of bridge steel box girder by section hoisting | |
CN202831628U (en) | Combined type bailey frame load-bearing shelving for pouring large span concrete beam | |
CN109162437B (en) | Integral steel platform for multi-cylinder steel plate shear wall and construction method thereof | |
CN102767282B (en) | Assembly-type high-formwork construction method for cantilever of oversized special-shaped conversion layer | |
CN202125061U (en) | Scaffold of large-space concrete structure | |
CN108222480B (en) | High-altitude cantilever main truss type steel formwork construction platform | |
CN212582721U (en) | Bearing platform of tower crane for vertical tower of top plate of foundation garage | |
CN211775609U (en) | Integrated form scaffold of independent post roof beam outer frame high-rise building | |
CN211949511U (en) | Aerial cast-in-place structure that encorbelments greatly strides sky combination bearing steel platform | |
CN203213019U (en) | Cast-in-situ construction bracket system of long cantilever bent cap | |
CN102312563A (en) | Method for connecting external scaffold with wall for large-span and ultra-story-height structures | |
CN103711112B (en) | Build large-span concrete beam combined type Bailey bracket bearing bent frame | |
CN209924434U (en) | High-altitude overhanging formwork support frame body | |
CN112049235A (en) | High-altitude large-span cantilever structure construction platform and method | |
CN114482561A (en) | Steel structure roof installation method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |