CN103691858B - Method for forging venturi pipe - Google Patents

Method for forging venturi pipe Download PDF

Info

Publication number
CN103691858B
CN103691858B CN201310543899.7A CN201310543899A CN103691858B CN 103691858 B CN103691858 B CN 103691858B CN 201310543899 A CN201310543899 A CN 201310543899A CN 103691858 B CN103691858 B CN 103691858B
Authority
CN
China
Prior art keywords
forging
venturi tube
heating
blank
venturi pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310543899.7A
Other languages
Chinese (zh)
Other versions
CN103691858A (en
Inventor
颜永丰
庞程
吴佩君
王费
朱志峰
刘丽敏
庞飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGYIN THROTTLING DEVICE MANUFACTURER CO Ltd
Original Assignee
JIANGYIN THROTTLING DEVICE MANUFACTURER CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGYIN THROTTLING DEVICE MANUFACTURER CO Ltd filed Critical JIANGYIN THROTTLING DEVICE MANUFACTURER CO Ltd
Priority to CN201310543899.7A priority Critical patent/CN103691858B/en
Publication of CN103691858A publication Critical patent/CN103691858A/en
Application granted granted Critical
Publication of CN103691858B publication Critical patent/CN103691858B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forging (AREA)

Abstract

The invention discloses a method for forging a venturi pipe. The method comprises the following steps of selecting the forging material 304SS; heating the blank material by a heating furnace; when the heating temperature reaches 1130 to 1180 DEG C, taking the blank material out of the furnace, and forging; when the forging temperature reaches 850 DEG C, reheating, and forging; punching the forged blank to form a blank which is used for manufacturing the venturi pipe; detecting the size of the blank, and heating the blank by the heating furnace after the blank is qualified; putting the heated blank onto compression molding forging equipment to process, and processing into the venturi pipe; detecting the size of the processed venturi pipe, heating the venturi pipe by the heating furnace after the venturi pipe is qualified, heating the temperature to 1010 to 1150 DEG C, maintaining the temperature for one hour, taking the venturi pipe out of the heating furnace, and putting into cooling liquid to quickly cool. In the forging process, the blank is processed into the venturi pipe by the compression molding forging equipment, the texture structure of the venturi pipe is discontinuous, the mechanical property of the processed venturi pipe is good, and the strength is high.

Description

A kind of method of forging Venturi tube
Technical field
The present invention relates to a kind of method of forging Venturi tube.
Background technology
Because the High Temperature High Pressure characteristic of nuclear power factory owner feedwater is so equipment must have enough intensity to meet safety Require, Venturi measuring body portion adopts forging process, and the blank shape of forging must be close to finished form, so that Equipment organizational structure adapts to the security requirement of nuclear power, and traditional forging mode is: in the middle of after blank material heating, punching rod enters Row forging, forging forging out is tubular, the machined aftershaping of forging, expands partly and afterwards part in anterior, front contracting Organizational structure is cut-off, so mechanical performance is generally speaking poor, product strength is relatively low.
Content of the invention
It is an object of the invention to overcoming defect present in prior art, provide a kind of method of forging Venturi tube, After forging, Venturi tube organizational structure is continuously uninterrupted, good mechanical property, and product strength is high.
For achieving the above object, the technical scheme is that provide a kind of forging Venturi tube method, have as Lower step:
A) select forging material to be 304ss, it is carried out with physicochemical property inspection, after ultrasonic examination according to calculating blanking weight Amount carries out blanking and becomes blank;
B) blank is heated by heating furnace, 1130 DEG C~1180 DEG C forgings of coming out of the stove of heating-up temperature, forging ratio is more than 1:3, when forging temperature reaches 850 DEG C, forges after reheating again;
C) blank after forging in step b) is punched out forming the base substrate manufacturing Venturi tube;
D) detect base substrate size, qualified after heated by heating furnace, heating-up temperature be 1130 DEG C~1180 ℃;
E) base substrate after step d) heating puts into processing on moulding pressing forging equipment, is processed into Venturi tube;
F) detection through step e) processing after Venturi tube size, qualified after heated by heating furnace, heat To 1010 DEG C~1150 DEG C, after insulation 1 is little, taking-up is put in coolant and is quickly cooled down.
Preferably, step b) is heated to 1170 DEG C of forgings of coming out of the stove.
Preferably, the concrete processing method of step e) is: the base substrate heating is put into moulding pressing forging equipment On;Molding rotation inner roll in two ends is pushed in base substrate punching hole, outer roller wheel extruded stock body;High-speed rotation makes base substrate along roller Wheel axial extension.
Preferably, the coolant in step f) is cooling water.
Preferably, in step f), Venturi tube is transported after coming out of the stove and is less than 55s to the time of cooling water.
Preferably, in step f), the concrete grammar of water-cooled is: Venturi tube immersion depth is not less than the tank of 1.5m Interior and reciprocating, described tank ON cycle water, not higher than 50 DEG C of water temperature in it.
Preferably, in step c), punch size is ф 80mm.
Advantages of the present invention and having the beneficial effects that: in forging process, by using moulding pressing forging equipment to base Body is processed into Venturi tube, and Venturi tube is continuously in the organizational structure of anterior, front contracting part and rear expansion part, processing Product good mechanical property afterwards, intensity is high.
Specific embodiment
With reference to embodiment, the specific embodiment of the present invention is further described.Following examples are only used for more Plus clearly demonstrate technical scheme, and can not be limited the scope of the invention with this.
A kind of method of forging Venturi tube it is characterised in that: there are following steps:
A) select forging material to be 304ss, it is carried out with physicochemical property inspection, after ultrasonic examination according to calculating blanking weight Amount carries out blanking and becomes blank;
B) blank is heated by heating furnace, 1130 DEG C~1180 DEG C forgings of coming out of the stove of heating-up temperature, forging ratio is more than 1:3, when forging temperature reaches 850 DEG C, forges after reheating again;
C) blank after forging in step b) is punched out forming the base substrate manufacturing Venturi tube, punch size is ф 80mm;
D) detect base substrate size, qualified after heated by heating furnace, heating-up temperature be 1130 DEG C~1180 ℃;
E) base substrate after step d) heating puts into processing on moulding pressing forging equipment, is processed into Venturi tube;
F) detection through step e) processing after Venturi tube size, qualified after heated by heating furnace, heat To 1010 DEG C~1150 DEG C, after insulation 1 is little, taking-up is put in coolant and is quickly cooled down.
Highly preferred technical scheme is that step b) is heated to 1170 DEG C of forgings of coming out of the stove.
The concrete processing method of step e) is: the base substrate heating is put on moulding pressing forging equipment;Two ends are become Type rotation inner roll pushes in base substrate punching hole, outer roller wheel extruded stock body;High-speed rotation makes base substrate along running roller axial extension, Two ends are forged using press forging mould, the shape after machining inside forging Venturi tube out, so each portion The organizational structure divided is continuously continual it is ensured that the mechanical performance of product is more reasonable, so that product strength more preferably, makes peace Full property is higher.
Coolant in step f) is cooling water, transports and do not surpass to the time of cooling water after Venturi tube is come out of the stove in step f) Cross 55s.Venturi tube immersion depth is not less than in the tank of 1.5m and reciprocating, described tank ON cycle water, its Not higher than 50 DEG C of interior water temperature.
In step b), forging includes jumping-up-pulling repeatedly, round as a ball afterwards, upsetting planar end surface, correction size.
The above is only the preferred embodiment of the present invention it is noted that ordinary skill people for the art For member, on the premise of without departing from the technology of the present invention principle, some improvements and modifications can also be made, these improvements and modifications Also should be regarded as protection scope of the present invention.

Claims (6)

1. a kind of method of forging Venturi tube it is characterised in that: there are following steps:
A) select forging material to be 304ss, it is carried out with physicochemical property inspection, enters according to calculating blanking weight after ultrasonic examination Row blanking becomes blank;
B) blank is heated by heating furnace, 1130 DEG C~1180 DEG C forgings of coming out of the stove of heating-up temperature, forging ratio is more than 1:3, When forging temperature reaches 850 DEG C, forge again after reheating;
C) blank after forging in step b) is punched out forming the base substrate manufacturing Venturi tube;
D) detect base substrate size, qualified after heated by heating furnace, heating-up temperature be 1130 DEG C~1180 DEG C;
E) base substrate after step d) heating puts into processing on moulding pressing forging equipment, is processed into Venturi tube, heating Good base substrate is put on moulding pressing forging equipment;Its concrete processing method is that molding rotation inner roll in two ends is pushed base substrate In punching hole, outer roller wheel extruded stock body;High-speed rotation makes base substrate along running roller axial extension;
F) detection through step e) processing after Venturi tube size, qualified after heated by heating furnace, be heated to 1010 DEG C~1150 DEG C, after insulation 1 is little, taking-up is put in coolant and is quickly cooled down.
2. as claimed in claim 1 forging Venturi tube method it is characterised in that: step b) is heated to 1170 DEG C of forgings of coming out of the stove Make.
3. as claimed in claim 1 forging Venturi tube method it is characterised in that: the coolant in step f) be cooling Water.
4. as claimed in claim 3 forging Venturi tube method it is characterised in that: after in step f), Venturi tube is come out of the stove transport The time transporting to cooling water is less than 55s.
5. as claimed in claim 4 forging Venturi tube method it is characterised in that: the concrete grammar of water-cooled in step f) It is: Venturi tube immersion depth is not less than in the tank of 1.5m and reciprocating, described tank ON cycle water, water in it Not higher than 50 DEG C of temperature.
6. as claimed in claim 1 forging Venturi tube method it is characterised in that: in step c) punch size be ф 80mm.
CN201310543899.7A 2013-11-06 2013-11-06 Method for forging venturi pipe Active CN103691858B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310543899.7A CN103691858B (en) 2013-11-06 2013-11-06 Method for forging venturi pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310543899.7A CN103691858B (en) 2013-11-06 2013-11-06 Method for forging venturi pipe

Publications (2)

Publication Number Publication Date
CN103691858A CN103691858A (en) 2014-04-02
CN103691858B true CN103691858B (en) 2017-02-01

Family

ID=50353610

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310543899.7A Active CN103691858B (en) 2013-11-06 2013-11-06 Method for forging venturi pipe

Country Status (1)

Country Link
CN (1) CN103691858B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106180501A (en) * 2015-04-29 2016-12-07 江苏昊鹏机械有限公司 A kind of Forging Technology
CN111346997A (en) * 2020-03-25 2020-06-30 攀钢集团江油长城特殊钢有限公司 Processing technology of shell for missile

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5855851B2 (en) * 1976-04-29 1983-12-12 愛知製鋼株式会社 Forging method
US7610818B2 (en) * 2006-10-05 2009-11-03 Syncrude Canada Ltd. Flow meter for bitumen froth pipelines
US20090071219A1 (en) * 2007-09-14 2009-03-19 Western Canada Machining Inc. Apparatus and method for forging premium coupling blanks
CN101774107B (en) * 2009-12-31 2011-05-04 上海新闵重型锻造有限公司 Method for forging Venturi tubes
CN101893462A (en) * 2010-06-28 2010-11-24 江阴市节流装置厂有限公司 Extension-type Venturi tube and processing method and application method thereof
CN202734879U (en) * 2012-07-25 2013-02-13 温州市达安仪表厂 Integral Venturi tube
CN202869562U (en) * 2012-10-27 2013-04-10 江阴市神州测控设备有限公司 Machining-type Venturi tube

Also Published As

Publication number Publication date
CN103691858A (en) 2014-04-02

Similar Documents

Publication Publication Date Title
CN103736734B (en) Hot rolling CPE unit prepares the technique of the super 13Cr seamless steel pipe of high-chromium alloy
CN103358100B (en) Forging and molding process method for titanium alloy tubular piece
CN101706019B (en) Method for manufacturing large-caliber thick-wall seamless steel tube in vertical extrusion way
CN103706743B (en) Die-forging forming process of titanium-alloy forged drum piece
CN105252230B (en) Machining process for inclined tee
CN103589975B (en) Die-less spinning technology for large thick-wall aluminum alloy curved bus type rotary body part
CN110369548A (en) A kind of titanium alloy is seamless square and rectangular pipe and its manufacturing method and application
CN104338882B (en) The forming method of generation Ⅲ nuclear power cooling medium pump motor casing forging
CN110125314A (en) A kind of forging method of high-carbon-chromium bearing steel forging stock
CN103691858B (en) Method for forging venturi pipe
CN104625627B (en) A kind of preparation method of plasma rotating electrode titanium alloy electrode rod
CN104551547A (en) Processing process of high-intensity titanium alloy pipe fittings
CN104759849A (en) Manufacturing method for flange component for controlling automobile exhaust
CN108237197B (en) A kind of forging method improving the flaw detection of structural steel large-sized ring part
CN108998650B (en) Method for manufacturing large-caliber thick-wall seamless steel pipe of 630 ℃ ultra-supercritical unit G115
CN103722043A (en) Production method and detection method of titanium alloy seamless tube
CN104138927B (en) A kind of method of producing titanium alloy tube
CN106002096A (en) One-time fire forging method for M50 steel bearing ring forge piece
CN107755454A (en) A kind of manufacture method of high-strength corrosion-resisting drawn tube for marine settings engineering
CN102873126B (en) Manufacturing method of large-aperture thin-walled seamless steel tube for nuclear power plant
CN107716587A (en) A kind of processing method of thin-wall titanium alloy pipe
CN108746440B (en) A kind of high cylindrical forged piece segmentation milling method of large-sized high-temperature alloy
CN113770290B (en) Forging method of large-specification high-utilization red copper thin-wall hollow tube
CN113305166B (en) Diameter-expanding hot extrusion process for bimetal alloy steel composite pipe
CN215746161U (en) Special-shaped horse bar and inner step gear forging

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Method for forging venturi pipe

Effective date of registration: 20180705

Granted publication date: 20170201

Pledgee: Bank of Communications Ltd Wuxi branch

Pledgor: JIANGYIN THROTTLING DEVICE MANUFACTURER CO., LTD.

Registration number: 2018320010027