CN103679369A - Method for project management for data - Google Patents

Method for project management for data Download PDF

Info

Publication number
CN103679369A
CN103679369A CN201310689214.XA CN201310689214A CN103679369A CN 103679369 A CN103679369 A CN 103679369A CN 201310689214 A CN201310689214 A CN 201310689214A CN 103679369 A CN103679369 A CN 103679369A
Authority
CN
China
Prior art keywords
data
document
activity
exported
version
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310689214.XA
Other languages
Chinese (zh)
Inventor
牛文生
田莉蓉
陈长胜
黄韬
王红春
袁晓军
邱征
余亚刚
逯计划
刘航
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
AVIC No 631 Research Institute
Original Assignee
AVIC No 631 Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by AVIC No 631 Research Institute filed Critical AVIC No 631 Research Institute
Priority to CN201310689214.XA priority Critical patent/CN103679369A/en
Publication of CN103679369A publication Critical patent/CN103679369A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention provides a method for project management for data. The method comprises the steps that in the WORD, a frame list of the data is established according to a process model of development, verification, configuration, a quality guarantee, airworthiness association of airworthiness and life cycle data in the processes of software development and hardware development are recorded. The frame list comprises a process, configuration item names (Item), Configuration ID and a state. The Item of each configuration item is associated to data of the latest version of the configuration item by means of a hyperlink. The problem of data state disorder is solved, the item data management is improved, orderly development of the items is guaranteed, the working process and whole data are clearly shown through the complete data list, and therefore great convenience is brought for data consultation.

Description

A kind of data-oriented project management method
Technical field
The invention belongs to the seaworthiness technology of aircraft, relate to electronic unit carries out all kinds of process datas that produce in hardware and software development process management according to seaworthiness flow process.
Background technology
Along with developing rapidly of China's civil aircraft, more and more highlight the importance of seaworthiness technology.Only obtain the authentication of seaworthiness office sides such as comprising Chinese CAAC, U.S. FAA and European EASA, the civil aircraft of development can come into the market to run.
In civil aircraft project development process, in order to meet the target of DO-178B, DO-254, relate to the Various types of data such as development data, checking/confirmation data, configuration management report, Quality Assurance Report, also may there is different states in each data, version, initial released version, change version etc. after first draft, evaluation, in order better project data to be managed, to guarantee the consistance of related data, also be convenient to the examination of data, need to formulate a kind of data-oriented project management method simultaneously.
Summary of the invention
In order to solve the technical matters of data mode confusion in project development process, the invention provides a kind of data-oriented project management method.
A data-oriented project management method, its special character is: comprise the following steps:
1] according to the process of project development, for each process, set up the framework list of data, the state of the sign of the title that described framework list comprises the document that each activity of carrying out in document title that this process exports, this process exports, the document that each activity is exported, the document that each activity is exported;
The title of the document of 2] each activity being exported is set up hyperlink, makes the title of document that each activity exports and the data correlation of the latest edition of the document that this activity is exported;
The sign of the document of 3] each activity being exported is set up hyperlink, makes the version change history file of the document that the sign of the movable document of exporting exports with this activity associated; Described version change history file comprises old version, Date Of Change and the change reason of the document that this activity is exported,
4] each old version is set up to hyperlink, make itself and the data correlation of corresponding version.
Said frame list is set up under WORD environment.
What above-mentioned version change history file adopted is Excel form.
The process of above-mentioned project development comprises planning, demand, design, the project development process such as integrated.
Compared with prior art, advantage is in the present invention:
A kind of data-oriented project management method of the present invention, a data panoramic view is provided, this view launches according to the process model of the exploitation of seaworthiness, checking, configuration, quality assurance, seaworthiness contact, clear in structure understands, and can successively be linked to final data entry and change history, kept the consistance of data.By complete data list clear shown the course of work and total data, for data audit provides convenience.
Accompanying drawing explanation
Fig. 1 is process data Governance framework;
Fig. 2 is that data item version change is historical.
Embodiment
Below in conjunction with accompanying drawing, the present invention is elaborated.
In the process of civil aircraft electronic equipment exploitation, according to DO-178B, defined software development process: planning, requirements capture, architecture design, bottom Demand Design, coding, integrated, defined sophisticated electronic parts development process according to DO-254: planning, requirements capture, Outline Design, detailed design, realization.
In each process, define the development activities of this process, and comprise checking/confirmation, configuration management, quality assurance and seaworthiness contact activity.
In WORD, according to these processes and movable framework list of setting up data.In software frame list, course of planning forms planning documentation and standard, requirements capture process forms high-rise demand, architecture design process forms software architecture document, bottom demand process forms bottom requirement documents, cataloged procedure forms software source code, compiling link data etc., and integration phase forms object code etc.
In the list of sophisticated electronic component framework, course of planning forms planning documentation and standard, and requirements capture process forms requirement documents, and Outline Design process forms design documentation, detailed design process forms source code, comprehensive constraint parameter etc., and integration phase forms object code etc.
Each process also forms data, configuration management data, quality assurance data, seaworthiness contact data of checking/confirmation etc., comprises peer review report, test report, analysis report, problem report, the configuration management state record, configuration management record, baseline report, QA review report, QA process handover report, accordance review report, final report etc.
Set up this framework list, record life cycle data in hardware and software development process, can fully represent with global view the process of project.As shown in Figure 1.
The state (Status) of the title (Item) of the document that in this process, correlated activation is exported, the sign (Configuration ID) of the movable document of exporting and the movable document of exporting has been described in each framework list.Project management and configuration management can be understood the current state of each configuration item.
The title of the document that in framework list, each activity is exported, the method by hyperlink is associated with the data of the latest edition of the document that this activity exports.Project team member carries out related work by associated latest edition data, has guaranteed the consistance of data in project development process, is also convenient to the collaborative work between project team member simultaneously.
The sign of the document that in framework list, each activity is exported (Configuration ID), is associated with the version change history file of this configuration item by the method for hyperlink.Version change history file adopts Excel form, the old version of recording configuration item (Rev), Date Of Change (Rev Date) and change reason (Revision Reason).
Each old version in version change history file is associated with the data of corresponding version by hyperlink.Comprise version, initial released version, change version etc. after the first draft, evaluation of configuration item.
Configuration management state record report in framework list, has recorded each project data of the evolution process of configuration item, framework list and link in project, has supported project management process and DER in-process review.

Claims (4)

1. a data-oriented project management method, is characterized in that: comprise the following steps:
1] according to the process of project development, for each process, set up the framework list of data, the state of the sign of the title that described framework list comprises the document that each activity of carrying out in document title that this process exports, this process exports, the document that each activity is exported, the document that each activity is exported;
The title of the document of 2] each activity being exported is set up hyperlink, makes the title of document that each activity exports and the data correlation of the latest edition of the document that this activity is exported;
The sign of the document of 3] each activity being exported is set up hyperlink, makes the version change history file of the document that the sign of the movable document of exporting exports with this activity associated; Described version change history file comprises old version, Date Of Change and the change reason of the document that this activity is exported,
4] each old version is set up to hyperlink, make itself and the data correlation of corresponding version.
2. data-oriented project management method according to claim 1, is characterized in that: described framework list is set up under WORD environment.
3. data-oriented project management method according to claim 1 and 2, is characterized in that: what described version change history file adopted is Excel form.
4. data-oriented project management method according to claim 3, is characterized in that: the process of described project development comprises planning, demand, design, the project development process such as integrated.
CN201310689214.XA 2013-12-14 2013-12-14 Method for project management for data Pending CN103679369A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310689214.XA CN103679369A (en) 2013-12-14 2013-12-14 Method for project management for data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310689214.XA CN103679369A (en) 2013-12-14 2013-12-14 Method for project management for data

Publications (1)

Publication Number Publication Date
CN103679369A true CN103679369A (en) 2014-03-26

Family

ID=50316846

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310689214.XA Pending CN103679369A (en) 2013-12-14 2013-12-14 Method for project management for data

Country Status (1)

Country Link
CN (1) CN103679369A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110310100A (en) * 2019-07-09 2019-10-08 西安点告网络科技有限公司 Project management method, device, electronic equipment and storage medium
CN113807798A (en) * 2020-06-12 2021-12-17 北京科益虹源光电技术有限公司 Configuration management method of comprehensive control software

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101739409A (en) * 2008-11-26 2010-06-16 英业达集团(天津)电子技术有限公司 Management system and method of electronic files
CN101770608A (en) * 2008-12-26 2010-07-07 新奥特(北京)视频技术有限公司 Management method and device of engineering versions
CN102857570A (en) * 2012-09-13 2013-01-02 清华大学 Cloud synchronized method of files and cloud storage server

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101739409A (en) * 2008-11-26 2010-06-16 英业达集团(天津)电子技术有限公司 Management system and method of electronic files
CN101770608A (en) * 2008-12-26 2010-07-07 新奥特(北京)视频技术有限公司 Management method and device of engineering versions
CN102857570A (en) * 2012-09-13 2013-01-02 清华大学 Cloud synchronized method of files and cloud storage server

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110310100A (en) * 2019-07-09 2019-10-08 西安点告网络科技有限公司 Project management method, device, electronic equipment and storage medium
CN113807798A (en) * 2020-06-12 2021-12-17 北京科益虹源光电技术有限公司 Configuration management method of comprehensive control software

Similar Documents

Publication Publication Date Title
Hamdi et al. BIM and Lean interactions from the bim capability maturity model perspective: A case study
CN110321281A (en) Web test platform and test method based on mixing automated test frame
CN105138386A (en) Logic design verification continuous integration platform based on Jenkins and vManager
CN104090776A (en) Software development method and system
Grieskamp et al. Model-based quality assurance of Windows protocol documentation
Garbade et al. DMU@ Airbus—Evolution of the Digital Mock-up (DMU) at Airbus to the Centre of Aircraft Development
CN103679369A (en) Method for project management for data
Lopata et al. The main principles of knowledge-based information systems engineering
Hryszko et al. Bottlenecks in software defect prediction implementation in industrial projects
CN103593295B (en) A kind of multi-branch software defect tracking and system
CN114911773A (en) Universal meta-model design method
Bruschi et al. Behavior driven development (BDD): a case study in healthtech
Bache et al. Specification by example with gui tests-how could that work?
CN106021209B (en) The source data management system for tracking of technical publications and comprehensive establishment management system
Herzig et al. Mining the Jazz repository: Challenges and opportunities
Sharma et al. Evaluation of the software requirement tools
Corrêa Towards automatic consistency preservation for model-driven software product lines
Grasela et al. Improving the efficiency and ensuring the quality of data assembly for pharmacometric analysis
Martins et al. ProjectIT-Enterprise: a software process improvement framework
Cai et al. A New Method of Version Management for Test Case
Yang et al. A Manufacturing Agent to Retrieve Machining Knowledge in Model-Based Manufacturing
Kühner et al. Employing industrial standards in software engineering for W7X
Song et al. Research on Application of Software Engineering Theory in Software Development
Tian et al. Research and practice of inertial measurement unit software productization
Xu Research on quality control and quality characteristic with knowledge management system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140326