CN103683326A - Method for calculating optimal admitting ability for wind power multipoint access of regional power grid - Google Patents

Method for calculating optimal admitting ability for wind power multipoint access of regional power grid Download PDF

Info

Publication number
CN103683326A
CN103683326A CN201310651758.7A CN201310651758A CN103683326A CN 103683326 A CN103683326 A CN 103683326A CN 201310651758 A CN201310651758 A CN 201310651758A CN 103683326 A CN103683326 A CN 103683326A
Authority
CN
China
Prior art keywords
wind
cost
turbine set
year
energy turbine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310651758.7A
Other languages
Chinese (zh)
Other versions
CN103683326B (en
Inventor
刘文霞
李盈枝
徐晓波
张玉莹
周樨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China Electric Power University
Original Assignee
North China Electric Power University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North China Electric Power University filed Critical North China Electric Power University
Priority to CN201310651758.7A priority Critical patent/CN103683326B/en
Publication of CN103683326A publication Critical patent/CN103683326A/en
Application granted granted Critical
Publication of CN103683326B publication Critical patent/CN103683326B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/76Power conversion electric or electronic aspects
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Control Of Eletrric Generators (AREA)

Abstract

The invention discloses a method for calculating the optimal admitting ability for wind power multipoint access of a regional power grid and belongs to the technical field of wind power penetration methods of the power grid. The method for calculating the optimal admitting ability for the wind power multipoint access of the regional power grid comprises the steps that the installed capacity of all wind power plants is initialized, and data such as the local wind speed are acquired; the output condition of all the wind power plants is calculated, and unit commitment and optimization within all dispatching cycles are conducted, so that an annual unit commitment mode of an electric power system comprising the wind power plants is obtained; power flow calculation is conducted based on each period of time, whether an operation constraint condition of the system is met is verified, and a final objective function value is calculated after simulation is conducted on the system for more than 8760 hours; the installed capacity of the wind power plants is updated, optimized iteration is conducted on an objective function, and optimal solution of the wind power generating capacity is achieved, namely the optimal admitting ability of the power grid which enables the economical efficiency of the system to be optimized on the premise that the safety and stability constraint conditions are met is achieved. According to the method for calculating the optimal admitting ability for the wind power multipoint access of the regional power grid, an optimal wind power admitting capacity calculation model with the largest net earning of a wind power plant and power grid combination system (with the environmental benefit considered) as the purpose is established, and suggestions can be provided for the proper establishment of the installed capacity of the regional wind power plants.

Description

A kind of regional power grid wind-powered electricity generation multiple spot accesses the computational methods of best receiving ability
Technical field
The present invention relates to the computational methods that a kind of regional power grid wind-powered electricity generation multiple spot accesses best receiving ability, belong to electrical network wind-powered electricity generation acceptance method technical field.
Background technology
Along with day by day highlighting of energy security problem and environmental problem, China has strengthened the exploitation dynamics to renewable energy power generation, and wherein wind-powered electricity generation is with fastest developing speed.Although wind-powered electricity generation has good reduction of discharging benefit, due to its randomness of exerting oneself, fluctuation, wind-electricity integration brings challenges to the security and stability of electrical network, and this also makes its economics of power generation lower than conventional thermal power generation.China's regenerative resource law regulation: electrical network must fully be received wind-powered electricity generation, this policy requirements electrical network must provide supporting grid-connected construction, the standby and peak regulation cost of increase operation for this reason, to power grid enterprises, brought certain financial burden, make power grid enterprises receive the enthusiasm of wind-powered electricity generation not high, cause the problems such as installed capacity of wind-driven power is superfluous, utilance is low.One side is the regulation that the electrical network of Renewable Energy Law is fully received wind-powered electricity generation, the requirement of electrical network to fail safe, reliability, economy on the one hand, make wind energy turbine set abandon wind phenomenon serious, installation serious waste, existing research mainly concentrates on the technological layer of considering ability to transmit electricity constraint and the constraint of peak load regulation network ability, what generally obtain is the receptive maximum wind capacity of electrical network under existing power supply structure, cannot meet the requirement of system economy, security and stability simultaneously.The present invention is intended to seek a kind of best installed capacity of wind-powered electricity generation that two aspects require that simultaneously meets, for Wind-Electric Power Stations construction is offered suggestions.
Summary of the invention
For receiving wind-powered electricity generation whether can lose---economy is carried out prediction and calculation, and current Wind Power Development situation and existing research above shortcomings, the object of this invention is to provide and a kind ofly meeting under the condition of system safety constraint, network transmission of electricity security constraint, make the wind-powered electricity generation of the real receptible system net profit maximum of electric power enterprise receive capacity calculation method (economy optimum, ask max), and based on improving DE algorithm, annual 8760 periods are carried out to analogue simulation, prove validity and the practicality of invention.
Technical scheme provided by the invention is,
Regional power grid wind-powered electricity generation multiple spot accesses computational methods for best receiving ability, and the method step is:
(1) each wind energy turbine set installed capacity of initialization P n, and gather local air speed data, conventional unit installed capacity, yearly peak load data, according to blower fan output calculation model, draw planning each output of wind electric field situation P in year w, j, h;
Described wind-powered electricity generation unit output calculation model:
p w ( v ) = 0 , 0 &le; v < v ci p N v i - v ci v R - v ci , v ci &le; v < v R P N , v R &le; v < v co ,
Wherein,
P w(v): wind power,
P n: blower fan rated power,
V ci: the incision wind speed of blower fan,
V r: the rated wind speed of blower fan,
V co: the cut-out wind speed of blower fan;
By year wind-powered electricity generation exert oneself situation in conjunction with load prediction level, carry out the system Unit Combination optimization of first dispatching cycle, according to economic dispatch model, obtain each operating states of the units and the generated output of each period in one day:
min E = &Sigma; t = 1 T &Sigma; i = 1 N U it f it ( P it ) ,
Constraints:
&Sigma; i = 1 N P G , i , h + &Sigma; j = 1 M P w , j , h = P Load , h + &Delta;P Loss , h ,
P G,i,h,min≤P G,i,h≤P G,i,h,max
P{D Ri≤P it-P it-1≤U Ri}≥β 1
Wherein,
E: system total power production cost,
T: hop count in the time of in research cycle,
N: the number of units of conventional power generation usage unit in system,
U it: conventional unit i is at the start and stop state of period t, U it=1 represents operation, U it=0 represents to shut down,
P it: conventional unit i is at the active power of output of period t,
F it(P it): the operating cost of conventional unit i, expression way is:
f it ( P it ) = a i + b i P it + c i P it 2 + | d i sin [ e i ( P it min - P it ) ] | , Wherein, a i, b i, c i, d i, e i: the coefficient of cost function,
Figure BDA0000431096100000034
: conventional unit i is at the lower limit of exerting oneself of period t,
M: the wind turbine number of organizing a performance,
P g, i, h: conventional unit is meritorious exerts oneself,
P w, j, h: wind-powered electricity generation unit is meritorious exerts oneself,
P load, h: burden with power size,
Δ P loss, h: active power loss,
P g, i, h, min, P g, i, h, max: represent respectively technology minimum load and the maximum output of conventional unit,
D ri, U ri: conventional unit i is at meritorious fall off rate and the climbing speed of exerting oneself of period t,
β 1: prior given confidence level;
(2) carry out the calculating of wind-powered electricity generation annual energy output, only obtain the target function subconstiuent relevant to wind power generation amount, described the target function subconstiuent relevant to wind power generation amount comprises electrical network sale of electricity income I g, s, j, compensation income I g, co, wind energy turbine set compensation income I w, co, Construction of Wind Power cost C w,c, wind energy turbine set year operation expense C w, opwith power grid construction cost C g, tr;
A. electrical network sale of electricity income I g, s, j, can be expressed as the product of electrical network electricity sales amount and sale of electricity price, compensation income, comprises the compensation to the compensation He Dui power grid enterprises of wind energy turbine set self;
Wind energy turbine set year compensation income:
I w,co=W w×p w,co
Wherein,
I w, co: wind energy turbine set year compensation income,
W w: wind energy turbine set annual energy output,
P w, co: the compensation of wind power generation annual energy output unit,
Electrical network year compensation income:
I g,co=W w×p g,co
Wherein,
I g, co: electrical network year compensation income,
P g, co: electrical network is received the compensation of wind-powered electricity generation annual energy output unit,
B. wind-powered electricity generation cost of investment comprise wind energy turbine set year construction cost and wind energy turbine set year operation expense;
Wind energy turbine set year construction cost:
C w , c , actual = C w , c &times; i / [ 1 - ( 1 + i ) - T w ] ,
Wherein,
C w, c, actual: wind energy turbine set year construction cost,
C w,c: the wind energy turbine set initial stage is built total cost,
I: bank's Annual Percentage Rate,
T w: the life-span time limit of wind energy turbine set,
Figure BDA0000431096100000052
: fund equivalence year value coefficient,
Wind energy turbine set year operation expense:
C w,op=W w×p w,co
Wherein,
C w, op: wind energy turbine set year operation expense,
P w, co: year unit operation expense,
C. the power grid construction cost that wind-electricity integration causes mainly refers to the construction cost of above-mentioned transmission line; The total cost of transmission line can be regarded the linear function of line length as; That is, power grid construction cost C g, trit is a linear function;
(3) proceed to real time execution simulation, based on each period, carry out trend calculating, and the whether satisfied constraint of verification, each subconstiuent the accumulation of this period association system if meet, obtained; Otherwise need to carry out the operating point that correcting property control and then definite system are new and export assistant service value at cost the accumulation of this period; Comprising degree of depth peak regulation cost and stand-by cost;
Degree of depth peak regulation cost: when conventional unit carries out degree of depth peak regulation while guaranteeing electricity net safety stable, just produced system degree of depth peak regulation cost:
C g,dl=W G,dl×p dl
Wherein,
C g, dl: degree of depth peak regulation cost,
W g, dl: normal power supplies participates in the energy output that degree of depth peak regulation reduces,
P dl: unit peak regulation cost;
It is the part energy output that unit output exceeds basic peak regulation that normal power supplies degree of depth peak regulation reduces energy output:
W G , dl = &Integral; K B P GN &GreaterEqual; P G , actual ( K B P GN - P G , actual )
Wherein,
K b: degree of depth peak regulation coefficient,
P gN: peak regulation unit rated capacity,
P g, actual: actual meritorious the exerting oneself of unit;
Get probability α ∈ (0,1) that reserve capacity meets system safety operation requirement as Reliability Index, the minimum new forms of energy reserve capacity of system that meets confidence level α is:
&Integral; - &infin; Res d 1 2 &pi; &sigma; wind , d exp ( - ( &xi; - &mu; wind , d ) 2 2 &sigma; 2 wind , d ) d&xi; = &alpha; ,
Wherein,
Res d: system is required newly-increased day reserve capacity of receiving wind-powered electricity generation,
μ wind, d: the average of predicated error,
σ 2 wind, d: the variance of predicated error,
α: system reliability level;
All conventional units of reserve capacity that provide all can obtain corresponding capacity compensation, and this part compensation is exactly the stand-by cost of electrical network for receiving wind-powered electricity generation to produce:
C res = &Sigma; d = 1 365 Res d &times; p res ,
Wherein,
C res: year wind-powered electricity generation stand-by cost,
P res: unit reserve capacity cost;
(4) repeat above-mentioned (1)-(3) process until simulation dispatching cycle finishes; Take one day 24 hours be dispatching cycle, repeating step (1)-(3), the continuous analog wind-powered electricity generation of 24 hours is exerted oneself and is calculated the accumulated value of every value at cost;
(5) carry out the economic dispatch of next cycle, repeat said process until annual simulation finishes, obtain the target function value based on simulation in annual 8760 hours, i.e. the net profit maxV of association system---described association system comprises wind energy turbine set, electrical network and social environment---:
max V = &Sigma; j = 1 N ( I w , co , j + I g , s , j + I g , co , j + I emi , j ) - &Sigma; j = 1 N [ C w , c , j i 1 - ( 1 + i ) - T w + C g , tr , j i 1 - ( 1 + i ) - T l + C w , o , j + C g , op , j + C g , an , j ] ,
Wherein,
I g,s: the year sale of electricity income of electrical network, depend on through electrical network and carry electric weight and the sale of electricity price that arrives user's side,
I emi: wind-powered electricity generation environmental benefit,
K: the kind of pollutant emission,
C g, tr: connection charge, be expressed as herein receive wind-powered electricity generation newly-built connect net track cost,
T l: the operation time limit of newly-built circuit,
C g, op: electrical network annual operating and maintenance cost, only consider network loss cost herein,
C g, an: electrical network year assistant service cost, the assistant service that in the present invention, wind-electricity integration causes comprises stand-by cost and peak regulation cost;
N: the wind turbine number of organizing a performance,
Constraints: system profitability constraint, the constraint of system active balance, the constraint of conventional unit output and circuit overload time-constrain;
V>0,
&Sigma; i = 1 M P G , i , h + &Sigma; j = 1 N P w , j , h = P Load , h + &Delta;P Loss , h ,
P G,i,h,min≤P G,i,h≤P G,i,h,max
T overload/T total≤0.05;
(6) upgrade wind energy turbine set installed capacity, repeat (1)-(5) process, based on differential evolution algorithm (DE), be optimized and finally obtain each wind energy turbine set installed capacity when maximum of associating net profit, be best receiving scheme;
The expression form of the described constraint implementation method being optimized based on differential evolution algorithm (DE) is:
F i , G + 1 = F min + r 1 F max , r 2 < &tau; 1 F i , , else
C Ri , G + 1 = r 3 , r 4 < &tau; 2 C Ri , G , else
Wherein, r 1, r 2, r 3, r 4: the uniform random number between [0,1], τ 1, τ 2: in population, adjust F and C that individual relative is answered rprobability.
Useful achievement of the present invention: the present invention is by wind energy turbine set that wind-electricity integration is caused and the analysis of electrical network cost benefit problem, a kind of best capacity calculation method of receiving of wind-powered electricity generation that turns to target with association system net profit maximum has been proposed, multianalysis the various costs and benefits that cause after wind-electricity integration, then based on improved DE algorithm, be optimized the best receiving ability of electrical network wind-powered electricity generation that calculates.The present invention is directed to and receive wind-powered electricity generation whether can lose problem, set up the best wind-powered electricity generation receiving capacity calculation model that is target with the net profit of wind energy turbine set and electrical network (consideration environmental benefit) association system to the maximum, the construction cost, operating cost, compensation income, the assistant service cost of electrical network and the environmental benefit that wind-powered electricity generation causes that in target function, comprise wind energy turbine set and electrical network have met the constraintss such as system profitability, generating active power and circuit overload simultaneously.The wind-powered electricity generation that feasible region electrical network economy, safety and stability combine is received capability evaluation.The best receiving ability of wind-powered electricity generation that the present invention finally obtains can be offered suggestions to regional Construction of Wind Power, make Wind-Electric Power Stations installed capacity neither can, because of excessive and cause installation waste, problem that utilance is low, also can not produce because installation is too small the problem that can not make full use of wind-resources.
Accompanying drawing explanation
Fig. 1 is pool cost effectiveness analysis schematic diagram figure of the present invention.Wherein, figure (a) is wind energy turbine set Cost-benefit analysis schematic diagram.Figure (b) is electrical network cost effectiveness analysis schematic diagram.
Fig. 2 is the best capacity calculation flow chart of receiving.
Fig. 3 is RTS79 electric power system topological structure schematic diagram.
Fig. 4 is the population location drawing in the last reign of a dynasty based on improving after DE algorithm optimization.
Embodiment
Below in conjunction with the drawings and specific embodiments, the present invention is described in further detail.
Fig. 1 is pool cost effectiveness analysis schematic diagram of the present invention.Wherein, figure (a) is wind energy turbine set Cost-benefit analysis schematic diagram.Figure (b) is electrical network cost effectiveness analysis schematic diagram.Fig. 2 is the best capacity calculation flow chart of receiving.Empty frame in Fig. 2 represents the time limit, is once a period, a dispatching cycle (one day), the whole year from inside to outside.Fig. 3 is RTS79 electric power system topological structure schematic diagram, and Fig. 4 is the population location drawing in the last reign of a dynasty based on improving after DE algorithm optimization.
The present invention be take certain District power network planning as example, adopts RTS-79 standard example, carries out the analysis of the best receiving ability of wind-powered electricity generation.Intending access point is Bus7 and Bus14, and wind-electricity integration adopts the control mode of PQ power factor to carry out, and power factor gets 0.95, and load prediction error adopts normal distribution model; Wind speed adopts Weibull distribution model.Wherein, accompanying drawing 3 is shown in by RTS79 standard example topological structure,, fan parameter arranges as follows:
Table 1 wind energy turbine set parameter
Figure BDA0000431096100000101
Somewhere wind park construction cost is 9000 yuan/kW; Average sales rate of electricity is 0.48 yuan/kWh inside the province; For receiving two, two wind farm grid-connected newly-increased circuits, specification is LGJ-185, and total length is 15km, and unit price is 1,300,000 yuan/km; Wind energy turbine set and power network compensation income are respectively 0.12 yuan/kWh and 0.1 yuan/kWh; Peak regulation COEFFICIENT K B gets 55%; Unit stand-by cost and unit peak regulation cost are got respectively 0.013 yuan/kWh and 0.1 yuan/kWh; An equivalence year value coefficient gets 0.08.
A kind of regional power grid wind-powered electricity generation multiple spot of realizing economy optimum accesses the computational methods of best receiving ability, and the method step is as follows:
1) the wind-powered electricity generation access point based on example and setting, the installed capacity of initialization wind energy turbine set 1 and wind energy turbine set 2, samples to two output of wind electric field in conjunction with Weibull distribution, based on normal distribution, system loading situation is sampled.In the present invention, will within one day, be divided into 24 operating points (operating point per hour), annual with the time scale sampling of 1h, form 8760 scenes.Corresponding wind energy turbine set 1 exert oneself P1, wind energy turbine set 2 exert oneself P2 and system loading PL under each scene.
Based on output of wind electric field sampling, take one day as dispatching cycle, according to economic dispatch model, contain Unit Combination optimization the preservation of wind energy turbine set;
2) carry out the calculating of wind-powered electricity generation annual energy output, only obtain the target function subconstiuent relevant to wind power generation amount, comprise electrical network sale of electricity income I g, s, j, compensation income I w, co, Construction of Wind Power cost C w,c, year operation expense C w, opwith power grid construction cost C g, tr.
3) proceed to real time execution simulation, based on each period, carry out trend calculating, and the whether satisfied constraint of verification, each subconstiuent the accumulation of this period association system if meet, obtained; Otherwise need to carry out the operating point that correcting property control and then definite system are new and export assistant service value at cost the accumulation of this period.Comprising degree of depth peak regulation cost and stand-by cost.
4) repeat said process until simulation dispatching cycle finishes; The one day 24h of take is dispatching cycle, repeating step 3), the wind-powered electricity generation of continuous analog 24h is exerted oneself and is calculated the accumulated value of every value at cost;
5) carry out the Unit Combination of next cycle, repeat said process until annual simulation finishes, obtain the target function value based on simulation in annual 8760 hours, i.e. the net profit maxV of association system;
max V = &Sigma; j = 1 N ( I w , co , j + I g , s , j + I g , co , j + I emi , j ) - &Sigma; j = 1 N [ C w , c , j i 1 - ( 1 + i ) - T w + C g , tr , j i 1 - ( 1 + i ) - T l + C w , o , j + C g , op , j + C g , an , j ] ,
Wherein,
I g,s: the year sale of electricity income of electrical network, depend on through electrical network and carry electric weight and the sale of electricity price that arrives user's side,
I emi: wind-powered electricity generation environmental benefit,
K: the kind of pollutant emission,
C g, tr: connection charge, be expressed as herein receive wind-powered electricity generation newly-built connect net track cost,
T l: the operation time limit of newly-built circuit,
C g, op: electrical network annual operating and maintenance cost, only consider network loss cost herein,
C g, an: electrical network year assistant service cost, the assistant service that in the present invention, wind-electricity integration causes comprises stand-by cost and peak regulation cost;
Constraints: system profitability constraint, the constraint of system active balance, the constraint of conventional unit output and circuit overload time-constrain;
V>0,
&Sigma; i = 1 M P G , i , h + &Sigma; j = 1 N P w , j , h = P Load , h + &Delta;P Loss , h ,
P G,i,h,min≤P G,i,h≤P G,i,h,max
T overload/T total≤0.05;
6) upgrade wind energy turbine set installed capacity, repeat said process, the result of calculating according to initial population, carries out differential, selects operation according to differential evolution algorithm operation initial population, forms population of new generation.Then population of new generation is brought into adaptive value function and calculates, and in like manner Population Regeneration until meet the end condition of iteration.Iterated conditional is that iterations arrives original maximum iteration time of setting, and is 100 times in the present invention.Based on differential evolution algorithm, be optimized and finally obtain each wind energy turbine set installed capacity when maximum of associating net profit, be best receiving scheme.Method finishes.
The present invention selects Output rusults to be the installed capacity of wind energy turbine set 1 and wind energy turbine set 2, whether to meet constraint and association system net profit.The simulation result that iteration is 100 times is as follows: (wherein, for constraint, whether meet one, 1 representative meets constraints, and 0 representative does not meet constraints, in follow-up processing, can be rejected).
Table 2. program Output rusults
Figure BDA0000431096100000122
Figure BDA0000431096100000131
Figure BDA0000431096100000141
From iteration result, can find out in table has the scheme that does not meet constraints to exist, after rejecting infeasible scheme and iteration scheme, can see through iteration, the optimum results of each population is more or less the same, the installed capacity of wind energy turbine set 1 is [262.5,264], in scope, wind energy turbine set 2 installed capacitys are in [360,410] scope, iteration result is more or less the same, and the maximum iteration time of selecting in this read-me is for 100 times rational.
In order more clearly to analyze every cost (benefit) proportion, in table 3, shown optimal case result:
Table 3. optimal case
Figure BDA0000431096100000142
Result shows, the installed capacity corresponding to point of associating net profit maximum is respectively 264MW and 373.5MW, and the best wind-powered electricity generation of required electrical network is received ability, and now the net profit of association system is 3.649 hundred million yuan.In optimal case, wind-powered electricity generation access has reduced via net loss cost, has caused certain new forms of energy stand-by cost simultaneously, has especially greatly increased peak regulation cost, has proved that the abundant property of peak load regulation network problem is to affect one of grid-connected main factor of large-scale wind power.In addition, wind-electricity integration must bring huge environmental benefit to society, this be also the new forms of energy such as wind-powered electricity generation can develop major reason rapidly.
The present invention is directed to and receive wind-powered electricity generation whether can lose problem, set up the best wind-powered electricity generation receiving capacity calculation model that is target with the net profit of wind energy turbine set and electrical network (consideration environmental benefit) association system to the maximum, the construction cost, operating cost, compensation income, the assistant service cost of electrical network and the environmental benefit that wind-powered electricity generation causes that in target function, comprise wind energy turbine set and electrical network have met the constraintss such as system profitability, generating active power and circuit overload simultaneously.The wind-powered electricity generation that feasible region electrical network economy, safety and stability combine is received capability evaluation.The best receiving ability of wind-powered electricity generation that the present invention finally obtains can be offered suggestions to regional Construction of Wind Power, make Wind-Electric Power Stations installed capacity neither can, because of excessive and cause installation waste, problem that utilance is low, also can not produce because installation is too small the problem that can not make full use of wind-resources.
Finally explanation is, above example is only unrestricted in order to technical scheme of the present invention to be described, although the present invention is had been described in detail with reference to preferred embodiments, those of ordinary skill in the art is to be understood that, can to technical scheme of the present invention modify or etc. between replace, and not departing from aim and the scope of technical solution of the present invention, it all should be encompassed in the middle of claim scope of the present invention.

Claims (2)

1. regional power grid wind-powered electricity generation multiple spot accesses computational methods for best receiving ability, it is characterized in that, the method step is as follows:
(1) each wind energy turbine set installed capacity of initialization P n, and gather local air speed data, conventional unit installed capacity, yearly peak load data, according to blower fan output calculation model, draw planning each output of wind electric field situation P in year w, j, h;
Described wind-powered electricity generation unit output calculation model:
p w ( v ) = 0 , 0 &le; v < v ci p N v i - v ci v R - v ci , v ci &le; v < v R P N , v R &le; v < v co ,
Wherein,
P w(v): wind power,
P n: blower fan rated power,
V ci: the incision wind speed of blower fan,
V r: the rated wind speed of blower fan,
V co: the cut-out wind speed of blower fan;
By year wind-powered electricity generation exert oneself situation in conjunction with load prediction level, carry out the system Unit Combination optimization of first dispatching cycle, according to economic dispatch model, obtain each operating states of the units and the generated output of each period in one day:
min E = &Sigma; t = 1 T &Sigma; i = 1 N U it f it ( P it ) ,
Constraints:
&Sigma; i = 1 N P G , i , h + &Sigma; j = 1 M P w , j , h = P Load , h + &Delta;P Loss , h ,
P G,i,h,min≤P G,i,h≤P G,i,h,max
P{D Ri≤P it-P it-1≤U Ri}≥β 1
Wherein,
E: system total power production cost,
T: hop count in the time of in research cycle,
N: the number of units of conventional power generation usage unit in system,
U it: conventional unit i is at the start and stop state of period t, U it=1 represents operation, U it=0 represents to shut down,
P it: conventional unit i is at the active power of output of period t,
F it(P it): the operating cost of conventional unit i, expression way is:
f it ( P it ) = a i + b i P it + c i P it 2 + | d i sin [ e i ( P it min - P it ) ] | , Wherein, a i, b i, c i, d i, e i: the coefficient of cost function,
: conventional unit i is at the lower limit of exerting oneself of period t,
M: the wind turbine number of organizing a performance,
P g, i, h: conventional unit is meritorious exerts oneself,
P w, j, h: wind-powered electricity generation unit is meritorious exerts oneself,
P load, h: burden with power size,
Δ P loss, h: active power loss,
P g, i, h, min, P g, i, h, max: represent respectively technology minimum load and the maximum output of conventional unit,
D ri, U ri: conventional unit i is at meritorious fall off rate and the climbing speed of exerting oneself of period t,
β 1: prior given confidence level;
(2) carry out the calculating of wind-powered electricity generation annual energy output, only obtain the target function subconstiuent relevant to wind power generation amount, described the target function subconstiuent relevant to wind power generation amount comprises electrical network sale of electricity income I g, s, j, compensation income I g, co, wind energy turbine set compensation income I w, co, Construction of Wind Power cost C w,c, wind energy turbine set year operation expense C w, opwith power grid construction cost C g, tr;
A. electrical network sale of electricity income I g, s, j, be expressed as the product of electrical network electricity sales amount and sale of electricity price; Compensation income, comprises the compensation to the compensation He Dui power grid enterprises of wind energy turbine set self;
Wind energy turbine set year compensation income:
I w,co=W w×p w,co
Wherein,
I w, co: wind energy turbine set year compensation income,
W w: wind energy turbine set annual energy output,
P w, co: the compensation of wind power generation annual energy output unit,
Electrical network year compensation income:
I g,co=W w×p g,co
Wherein,
I g, co: electrical network year compensation income,
P g, co: electrical network is received the compensation of wind-powered electricity generation annual energy output unit,
B. wind-powered electricity generation cost of investment comprise wind energy turbine set year construction cost and wind energy turbine set year operation expense;
Wind energy turbine set year construction cost:
C w , c , actual = C w , c &times; i / [ 1 - ( 1 + i ) - T w ] ,
Wherein,
C w, c, actual: wind energy turbine set year construction cost,
C w,c: the wind energy turbine set initial stage is built total cost,
I: bank's Annual Percentage Rate,
T w: the life-span time limit of wind energy turbine set,
: fund equivalence year value coefficient,
Wind energy turbine set year operation expense:
C w,op=W w×p w,co
Wherein,
C w, op: wind energy turbine set year operation expense,
P w, co: year unit operation expense,
C. the power grid construction cost that wind-electricity integration causes mainly refers to the construction cost of above-mentioned transmission line; The total cost of transmission line can be regarded the linear function of line length as; That is, power grid construction cost C g, trit is a linear function;
(3) proceed to real time execution simulation, based on each period, carry out trend calculating, and the whether satisfied constraint of verification, each subconstiuent the accumulation of this period association system if meet, obtained; Otherwise need to carry out the operating point that correcting property control and then definite system are new and export assistant service value at cost the accumulation of this period; Comprising degree of depth peak regulation cost and stand-by cost;
Degree of depth peak regulation cost: when conventional unit carries out degree of depth peak regulation while guaranteeing electricity net safety stable, just produced system degree of depth peak regulation cost:
C g,dl=W G,dl×p dl
Wherein,
C g, dl: degree of depth peak regulation cost,
W g, dl: normal power supplies participates in the energy output that degree of depth peak regulation reduces,
P dl: unit peak regulation cost;
It is the part energy output that unit output exceeds basic peak regulation that normal power supplies degree of depth peak regulation reduces energy output:
W G , dl = &Integral; K B P GN &GreaterEqual; P G , actual ( K B P GN - P G , actual )
Wherein,
K b: degree of depth peak regulation coefficient,
P gN: peak regulation unit rated capacity,
P g, actual: actual meritorious the exerting oneself of unit;
Get probability α ∈ (0,1) that reserve capacity meets system safety operation requirement as Reliability Index, the minimum new forms of energy reserve capacity of system that meets confidence level α is:
&Integral; - &infin; Res d 1 2 &pi; &sigma; wind , d exp ( - ( &xi; - &mu; wind , d ) 2 2 &sigma; 2 wind , d ) d&xi; = &alpha; ,
Wherein,
Res d: system is required newly-increased day reserve capacity of receiving wind-powered electricity generation,
μ wind, d: the average of predicated error,
σ 2 wind, d: the variance of predicated error,
α: system reliability level;
All conventional units of reserve capacity that provide all can obtain corresponding capacity compensation, and this part compensation is exactly the stand-by cost of electrical network for receiving wind-powered electricity generation to produce:
C res = &Sigma; d = 1 365 Res d &times; p res ,
Wherein,
C res: year wind-powered electricity generation stand-by cost,
P res: unit reserve capacity cost;
(4) repeat above-mentioned (1)-(3) process until simulation dispatching cycle finishes; Take one day 24 hours be dispatching cycle, repeating step (1)-(3), the continuous analog wind-powered electricity generation of 24 hours is exerted oneself and is calculated the accumulated value of every value at cost;
(5) carry out the economic dispatch of next cycle, repeat said process until annual simulation finishes, obtain the target function value based on simulation in annual 8760 hours, association system-described association system comprise wind energy turbine set, electrical network and social environment-net profit maxV:
max V = &Sigma; j = 1 N ( I w , co , j + I g , s , j + I g , co , j + I emi , j ) - &Sigma; j = 1 N [ C w , c , j i 1 - ( 1 + i ) - T w + C g , tr , j i 1 - ( 1 + i ) - T l + C w , o , j + C g , op , j + C g , an , j ] ,
Wherein,
I g,s: the year sale of electricity income of electrical network, depend on through electrical network and carry electric weight and the sale of electricity price that arrives user's side,
I emi: wind-powered electricity generation environmental benefit,
K: the kind of pollutant emission,
C g, tr: connection charge, be expressed as herein receive wind-powered electricity generation newly-built connect net track cost,
T l: the operation time limit of newly-built circuit,
C g, op: electrical network annual operating and maintenance cost, only consider network loss cost herein,
C g, an: electrical network year assistant service cost, the assistant service that in the present invention, wind-electricity integration causes comprises stand-by cost and peak regulation cost;
N: the wind turbine number of organizing a performance,
Constraints: system profitability constraint, the constraint of system active balance, the constraint of conventional unit output and circuit overload time-constrain;
V>0,
&Sigma; i = 1 M P G , i , h + &Sigma; j = 1 N P w , j , h = P Load , h + &Delta;P Loss , h ,
P G,i,h,min≤P G,i,h≤P G,i,h,max
T overload/T total≤0.05;
(6) upgrade wind energy turbine set installed capacity, repeat (1)-(5) process, based on differential evolution algorithm (DE), be optimized and finally obtain each wind energy turbine set installed capacity when maximum of associating net profit, be best receiving scheme;
The expression form of the described constraint implementation method being optimized based on differential evolution algorithm (DE) is:
F i , G + 1 = F min + r 1 F max , r 2 < &tau; 1 F i , , else
C Ri , G + 1 = r 3 , r 4 < &tau; 2 C Ri , G , else
Wherein, r 1, r 2, r 3, r 4: the uniform random number between [0,1], τ 1, τ 2: in population, adjust F and C that individual relative is answered rprobability.
2. a kind of regional power grid wind-powered electricity generation multiple spot according to claim 1 accesses the computational methods of best receiving ability, it is characterized in that described degree of depth peak regulation COEFFICIENT K bget 50%-60%.
CN201310651758.7A 2013-12-05 2013-12-05 A kind of regional power grid wind-powered electricity generation multiple spot accesses the computational methods of best receiving ability Active CN103683326B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310651758.7A CN103683326B (en) 2013-12-05 2013-12-05 A kind of regional power grid wind-powered electricity generation multiple spot accesses the computational methods of best receiving ability

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310651758.7A CN103683326B (en) 2013-12-05 2013-12-05 A kind of regional power grid wind-powered electricity generation multiple spot accesses the computational methods of best receiving ability

Publications (2)

Publication Number Publication Date
CN103683326A true CN103683326A (en) 2014-03-26
CN103683326B CN103683326B (en) 2015-12-30

Family

ID=50319998

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310651758.7A Active CN103683326B (en) 2013-12-05 2013-12-05 A kind of regional power grid wind-powered electricity generation multiple spot accesses the computational methods of best receiving ability

Country Status (1)

Country Link
CN (1) CN103683326B (en)

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103996149A (en) * 2014-05-30 2014-08-20 国家电网公司 Method for analyzing wind power layout of regional power grid based on quiescent voltage stability
CN104037790A (en) * 2014-05-22 2014-09-10 南方电网科学研究院有限责任公司 Evaluation method of acceptance capability of new energy based on sequential Monte Carlo simulation
CN104156890A (en) * 2014-08-15 2014-11-19 贵州电力试验研究院 Wind power grid-connection scheme decision method
CN104200289A (en) * 2014-09-25 2014-12-10 国网上海市电力公司 Distributed photovoltaic installed capacity prediction method based on investment return rate
CN104504606A (en) * 2014-08-14 2015-04-08 贵州电力试验研究院 Credible capacity calculating method for distributed grid connection of multiple types of power supplies
CN104578059A (en) * 2015-01-21 2015-04-29 南通大学 Power grid day-ahead wind power integration capacity evaluation method based on multi-objective optimization
CN104732294A (en) * 2015-03-30 2015-06-24 国家电网公司 Comprehensive assessment method for wind power accepting capacity of multiple grid connection points
CN105244922A (en) * 2015-11-13 2016-01-13 东北电力大学 Double-fed wind power plant group active power output optimization distribution method in wind limit case
CN105811472A (en) * 2016-04-14 2016-07-27 国电联合动力技术有限公司 Wind farm economy-based active power adjusting method and system
CN106058941A (en) * 2016-07-29 2016-10-26 武汉大学 Wind farm stochastic optimization scheduling method based on scene analysis
CN106602591A (en) * 2015-10-20 2017-04-26 上海交通大学 Seawater pumped storage wind power combination control method for multi-target optimized control
CN107147116A (en) * 2017-06-28 2017-09-08 国网江苏省电力公司经济技术研究院 A kind of optimization method, device and the computing device of wind-powered electricity generation investment planning
CN107634547A (en) * 2017-11-22 2018-01-26 国家电网公司 Contributed based on new energy and predict that the electric association system of error goes out electric control method
CN107844652A (en) * 2017-11-09 2018-03-27 中国电力工程顾问集团西北电力设计院有限公司 A kind of power system production analogy method of the regulating course containing electricity
CN108023348A (en) * 2017-12-13 2018-05-11 国网安徽省电力有限公司 A kind of method that the optimal peak regulation installation scale of wind-powered electricity generation is determined based on Transmission Corridor
CN108869059A (en) * 2018-06-26 2018-11-23 广东电网有限责任公司 Cold standby compensation calculation method, apparatus, equipment and the storage medium of Gas Generator Set
CN109274121A (en) * 2018-11-15 2019-01-25 山东中车风电有限公司 A kind of wind power plant Optimization about control parameter method and system
CN109449993A (en) * 2018-12-26 2019-03-08 西安交通大学 A kind of Multiple Time Scales production analogy method towards electric system of providing multiple forms of energy to complement each other
CN109728578A (en) * 2019-02-19 2019-05-07 清华大学 Electric system stochastic and dynamic Unit Combination method based on Newton Algorithm quantile
CN112186751A (en) * 2020-09-24 2021-01-05 中国电力工程顾问集团西北电力设计院有限公司 New energy effective capacity calculation method and system considering grid constraints
CN112736914A (en) * 2020-12-29 2021-04-30 国网吉林省电力有限公司 Available transmission capacity probability calculation method considering wind power correlation
CN113131529A (en) * 2021-04-25 2021-07-16 南京创智力合电力科技有限公司 Renewable energy bearing capacity assessment method considering multiple flexible resources

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102013679A (en) * 2010-11-24 2011-04-13 中国电力科学研究院 Method for analyzing influence on power grid after large-scale wind power central integration
CN102280878A (en) * 2011-07-26 2011-12-14 国电南瑞科技股份有限公司 Wind power penetration optimization evaluation method based on SCED
CN102290829A (en) * 2011-08-13 2011-12-21 东北电力大学 Full-system large-scale wind power control method with low generating cost
CN102593853A (en) * 2012-02-27 2012-07-18 东北电力大学 Energy storage system capacity configuration optimizing method capable of enhancing wind power receiving capacity

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102013679A (en) * 2010-11-24 2011-04-13 中国电力科学研究院 Method for analyzing influence on power grid after large-scale wind power central integration
CN102280878A (en) * 2011-07-26 2011-12-14 国电南瑞科技股份有限公司 Wind power penetration optimization evaluation method based on SCED
CN102290829A (en) * 2011-08-13 2011-12-21 东北电力大学 Full-system large-scale wind power control method with low generating cost
CN102593853A (en) * 2012-02-27 2012-07-18 东北电力大学 Energy storage system capacity configuration optimizing method capable of enhancing wind power receiving capacity

Cited By (38)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104037790B (en) * 2014-05-22 2016-04-27 南方电网科学研究院有限责任公司 A kind of new forms of energy based on sequential Monte Carlo simulation receive capability assessment method
CN104037790A (en) * 2014-05-22 2014-09-10 南方电网科学研究院有限责任公司 Evaluation method of acceptance capability of new energy based on sequential Monte Carlo simulation
CN103996149A (en) * 2014-05-30 2014-08-20 国家电网公司 Method for analyzing wind power layout of regional power grid based on quiescent voltage stability
CN103996149B (en) * 2014-05-30 2017-11-07 国家电网公司 Regional power grid wind-powered electricity generation topological analysis method based on static electric voltage stability
CN104504606A (en) * 2014-08-14 2015-04-08 贵州电力试验研究院 Credible capacity calculating method for distributed grid connection of multiple types of power supplies
CN104156890A (en) * 2014-08-15 2014-11-19 贵州电力试验研究院 Wind power grid-connection scheme decision method
CN104200289A (en) * 2014-09-25 2014-12-10 国网上海市电力公司 Distributed photovoltaic installed capacity prediction method based on investment return rate
CN104578059A (en) * 2015-01-21 2015-04-29 南通大学 Power grid day-ahead wind power integration capacity evaluation method based on multi-objective optimization
CN106026077B (en) * 2015-01-21 2018-05-15 南通大学 Wind-powered electricity generation receives the wind-powered electricity generation unit of capability assessment method to receive the indicator of costs to determine method to power grid based on multiple-objection optimization a few days ago
CN106026077A (en) * 2015-01-21 2016-10-12 南通大学 Wind power unit acceptance cost index determining method for power grid day-ahead wind power acceptance capability evaluation method based on multi-target optimization
CN104732294A (en) * 2015-03-30 2015-06-24 国家电网公司 Comprehensive assessment method for wind power accepting capacity of multiple grid connection points
CN106602591A (en) * 2015-10-20 2017-04-26 上海交通大学 Seawater pumped storage wind power combination control method for multi-target optimized control
CN106602591B (en) * 2015-10-20 2018-11-20 上海交通大学 A kind of seawater pumped storage wind-powered electricity generation combination control method of multiobjective optimal control
CN105244922B (en) * 2015-11-13 2017-09-05 东北电力大学 Limit Double-feed wind power group's active power output optimizing distribution method in the case of wind
CN105244922A (en) * 2015-11-13 2016-01-13 东北电力大学 Double-fed wind power plant group active power output optimization distribution method in wind limit case
CN105811472A (en) * 2016-04-14 2016-07-27 国电联合动力技术有限公司 Wind farm economy-based active power adjusting method and system
CN106058941A (en) * 2016-07-29 2016-10-26 武汉大学 Wind farm stochastic optimization scheduling method based on scene analysis
CN106058941B (en) * 2016-07-29 2018-08-21 武汉大学 A kind of wind power plant random optimization dispatching method based on scene analysis
CN107147116A (en) * 2017-06-28 2017-09-08 国网江苏省电力公司经济技术研究院 A kind of optimization method, device and the computing device of wind-powered electricity generation investment planning
CN107147116B (en) * 2017-06-28 2019-07-02 国网江苏省电力公司经济技术研究院 A kind of optimization method of wind-powered electricity generation investment planning, device and calculate equipment
CN107844652A (en) * 2017-11-09 2018-03-27 中国电力工程顾问集团西北电力设计院有限公司 A kind of power system production analogy method of the regulating course containing electricity
CN107844652B (en) * 2017-11-09 2021-06-08 中国电力工程顾问集团西北电力设计院有限公司 Production simulation method for power system with electric quantity regulation layer
CN107634547A (en) * 2017-11-22 2018-01-26 国家电网公司 Contributed based on new energy and predict that the electric association system of error goes out electric control method
CN108023348A (en) * 2017-12-13 2018-05-11 国网安徽省电力有限公司 A kind of method that the optimal peak regulation installation scale of wind-powered electricity generation is determined based on Transmission Corridor
CN108023348B (en) * 2017-12-13 2020-10-23 国网安徽省电力有限公司 Method for determining optimal peak shaving installed scale of wind power based on outgoing channel
CN108869059A (en) * 2018-06-26 2018-11-23 广东电网有限责任公司 Cold standby compensation calculation method, apparatus, equipment and the storage medium of Gas Generator Set
CN109274121B (en) * 2018-11-15 2021-03-23 山东中车风电有限公司 Wind power plant control parameter optimization method and system
CN109274121A (en) * 2018-11-15 2019-01-25 山东中车风电有限公司 A kind of wind power plant Optimization about control parameter method and system
CN109449993B (en) * 2018-12-26 2021-10-22 西安交通大学 Multi-time scale production simulation method for multi-energy complementary power system
CN109449993A (en) * 2018-12-26 2019-03-08 西安交通大学 A kind of Multiple Time Scales production analogy method towards electric system of providing multiple forms of energy to complement each other
CN109728578B (en) * 2019-02-19 2020-09-25 清华大学 Newton method based power system random dynamic unit combination method for solving quantiles
CN109728578A (en) * 2019-02-19 2019-05-07 清华大学 Electric system stochastic and dynamic Unit Combination method based on Newton Algorithm quantile
CN112186751A (en) * 2020-09-24 2021-01-05 中国电力工程顾问集团西北电力设计院有限公司 New energy effective capacity calculation method and system considering grid constraints
CN112186751B (en) * 2020-09-24 2022-04-01 中国电力工程顾问集团西北电力设计院有限公司 New energy effective capacity calculation method and system considering grid constraints
CN112736914A (en) * 2020-12-29 2021-04-30 国网吉林省电力有限公司 Available transmission capacity probability calculation method considering wind power correlation
CN112736914B (en) * 2020-12-29 2022-11-11 国网吉林省电力有限公司 Available transmission capacity probability calculation method considering wind power correlation
CN113131529A (en) * 2021-04-25 2021-07-16 南京创智力合电力科技有限公司 Renewable energy bearing capacity assessment method considering multiple flexible resources
CN113131529B (en) * 2021-04-25 2024-02-06 南京创智力合电力科技有限公司 Renewable energy bearing capacity assessment method considering multiple flexible resources

Also Published As

Publication number Publication date
CN103683326B (en) 2015-12-30

Similar Documents

Publication Publication Date Title
CN103683326B (en) A kind of regional power grid wind-powered electricity generation multiple spot accesses the computational methods of best receiving ability
CN104751246B (en) A kind of active power distribution network planing method based on Stochastic Chance-constrained
CN103545832B (en) A kind of photovoltaic system energy accumulation capacity configuration based on generating predicated error
CN107069814B (en) The Fuzzy Chance Constrained Programming method and system that distribution distributed generation resource capacity is layouted
CN108599206B (en) Power distribution network hybrid energy storage configuration method under high-proportion uncertain power supply scene
CN111445067B (en) Multi-objective planning method suitable for high-speed rail station comprehensive energy system
CN108229865A (en) A kind of electric heating gas integrated energy system low-carbon economy dispatching method based on carbon transaction
CN107316125A (en) A kind of active distribution network economical operation evaluation method based on economical operation domain
CN103473393B (en) A kind of transmission of electricity nargin Controlling model modeling method considering random chance
CN104810863B (en) Generator set active power real-time dispatching method considering wind power prediction error
CN103065202A (en) Wind power plant ultrashort term wind speed prediction method based on combination kernel function
CN105305488B (en) A kind of evaluation method for considering new-energy grid-connected and power transmission network utilization rate being influenced
CN111445107A (en) Multi-objective optimization configuration method for cold-heat-power combined supply type micro-grid
CN106611243A (en) Residual correction method for wind speed prediction based on GARCH (Generalized ARCH) model
CN109888770A (en) Wind energy turbine set installed capacity optimization method based on chance constrained programming and fluctuation cost
CN110994606A (en) Multi-energy power supply capacity configuration method based on complex adaptive system theory
CN112072643A (en) Light-storage system online scheduling method based on depth certainty gradient strategy
CN104636824A (en) Distributed photovoltaic siting and sizing method for determining minimum permeability
CN114301089B (en) Energy storage capacity configuration optimization method for wind-solar combined power generation system
CN113991742B (en) Distributed photovoltaic double-layer collaborative optimization investment decision-making method for power distribution network
Wen et al. ELCC-based capacity value estimation of combined wind-storage system using IPSO algorithm
CN105305485A (en) Large-scale intermittent energy consuming security constrained economic dispatch method
CN105207255B (en) A kind of power system peak regulation computational methods suitable for wind power output
CN117252425A (en) Power supply planning and thermal power transformation decision modeling method considering carbon emission and power balance risk
CN105608501A (en) Medium and long term power grid planning method for optimizing new energy construction and grid connected time sequence

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Liu Wenxia

Inventor after: Xu Yiming

Inventor after: Wang Shu

Inventor after: Dan Xiaodong

Inventor after: Tian Xuefeng

Inventor after: Guo Chenyang

Inventor before: Liu Wenxia

Inventor before: Li Yingzhi

Inventor before: Xu Xiaobo

Inventor before: Zhang Yuying

Inventor before: Zhou Xi

COR Change of bibliographic data