CN103700024A - 基于d5000系统的省地一体化远动信息自动导入方法 - Google Patents
基于d5000系统的省地一体化远动信息自动导入方法 Download PDFInfo
- Publication number
- CN103700024A CN103700024A CN201310561136.5A CN201310561136A CN103700024A CN 103700024 A CN103700024 A CN 103700024A CN 201310561136 A CN201310561136 A CN 201310561136A CN 103700024 A CN103700024 A CN 103700024A
- Authority
- CN
- China
- Prior art keywords
- remote signaling
- record
- telecontrol
- name
- remote
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
本发明涉及一种基于D5000系统的省地一体化远动信息自动导入方法,其步骤如下:(1)由List.conf配置文件获取需批量导入的远动文本信息;(2)顺序读取所述远动文本;(3)检查并补充对应厂站、相关电压等级、间隔和设备;(4)导入测点类型,选择遥信信号和遥测信号;(5)所述遥信信息按D5000系统遥信点命名生成规则获得全路径遥信名,对遥信表中相应记录做必要的更新;(6)检查、补充或更新前置接收遥信表记录,写入点号、链路名;(7)所述遥测信息按D5000系统遥测点命名生成规则获得全路径遥测名,对遥测表中相应记录做必要的更新;(8)是否还有需导入的远动文件。本发明极大地提高了工作效率。
Description
技术领域
本发明涉及一种基于D5000系统的省地一体化远动信息自动导入方法。适用于D5000系统建设期间的厂站接入和以后日常自动化数据维护。
背景技术
由于220kV及以上变电站要和有调度关系的多个调度机构通信,按照“直调直采、直采直送”的技术原则,变电站要同不同的调度自动化系统建立数据联系。由于省调及各地调新老系统更替步伐前后不一以及调度监控需求不同和原有信息资源的限制,省调与各地调分别执行各自的远动信息,站端需要针对不同调度主站建立不同的远动信息数据库,变电站投运和日常传动试验需要和各调度主站分别核对远动信息。特别在各级调度备调体系完善后,工作量更是成倍增加,大量耗费人员的精力,更增加了数据不一致、更新不及时导致的运行风险和安全隐患。
传统的新增/改造厂站的D5000系统数据库维护需在DBI数据库维护工具中打开厂站表、电压等级表和不同的设备类表添加厂站、电压等级、设备,再在前置的接收遥测/遥信表中添加测点对应点号、链路名、系数等,工作量大,工作繁琐且容易出错。
发明内容
本发明所要解决的技术问题是提供一种能够减轻主站维修工作量、避免由人工输入带来的安全隐患、大大提高工作效率的基于D5000系统的省地一体化远动信息自动导入方法。
本发明解决其技术问题所采用的技术方案是:
本发明是在分析并研究D5000系统的电网模型定义及SCADA数据整合功能的基础上,基于省地一体的统一、规范的远动定值单,开发了适用于D5000系统的远动定值信息导入方法。本发明可实现对厂站表、电压等级表、设备类表相应记录的自动检查和添加,以及对前置类表信息的自动维护。所述远动定值单是指包含了各种远动信息的文本。
本发明的具体技术方案如下:
一种基于D5000系统的省地一体化远动信息自动导入方法,其特征在于步骤如下:
(1)开始;
(2)由List.conf配置文件获取需批量导入的远动文本信息;
(3)顺序读取所述远动文本;
(4)检查并补充对应厂站、相关电压等级、间隔和设备;
(5)导入测点类型,选择遥信信号和遥测信号;
(6) 所述遥信信息按D5000系统遥信点命名生成规则获得全路径遥信名,对遥信表中相应记录做必要的更新;
(7)检查、补充或更新前置接收遥信表记录,写入点号、链路名;
(8) 所述遥测信息按D5000系统遥测点命名生成规则获得全路径遥测名,对遥测表中相应记录做必要的更新;
(9) 检查、补充或更新前置接收遥测表记录,写入点号、链路名、系数、偏移量;
(10)是否还有需导入的远动文件;
(11) 结束。
所述省地一体化远动信息包含了电网模型设备命名、间隔命名、测点命名、前置点号、前置系数等全部信息。
本发明实现了以下几个功能:
1)读取并解析指定的多个厂站的远动定值单(此处所指远动定值单是指包含了各种远动信息的文本),按遥测、遥信分类读入测点对应的相关信息;
2)根据远动信息文本提供的厂站信息,检查数据库中是否存在相应厂站,若不存在添加新厂站;
3) 按测点信息逐一对相关设备、电压等级进行检查,在电压等级表中补充相应电压等级记录,在相应设备类表中补充相应设备记录,并依照电网设备通用数据模型命名规范,兼顾D5000定义的测点名称生成规则得出预期的数据库中触发生成的测点名称;
4) 在遥测/遥信表中逐一查询、核对相应测点,更新数据库中前置类的接收遥测/遥信信息表,更新或补充相应记录。根据厂站名写入相应链路ID,根据测点信息写入远动点号、遥测的系数、偏移量等。
本发明的有益效果如下:
本发明在河北省调D5000系统建设中得到了有效检验,在系统建设期间厂站接入过程中,以往数据库生成核对至少耗时4小时,现在仅需5分钟,工作效率提升了近50倍,在实际工作中,创造了一人一天接入13个厂站的记录,极大地提高了工作效率。
附图说明
图1为本发明的工作流程图。
具体实施方式
本发明在河北省调D5000系统建设中的应用如下:
(1)开始;
(2)由List.conf配置文件获取需批量导入的远动文本信息;导入以下远动定值文件:test_rp.txt test_ra.txt
(3)顺序读取所述远动文本;
(4)检查并补充对应厂站、相关电压等级、间隔和设备:
检查厂站<河北.测试站>是否存在;
是否添加新厂站<河北.测试站>? (Y/N);
准备添加新厂站;
请输入厂站电压等级(500kV/220kV/110kV):500kV;
请输入厂站区域名称(河北/石家庄/衡水 等):河北;
将添加以下间隔表记录:
河北.测试站/220kV.213间隔 ; 河北.测试站/500kV.3#主变间隔;
河北.测试站/500kV.5011间隔 ; 河北.测试站/500kV.5012间隔;
河北.测试站/500kV.5013间隔; 河北.测试站/66kV.613间隔;
将添加以下4条设备记录:
河北.测试站/220kV.213开关 河北.测试站/500kV.5011开关
河北.测试站/500kV.5012开关 河北.测试站/500kV.5013开关
(5)导入测点类型,选择遥信信号和遥测信号;
(6)所述遥信信息按D5000系统遥信点命名生成规则获得全路径遥信名,对遥信表中相应记录做必要的更新:
准备添加、更新设备表记录,添加、更新设备时调用ModelModify接口;
++++sam_service: g_locator_samservice already exsit:0x937010++++
+++ current m_HostName: he1-sca1
ip == 192.168.184.132 ModelModify接口;
++++sam_service: g_locator_samservice already exsit:0x937010++++
+++ current m_HostName: he1-sca1
ip == 192.168.184.132
更新遥测/遥信点时调用ModelModify接口完毕!
logoff ...
Freeing handles ...
ERROR CODE = 0
按测点检查并添加、更新设备成功!
(7)检查、补充或更新前置接收遥信表记录,写入点号、链路名等:
准备更新遥测/遥信表记录,更新遥测/遥信点时调用;
准备更新前置接收遥测/遥信表记录,更新前置测点时调用ModelModify接口;
++++sam_service: g_locator_samservice already exsit:0x937010++++
+++ current m_HostName: he1-sca1
ip == 192.168.184.132
更新前置测点时调用ModelModify接口完毕!
文件test_rp.txt中的数据已成功导入前置表!
(8)所述遥测信息按D5000系统遥测点命名生成规则获得全路径遥测名,对遥测表中相应记录做必要的更新:
检查厂站<河北.测试站>是否存在;
厂站<河北.测试站>已存在;
河北.测试站 key_region_id: 13 region_id: 13
导入数据文件为接收遥测,默认对应链路名为<河北.测试站>
>>>>将添加以下共计1条aclinesegment记录:
河北.测试I线
>>>>将添加以下共计1条powertransformer记录:
河北.测试站/2#主变
>>>>将添加以下共计2条busbarsection记录:
河北.测试站/500kV.1母线 河北.测试站/500kV.2母线
>>>>将添加以下共计1条compensator_p记录:
河北.测试站/66kV.6623电容器
>>>>将添加以下共计1条compensator_p记录:
河北.测试站/66kV.6624电抗器;
(9)检查、补充或更新前置接收遥测表记录,写入点号、链路名、系数、偏移量等:
准备更新前置接收遥测/遥信表记录,
>>>更新前置测点时调用ModelModify接口...
++++sam_service: g_locator_samservice already exsit:0x1605010++++
+++ current m_HostName: he1-sca1
ip == 192.168.184.132
>>>更新前置测点时调用ModelModify接口完毕!
>>>>>>文件test_ra.txt中的数据已成功导入前置表!
(10)是否还有需导入的远动文件;
(11)结束。
Claims (1)
1.一种基于D5000系统的省地一体化远动信息自动导入方法,其特征在于步骤如下:
(1)开始;
(2)由List.conf配置文件获取需批量导入的远动文本信息;
(3)顺序读取所述远动文本;
(4)检查并补充对应厂站、相关电压等级、间隔和设备;
(5)导入测点类型,选择遥信信号和遥测信号;
(6)所述遥信信息按D5000系统遥信点命名生成规则获得全路径遥信名,对遥信表中相应记录做必要的更新;
(7)检查、补充或更新前置接收遥信表记录,写入点号、链路名;
(8)所述遥测信息按D5000系统遥测点命名生成规则获得全路径遥测名,对遥测表中相应记录做必要的更新;
(9)检查、补充或更新前置接收遥测表记录,写入点号、链路名、系数、偏移量;
(10)是否还有需导入的远动文件;
(11)结束。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310561136.5A CN103700024A (zh) | 2013-11-13 | 2013-11-13 | 基于d5000系统的省地一体化远动信息自动导入方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310561136.5A CN103700024A (zh) | 2013-11-13 | 2013-11-13 | 基于d5000系统的省地一体化远动信息自动导入方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103700024A true CN103700024A (zh) | 2014-04-02 |
Family
ID=50361543
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310561136.5A Pending CN103700024A (zh) | 2013-11-13 | 2013-11-13 | 基于d5000系统的省地一体化远动信息自动导入方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103700024A (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104104151A (zh) * | 2014-07-16 | 2014-10-15 | 国家电网公司 | 配电终端设备信息的接入方法 |
CN106294300A (zh) * | 2016-08-09 | 2017-01-04 | 国网江苏省电力公司无锡供电公司 | 基于智能调度系统的辅助报表智能生成方法 |
CN106780150A (zh) * | 2016-12-31 | 2017-05-31 | 国家电网公司 | 智能远动定值单制作平台和方法 |
CN111061920A (zh) * | 2019-11-20 | 2020-04-24 | 广东电网有限责任公司 | 一种设备参数继承的信号描述正确性校验方法 |
CN113791595A (zh) * | 2021-11-15 | 2021-12-14 | 西安热工研究院有限公司 | 分散控制系统测点数据导入方法、系统、设备及介质 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090088990A1 (en) * | 2007-09-30 | 2009-04-02 | Schweitzer Iii Edmund O | Synchronized phasor processor for a power system |
CN101697551A (zh) * | 2009-11-05 | 2010-04-21 | 华北电力大学(保定) | 一种网络化电力远动通信方法 |
CN102724318A (zh) * | 2012-06-20 | 2012-10-10 | 湖州电力局 | 地县调控一体化技术支持系统 |
-
2013
- 2013-11-13 CN CN201310561136.5A patent/CN103700024A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090088990A1 (en) * | 2007-09-30 | 2009-04-02 | Schweitzer Iii Edmund O | Synchronized phasor processor for a power system |
CN101697551A (zh) * | 2009-11-05 | 2010-04-21 | 华北电力大学(保定) | 一种网络化电力远动通信方法 |
CN102724318A (zh) * | 2012-06-20 | 2012-10-10 | 湖州电力局 | 地县调控一体化技术支持系统 |
Non-Patent Citations (2)
Title |
---|
肖健 等: ""调度集控自动化系统远动信息接入预处理软件设计"", 《南方电网技术》 * |
邱建斌 等: ""基于IEC 61850的智能变电站远动信息接入方法及其改进"", 《电工电气》 * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104104151A (zh) * | 2014-07-16 | 2014-10-15 | 国家电网公司 | 配电终端设备信息的接入方法 |
CN104104151B (zh) * | 2014-07-16 | 2016-10-05 | 国家电网公司 | 配电终端设备信息的接入方法 |
CN106294300A (zh) * | 2016-08-09 | 2017-01-04 | 国网江苏省电力公司无锡供电公司 | 基于智能调度系统的辅助报表智能生成方法 |
CN106780150A (zh) * | 2016-12-31 | 2017-05-31 | 国家电网公司 | 智能远动定值单制作平台和方法 |
CN111061920A (zh) * | 2019-11-20 | 2020-04-24 | 广东电网有限责任公司 | 一种设备参数继承的信号描述正确性校验方法 |
CN111061920B (zh) * | 2019-11-20 | 2024-03-29 | 广东电网有限责任公司 | 一种设备参数继承的信号描述正确性校验方法 |
CN113791595A (zh) * | 2021-11-15 | 2021-12-14 | 西安热工研究院有限公司 | 分散控制系统测点数据导入方法、系统、设备及介质 |
CN113791595B (zh) * | 2021-11-15 | 2022-02-11 | 西安热工研究院有限公司 | 分散控制系统测点数据导入方法、系统、设备及介质 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108765187B (zh) | 一种停电故障辅助研判方法、装置及系统 | |
CN107317399B (zh) | 智能变电站可视化自动对点方法 | |
CN102545213B (zh) | 电网线损实时管理系统及方法 | |
CN106872856B (zh) | 基于多元故障采集的配电网故障主动抢修系统、方法 | |
CN110570101A (zh) | 一种电网配网用智能oms系统 | |
CN103700024A (zh) | 基于d5000系统的省地一体化远动信息自动导入方法 | |
CN105809260A (zh) | 一种调度自动化系统监控信息点表智能生成方法 | |
CN101873008A (zh) | 变电站scd模型到调度中心cim模型的转换方法 | |
CN111934274A (zh) | 一种智能变电站保护定值智能下装方法 | |
CN106814286B (zh) | 基于多元故障采集的配电网故障定位系统、方法及服务器 | |
CN110825834A (zh) | 一种计量自动化终端数据与gis系统配变关联匹配的方法、系统和可读存储介质 | |
CN106940826B (zh) | 模块化供电方案自动生成方法 | |
CN111275210B (zh) | 一种变电站辅助设备台账信息共享方法及装置 | |
CN106845802B (zh) | 一种基于历史数据统计的停电工期判断方法 | |
CN101867185A (zh) | 电力系统的pi测点自动维护系统及其维护方法 | |
WO2019056564A1 (zh) | 基于iec61968标准信息交互总线的配电网故障抢修系统数据共享方法 | |
CN104112183A (zh) | 智能变电站即插即用的智能调度模型管理系统及管理方法 | |
Devanand et al. | Advanced distribution management system: Improving distribution efficiency through an integrated approach | |
CN109710669B (zh) | 基于校验规则库的提高全电网模型数据准确性的方法 | |
CN116826709A (zh) | 可调节负荷资源与调度主站模型的自动匹配方法、装置、存储介质 | |
CN110955808A (zh) | 一种主厂站四遥监控信息匹配关联的方法 | |
CN104199663A (zh) | 一种综合自动化信息表自动生成方法及系统 | |
CN104318739A (zh) | 一种电力专用安全、质量现场监察主站-无线数据终端 | |
CN103226793A (zh) | 一种电力设备状态监测电网模型数据的合并方法和系统 | |
CN103632233B (zh) | 一种电力企业电测专业实用型管理系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20140402 |