CN103700056A - System and method for realizing controlled writing of eID (Electronic Identification) - Google Patents
System and method for realizing controlled writing of eID (Electronic Identification) Download PDFInfo
- Publication number
- CN103700056A CN103700056A CN201310698428.3A CN201310698428A CN103700056A CN 103700056 A CN103700056 A CN 103700056A CN 201310698428 A CN201310698428 A CN 201310698428A CN 103700056 A CN103700056 A CN 103700056A
- Authority
- CN
- China
- Prior art keywords
- eid
- work order
- management terminal
- mobile management
- electronic work
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Mobile Radio Communication Systems (AREA)
Abstract
The invention discloses a system and a method for realizing controlled writing of eID (Electronic Identification), and relates to the field of light distribution. The method comprises the steps of transmitting a request of to-be-written eID to a central management control platform when the eID needs to be written in equipment of an IOT (Internet Of Things) or an ODN (Optical Distribution Network), generating an electronic work order after the request is received by the central management control platform, transmitting the electronic work order to a mobile management terminal, analyzing the electronic work order by the mobile management terminal, converting analyzed information into an operating command, transmitting the operating command to the equipment, completing writing operation of the eID after the information of the operating command is received by the equipment, transmitting the state information whether the writing of the eID is completed or not back to the mobile management terminal, transmitting the state information back to the central management control platform by the mobile management terminal, and changing the state of the electronic work order after the state information is received by the central management control platform. According to the system and the method, disclosed by the invention, the cost can be effectively reduced, the comprehensive utilization of resource can be realized, and the written information of the eID is safe, reliable, controllable and accurate.
Description
Technical field
The present invention relates to light and distribute field, specifically relate to a kind of electronic tag controlled write realize system and method.
Background technology
Development along with optical communication technique, especially PON(Passive Optical Network, passive optical-fiber network) widespread use of technology in Access Network, whole world ODN(Optical Division Network, Optical Distribution Network) market welcomes the growth of explosion type, and the technology of Internet of Things is also in development at full speed on the other hand.
Early stage lightguide cable link is substantially all point to point line, and management is relatively easy, and in distribution process, the general method that adopts traditional manual label record, although this method is simple and easy to use, very inapplicable for complicated system.For addressing this problem, there is the light distribution management system of intelligent ODN, it take electronic tag as basis, to each fiber active linker, gives an ID(IDentity with global unique coding, identify label number) chip.In actual light distribution administrative skill, each port will configure electronic tag, and electronic tag is in core status in Internet of Things and intelligent ODN system, and the core essence of managing in Internet of Things and intelligent ODN system is exactly the management to electronic tag.
The basic function of electronic tag reading and writing device is by the mode of contact or the data message in non-contacting mode reading electronic labels, the mode of contact is mainly eID(electronic tag) label, non-contacting mode is mainly RFID(Radio Frequency Identification, radio-frequency (RF) identification) label.From functional perspective, the equipment of realizing merely contactless reading electronic labels information is called reader, readout device, scanner etc.Simple realization to the equipment of writing information in electronic tag internal memory is called programmable device, write device etc.Comprehensively there is contactless reading with the equipment that writes electronic tag memory information and be called read write line, communicator etc.
Some electronic tag, when dispatching from the factory, writes complete label information.In this case, in application process, electronic tag generally has read-only function.Writing of read only tag information is in the production run at electronic label chip in more situation, by special-purpose initialization apparatus, complete label information write to chip.In Internet of Things or intelligent ODN management system, generally, electronic tag is all to write when dispatching from the factory, but electronic tag there will be the situations such as damaged or loss in the process of using, when there is damage or the problem of loss, need to again write electronics note, the mode writing can write by the equipment of special-purpose read-write electronic tag.
Electronic tag is in core status in Internet of Things and intelligent ODN system, and the core of management system is exactly the management for electronic labeling information.Once electronic labeling information is impaired, destruction etc., just need to recover as early as possible electronic labeling information.Controlled writing is the important measures that electronic labeling information is replied.In the construction of Internet of Things or ODN and safeguarding, sometimes just damage or lose a few electronic tag, carry special-purpose electronic label read-write equipment, for building and construction brings many constant.And special-purpose electronic label read-write equipment is not generally connected by the mode of wired or wireless network and the central management of Internet of things system or intelligent ODN system control platform, the controlled meeting that the write operation of electronic tag is subject to central management to control platform weakens, the operation that even electronic tag writes is not subject to central management to control the management and control of platform, increase along with the electronic tag object of managing in Internet of Things or ODN, the electronic tag that not write by the management and control of central management control platform can be to Internet of Things, the management of intelligence ODN system is made troubles, for example: some electronic tag writing does not deposit central management in and controls in the database of platform.Even if having the electronic label read-write equipment of minority special use to control platform by wired or wireless and central management is connected, cause the read-write equipment cost of electronic tag to significantly improve, can not meet the requirement reducing costs in Internet of Things or intelligent ODN construction and maintenance.
Summary of the invention
The object of the invention is in order to overcome the deficiency of above-mentioned background technology, provide a kind of electronic tag controlled write realize system and method, can effectively reduce costs, realize the comprehensive utilization of resource, the information security that electronic tag writes is reliable, controlled, accurate.
The invention provides the controlled system that realizes writing of a kind of electronic tag, the some equipment and the some electronic tags that comprise central management control platform, Internet of Things or ODN, also comprise mobile management terminal, described central management is controlled platform and is connected with mobile management terminal, mobile management terminal is connected respectively with some equipment of Internet of Things or ODN, central management is controlled platform and is connected respectively with some equipment of Internet of Things or ODN, and each equipment of Internet of Things or ODN is respectively inserted with an electronic tag;
Described central management is controlled platform, for:
(1) information of recorded electronic label;
(2), according to customer requirement, generate electronic work order;
(3) management maintenance workmen information, the workmen who only allows to obtain the authorization logins mobile management terminal and carries out constructing operation;
(4) issue electronic work order and receive the receipt after carrying out;
Described mobile management terminal, for:
(1) authentication workmen logging request, just allows to carry out constructing operation after authentication success;
(2) by central management, control platform and obtain the electronic work order of sending to workmen;
(3) resolve electronic work order, the equipment of automatically controlling Internet of Things or ODN carries out write operation to the electronic tag of designated port;
(4) return to worksheet result and control platform to central management;
When the equipment of Internet of Things or ODN need to write electronic tag, mobile management terminal is controlled platform by the communication of eID to be written to the central management of Internet of Things or ODN, or operating personnel are directly inputted to central management by the information of eID to be written and control platform, central management is controlled the information that platform records each port eID, central management is controlled after the information that platform receives that eID writes, and will write the Information generation electronic work order packet of eID, and by wireless mode by the electronic work order Packet Generation generating to mobile management terminal, mobile management terminal is carried out authentication operations, after authentication operations success, mobile management terminal establishes a communications link by the equipment of wired or wireless mode and Internet of Things or ODN, mobile management terminal receives electronic work order packet and generates electronic work order, and electronic work order is handed down to the equipment of Internet of Things or ODN, the equipment of Internet of Things or ODN is received after electronic work order, automatically by the mode of sequential, control the electronic tag write operation to designated port, if electronic tag writes successfully, equipment will write the successful receipt of electronic tag and pass to mobile management terminal, mobile management terminal returns to central management and controls platform writing electronic work order that electronic tag completed again, central management is controlled platform and is received that electronic tag writes after successful electronic work order, the operation store that this is write to electronic tag is controlled in the database of platform in central management.
On the basis of technique scheme, the process that described mobile management terminal is carried out authentication operations is as follows: central management is controlled platform and issued a configuration work order to mobile management terminal, configuration work order comprises the user name that has equipment operation authority, password and device type information, after the equipment of mobile management terminal and Internet of Things or ODN establishes a communications link, the title of the equipment of Internet of Things or ODN is presented in mobile management terminal, there is a log-in interface of filling in username and password, after the username and password that input and configuration work order match on log-in interface, authentication operations success, the equipment of Internet of Things or ODN is carried out the operation that relevant eID writes.
On the basis of technique scheme, described mobile management terminal receives electronic work order packet and generates the process of electronic work order as follows: mobile management terminal starts to receive electronic work order packet; After electronic work order packet of the every reception of mobile management terminal, carry out one-time detection, whether detect this electronic work order packet receives successfully, if detected, take defeat, the order of feedback reception electronic work order packet failure is controlled platform to central management, and request central management is controlled platform and resend this electronic work order packet; If receive the success of electronic work order packet, start to receive next electronic work order packet, then detect; After all electronic work order packets receive successfully, mobile management terminal is integrated received electronic work order packet automatically, automatically generates electronic work order after integrating, and is presented at the interface of mobile management terminal.
On the basis of technique scheme, described wireless mode comprises bluetooth, infrared and wifi.
The present invention also provides a kind of electronic tag based on said system the controlled implementation method writing, and comprises the following steps:
When the equipment of A, Internet of Things or ODN need to write electronic tag, the demand of electronic tag to be written is transferred to central management and controls platform, central management is controlled platform and is received after the demand that writes electronic tag, the demand that writes electronic tag is generated to electronic work order by related algorithm mechanism, generate electronic work order and pass to mobile management terminal by wireless or wired transmission mode, after the success of mobile management terminal authentication, receive electronic work order; After mobile management terminal receives electronic work order, set up and communicate by letter with equipment, to equipment, issue electronic work order, this electronic work order comprises port numbers, type, size of data to be written, the start time that writes eID and the end time of eID to be written, and the type of eID to be written comprises jumping fiber eID, tail optical fiber eID and shunt eID, equipment box eID; Equipment receives after this electronic work order, resolves the information of electronic work order, obtains the port numbers of eID to be written and the type of eID to be written;
When the type of B, eID to be written is jumping fiber eID, eID to be written is inserted to the two ends of jumping fiber, whether the two ends of the electronic work order appointment of mobile management terminal judges jumping fiber there is eID, if all there is eID in the two ends of electronic work order appointment, the electronic tag write operation of the sub-work order designated port of mode automatic control electric of sequential for equipment, circulation writes the information of the eID of two ports insertions, and after eID has write, equipment returns to a numeric data code to mobile management terminal; If the two ends of electronic work order appointment only have one end to have eID, mobile management terminal notifying inserts one end of jumping fiber; If the port of electronic work order appointment does not have eID, mobile management terminal notifying inserts the two ends of jumping fiber; According to the prompting of mobile management terminal, eID is inserted to the one or both ends of jumping fiber, then return to step B;
When the type of eID to be written is the eID of tail optical fiber, eID to be written is inserted to the port of tail optical fiber, whether the port of mobile management terminal judges electronic work order appointment there is eID, if there is eID in the port of electronic work order appointment, the electronic tag write operation of the sub-work order designated port of mode automatic control electric of sequential for equipment, after the eID of tail optical fiber has write, equipment returns to a numeric data code to mobile management terminal; If the port of electronic work order appointment does not have eID, according to the prompting of mobile management terminal, eID is inserted to the designated port of tail optical fiber, then return to step B;
When the type of eID to be written is shunt eID, equipment box eID, eID to be written is inserted to the port of electronic work order appointment, whether the port of mobile management terminal judges electronic work order appointment there is eID, if there is eID in the port of electronic work order appointment, the electronic tag write operation of the sub-work order designated port of mode automatic control electric of sequential for equipment, after eID has write, equipment returns to a numeric data code to mobile management terminal; If the port of electronic work order appointment does not have eID, according to the prompting of mobile management terminal, eID is inserted to the port of electronic work order appointment, then return to step B;
C, judge that mobile management terminal receives the whether success of numeric data code write eID, if success, mobile management terminal writes successful receipt by eID and feeds back to central management and control platform; Judge whether mobile management terminal is successfully fed back eID and write successful receipt and control platform to central management, if success, central management is controlled platform and is received that mobile management terminal eID writes after successful receipt, change the state of electronic work order for completing, and the electronic work order of this controlled eID of writing is stored in the database of central management control platform; If central management is controlled platform and do not received that within a certain period of time the eID of mobile management terminal feedback writes successful receipt, the state of changing electronic work order is not completion.
On the basis of technique scheme, the flow process that described mobile management terminal writes jumping fiber eID to equipment is as follows:
When the equipment of step 101, Internet of Things or ODN need to write electronic tag, the demand of electronic tag to be written is transferred to central management and controls platform, central management is controlled platform and is received after the demand that writes electronic tag, the demand that writes electronic tag is generated to electronic work order by related algorithm mechanism, generate electronic work order and pass to mobile management terminal by wireless or wired transmission mode, after the success of mobile management terminal authentication, receive electronic work order;
After step 102, mobile management terminal receive electronic work order, set up and communicate by letter with equipment, to equipment, issue electronic work order, equipment receives after this electronic work order, resolves the information of electronic work order, obtains the port numbers of eID to be written and the type of eID to be written;
When the type of step 103, eID to be written is jumping fiber eID, eID to be written is inserted to the two ends of jumping fiber, whether the two ends of the electronic work order appointment of mobile management terminal judges jumping fiber there is eID, if the two ends of electronic work order appointment all exist eID, forward step 105 to; Otherwise forward step 104 to;
If the two ends of step 104 electronic work order appointment only have one end to have eID, mobile management terminal notifying inserts one end of jumping fiber; If the port of electronic work order appointment does not have eID, mobile management terminal notifying inserts the two ends of jumping fiber; According to the prompting of mobile management terminal, eID is inserted to the one or both ends of jumping fiber, then return to step 103;
The electronic tag write operation of the sub-work order designated port of mode automatic control electric of sequential of step 105, equipment, circulation writes the information of the eID of two ports insertions, and after eID has write, equipment returns to a numeric data code to mobile management terminal;
If step 109 central management is controlled platform and do not received that within a certain period of time the eID of mobile management terminal feedback writes successful receipt, the state of changing electronic work order is not completion.
On the basis of technique scheme, the flow process that described mobile management terminal writes tail optical fiber eID to equipment is as follows:
When the equipment of step 201, Internet of Things or ODN need to write electronic tag, the demand of electronic tag to be written is transferred to central management and controls platform, central management is controlled platform and is received after the demand that writes electronic tag, the demand that writes electronic tag is generated to electronic work order by related algorithm mechanism, generate electronic work order and pass to mobile management terminal by wireless or wired transmission mode, after the success of mobile management terminal authentication, receive electronic work order;
After step 202, mobile management terminal receive electronic work order, set up and communicate by letter with equipment, to equipment, issue electronic work order; Equipment receives after this electronic work order, resolves the information of electronic work order, obtains the port numbers of eID to be written and the type of eID to be written;
When the type of step 203, eID to be written is the eID of tail optical fiber, eID to be written is inserted to the port of tail optical fiber, whether the port of mobile management terminal judges electronic work order appointment there is eID, if the port of electronic work order appointment exists eID, forwards step 205 to; Otherwise forward step 204 to;
If the port of step 204 electronic work order appointment does not have eID, according to the prompting of mobile management terminal, eID is inserted to the designated port of tail optical fiber, then return to step 203;
The electronic tag write operation of the sub-work order designated port of mode automatic control electric of sequential of step 205, equipment, after the eID of tail optical fiber has write, equipment returns to a numeric data code to mobile management terminal;
Step 206, judge that mobile management terminal receives the whether success of numeric data code write eID, if success forwards step 207 to; Otherwise forward step 209 to;
If step 209 central management is controlled platform and do not received that within a certain period of time the eID of mobile management terminal feedback writes successful receipt, the state of changing electronic work order is not completion.
On the basis of technique scheme, the flow process that described mobile management terminal writes other type eID to equipment is as follows:
When the equipment of step 301, Internet of Things or ODN need to write electronic tag, the demand of electronic tag to be written is transferred to central management and controls platform, central management is controlled platform and is received after the demand that writes electronic tag, the demand that writes electronic tag is generated to electronic work order by related algorithm mechanism, generate electronic work order and pass to mobile management terminal by wireless or wired transmission mode, after the success of mobile management terminal authentication, receive electronic work order;
After step 302, mobile management terminal receive electronic work order, set up and communicate by letter with equipment, to equipment, issue electronic work order; Equipment receives after this electronic work order, resolves the information of electronic work order, obtains the port numbers of eID to be written and the type of eID to be written;
When the type of step 303, eID to be written is shunt eID, equipment box eID, eID to be written is inserted to the port of electronic work order appointment, whether the port of mobile management terminal judges electronic work order appointment there is eID, if the port of electronic work order appointment exists eID, forwards step 305 to; Otherwise forward step 304 to;
If the port of step 304 electronic work order appointment does not have eID, according to the prompting of mobile management terminal, eID is inserted to the port of electronic work order appointment, then return to step 303;
The electronic tag write operation of the sub-work order designated port of mode automatic control electric of sequential of step 305, equipment, after eID has write, equipment returns to a numeric data code to mobile management terminal;
Step 306, judge that mobile management terminal receives the whether success of numeric data code write eID, if success forwards step 307 to; Otherwise forward step 309 to;
Step 307, mobile management terminal write successful receipt by eID and feed back to central management control platform; Judge whether mobile management terminal is successfully fed back eID and write successful receipt and control platform to central management, if success forwards step 308 to; Otherwise forward step 309 to;
Step 308, central management are controlled platform and are received that mobile management terminal eID writes after successful receipt, change the state of electronic work order for completing, and the electronic work order of this controlled eID of writing are stored in the database of central management control platform;
If step 309 central management is controlled platform and do not received that within a certain period of time the eID of mobile management terminal feedback writes successful receipt, the state of changing electronic work order is not completion.
On the basis of technique scheme, the process that described mobile management terminal is carried out authentication operations is as follows: central management is controlled platform and issued a configuration work order to mobile management terminal, configuration work order comprises the user name that has equipment operation authority, password and device type information, the equipment of mobile management terminal and Internet of Things or ODN establishes a communications link, the title of the equipment of Internet of Things or ODN is presented in mobile management terminal, there is a log-in interface of filling in username and password, after the username and password that input and configuration work order match on log-in interface, authentication operations success, the equipment of Internet of Things or ODN is carried out the operation that relevant eID writes.
On the basis of technique scheme, described mobile management terminal receives electronic work order packet and generates the process of electronic work order as follows: mobile management terminal starts to receive electronic work order packet; After electronic work order packet of the every reception of mobile management terminal, carry out one-time detection, whether detect this electronic work order packet receives successfully, if detected, take defeat, the order of feedback reception electronic work order packet failure is controlled platform to central management, and request central management is controlled platform and resend this electronic work order packet; If receive the success of electronic work order packet, start to receive next electronic work order packet, then detect; After all electronic work order packets receive successfully, mobile management terminal is integrated received electronic work order packet automatically, automatically generates electronic work order after integrating, and is presented at the interface of mobile management terminal.
Compared with prior art, advantage of the present invention is as follows:
(1) the present invention's writing by integrated equipment in Internet of Things or ODN electronic tag, only need in the central management of Internet of Things or ODN net is controlled platform, mobile management terminal, increase software just can realize, mobile management terminal in Internet of Things, ODN is connected with central network management platform by wireless, by the relevant algorithm of software and relevant communication protocol, just can realize the controlled electronic tag that writes, do not need the extra new equipment that increases, can effectively reduce costs, realize the comprehensive utilization of resource.
(2) the present invention is in the mechanism of the middle introducing authentication of writing of electronic tag, in the mode of work order, writes electronic tag, makes writing of electronic tag be subject to central management to control the strict control of platform, and the information security that electronic tag writes is reliable, controlled, accurate.
Accompanying drawing explanation
Fig. 1 is the structural drawing of the controlled system that realizes writing of electronic tag in the embodiment of the present invention.
Fig. 2 is the process flow diagram of the controlled implementation method writing of electronic tag in the embodiment of the present invention.
Fig. 3 is the process flow diagram that in the embodiment of the present invention, mobile management terminal writes jumping fiber eID.
Fig. 4 is the process flow diagram that in the embodiment of the present invention, mobile management terminal writes tail optical fiber eID.
Fig. 5 is the process flow diagram that in the embodiment of the present invention, mobile management terminal writes other types eID.
Embodiment
Below in conjunction with drawings and the specific embodiments, the present invention is described in further detail.
Shown in Figure 1, the embodiment of the present invention provides a kind of electronic tag the controlled system that realizes writing, the some equipment and the some electronic tags that comprise central management control platform (being equivalent to the webmaster in ODN), mobile management terminal, Internet of Things or ODN, central management is controlled platform and is connected with mobile management terminal, mobile management terminal is connected respectively with some equipment of Internet of Things or ODN, central management is controlled platform and is connected respectively with some equipment of Internet of Things or ODN, and each equipment of Internet of Things or ODN is respectively inserted with an electronic tag.
Central management is controlled platform, for:
(1) information of recorded electronic label;
(2), according to customer requirement, generate electronic work order;
(3) management maintenance workmen information, the workmen who only allows to obtain the authorization logins mobile management terminal and carries out constructing operation;
(4) issue electronic work order and receive the receipt after carrying out.
Mobile management terminal, for:
(1) authentication workmen logging request, just allows to carry out constructing operation after authentication success;
(2) by central management, control platform and obtain the electronic work order of sending to workmen;
(3) resolve electronic work order, the equipment of automatically controlling Internet of Things or ODN carries out write operation to the electronic tag of designated port;
(4) return to worksheet result and control platform to central management.
In the construction of Internet of Things or ODN, transformation, when the electronic tag of the equipment of Internet of Things or ODN damages, lacks or has other demand to write electronic tag, mobile management terminal is controlled platform by the communication of eID to be written to the central management of Internet of Things or ODN, or operating personnel are directly inputted to central management by the information of eID to be written and control platform, central management is controlled the information that platform records each port eID; Central management is controlled after the information that platform receives that eID writes, and software mechanism and algorithm mechanism that the information exchange that writes eID is excessively relevant generate electronic work order packet, and by wireless mode by the electronic work order Packet Generation generating to mobile management terminal.
For prevent unrelated person or do not have operation qualification personnel equipment is carried out to maloperation, mobile management terminal is carried out authentication operations: central management is controlled platform and issued a configuration work order to mobile management terminal, configuration work order comprises the user name that has equipment operation authority, the information such as password and device type, mobile management terminal is by wired or bluetooth, infrared, the equipment of the wireless modes such as wifi and Internet of Things or ODN establishes a communications link, the title of the equipment of Internet of Things or ODN is presented in mobile management terminal, there is a log-in interface of filling in username and password, after the username and password that only input and configuration work order match on log-in interface, just calculate authentication operations success, the equipment of Internet of Things or ODN is just carried out the operation that relevant eID writes.Mobile management terminal carries out, after authentication operations success, could receiving electronic work order, the operation of being correlated with, otherwise without operating right.
After authentication operations success, mobile management terminal establishes a communications link by the equipment of wired or wireless mode and Internet of Things or ODN, and mobile management terminal starts to receive electronic work order packet, after electronic work order packet of the every reception of mobile management terminal, just carry out one-time detection, whether detect this electronic work order packet receives successfully, if detected, take defeat, just the order of feedback reception electronic work order packet failure is controlled platform to central management, request central management is controlled platform and is resend this electronic work order packet, if receive the success of electronic work order packet, just start to receive next electronic work order packet, detect again, after all electronic work order packets receive successfully, mobile management terminal is integrated received electronic work order packet automatically, after integrating, automatically generate electronic work order, and be presented at the interface of mobile management terminal.
Mobile management terminal is handed down to electronic work order the equipment of Internet of Things or ODN, the equipment of Internet of Things or ODN is received after electronic work order, automatically by the mode of sequential, control the electronic tag write operation to designated port, if electronic tag writes successfully, equipment will write the successful receipt of electronic tag and pass to mobile management terminal, mobile management terminal returns to central management and controls platform writing electronic work order that electronic tag completed again, central management is controlled platform and is received that electronic tag writes after successful electronic work order, the operation store that this is write to electronic tag is controlled in the database of platform in central management.
The embodiment of the present invention also provides a kind of electronic tag based on said system the controlled implementation method writing, and comprises the following steps:
When the equipment of A, Internet of Things or ODN need to write electronic tag, the demand of electronic tag to be written is transferred to central management and controls platform, central management is controlled platform and is received after the demand that writes electronic tag, the demand that writes electronic tag is generated to electronic work order by related algorithm mechanism, generate electronic work order and pass to mobile management terminal by wireless or wired transmission mode, after the success of mobile management terminal authentication, receive electronic work order; After mobile management terminal receives electronic work order, set up and communicate by letter with equipment, to equipment, issue electronic work order, this electronic work order comprise eID to be written port numbers, type, size of data to be written, write the start time and the information relevant to write operation such as end time of eID, the type of eID to be written comprises other type eID such as jumping fiber eID, tail optical fiber eID and shunt eID, equipment box eID; Equipment receives after this electronic work order, resolves the information of electronic work order, obtains the port numbers of eID to be written and the type of eID to be written;
When the type of B, eID to be written is jumping fiber eID, eID to be written is inserted to the two ends of jumping fiber, whether the two ends of the electronic work order appointment of mobile management terminal judges jumping fiber there is eID, if all there is eID in the two ends of electronic work order appointment, the electronic tag write operation of the sub-work order designated port of mode automatic control electric of sequential for equipment, circulation writes the information of the eID of two ports insertions, and after eID has write, equipment returns to a numeric data code to mobile management terminal; If the two ends of electronic work order appointment only have one end to have eID, mobile management terminal notifying inserts one end of jumping fiber; If the port of electronic work order appointment does not have eID, mobile management terminal notifying inserts the two ends of jumping fiber; According to the prompting of mobile management terminal, eID is inserted to the one or both ends of jumping fiber, then return to step B;
When the type of eID to be written is the eID of tail optical fiber, eID to be written is inserted to the port of tail optical fiber, whether the port of mobile management terminal judges electronic work order appointment there is eID, if there is eID in the port of electronic work order appointment, the electronic tag write operation of the sub-work order designated port of mode automatic control electric of sequential for equipment, after the eID of tail optical fiber has write, equipment returns to a numeric data code to mobile management terminal; If the port of electronic work order appointment does not have eID, according to the prompting of mobile management terminal, eID is inserted to the designated port of tail optical fiber, then return to step B;
When the type of eID to be written is the eID of other types such as shunt eID, equipment box eID, eID to be written is inserted to the port of electronic work order appointment, whether the port of mobile management terminal judges electronic work order appointment there is eID, if there is eID in the port of electronic work order appointment, the electronic tag write operation of the sub-work order designated port of mode automatic control electric of sequential for equipment, after eID has write, equipment returns to a numeric data code to mobile management terminal; If the port of electronic work order appointment does not have eID, according to the prompting of mobile management terminal, eID is inserted to the port of electronic work order appointment, then return to step B;
C, judge that mobile management terminal receives the whether success of numeric data code write eID, if success, mobile management terminal writes successful receipt by eID and feeds back to central management and control platform; Judge whether mobile management terminal is successfully fed back eID and write successful receipt and control platform to central management, if success, central management is controlled platform and is received that mobile management terminal eID writes after successful receipt, change the state of electronic work order for completing, and the electronic work order of this controlled eID of writing is stored in the database of central management control platform; If central management is controlled platform and do not received that within a certain period of time the eID of mobile management terminal feedback writes successful receipt, the state of changing electronic work order is not completion.
Shown in Figure 3, the flow process that mobile management terminal writes jumping fiber eID to equipment is as follows:
When the equipment of step 101, Internet of Things or ODN need to write electronic tag, the demand of electronic tag to be written is transferred to central management and controls platform, central management is controlled platform and is received after the demand that writes electronic tag, the demand that writes electronic tag is generated to electronic work order by related algorithm mechanism, generate electronic work order and pass to mobile management terminal by wireless or wired transmission mode, after the success of mobile management terminal authentication, receive electronic work order;
After step 102, mobile management terminal receive electronic work order, set up and communicate by letter with equipment, to equipment, issue electronic work order, equipment receives after this electronic work order, resolves the information of electronic work order, obtains the port numbers of eID to be written and the type of eID to be written;
When the type of step 103, eID to be written is jumping fiber eID, eID to be written is inserted to the two ends of jumping fiber, whether the two ends of the electronic work order appointment of mobile management terminal judges jumping fiber there is eID, if the two ends of electronic work order appointment all exist eID, forward step 105 to; Otherwise forward step 104 to;
If the two ends of step 104 electronic work order appointment only have one end to have eID, mobile management terminal notifying inserts one end of jumping fiber; If the port of electronic work order appointment does not have eID, mobile management terminal notifying inserts the two ends of jumping fiber; According to the prompting of mobile management terminal, eID is inserted to the one or both ends of jumping fiber, then return to step 103;
The electronic tag write operation of the sub-work order designated port of mode automatic control electric of sequential of step 105, equipment, circulation writes the information of the eID of two ports insertions, and after eID has write, equipment returns to a numeric data code to mobile management terminal;
If step 109 central management is controlled platform and do not received that within a certain period of time the eID of mobile management terminal feedback writes successful receipt, the state of changing electronic work order is not completion.
Shown in Figure 4, the flow process that mobile management terminal writes tail optical fiber eID to equipment is as follows:
When the equipment of step 201, Internet of Things or ODN need to write electronic tag, the demand of electronic tag to be written is transferred to central management and controls platform, central management is controlled platform and is received after the demand that writes electronic tag, the demand that writes electronic tag is generated to electronic work order by related algorithm mechanism, generate electronic work order and pass to mobile management terminal by wireless or wired transmission mode, after the success of mobile management terminal authentication, receive electronic work order;
After step 202, mobile management terminal receive electronic work order, set up and communicate by letter with equipment, to equipment, issue electronic work order; Equipment receives after this electronic work order, resolves the information of electronic work order, obtains the port numbers of eID to be written and the type of eID to be written;
When the type of step 203, eID to be written is the eID of tail optical fiber, eID to be written is inserted to the port of tail optical fiber, whether the port of mobile management terminal judges electronic work order appointment there is eID, if the port of electronic work order appointment exists eID, forwards step 205 to; Otherwise forward step 204 to;
If the port of step 204 electronic work order appointment does not have eID, according to the prompting of mobile management terminal, eID is inserted to the designated port of tail optical fiber, then return to step 203;
The electronic tag write operation of the sub-work order designated port of mode automatic control electric of sequential of step 205, equipment, after the eID of tail optical fiber has write, equipment returns to a numeric data code to mobile management terminal;
Step 206, judge that mobile management terminal receives the whether success of numeric data code write eID, if success forwards step 207 to; Otherwise forward step 209 to;
If step 209 central management is controlled platform and do not received that within a certain period of time the eID of mobile management terminal feedback writes successful receipt, the state of changing electronic work order is not completion.
Shown in Figure 5, the flow process that mobile management terminal writes other type eID to equipment is as follows:
When the equipment of step 301, Internet of Things or ODN need to write electronic tag, the demand of electronic tag to be written is transferred to central management and controls platform, central management is controlled platform and is received after the demand that writes electronic tag, the demand that writes electronic tag is generated to electronic work order by related algorithm mechanism, generate electronic work order and pass to mobile management terminal by wireless or wired transmission mode, after the success of mobile management terminal authentication, receive electronic work order;
After step 302, mobile management terminal receive electronic work order, set up and communicate by letter with equipment, to equipment, issue electronic work order; Equipment receives after this electronic work order, resolves the information of electronic work order, obtains the port numbers of eID to be written and the type of eID to be written;
When the type of step 303, eID to be written is the eID of other types such as shunt eID, equipment box eID, eID to be written is inserted to the port of electronic work order appointment, whether the port of mobile management terminal judges electronic work order appointment there is eID, if the port of electronic work order appointment exists eID, forward step 305 to; Otherwise forward step 304 to;
If the port of step 304 electronic work order appointment does not have eID, according to the prompting of mobile management terminal, eID is inserted to the port of electronic work order appointment, then return to step 303;
The electronic tag write operation of the sub-work order designated port of mode automatic control electric of sequential of step 305, equipment, after eID has write, equipment returns to a numeric data code to mobile management terminal;
Step 306, judge that mobile management terminal receives the whether success of numeric data code write eID, if success forwards step 307 to; Otherwise forward step 309 to;
Step 307, mobile management terminal write successful receipt by eID and feed back to central management control platform; Judge whether mobile management terminal is successfully fed back eID and write successful receipt and control platform to central management, if success forwards step 308 to; Otherwise forward step 309 to;
Step 308, central management are controlled platform and are received that mobile management terminal eID writes after successful receipt, change the state of electronic work order for completing, and the electronic work order of this controlled eID of writing are stored in the database of central management control platform;
If step 309 central management is controlled platform and do not received that within a certain period of time the eID of mobile management terminal feedback writes successful receipt, the state of changing electronic work order is not completion.
Those skilled in the art can carry out various modifications and variations to the embodiment of the present invention, if these revise and modification within the scope of the claims in the present invention and equivalent technologies thereof, these modifications and modification are also within protection scope of the present invention.
The prior art that the content of not describing in detail in instructions is known to the skilled person.
Claims (10)
1. the controlled system that realizes writing of electronic tag, the some equipment and the some electronic tags that comprise central management control platform, Internet of Things or ODN, it is characterized in that: also comprise mobile management terminal, described central management is controlled platform and is connected with mobile management terminal, mobile management terminal is connected respectively with some equipment of Internet of Things or ODN, central management is controlled platform and is connected respectively with some equipment of Internet of Things or ODN, and each equipment of Internet of Things or ODN is respectively inserted with an electronic tag;
Described central management is controlled platform, for:
(1) information of recorded electronic label;
(2), according to customer requirement, generate electronic work order;
(3) management maintenance workmen information, the workmen who only allows to obtain the authorization logins mobile management terminal and carries out constructing operation;
(4) issue electronic work order and receive the receipt after carrying out;
Described mobile management terminal, for:
(1) authentication workmen logging request, just allows to carry out constructing operation after authentication success;
(2) by central management, control platform and obtain the electronic work order of sending to workmen;
(3) resolve electronic work order, the equipment of automatically controlling Internet of Things or ODN carries out write operation to the electronic tag of designated port;
(4) return to worksheet result and control platform to central management;
When the equipment of Internet of Things or ODN need to write electronic tag, mobile management terminal is controlled platform by the communication of eID to be written to the central management of Internet of Things or ODN, or operating personnel are directly inputted to central management by the information of eID to be written and control platform, central management is controlled the information that platform records each port eID, central management is controlled after the information that platform receives that eID writes, and will write the Information generation electronic work order packet of eID, and by wireless mode by the electronic work order Packet Generation generating to mobile management terminal, mobile management terminal is carried out authentication operations, after authentication operations success, mobile management terminal establishes a communications link by the equipment of wired or wireless mode and Internet of Things or ODN, mobile management terminal receives electronic work order packet and generates electronic work order, and electronic work order is handed down to the equipment of Internet of Things or ODN, the equipment of Internet of Things or ODN is received after electronic work order, automatically by the mode of sequential, control the electronic tag write operation to designated port, if electronic tag writes successfully, equipment will write the successful receipt of electronic tag and pass to mobile management terminal, mobile management terminal returns to central management and controls platform writing electronic work order that electronic tag completed again, central management is controlled platform and is received that electronic tag writes after successful electronic work order, the operation store that this is write to electronic tag is controlled in the database of platform in central management.
2. the controlled system that realizes writing of electronic tag as claimed in claim 1, it is characterized in that: the process that described mobile management terminal is carried out authentication operations is as follows: central management is controlled platform and issued a configuration work order to mobile management terminal, configuration work order comprises the user name that has equipment operation authority, password and device type information, after the equipment of mobile management terminal and Internet of Things or ODN establishes a communications link, the title of the equipment of Internet of Things or ODN is presented in mobile management terminal, there is a log-in interface of filling in username and password, after the username and password that input and configuration work order match on log-in interface, authentication operations success, the equipment of Internet of Things or ODN is carried out the operation that relevant eID writes.
3. the controlled system that realizes writing of electronic tag as claimed in claim 1, is characterized in that: described mobile management terminal receives electronic work order packet and generate the process of electronic work order as follows: mobile management terminal starts to receive electronic work order packet; After electronic work order packet of the every reception of mobile management terminal, carry out one-time detection, whether detect this electronic work order packet receives successfully, if detected, take defeat, the order of feedback reception electronic work order packet failure is controlled platform to central management, and request central management is controlled platform and resend this electronic work order packet; If receive the success of electronic work order packet, start to receive next electronic work order packet, then detect; After all electronic work order packets receive successfully, mobile management terminal is integrated received electronic work order packet automatically, automatically generates electronic work order after integrating, and is presented at the interface of mobile management terminal.
4. the controlled system that realizes writing of electronic tag as claimed any one in claims 1 to 3, is characterized in that: described wireless mode comprises bluetooth, infrared and wifi.
5. the controlled implementation method writing of the electronic tag based on system described in any one in claim 1 to 4, is characterized in that, comprises the following steps:
When the equipment of A, Internet of Things or ODN need to write electronic tag, the demand of electronic tag to be written is transferred to central management and controls platform, central management is controlled platform and is received after the demand that writes electronic tag, the demand that writes electronic tag is generated to electronic work order by related algorithm mechanism, generate electronic work order and pass to mobile management terminal by wireless or wired transmission mode, after the success of mobile management terminal authentication, receive electronic work order; After mobile management terminal receives electronic work order, set up and communicate by letter with equipment, to equipment, issue electronic work order, this electronic work order comprises port numbers, type, size of data to be written, the start time that writes eID and the end time of eID to be written, and the type of eID to be written comprises jumping fiber eID, tail optical fiber eID and shunt eID, equipment box eID; Equipment receives after this electronic work order, resolves the information of electronic work order, obtains the port numbers of eID to be written and the type of eID to be written;
When the type of B, eID to be written is jumping fiber eID, eID to be written is inserted to the two ends of jumping fiber, whether the two ends of the electronic work order appointment of mobile management terminal judges jumping fiber there is eID, if all there is eID in the two ends of electronic work order appointment, the electronic tag write operation of the sub-work order designated port of mode automatic control electric of sequential for equipment, circulation writes the information of the eID of two ports insertions, and after eID has write, equipment returns to a numeric data code to mobile management terminal; If the two ends of electronic work order appointment only have one end to have eID, mobile management terminal notifying inserts one end of jumping fiber; If the port of electronic work order appointment does not have eID, mobile management terminal notifying inserts the two ends of jumping fiber; According to the prompting of mobile management terminal, eID is inserted to the one or both ends of jumping fiber, then return to step B;
When the type of eID to be written is the eID of tail optical fiber, eID to be written is inserted to the port of tail optical fiber, whether the port of mobile management terminal judges electronic work order appointment there is eID, if there is eID in the port of electronic work order appointment, the electronic tag write operation of the sub-work order designated port of mode automatic control electric of sequential for equipment, after the eID of tail optical fiber has write, equipment returns to a numeric data code to mobile management terminal; If the port of electronic work order appointment does not have eID, according to the prompting of mobile management terminal, eID is inserted to the designated port of tail optical fiber, then return to step B;
When the type of eID to be written is shunt eID, equipment box eID, eID to be written is inserted to the port of electronic work order appointment, whether the port of mobile management terminal judges electronic work order appointment there is eID, if there is eID in the port of electronic work order appointment, the electronic tag write operation of the sub-work order designated port of mode automatic control electric of sequential for equipment, after eID has write, equipment returns to a numeric data code to mobile management terminal; If the port of electronic work order appointment does not have eID, according to the prompting of mobile management terminal, eID is inserted to the port of electronic work order appointment, then return to step B;
C, judge that mobile management terminal receives the whether success of numeric data code write eID, if success, mobile management terminal writes successful receipt by eID and feeds back to central management and control platform; Judge whether mobile management terminal is successfully fed back eID and write successful receipt and control platform to central management, if success, central management is controlled platform and is received that mobile management terminal eID writes after successful receipt, change the state of electronic work order for completing, and the electronic work order of this controlled eID of writing is stored in the database of central management control platform; If central management is controlled platform and do not received that within a certain period of time the eID of mobile management terminal feedback writes successful receipt, the state of changing electronic work order is not completion.
6. the controlled implementation method writing of electronic tag as claimed in claim 5, is characterized in that: the flow process that described mobile management terminal writes jumping fiber eID to equipment is as follows:
When the equipment of step 101, Internet of Things or ODN need to write electronic tag, the demand of electronic tag to be written is transferred to central management and controls platform, central management is controlled platform and is received after the demand that writes electronic tag, the demand that writes electronic tag is generated to electronic work order by related algorithm mechanism, generate electronic work order and pass to mobile management terminal by wireless or wired transmission mode, after the success of mobile management terminal authentication, receive electronic work order;
After step 102, mobile management terminal receive electronic work order, set up and communicate by letter with equipment, to equipment, issue electronic work order, equipment receives after this electronic work order, resolves the information of electronic work order, obtains the port numbers of eID to be written and the type of eID to be written;
When the type of step 103, eID to be written is jumping fiber eID, eID to be written is inserted to the two ends of jumping fiber, whether the two ends of the electronic work order appointment of mobile management terminal judges jumping fiber there is eID, if the two ends of electronic work order appointment all exist eID, forward step 105 to; Otherwise forward step 104 to;
If the two ends of step 104 electronic work order appointment only have one end to have eID, mobile management terminal notifying inserts one end of jumping fiber; If the port of electronic work order appointment does not have eID, mobile management terminal notifying inserts the two ends of jumping fiber; According to the prompting of mobile management terminal, eID is inserted to the one or both ends of jumping fiber, then return to step 103;
The electronic tag write operation of the sub-work order designated port of mode automatic control electric of sequential of step 105, equipment, circulation writes the information of the eID of two ports insertions, and after eID has write, equipment returns to a numeric data code to mobile management terminal;
Step 106, judge that mobile management terminal receives the whether success of numeric data code write eID, if success forwards step 107 to; Otherwise forward step 109 to;
Step 107, mobile management terminal write successful receipt by eID and feed back to central management control platform; Judge whether mobile management terminal is successfully fed back eID and write successful receipt and control platform to central management, if success forwards step 108 to; Otherwise forward step 109 to;
Step 108, central management are controlled platform and are received that mobile management terminal eID writes after successful receipt, change the state of electronic work order for completing, and the electronic work order of this controlled eID of writing are stored in the database of central management control platform;
If step 109 central management is controlled platform and do not received that within a certain period of time the eID of mobile management terminal feedback writes successful receipt, the state of changing electronic work order is not completion.
7. the controlled implementation method writing of electronic tag as claimed in claim 5, is characterized in that: the flow process that described mobile management terminal writes tail optical fiber eID to equipment is as follows:
When the equipment of step 201, Internet of Things or ODN need to write electronic tag, the demand of electronic tag to be written is transferred to central management and controls platform, central management is controlled platform and is received after the demand that writes electronic tag, the demand that writes electronic tag is generated to electronic work order by related algorithm mechanism, generate electronic work order and pass to mobile management terminal by wireless or wired transmission mode, after the success of mobile management terminal authentication, receive electronic work order;
After step 202, mobile management terminal receive electronic work order, set up and communicate by letter with equipment, to equipment, issue electronic work order; Equipment receives after this electronic work order, resolves the information of electronic work order, obtains the port numbers of eID to be written and the type of eID to be written;
When the type of step 203, eID to be written is the eID of tail optical fiber, eID to be written is inserted to the port of tail optical fiber, whether the port of mobile management terminal judges electronic work order appointment there is eID, if the port of electronic work order appointment exists eID, forwards step 205 to; Otherwise forward step 204 to;
If the port of step 204 electronic work order appointment does not have eID, according to the prompting of mobile management terminal, eID is inserted to the designated port of tail optical fiber, then return to step 203;
The electronic tag write operation of the sub-work order designated port of mode automatic control electric of sequential of step 205, equipment, after the eID of tail optical fiber has write, equipment returns to a numeric data code to mobile management terminal;
Step 206, judge that mobile management terminal receives the whether success of numeric data code write eID, if success forwards step 207 to; Otherwise forward step 209 to;
Step 207, mobile management terminal write successful receipt by eID and feed back to central management control platform; Judge whether mobile management terminal is successfully fed back eID and write successful receipt and control platform to central management, if success forwards step 208 to; Otherwise forward step 209 to;
Step 208, central management are controlled platform and are received that mobile management terminal eID writes after successful receipt, change the state of electronic work order for completing, and the electronic work order of this controlled eID of writing are stored in the database of central management control platform;
If step 209 central management is controlled platform and do not received that within a certain period of time the eID of mobile management terminal feedback writes successful receipt, the state of changing electronic work order is not completion.
8. the controlled implementation method writing of electronic tag as claimed in claim 5, is characterized in that: the flow process that described mobile management terminal writes other type eID to equipment is as follows:
When the equipment of step 301, Internet of Things or ODN need to write electronic tag, the demand of electronic tag to be written is transferred to central management and controls platform, central management is controlled platform and is received after the demand that writes electronic tag, the demand that writes electronic tag is generated to electronic work order by related algorithm mechanism, generate electronic work order and pass to mobile management terminal by wireless or wired transmission mode, after the success of mobile management terminal authentication, receive electronic work order;
After step 302, mobile management terminal receive electronic work order, set up and communicate by letter with equipment, to equipment, issue electronic work order; Equipment receives after this electronic work order, resolves the information of electronic work order, obtains the port numbers of eID to be written and the type of eID to be written;
When the type of step 303, eID to be written is shunt eID, equipment box eID, eID to be written is inserted to the port of electronic work order appointment, whether the port of mobile management terminal judges electronic work order appointment there is eID, if the port of electronic work order appointment exists eID, forwards step 305 to; Otherwise forward step 304 to;
If the port of step 304 electronic work order appointment does not have eID, according to the prompting of mobile management terminal, eID is inserted to the port of electronic work order appointment, then return to step 303;
The electronic tag write operation of the sub-work order designated port of mode automatic control electric of sequential of step 305, equipment, after eID has write, equipment returns to a numeric data code to mobile management terminal;
Step 306, judge that mobile management terminal receives the whether success of numeric data code write eID, if success forwards step 307 to; Otherwise forward step 309 to;
Step 307, mobile management terminal write successful receipt by eID and feed back to central management control platform; Judge whether mobile management terminal is successfully fed back eID and write successful receipt and control platform to central management, if success forwards step 308 to; Otherwise forward step 309 to;
Step 308, central management are controlled platform and are received that mobile management terminal eID writes after successful receipt, change the state of electronic work order for completing, and the electronic work order of this controlled eID of writing are stored in the database of central management control platform;
If step 309 central management is controlled platform and do not received that within a certain period of time the eID of mobile management terminal feedback writes successful receipt, the state of changing electronic work order is not completion.
9. the controlled implementation method writing of the electronic tag as described in any one in claim 5 to 8, it is characterized in that: the process that described mobile management terminal is carried out authentication operations is as follows: central management is controlled platform and issued a configuration work order to mobile management terminal, configuration work order comprises the user name that has equipment operation authority, password and device type information, the equipment of mobile management terminal and Internet of Things or ODN establishes a communications link, the title of the equipment of Internet of Things or ODN is presented in mobile management terminal, there is a log-in interface of filling in username and password, after the username and password that input and configuration work order match on log-in interface, authentication operations success, the equipment of Internet of Things or ODN is carried out the operation that relevant eID writes.
10. the controlled implementation method writing of the electronic tag as described in any one in claim 5 to 8, is characterized in that: described mobile management terminal receives electronic work order packet and generate the process of electronic work order as follows: mobile management terminal starts to receive electronic work order packet; After electronic work order packet of the every reception of mobile management terminal, carry out one-time detection, whether detect this electronic work order packet receives successfully, if detected, take defeat, the order of feedback reception electronic work order packet failure is controlled platform to central management, and request central management is controlled platform and resend this electronic work order packet; If receive the success of electronic work order packet, start to receive next electronic work order packet, then detect; After all electronic work order packets receive successfully, mobile management terminal is integrated received electronic work order packet automatically, automatically generates electronic work order after integrating, and is presented at the interface of mobile management terminal.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310698428.3A CN103700056A (en) | 2013-12-18 | 2013-12-18 | System and method for realizing controlled writing of eID (Electronic Identification) |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310698428.3A CN103700056A (en) | 2013-12-18 | 2013-12-18 | System and method for realizing controlled writing of eID (Electronic Identification) |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103700056A true CN103700056A (en) | 2014-04-02 |
Family
ID=50361575
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310698428.3A Pending CN103700056A (en) | 2013-12-18 | 2013-12-18 | System and method for realizing controlled writing of eID (Electronic Identification) |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103700056A (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103955725A (en) * | 2014-04-11 | 2014-07-30 | 烽火通信科技股份有限公司 | Optimized electronic identity coding method |
CN104301143A (en) * | 2014-10-14 | 2015-01-21 | 烽火通信科技股份有限公司 | ODN network management method of different scenes |
CN105141437A (en) * | 2014-06-05 | 2015-12-09 | 中睿通信规划设计有限公司 | Community broadband equal access system and method |
CN105245282A (en) * | 2015-11-03 | 2016-01-13 | 黄迪 | Intelligent optical fiber management system and testing method thereof |
CN105307062A (en) * | 2015-11-10 | 2016-02-03 | 烽火通信科技股份有限公司 | EID (Electronic Identity)-based sODN (smart Optical Division Network) system and method supporting near-end operation and far-end guiding construction |
CN106936634A (en) * | 2017-03-09 | 2017-07-07 | 烽火通信科技股份有限公司 | For the wireless management system and equipment of active scene |
CN109412858A (en) * | 2018-11-14 | 2019-03-01 | 烽火通信科技股份有限公司 | A kind of management method of Optical Distribution Network, intelligent mobile terminal and management system |
CN109474331A (en) * | 2018-12-18 | 2019-03-15 | 京信通信系统(中国)有限公司 | O&M monitoring method, device, storage medium and the terminal device of Optical Distribution Network |
CN109951294A (en) * | 2019-02-21 | 2019-06-28 | 中云信安(深圳)科技有限公司 | Information update management method and relevant device in electronic labelling system |
CN113033725A (en) * | 2019-12-25 | 2021-06-25 | 北京华为数字技术有限公司 | ODN resource information management method, device and storage medium |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102307107A (en) * | 2011-08-16 | 2012-01-04 | 无锡互惠信息技术有限公司 | Intelligent management system of ODN (optical distribution network) based on RFID (radio frequency identification) |
CN102932062A (en) * | 2012-10-24 | 2013-02-13 | 沈越 | Intelligent optical fiber connecting and distributing system and adapter port state information identification method |
CN103368778A (en) * | 2013-07-15 | 2013-10-23 | 南京普天通信股份有限公司 | Optical fiber distribution equipment passive intelligent management system based on wireless transmission |
-
2013
- 2013-12-18 CN CN201310698428.3A patent/CN103700056A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102307107A (en) * | 2011-08-16 | 2012-01-04 | 无锡互惠信息技术有限公司 | Intelligent management system of ODN (optical distribution network) based on RFID (radio frequency identification) |
CN102932062A (en) * | 2012-10-24 | 2013-02-13 | 沈越 | Intelligent optical fiber connecting and distributing system and adapter port state information identification method |
CN103368778A (en) * | 2013-07-15 | 2013-10-23 | 南京普天通信股份有限公司 | Optical fiber distribution equipment passive intelligent management system based on wireless transmission |
Non-Patent Citations (1)
Title |
---|
敖立: "智能化是 ODN 技术发展的方向", 《人民邮电》 * |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103955725A (en) * | 2014-04-11 | 2014-07-30 | 烽火通信科技股份有限公司 | Optimized electronic identity coding method |
CN105141437A (en) * | 2014-06-05 | 2015-12-09 | 中睿通信规划设计有限公司 | Community broadband equal access system and method |
CN105141437B (en) * | 2014-06-05 | 2018-06-29 | 中睿通信规划设计有限公司 | A kind of community broad band equal access system and method |
CN104301143A (en) * | 2014-10-14 | 2015-01-21 | 烽火通信科技股份有限公司 | ODN network management method of different scenes |
CN105245282A (en) * | 2015-11-03 | 2016-01-13 | 黄迪 | Intelligent optical fiber management system and testing method thereof |
CN105307062A (en) * | 2015-11-10 | 2016-02-03 | 烽火通信科技股份有限公司 | EID (Electronic Identity)-based sODN (smart Optical Division Network) system and method supporting near-end operation and far-end guiding construction |
CN105307062B (en) * | 2015-11-10 | 2019-01-29 | 烽火通信科技股份有限公司 | The sODN system and method for support proximal end operation and distal end guiding construction based on eID |
CN106936634B (en) * | 2017-03-09 | 2019-09-27 | 烽火通信科技股份有限公司 | Wireless management system and equipment for active scene |
CN106936634A (en) * | 2017-03-09 | 2017-07-07 | 烽火通信科技股份有限公司 | For the wireless management system and equipment of active scene |
CN109412858A (en) * | 2018-11-14 | 2019-03-01 | 烽火通信科技股份有限公司 | A kind of management method of Optical Distribution Network, intelligent mobile terminal and management system |
CN109412858B (en) * | 2018-11-14 | 2021-11-16 | 烽火通信科技股份有限公司 | Management method, intelligent mobile terminal and management system of optical distribution network |
CN109474331A (en) * | 2018-12-18 | 2019-03-15 | 京信通信系统(中国)有限公司 | O&M monitoring method, device, storage medium and the terminal device of Optical Distribution Network |
CN109474331B (en) * | 2018-12-18 | 2021-02-23 | 京信通信系统(中国)有限公司 | Operation and maintenance monitoring method and device for optical distribution network, storage medium and terminal equipment |
CN109951294A (en) * | 2019-02-21 | 2019-06-28 | 中云信安(深圳)科技有限公司 | Information update management method and relevant device in electronic labelling system |
CN109951294B (en) * | 2019-02-21 | 2021-12-14 | 中云信安(深圳)科技有限公司 | Information updating management method in electronic label system and related equipment |
CN113033725A (en) * | 2019-12-25 | 2021-06-25 | 北京华为数字技术有限公司 | ODN resource information management method, device and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103700056A (en) | System and method for realizing controlled writing of eID (Electronic Identification) | |
CN103001671B (en) | Systems and methods for providing nfc secure application support in battery-off mode when no nonvolatile memory write access is available | |
CN103095678B (en) | Management is related to the method for the incoming command of the application of the non-contact type in wireless device | |
CN101238478B (en) | Data communication system, device for executing ic card function, control method for the device, and information processing terminal | |
CN103516551B (en) | Utilize passive pair of RFID tag to optical fiber physical port intelligent management system | |
CN103746850B (en) | Method and device for positioning fault and PON (Passive Optical Network) system | |
CN104065639A (en) | Bank card binding method and system | |
US10181022B2 (en) | System for automated login initialization on detection of identification device | |
CN102100121A (en) | Method and system for managing multiple applications in near field communication | |
CN103778705A (en) | Realization method and system of NFC (near field communication) electronic lock and NFC electronic lock card reader | |
CN103108262A (en) | Method for upgrading configuration file of optical network unit in GPON system | |
CN103560886A (en) | Authentication method for electronic signature equipment | |
CN103559523B (en) | The contactless read-write device realized based on SWP SE and method | |
CN105095943A (en) | Reflective type passive optical tag, optical read-write apparatus, and intelligent optical distribution network | |
CN105095947A (en) | Passive optical label, optical reading/ writing device and intelligent optical distribution network | |
CN105323094A (en) | Safety management method based on equipment identification and system thereof | |
CN101246609A (en) | Free-card access control system | |
CN104392339A (en) | Combined handover authentication method and system for escort logistics | |
CN103227782A (en) | Interphone, client, remote server, software distributing method and software updating method | |
CN104102961A (en) | Electric power tool and instrument management system and management method | |
CN102112992A (en) | Communication device, communication method, and program | |
CN117035792A (en) | Steel forging process management method and management system based on block chain technology | |
CN103699994B (en) | A kind of method and system that space transference is carried out to mobile terminal stored value card | |
CN206948532U (en) | Optical fiber distribution apparatus and optical fiber wiring system | |
CN104573765A (en) | Smart card information processing method and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20140402 |