CN103700454B - 支撑绝缘子 - Google Patents

支撑绝缘子 Download PDF

Info

Publication number
CN103700454B
CN103700454B CN201310619409.7A CN201310619409A CN103700454B CN 103700454 B CN103700454 B CN 103700454B CN 201310619409 A CN201310619409 A CN 201310619409A CN 103700454 B CN103700454 B CN 103700454B
Authority
CN
China
Prior art keywords
supports insulative
insulator
support column
cylindrical body
bus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310619409.7A
Other languages
English (en)
Other versions
CN103700454A (zh
Inventor
阮全荣
万青
康本贤
谢小平
邹斌
桑志强
杨镇澴
李学斌
王亚红
杨存龙
庞秀兰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUBEI ELECTRIC POWER EQUIPMENT Co Ltd
HYDROPOWER AND WATER RESOURCES PLANNING AND DESIGN GENERAL INSTITUTE
Huanghe Hydropower Development Co Ltd
PowerChina Northwest Engineering Corp Ltd
Original Assignee
HUBEI ELECTRIC POWER EQUIPMENT Co Ltd
HYDROPOWER AND WATER RESOURCES PLANNING AND DESIGN GENERAL INSTITUTE
Huanghe Hydropower Development Co Ltd
PowerChina Northwest Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUBEI ELECTRIC POWER EQUIPMENT Co Ltd, HYDROPOWER AND WATER RESOURCES PLANNING AND DESIGN GENERAL INSTITUTE, Huanghe Hydropower Development Co Ltd, PowerChina Northwest Engineering Corp Ltd filed Critical HUBEI ELECTRIC POWER EQUIPMENT Co Ltd
Priority to CN201310619409.7A priority Critical patent/CN103700454B/zh
Publication of CN103700454A publication Critical patent/CN103700454A/zh
Application granted granted Critical
Publication of CN103700454B publication Critical patent/CN103700454B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明涉及一种支撑绝缘子,它至少包括绝缘体(1)和中心接管(2),其特征是:所述的绝缘体(1)中间为圆筒形管体,沿圆筒形管体的外表面有与之一次浇注成一整体的支撑柱(3);支撑柱(3)为3个,3个支撑柱(3)沿管体的圆周方向均匀分布并与管体的外表面垂直;绝缘体(1)的圆筒形管体套在中心接管(2)上。本发明能够保证支撑绝缘子与母线筒体的内壁可靠接触,使母线导体连接相对<b>牢固,</b>防止涡流产生,同时能够使支撑绝缘子在母线筒体内部自由移动。

Description

支撑绝缘子
技术领域
本发明特别涉及一种用于大电流电力传输设备的支撑绝缘子,属于电力电气领域。
背景技术
在GIB中,根据电压等级和结构要求,现有的支撑绝缘子采用单支绝缘子,这种支撑绝缘子安装在母线筒体内部,不可以自由活动。由于支撑绝缘子的支撑柱只有一个,同时支撑柱顶部是平面,与外壳筒体内壁不能可靠接触,容易产生悬浮电位。该支撑绝缘子的绝缘体与中心接管为一体式结构,中心接管的管径与支撑绝缘子也不能保证可靠接触,中心接管的管径变动范围小。其中,GIB是“Gasinsulatedtransmissionbus”的简称,中文名为“气体绝缘输电母线”。
发明内容
本发明的目的就是为了解决上述存在的问题,提出的一种新型支撑绝缘子,它能够保证支撑绝缘子与母线筒体的内壁可靠接触,使母线导体连接相对牢固,并防止悬浮电位的产生,同时能够使支撑绝缘子在母线筒体内部自由移动。
本发明的技术方案是:支撑绝缘子,它至少包括绝缘体和中心接管,其特征是:所述的绝缘体中间为圆筒形管体,沿圆筒形管体的外表面有与之一次浇注成一整体的支撑柱;支撑柱为3个,3个支撑柱沿管体的圆周方向均匀分布并与管体的外表面垂直;绝缘体的圆筒形管体套在中心接管上。
所述的3个支撑柱中,其中一个支撑柱顶端有凹槽,在凹槽内竖直设置有弹簧;另外两个支撑柱的顶端设置有弧形的支撑头。
所述的支撑头的材料为金属材料。
本发明的有益效果是:在绝缘体的圆筒形管体沿圆周方向均匀分布三个支撑柱,其中两个支撑柱顶部采用固定球面设计,另一个支撑柱采用弹簧伸缩结构,可以调整支撑绝缘子外接圆,保证支撑绝缘子与母线筒体内壁可靠接触,使母线导体连接相对牢固,防止悬浮电位产生,同时能够使支撑绝缘子在母线筒体内部自由移动。另外,绝缘体的圆筒形管体套在中心接管上,中心接管可以根据需要采用不同内径的金属管,中心接管可以套在不同管径导体外部,能够自由移动,在合适位置,将支撑绝缘子和母线导体通过配钻孔进行固定连接;这样可以保证对母线筒体内导线支撑部位的灵活控制。本发明的支撑绝缘子结构简单,绝缘性能满足要求,安装方便。
以下结合附图及实施例对本发明作进一步的说明,但不作为对本发明的限定。
附图说明
图1为本发明实施例的支撑绝缘子主视图;
图2为本发明实施例的支撑绝缘子侧视图;
图3为本发明实施例的为支撑绝缘子剖视图。
图中:1、绝缘体;2、中心接管;3、支撑柱;4、支撑头;5、凹槽;6、弹簧。
具体实施方式
实施例1
如图1、图2所示:支撑绝缘子,它至少包括绝缘体1和中心接管2,所述的绝缘体1中间为圆筒形管体,沿圆筒形管体的外表面有与之一次浇注成一整体的支撑柱3;支撑柱3为3个,3个支撑柱3沿管体的圆周方向均匀分布并与管体的外表面垂直;绝缘体1的圆筒形管体套在中心接管2上。
实施例2
在实施例1的基础上,如图3所示:所述的3个支撑柱3中,其中一个支撑柱3上端有凹槽5,在凹槽5内竖直设置有弹簧6;另外两个支撑柱3的顶端设置有弧形的支撑头4。所述的支撑头4的材料为金属材料。弧形的金属支撑头4能方便支撑绝缘子在母线筒体移动。
本发明支撑绝缘子在支撑绝缘子与母线筒体接触时,支撑柱的弹簧自由伸缩,可以适当改变支撑绝缘子的支撑柱相对位置,适应筒体内壁不圆度,保证其可靠接触,使母线导体连接相对牢固,防止悬浮电位产生,同时能够使支撑绝缘子在母线筒体内部自由移动。根据不同管径的导体,选择相应的支撑绝缘子的中心接管套在导体外部,可以自由移动,在合适位置,将支撑绝缘子和母线导体通过配钻孔进行固定连接,这样可以保证对母线筒体内导线支撑部位的灵活控制。中心接管可以根据需要采用不同内径的金属管。
本实施例没有详细叙述的部件和结构属本行业的公知部件和常用结构或常用手段,这里不一一叙述。

Claims (1)

1.支撑绝缘子,它至少包括绝缘体(1)和中心接管(2),其特征是:所述的绝缘体(1)中间为圆筒形管体,沿圆筒形管体的外表面有与之一次浇注成一整体的支撑柱(3);支撑柱(3)为3个,3个支撑柱(3)沿管体的圆周方向均匀分布并与管体的外表面垂直;绝缘体(1)的圆筒形管体套在中心接管(2)上;所述的3个支撑柱(3)中,其中一个支撑柱(3)上端有凹槽(5),在凹槽(5)内竖直设置有弹簧(6);另外两个支撑柱(3)的顶端设置有弧形的支撑头(4);所述的支撑头(4)的材料为金属材料;绝缘体的圆筒形管体套在中心接管上,中心接管可以根据需要采用不同内径的金属管,中心接管可以套在不同管径导体外部,能够自由移动,在合适位置,将支撑绝缘子和母线导体通过配钻孔进行固定连接。
CN201310619409.7A 2013-11-29 2013-11-29 支撑绝缘子 Active CN103700454B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310619409.7A CN103700454B (zh) 2013-11-29 2013-11-29 支撑绝缘子

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310619409.7A CN103700454B (zh) 2013-11-29 2013-11-29 支撑绝缘子

Publications (2)

Publication Number Publication Date
CN103700454A CN103700454A (zh) 2014-04-02
CN103700454B true CN103700454B (zh) 2016-06-22

Family

ID=50361950

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310619409.7A Active CN103700454B (zh) 2013-11-29 2013-11-29 支撑绝缘子

Country Status (1)

Country Link
CN (1) CN103700454B (zh)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2884445Y (zh) * 2006-04-04 2007-03-28 大全集团有限公司 高压气体绝缘母线用三柱式绝缘子
CN201975178U (zh) * 2010-12-15 2011-09-14 中国西电电气股份有限公司 一种管道母线三支柱绝缘子结构
CN103296619A (zh) * 2013-06-20 2013-09-11 国家电网公司 导线分隔支撑管
CN203644479U (zh) * 2013-11-29 2014-06-11 中国水电顾问集团西北勘测设计研究院有限公司 支撑绝缘子

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
PL133532B1 (en) * 1980-08-01 1985-06-29 Przedsieb Montazu Elektryczneg Mounting of current busway to tube casing

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2884445Y (zh) * 2006-04-04 2007-03-28 大全集团有限公司 高压气体绝缘母线用三柱式绝缘子
CN201975178U (zh) * 2010-12-15 2011-09-14 中国西电电气股份有限公司 一种管道母线三支柱绝缘子结构
CN103296619A (zh) * 2013-06-20 2013-09-11 国家电网公司 导线分隔支撑管
CN203644479U (zh) * 2013-11-29 2014-06-11 中国水电顾问集团西北勘测设计研究院有限公司 支撑绝缘子

Also Published As

Publication number Publication date
CN103700454A (zh) 2014-04-02

Similar Documents

Publication Publication Date Title
CN205384910U (zh) 气体绝缘母线用三柱式绝缘子
CN203644479U (zh) 支撑绝缘子
CN104036979A (zh) 阀厅的静触头装配及其管形母线与静触头的连接金具
CN103245804B (zh) 一种充气组装式高电压均压环
CN103700454B (zh) 支撑绝缘子
CN204216296U (zh) 一种快速插接头
CN203503540U (zh) 一种高压断路器的瓷套
CN203674421U (zh) 一种通用接地线
CN105469935A (zh) 变压器套管油中均压球的防护绝缘筒
CN105870707B (zh) 一种导向密封连接杆
CN104201504A (zh) 一种高强耐压双通套管
CN204349323U (zh) 转接装置及其转接导体
CN102176363B (zh) 一种特高压避雷器的均压结构
CN103982528A (zh) 一种蜗轮转换轴
CN203760728U (zh) 一种连接器接触件齿套
CN105449622A (zh) 连接套管及使用该连接套管的套管装置
CN204088696U (zh) 一种高强耐压双通套管
CN205050751U (zh) 一种动触头及直动式隔离开关
CN208806136U (zh) 瓷套固定装置
CN204884707U (zh) 电缆连硫挤出机加料装置
CN203553874U (zh) 高压电缆连接器
CN205846258U (zh) 一种电连接装置
CN104716449A (zh) 一种n型母头射频同轴连接器
CN204242816U (zh) 一种新型的双凸形结构陶瓷电容器
CN202737431U (zh) 一种碟式母线套管

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 710065 Shaanxi Province, Xi'an City Road eight No. 18 survey and Design Institute of the northwest department of science and technology

Patentee after: Co., Ltd of northwest survey and design research institute of electricity Jian group of China

Patentee after: HUBEI ELECTRIC POWER EQUIPMENT CO., LTD.

Patentee after: HYDROPOWER AND WATER RESOURCES PLANNING AND DESIGN GENERAL INSTITUTE

Patentee after: Huanghe Hydropower Development Co., Ltd.

Address before: 710065 Shaanxi Province, Xi'an City Road eight No. 18 survey and Design Institute of the northwest department of science and technology

Patentee before: HYDROCHINA XIBEI ENGINEERING CORPORATION

Patentee before: HUBEI ELECTRIC POWER EQUIPMENT CO., LTD.

Patentee before: HYDROPOWER AND WATER RESOURCES PLANNING AND DESIGN GENERAL INSTITUTE

Patentee before: Huanghe Hydropower Development Co., Ltd.