CN103693594A - Streetlamp construction work platform - Google Patents

Streetlamp construction work platform Download PDF

Info

Publication number
CN103693594A
CN103693594A CN201310636831.3A CN201310636831A CN103693594A CN 103693594 A CN103693594 A CN 103693594A CN 201310636831 A CN201310636831 A CN 201310636831A CN 103693594 A CN103693594 A CN 103693594A
Authority
CN
China
Prior art keywords
fixed friction
friction piece
platform
upper fixed
lower fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310636831.3A
Other languages
Chinese (zh)
Other versions
CN103693594B (en
Inventor
邵汉琦
邵威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University City College ZUCC
Original Assignee
邵汉琦
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 邵汉琦 filed Critical 邵汉琦
Priority to CN201310636831.3A priority Critical patent/CN103693594B/en
Publication of CN103693594A publication Critical patent/CN103693594A/en
Application granted granted Critical
Publication of CN103693594B publication Critical patent/CN103693594B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a streetlamp construction work platform. The streetlamp construction work platform comprises an upper fixed friction block group and a lower fixed friction block group which surround a streetlamp pole (1), the upper fixed friction block group comprises more than two upper fixed friction blocks (2) which are connected together with a rope, and the upper fixed friction blocks (2) are articulated with a work platform (5); the lower fixed friction block group comprises more than two lower fixed friction blocks (6), the outer sides of the lower fixed friction blocks (6) are provided with connecting blocks (7), the connecting blocks (7) are provided with threaded holes (8), each two neighboring connecting blocks (7) are connected through an externally threaded connecting bolt (9), each connecting bolt (9) is also articulated with a connecting rod (10), and the upper ends of the connecting rods (10) are articulated with the work platform (5). The streetlamp construction work platform can be carried in the form of parts, moreover, the stable work platform can be quickly set up on the streetlamp pole, the quickly mounted work platform is steady, reliable and safe, and furthermore, the streetlamp construction work platform also has the advantages of reasonable structure, flexibility and convenience in use and low cost and can be applied in streetlamp pole projects in a large quantity.

Description

Street lamp construction operation platform
Technical field
The present invention relates to a kind of construction operation platform, particularly a kind of for street lamp being carried out to the job platform of high-altitude construction, the present invention also can be used for the aloft work to direct rod shape buildings such as electric pole, chimney, trees.
Background technology
Street lamp workmen can be permitted to carry a certain amount of power tool and material when ascend operation, workmen's no operatton platform in the time of due to aloft work, power tool and material often need be carried, long-term heavy burden is larger, labour intensity is higher, even if adopt aerial working platform vehicle ascend operation, its heavy burden ability and working space scope are also restricted.Therefore street lamp construction operation is a high risk industries always.For improving street lamp construction operation efficiency, alleviate street lamp workmen's homework burden, expand street lamp workmen's working space, the street lamp job platform of a kind of energy fast construction and safety and stability becomes street lamp workmen's requisite.
Summary of the invention
The object of the invention is to, a kind of street lamp construction operation platform is provided.The present invention can carry by loose mail, and on light pole, build fast a stable workplatform, workplatform after Fast Installation firmly, reliable, safety, and the present invention installs and also to have advantages of rational in infrastructure, flexible and convenient to use, with low costly, can be widely used in light pole job engineering.
Technical scheme of the present invention: a kind of street lamp construction operation platform, comprise the upper fixed friction piece group and the lower fixed friction piece group that hold around light pole, upper fixed friction piece group comprises two above upper fixed friction pieces that link together with rope, and upper fixed friction piece is hinged with a job platform; Described lower fixed friction piece group comprises two above lower fixed friction pieces, the outside of lower fixed friction piece is provided with contiguous block, contiguous block is provided with tapped bore, adjacent contiguous block connects by having externally threaded tie bolt, tie bolt is also hinged with a pipe link, and upper end and the job platform of pipe link are articulated and connected.
In above-mentioned street lamp construction operation platform, described upper fixed friction piece group comprises four upper fixed friction pieces, and described lower fixed friction piece group comprises four lower fixed friction pieces.
In aforesaid street lamp construction operation platform, described upper fixed friction piece and the interior contact surface of lower fixed friction piece all adopt great friction coefficient rubber.
In aforesaid street lamp construction operation platform, described upper fixed friction piece and the inner side of lower fixed friction piece have the tapering same with light pole.
In aforesaid street lamp construction operation platform, the top of described pipe link is provided with hinged block, and the other end and the job platform of hinged block are articulated and connected; The end of described pipe link is provided with negative thread, and the bottom of hinged block is provided with outside thread, and pipe link and hinged block, by screw thread fit, regulate the length of pipe link.
In aforesaid street lamp construction operation platform, the both sides of described upper fixed friction piece are provided with limiting platform, the hinge hole of upper fixed friction piece is arranged on limiting platform top, when job platform turns to horizontal surface, the bottom surface of job platform contacts with limiting platform, and limiting platform plays support, fixing effect to job platform.
In aforesaid street lamp construction operation platform, the upper surface of described limiting platform is a dip plane, and the angle of dip plane is 10-20 degree.
Compared with prior art, the present invention includes fixed friction piece group and lower fixed friction piece group, upper fixed friction piece group comprises 2 above upper fixed friction pieces, upper fixed friction piece links together as steel rope with rope, upper fixed friction piece holds light pole upper end, and the upper fixed end of light pole is provided.The both sides of upper fixed friction piece have limiting platform, limiting platform is provided with hinge hole, hinge hole is hinged with job platform, job platform can rotate up and down on vertical plane, while turning to horizontal surface, the limiting platform of upper fixed friction piece supports job platform, makes job platform maintenance level, for personnel, stands and instrument placement.The present invention also comprises a lower fixed friction piece group, lower fixed friction piece group forms with upper and lower fixed friction piece by two equally, the outside of every lower fixed friction piece is provided with contiguous block, contiguous block is provided with tapped bore, adjacent tapped bore is connected with a tie bolt, lower fixed friction piece is connected by tie bolt and holds light pole lower end, and the lower fixed end of light pole is provided.Described tie bolt is also hinged with pipe link, upper end and the job platform of pipe link are hinged, and provide job platform bottom surface outside to upper support, limiting platform provide inboard, job platform bottom surface to upper support, both sides combined action guarantee construction operation platform level, firmly, reliable and safety.Meanwhile, the present invention is simple and reasonable, with low cost, uses also very simply, and the present invention is owing to adopting modular member, and assembles with hinge and rope, thus Assembly &Disassembly very fast, flexibly, facilitate.
Meanwhile, due to being connected of pipe link and lower fixed friction piece, being threaded of contiguous block by the tie bolt hinged with pipe link and lower friction fixed block, effect platform can drive the rotation of tie bolt while rotating, tie bolt two ends and contiguous block turn tighter and tighter, and in tie bolt rotation process, can cause lower fixed friction piece to tighten up, increase the friction force of holding tightly of lower fixed friction piece group.And the weight of bearing on job platform is larger, lower fixed friction piece is received tightlyer, and the enclasping force that lower fixed friction piece provides is just larger, effectively guaranteed the present invention can be firmly, be fixed on light pole reliably.
As further preferred, described upper fixed friction piece group comprises four upper fixed friction pieces, lower fixed friction piece group also comprises four lower fixed friction piece groups, and the interior contact surface of upper fixed friction piece and lower fixed friction piece all adopts high friction system rubber, they have the tapering same with light pole in inner side.Friction shoe after improvement can improve the present invention and the fixing firmness of light pole further, guarantees user's use safety.
Further again, the upper end of described pipe link is provided with hinged block, and the other end and the job platform of hinged block are hinged, wherein pipe link and hinged block are threaded connection, by rotary screwing thread, the length of fine setting pipe link, improves practicality of the present invention and alerting ability like this.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is sectional perspective schematic diagram of the present invention;
Fig. 3 is upper fixed friction piece and job platform mounting structure schematic diagram;
Fig. 4 is the mounting structure schematic diagram of tie bolt and pipe link;
Fig. 5 is the mounting structure schematic diagram of pipe link and job platform.
Being labeled as in accompanying drawing: 1-light pole, the upper fixed friction piece of 2-, 3-limiting platform, 4-hinge hole, 5-job platform, fixed friction piece under 6-, 7-contiguous block, 8-tapped bore, 9-tie bolt, 10-pipe link, 11-hinged block.
The specific embodiment
Below in conjunction with embodiment, the present invention is described in further detail, but not as limitation of the present invention.
Embodiment: a kind of street lamp construction operation platform, form as depicted in figs. 1 and 2, comprise the upper fixed friction piece group and the lower fixed friction piece group that hold around light pole 1, upper fixed friction piece group comprises two above upper fixed friction pieces 2 that link together with rope, the quantity of upper fixed friction piece can be that 2,3,4 are even more, but from holding fastness, stability and part degree of simplifying tightly, consider, upper fixed friction piece group comprises that 4 upper fixed friction pieces are the most rational.As shown in Figure 3, the both sides of upper fixed friction piece 2 are provided with limiting platform 3, limiting platform 3 tops are provided with hinge hole 4, hinge hole 4 has a job platform 5 through chain connection, when job platform turns to horizontal surface, the bottom surface of job platform contacts with limiting platform, and limiting platform plays support, fixing effect to job platform, every upper fixed friction piece correspondence arranges 4 job platforms, and 4 job platforms form the complete scope of operation.The upper surface of described limiting platform is a dip plane, dip plane is to job platform lopsidedness, and the angle of dip plane is 15 degree, and it is to make job platform when forwarding horizontal surface to that a dip plane is set, the rotation space that also has downward 15 degree, is convenient to the adjustment of buffering and other parts.Described lower fixed friction piece group comprises two above lower fixed friction pieces 6, and the angle that the outside of lower fixed friction piece 6 is provided with 7,2 contiguous blocks of 2 contiguous blocks is 90 degree, and therefore the homonymy contiguous block of adjacent lower fixed friction piece is in parastate.As shown in Figure 4, contiguous block 7 is provided with tapped bore 8, and adjacent tapped bore 8 connects by the threaded tie bolt 9 of tool, and tie bolt 9 is hinged with a pipe link 10, and the upper end of pipe link 10 and job platform 5 are articulated and connected.The same with the composition of upper fixed friction piece group, described lower fixed friction piece group also comprises four lower fixed friction pieces 6.And described upper fixed friction piece 2 and the interior contact surface of lower fixed friction piece 6 all adopt great friction coefficient rubber, the inner side of upper fixed friction piece 2 and lower fixed friction piece 6 has the tapering same with light pole.As shown in Figure 5, the top of described pipe link 10 is provided with hinged block 11, and the other end of hinged block 11 and job platform 5 are articulated and connected; The end of described pipe link 10 is provided with outside thread, and the bottom of hinged block 11 is provided with negative thread, and pipe link 10 by screw thread fit, regulates the length of pipe link 10 with hinged block 11.
Principle of work: during installation, determine the fixed position of job platform on light pole, 4 upper fixed friction pieces are held to this attachment point of light pole with steel rope, with the hinged job platform of hinge, again that hinge-point and the pipe link in job platform outside is hinged, the lower end of pipe link and tie bolt carry out hinged, and the two ends of tie bolt screw and are connected with contiguous block on lower fixed friction piece, complete the installation of first job platform.Complete successively again the installation of remaining three job platforms, lower fixed friction piece connects and surrounds light pole through four tie bolts, and under the application of force of four pipe links, automatically hold light pole tightly, because tie bolt and contiguous block are screw thread fit, when job platform load-bearing larger, the pipe link application of force is larger, the screw thread fit of tie bolt and contiguous block is tighter, make to receive tightlyer between adjacent lower fixed friction piece, the enclasping force that lower fixed friction piece group provides is just larger, effectively guaranteed the present invention can be firmly, be fixed on light pole reliably.

Claims (7)

1. street lamp construction operation platform, it is characterized in that: comprise the upper fixed friction piece group and the lower fixed friction piece group that hold around light pole (1), upper fixed friction piece group comprises two above upper fixed friction pieces (2) that link together with rope, and upper fixed friction piece is hinged with a job platform (5); Described lower fixed friction piece group comprises two above lower fixed friction pieces (6), the outside of lower fixed friction piece (6) is provided with contiguous block (7), contiguous block (7) is provided with tapped bore (8), adjacent contiguous block (8) connects by having externally threaded tie bolt (9), tie bolt (9) is also hinged with a pipe link (10), and the upper end of pipe link (10) and job platform (5) are articulated and connected.
2. street lamp construction operation platform according to claim 1, is characterized in that: described upper fixed friction piece group comprises four upper fixed friction pieces (2), and described lower fixed friction piece group comprises four lower fixed friction pieces (6).
3. street lamp construction operation platform according to claim 2, is characterized in that: described upper fixed friction piece (2) and the interior contact surface of lower fixed friction piece (6) all adopt great friction coefficient rubber.
4. street lamp construction operation platform according to claim 3, is characterized in that: described upper fixed friction piece (2) and the inner side of lower fixed friction piece (6) have the tapering same with light pole.
5. street lamp construction operation platform according to claim 1, is characterized in that: the top of described pipe link (10) is provided with hinged block (11), and the other end of hinged block (11) and job platform (5) are articulated and connected; The end of described pipe link (10) is provided with negative thread, and the bottom of hinged block (11) is provided with outside thread, and pipe link and hinged block, by screw thread fit, regulate the length of pipe link.
6. according to the street lamp construction operation platform described in claim 1 to 5 any one, it is characterized in that: the both sides of described upper fixed friction piece (2) are provided with limiting platform (3), the hinge hole of upper fixed friction piece is arranged on limiting platform (3) top, when job platform turns to horizontal surface, the bottom surface of job platform contacts with limiting platform, and limiting platform plays support, fixing effect to job platform.
7. street lamp construction operation platform according to claim 6, is characterized in that: the upper surface of described limiting platform is a dip plane, and the angle of dip plane is 10-20 degree.
CN201310636831.3A 2013-12-02 2013-12-02 Streetlamp construction work platform Expired - Fee Related CN103693594B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310636831.3A CN103693594B (en) 2013-12-02 2013-12-02 Streetlamp construction work platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310636831.3A CN103693594B (en) 2013-12-02 2013-12-02 Streetlamp construction work platform

Publications (2)

Publication Number Publication Date
CN103693594A true CN103693594A (en) 2014-04-02
CN103693594B CN103693594B (en) 2016-02-17

Family

ID=50355295

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310636831.3A Expired - Fee Related CN103693594B (en) 2013-12-02 2013-12-02 Streetlamp construction work platform

Country Status (1)

Country Link
CN (1) CN103693594B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU526592A1 (en) * 1972-11-22 1976-08-30 Ленинградский Филиал Всесоюзного Института По Проектированию Организации Энергетического Строительства "Оргэнергострой" Device for installation of power line poles
JPH0484550U (en) * 1990-11-29 1992-07-22
GB2356355A (en) * 1999-11-22 2001-05-23 Nicholas Woodmansey Portable mast climbing device
CN201128880Y (en) * 2007-11-15 2008-10-08 中交第一公路工程局有限公司 Hold hoops and support integrated structure for circular single pier
CN201280812Y (en) * 2008-09-24 2009-07-29 上海市机械施工有限公司 Chain anchor ear device
CN201355750Y (en) * 2008-12-30 2009-12-02 上海市南电力工程有限公司 Rotating insulated ladder for operation on live distribution lines
CN202856235U (en) * 2012-09-06 2013-04-03 四川电力科学研究院 Insulation platform for live operation
CN202945031U (en) * 2012-11-05 2013-05-22 湖南省电力公司娄底电业局 Comprehensive insulation lifting platform

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU526592A1 (en) * 1972-11-22 1976-08-30 Ленинградский Филиал Всесоюзного Института По Проектированию Организации Энергетического Строительства "Оргэнергострой" Device for installation of power line poles
JPH0484550U (en) * 1990-11-29 1992-07-22
GB2356355A (en) * 1999-11-22 2001-05-23 Nicholas Woodmansey Portable mast climbing device
CN201128880Y (en) * 2007-11-15 2008-10-08 中交第一公路工程局有限公司 Hold hoops and support integrated structure for circular single pier
CN201280812Y (en) * 2008-09-24 2009-07-29 上海市机械施工有限公司 Chain anchor ear device
CN201355750Y (en) * 2008-12-30 2009-12-02 上海市南电力工程有限公司 Rotating insulated ladder for operation on live distribution lines
CN202856235U (en) * 2012-09-06 2013-04-03 四川电力科学研究院 Insulation platform for live operation
CN202945031U (en) * 2012-11-05 2013-05-22 湖南省电力公司娄底电业局 Comprehensive insulation lifting platform

Also Published As

Publication number Publication date
CN103693594B (en) 2016-02-17

Similar Documents

Publication Publication Date Title
CN103579961B (en) The cable joint implementation method of adjustable lifting type fixture
CN204369468U (en) A kind of lifting device for 220kV tension-resistant china bottle replacement
CN203895908U (en) Balance cross-arm
CN204456815U (en) A kind of cradle for constructional engineering
CN203481723U (en) Adjustable lifting type fixing device applied for manufacturing cable joint
CN103693594B (en) Streetlamp construction work platform
CN103269022B (en) Electric power overhaul dedicated wires bar umbrella
CN204893863U (en) Jumper clamp bolt fastening tool
CN203301067U (en) Apparatus for replacing pin insulator
CN204676756U (en) The fastener of top board furred ceiling
CN204152417U (en) A kind of removable hanging ladder
CN108862131B (en) Insulating platform of manual level (l) ing
CN204175175U (en) Circuit tower cable maintenance ladder
CN205102073U (en) A device that is used for support of column pipe intracavity to fix a position
CN206401824U (en) Colliery Combined pulley formula cable clip
CN205976589U (en) Annular pole crack reinforcing apparatus
CN204238567U (en) Hanger erection device
CN205284452U (en) Be applicable to open -air monitoring facilities fixing device of forestry technique
CN204108385U (en) A kind of rig operation adjusting device of installing of being convenient to heal up
CN203779453U (en) Anti-explosion lampshade disassembling device
CN210350671U (en) Bridge support structure for cable box
CN201975716U (en) Rotary-top aerial work platform frame
CN203398635U (en) Bracing frame for replacing vibration damper
CN109323190B (en) Street lamp
CN211030723U (en) Drilling support for constructional engineering

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Shao Wei

Inventor before: Shao Hanqi

Inventor before: Shao Wei

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20151217

Address after: 310015 Huzhou street, Zhejiang, Gongshu District, No. 51, No.

Applicant after: Urban College of Zhejiang Univ.

Address before: 316131, Zhejiang, Zhoushan province Putuo District six horizontal town Shao village month hole Road No. 39

Applicant before: Shao Hanqi

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160217

Termination date: 20181202