CN103673617B - Furnace water-cooling partition wall capable of being installed on line and manufacturing and installing method thereof - Google Patents

Furnace water-cooling partition wall capable of being installed on line and manufacturing and installing method thereof Download PDF

Info

Publication number
CN103673617B
CN103673617B CN201310619608.8A CN201310619608A CN103673617B CN 103673617 B CN103673617 B CN 103673617B CN 201310619608 A CN201310619608 A CN 201310619608A CN 103673617 B CN103673617 B CN 103673617B
Authority
CN
China
Prior art keywords
water
water tank
hanging
partition wall
cooled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310619608.8A
Other languages
Chinese (zh)
Other versions
CN103673617A (en
Inventor
王鹏飞
张大宝
王明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wisdri Wuhan Wis Industrial Furnace Co Ltd
Original Assignee
Wisdri Wuhan Wis Industrial Furnace Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wisdri Wuhan Wis Industrial Furnace Co Ltd filed Critical Wisdri Wuhan Wis Industrial Furnace Co Ltd
Priority to CN201310619608.8A priority Critical patent/CN103673617B/en
Publication of CN103673617A publication Critical patent/CN103673617A/en
Application granted granted Critical
Publication of CN103673617B publication Critical patent/CN103673617B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Abstract

The invention relates to a furnace water-cooling partition wall capable of being installed on line, which is characterized in that: the fireproof wall mainly comprises a partition steel structure and an unshaped fireproof material; the interior of the hanging water tank is divided into a plurality of same water tank chambers along the length direction or only one water tank chamber is formed without division; the lower part of each water tank chamber is fixedly connected with a water cooling pipeline in a shape of Chinese character 'shan', and pipe orifices on two sides of the water cooling pipeline are respectively and fixedly connected to two ends of the water tank chamber and communicated with the water tank chamber; the middle part of each water tank chamber is provided with a water tank water outlet; the unshaped refractory materials are poured in the middle and the lower part of each water-cooling pipeline at the same time and are coated in the water-cooling pipelines to form a rectangular wall body; the upper surface of hanging the water tank is fixed with a plurality of girder steels of hanging and a pair of hoist and mount earrings, a pair of hoist and mount earrings are located the both ends of hanging the water tank respectively. The invention has reasonable structural design, stable performance and convenient installation and replacement, can be integrally assembled outside the furnace and can be installed and replaced on line.

Description

Water-cooled partition wall and making thereof in a kind of stove that can install online, installation method
Technical field
The present invention relates to heater for rolling steel or heat-treatment furnace technical field, to relate in particular in a kind of stove that can install online water-cooled partition wall and making thereof, installation method.
Background technology
Heating furnace and heat-treatment furnace are the widely used firing equipments of Steel-rolling Industry.Its furnace binding mostly is regular rectangle or end to end annular, each important temperature controlled section and take on the differentiation of the technique stove sections such as material and stove section gas isolating mainly by partition wall, also known as " pressure " in stove.
Traditional partition wall mainly divides without cooling and Air flow two kinds according to the type of cooling, and version mostly is arch or " V " type.In furnace design and work progress, design, material type selecting and the details of constructing of partition wall are most important.Reason: first, partition wall is the key equipment that heating-furnace section divides, and its stable performance is the important guarantee of the normal production run of heating furnace; Secondly, it is high that the version of traditional partition wall determines its designing requirement, and difficulty of construction is large, because partition wall is hanging equipment, and arch or " V " type are polymorphic structure, hanging anchoring uniform stressed problem, the sealing between partition wall and body of heater and expansion absorption problem etc. are all design and construction Difficulties; Again, under Non-water-cooled or Air flow two kinds of type of cooling states, the resistance to thermic load of partition wall is large, and working face amorphous refractory swelling cracking causes partition wall to wear the phenomenons such as fire happening occasionally, and severe patient exists body of wall and to collapse risk.
Summary of the invention
For the problems referred to above, to the object of the present invention is to provide in a kind of stove that can install online water-cooled partition wall and making thereof, installation method, this curtain wall structure is reasonable in design, stable performance, that installation is changed is convenient, can assemble integrated at external stove integral and can install and change by line.
For achieving the above object, the technical solution used in the present invention is:
A water-cooled partition wall in the stove that can install online, is characterized in that: it is formed primarily of partition wall steel construction and amorphous refractory; Described partition wall steel construction comprises the hanging water tank that a length and body of heater width match, and described hanging water tank inside is separated into multiple identical water tank room along its length or does not separate an only formation water tank room; Bottom, described each water tank room is fixedly connected with a mountain font water cooled pipeline, the mouth of pipe in the middle of described water cooled pipeline is sealedly and fixedly connected with it through the lower wall in the middle part of water tank room and upper wall successively, and the mouth of pipe of described water cooled pipeline both sides is fixedly connected on the two ends of water tank room respectively and is communicated with it; The middle part of described each water tank room is provided with a water outlet of water tank; The middle part of described water cooled pipeline and bottom are provided with several anchors, and are coated with refractory fiber blanket; Described amorphous refractory is cast in middle part and the bottom of each water cooled pipeline simultaneously, and by its coated formation therein one piece of rectangular wall body; The upper surface of described hanging water tank is fixed with multiple hanging girder steel and a pair lifting earrings, and described a pair lifting earrings lays respectively at the two ends of hanging water tank.
Described hanging water tank is made up of one or more separate water tank room, and described multiple self-contained water tank room is in-line welding.
Described hanging water tank is welded by two separate water tank rooms, and the middle part of described two water tank rooms is all fixedly connected with a hanging girder steel and a lifting earrings, and the weld between described two water tank rooms is provided with a hanging girder steel.
Described hanging water tank is formed by two channel-section steel airtight weldings, and two ends are sealed to a cuboid hollow structure by steel plate pressure-tight weld.
The middle part of described water tank room is provided with about one circular hole run through, the mouth of pipe in the middle of described water cooled pipeline through this circular hole, and with the lower wall of water tank room and upper wall airtight welding, described circular hole be directly 1/2nd of lower wall width on water tank room.
The mouth of pipe in the middle of described water cooled pipeline and water outlet of water tank are equipped with flanged fitting.
Described amorphous refractory waters the one piece of rectangular wall body built up and is divided into upper, middle and lower three layers, separates between layers by dilatation joint.
Described anchor is anchoring piece, and the middle part of described water cooled pipeline and bottom are provided with the anchoring piece of several varying lengths, and the surface of described anchoring piece is brushed with water proofing asphalt.
Described anchor is partition wall amorphous refractory supporting plate, and described partition wall amorphous refractory pallets level is arranged on the outer wall of water cooled pipeline, and the surface of described partition wall amorphous refractory supporting plate is brushed with water proofing asphalt.
Described hanging girder steel is made up of the channel-section steel of two parallel placements, two channel-section steels are by connecting at welding edges Interal fixation, the lower surface of two channel-section steels is welded with two pieces of locating parts, when hanging girder steel and hanging on two furnace roof crossbeams, two pieces of locating parts are positioned at the inner side of two furnace roof crossbeams simultaneously and contact with it.
Described hanging water tank weld by one block of steel plate with bolt hole with hanging girder steel fixed connection place, the lower surface of the channel-section steel of described hanging girder steel offers bolt hole corresponding with it, hang girder steel and be bolted to connection on this steel plate.
A preparation method for water-cooled partition wall in the stove that can install online, is characterized in that comprising the following steps:
The first step, makes partition wall steel construction:
1) a hanging water tank is made according to the width of body of heater, one or more steel plate is welded at the inner watertight of hanging water tank, be divided into multiple water tank room, then on the upper wall of each water tank room, offer a water outlet of water tank, this water outlet of water tank watertight is welded with flanged fitting; Weld a lifting earrings respectively at the two ends of hanging water tank upper wall, then be fixedly connected with multiple hanging girder steel on the upper wall of hanging water tank;
2) according to the water cooled pipeline of the dimensioned dimension size of water tank room, water cooled pipeline is mountain font, and cooling water is entered by the middle mouth of pipe, flows out from the both sides mouth of pipe; Water cooled pipeline intervalve saliva is close is welded with flanged fitting; At the middle part of water cooled pipeline and several anchoring pieces differed in length of lower weld;
3) about one circular hole run through is offered at the middle part of water tank room, then by the middle mouth of pipe of water cooled pipeline through this circular hole, simultaneously with lower wall and the upper wall airtight welding of water tank room; On the lower wall at two ends, water tank room, offer a through hole respectively, then by the mouth of pipe of water cooled pipeline both sides respectively watertight be welded on through hole; Water tank room and water cooled pipeline form a water-cooled pipe-line system, and cooling water is entered by the middle mouth of pipe, flow out to water tank indoor from the both sides mouth of pipe, then discharge from water outlet of water tank;
Second step, carries out bulge test to water-cooled pipe-line system:
After partition wall structure steel fabrication completes, by water outlet of water tank blind plate sealing, then mouth of pipe water flowing pressurization in the middle of water cooled pipeline, carry out bulge test to water-cooled pipe-line system, test pressure gets the 1.25-1.5 of design pressure doubly;
3rd step, build preparation before amorphous refractory:
1) after bulge test completes, then in the middle part of water cooled pipeline and the coated one deck refractory fiber blanket of lower surface, and with adhesive tape refractory fiber blanket twined tie up fixing;
2) at anchoring piece external coating one deck water proofing asphalt;
4th step, build amorphous refractory:
1) according to need the specification of rectangular wall body, the method adopting formwork to build builds amorphous refractory;
2) rectangular wall body built up is watered to amorphous refractory and carry out maintenance aftershaping, reach mounting condition.
Rectangular wall body in shown 4th step is divided into three formworks to build from top to bottom, first builds lower floor's amorphous refractory, after its maintenance is shaping, builds middle level amorphous refractory again, built upper, middle and lower three layers of amorphous refractory by that analogy.
An installation method for water-cooled partition wall in the stove that can install online, is characterized in that comprising the steps:
1) installing hole that body of heater top is reserved is opened, by clean for the cleaning of periphery amorphous refractory surface; Fix a circle refractory fiber blanket on the surface of installing hole, this refractory fiber blanket wraps with plastic sheeting in advance;
2) this water-cooled partition wall is entered body of heater installing hole by hoisting machine tool integral hoisting, the hanging of hanging girder steel is on furnace roof crossbeam, closely knit by clogging between this water-cooled partition wall and body of heater with the refractory fiber blanket fixed in step 1);
3) two-layer refractory brick is added a cover at the sealing surface of body of heater installing hole and this water-cooled partition wall;
4) first outer to water outlet of water tank and stove drainpipe is connected, outer to the mouth of pipe in the middle of water cooled pipeline and stove water inlet pipe is connected, and water flowing; So far, partition wall enters running status.
Beneficial effect of the present invention:
1, reasonable in design of the present invention, stable performance, installation are changed conveniently, can assemble integrated at external stove integral and can install replacing by line; The all building blocks of this partition wall can at external stove integral assembled formation, and resistance to 1300 DEG C of high temperature; This partition wall and body of heater adopt refractory fiber blanket soft seal to be connected, and can overall online install or change, and install or in Renewal process without the need to destroying or the relevant furnace equipment facility of transformation;
2, the curtain wall structure of this particular design of the present invention short and sweet (for rectangle), uniform force, greatly reduces Problems existing and risk in design process;
3, the present invention at external stove integral assembled formation, can install and change integral hoisting, greatly reduce construction and installation difficulty, improve efficiency of construction, saved cost;
4, the present invention adopts water-cooled form, good cooling results, enhances the stability that partition wall uses, extends its service life.
Accompanying drawing explanation
Fig. 1 is overall structure front schematic view of the present invention (in figure, water cooled pipeline part is sectional plane).
Fig. 2 is A-A place sectional drawing in Fig. 1.
Fig. 3 is the front schematic view of hanging girder steel.
Fig. 4 is the side middle section schematic diagram hanging girder steel in Fig. 3.
Fig. 5 be independently single water tank room time partition wall steel construction schematic diagram.
Fig. 6 is partition wall steel construction schematic diagram when having hanging water tank to be separated into two water tank rooms.
Fig. 7 is the top view of Fig. 6.
Fig. 8 is the front schematic view of the present invention when being arranged on body of heater.
Fig. 9 is B-B place sectional drawing in Fig. 8.
Description of reference numerals: 1-hanging water tank, 2-water cooled pipeline, 3-hanging girder steel, 4-water outlet of water tank, 5-lifting earrings, 6-anchor, 7-amorphous refractory, 8-refractory brick, 9-refractory fiber blanket, 10-body of heater, 11-furnace roof crossbeam, 12-locating part.
Detailed description of the invention
For a better understanding of the present invention, with specific embodiment, the present invention is described further by reference to the accompanying drawings (as shown in figs 1-9) below.
A water-cooled partition wall in the stove that can install online, is characterized in that: it is formed primarily of partition wall steel construction and amorphous refractory 7; Described partition wall steel construction comprises the hanging water tank 1 that a length and body of heater 10 width match, and described hanging water tank 1 inside is separated into multiple identical water tank room along its length or does not separate and only forms a water tank room; Bottom, described each water tank room is fixedly connected with a mountain font water cooled pipeline 2, the mouth of pipe in the middle of described water cooled pipeline 2 is sealedly and fixedly connected with it through the lower wall in the middle part of water tank room and upper wall successively, and the mouth of pipe of described water cooled pipeline 2 both sides is fixedly connected on the two ends of water tank room respectively and is communicated with it; The middle part of described each water tank room is provided with a water outlet of water tank 4; The middle part of described water cooled pipeline 2 and bottom are provided with several anchors 6, and are coated with refractory fiber blanket; Described amorphous refractory 7 is cast in middle part and the bottom of each water cooled pipeline 2 simultaneously, and by its coated formation therein one piece of rectangular wall body; The upper surface of described hanging water tank 1 is fixed with multiple hanging girder steel 3 and a pair lifting earrings 5, and described a pair lifting earrings 5 lays respectively at the two ends of hanging water tank 1.
Described hanging water tank 1 is made up of one or more separate water tank room, and described multiple self-contained water tank room is in-line welding.
Described hanging water tank 1 is welded by two separate water tank rooms, and the middle part of described two water tank rooms is all fixedly connected with a hanging girder steel 3 and a lifting earrings 5, and the weld between described two water tank rooms is provided with a hanging girder steel 3.
Described hanging water tank 1 is formed by two channel-section steel airtight weldings, and two ends are sealed to a cuboid hollow structure by steel plate pressure-tight weld.
The middle part of described water tank room is provided with about one circular hole run through, the mouth of pipe in the middle of described water cooled pipeline 2 through this circular hole, and with the lower wall of water tank room and upper wall airtight welding, described circular hole be directly 1/2nd of lower wall width on water tank room.
The mouth of pipe in the middle of described water cooled pipeline 2 and water outlet of water tank 4 are equipped with flanged fitting.
Described amorphous refractory 7 waters the one piece of rectangular wall body built up and is divided into upper, middle and lower three layers, separates between layers by dilatation joint.
Described anchor 6 is anchoring piece, and the middle part of described water cooled pipeline 2 and bottom are provided with the anchoring piece of several varying lengths, and the surface of described anchoring piece is brushed with water proofing asphalt.
Described anchor 6 is partition wall amorphous refractory supporting plate, and described partition wall amorphous refractory pallets level is arranged on the outer wall of water cooled pipeline 2, and the surface of described partition wall amorphous refractory supporting plate is brushed with water proofing asphalt.
Described hanging girder steel 3 is made up of the channel-section steel of two parallel placements, two channel-section steels are by connecting at welding edges Interal fixation, the lower surface of two channel-section steels is welded with two pieces of locating parts 12, when hanging girder steel 3 and hanging on two furnace roof crossbeams 11, two pieces of locating parts 12 are positioned at the inner side of two furnace roof crossbeams 11 simultaneously and contact with it.
Described hanging water tank 1 weld by one block of steel plate with bolt hole with hanging girder steel 3 fixed connection place, the lower surface of the channel-section steel of described hanging girder steel 3 offers bolt hole corresponding with it, hang girder steel 3 and be bolted to connection on this steel plate.
A preparation method for water-cooled partition wall in the stove that can install online, is characterized in that comprising the following steps:
The first step, makes partition wall steel construction:
1) a hanging water tank 1 is made according to the width of body of heater 10, one or more steel plate is welded at the inner watertight of hanging water tank 1, be divided into multiple water tank room, then on the upper wall of each water tank room, offer a water outlet of water tank 4, this water outlet of water tank 4 watertight is welded with flanged fitting; Weld a lifting earrings 5 respectively at the two ends of hanging water tank 1 upper wall, then be fixedly connected with multiple hanging girder steel 3 on the upper wall of hanging water tank 1;
2) according to the water cooled pipeline 2 of the dimensioned dimension size of water tank room, water cooled pipeline 2 is mountain font, and cooling water is entered by the middle mouth of pipe, flows out from the both sides mouth of pipe; Water cooled pipeline 2 intervalve saliva is close is welded with flanged fitting; At the middle part of water cooled pipeline 2 and several anchoring pieces differed in length of lower weld;
3) about one circular hole run through is offered at the middle part of water tank room, then by the middle mouth of pipe of water cooled pipeline 2 through this circular hole, simultaneously with lower wall and the upper wall airtight welding of water tank room; On the lower wall at two ends, water tank room, offer a through hole respectively, then by the mouth of pipe of water cooled pipeline 2 both sides respectively watertight be welded on through hole; Water tank room and water cooled pipeline 2 form a water-cooled pipe-line system, and cooling water is entered by the middle mouth of pipe, flow out to water tank indoor from the both sides mouth of pipe, then discharge from water outlet of water tank 4;
Second step, carries out bulge test to water-cooled pipe-line system:
After partition wall structure steel fabrication completes, by water outlet of water tank 4 blind plate sealing, then in the middle mouth of pipe water flowing pressurization of water cooled pipeline 2, carry out bulge test to water-cooled pipe-line system, test pressure gets the 1.25-1.5 of design pressure doubly;
3rd step, build preparation before amorphous refractory:
1) after bulge test completes, then in the middle part of water cooled pipeline 2 and the coated one deck refractory fiber blanket 9 of lower surface, and with adhesive tape refractory fiber blanket 9 twined tie up fixing;
2) at anchoring piece external coating one deck water proofing asphalt;
4th step, build amorphous refractory 7:
1) according to need the specification of rectangular wall body, the method adopting formwork to build builds amorphous refractory 7;
2) rectangular wall body built up is watered to amorphous refractory 7 and carry out maintenance aftershaping, reach mounting condition.
Rectangular wall body in shown 4th step is divided into three formworks to build from top to bottom, first builds lower floor's amorphous refractory 7, after its maintenance is shaping, builds middle level amorphous refractory 7 again, built upper, middle and lower three layers of amorphous refractory 7 by that analogy.
An installation method for water-cooled partition wall in the stove that can install online, is characterized in that comprising the steps:
1) installing hole that body of heater 10 top is reserved is opened, by clean for the cleaning of periphery amorphous refractory surface; Fix a circle refractory fiber blanket 9 on the surface of installing hole, this refractory fiber blanket 9 wraps with plastic sheeting in advance;
2) this water-cooled partition wall is entered body of heater 10 installing hole by hoisting machine tool integral hoisting, hanging girder steel 3 is hung on furnace roof crossbeam, closely knit by clogging between this water-cooled partition wall and body of heater 10 with the refractory fiber blanket 9 fixed in step 1);
3) two-layer refractory brick is added a cover at the sealing surface of body of heater 10 installing hole and this water-cooled partition wall;
4) first outer to water outlet of water tank 4 and stove drainpipe is connected, outer to middle for water cooled pipeline 2 mouth of pipe and stove water inlet pipe is connected, and water flowing; So far, partition wall enters running status.
Above-described amorphous refractory 7 is castable, moldable etc.
Above disclosedly be only preferred embodiment of the present invention, certainly can not limit the interest field of the present invention with this, therefore according to the equivalence change that the present patent application the scope of the claims is done, still belong to protection scope of the present invention.

Claims (12)

1. a water-cooled partition wall in the stove can installed online, is characterized in that: it is formed primarily of partition wall steel construction and amorphous refractory (7); Described partition wall steel construction comprises the hanging water tank (1) that a length and body of heater (10) width match, and described hanging water tank (1) inside is separated into multiple identical water tank room along its length or does not separate an only formation water tank room; Bottom, described each water tank room is fixedly connected with mountain font water cooled pipeline (2), the mouth of pipe in the middle of described water cooled pipeline (2) is sealedly and fixedly connected with it through the lower wall in the middle part of water tank room and upper wall successively, and the mouth of pipe of described water cooled pipeline (2) both sides is fixedly connected on the two ends of water tank room respectively and is communicated with it; The middle part of described each water tank room is provided with a water outlet of water tank (4); The middle part of described water cooled pipeline (2) and bottom are provided with several anchors (6), and are coated with refractory fiber blanket; Described amorphous refractory (7) is cast in middle part and the bottom of each water cooled pipeline (2) simultaneously, and by its coated formation therein one piece of rectangular wall body; The upper surface of described hanging water tank (1) is fixed with multiple hanging girder steel (3) and a pair lifting earrings (5), and described a pair lifting earrings (5) lays respectively at the two ends of hanging water tank (1);
The mouth of pipe in the middle of described water cooled pipeline (2) and water outlet of water tank (4) are equipped with flanged fitting;
Described amorphous refractory (7) waters the one piece of rectangular wall body built up and is divided into upper, middle and lower three layers, separates between layers by dilatation joint.
2. water-cooled partition wall in a kind of stove that can install online according to claim 1, is characterized in that: described hanging water tank (1) is made up of one or more separate water tank room, and described multiple self-contained water tank room is in-line welding.
3. water-cooled partition wall in a kind of stove that can install online according to claim 1, it is characterized in that: described hanging water tank (1) is welded by two separate water tank rooms, the middle part of described two water tank rooms is all fixedly connected with hanging girder steel (3) and lifting earrings (5), and the weld between described two water tank rooms is provided with hanging girder steel (3).
4. water-cooled partition wall in a kind of stove that can install online according to claim 1, is characterized in that: described hanging water tank (1) is formed by two channel-section steel airtight weldings, and two ends are sealed to a cuboid hollow structure by steel plate pressure-tight weld.
5. water-cooled partition wall in a kind of stove that can install online according to claim 1, it is characterized in that: the middle part of described water tank room is provided with about one circular hole run through, the mouth of pipe in the middle of described water cooled pipeline (2) is through this circular hole, and with lower wall and the upper wall airtight welding of water tank room, described circular hole be directly 1/2nd of lower wall width on water tank room.
6. water-cooled partition wall in a kind of stove that can install online according to claim 1, it is characterized in that: described anchor (6) is anchoring piece, the middle part of described water cooled pipeline (2) and bottom are provided with the anchoring piece of several varying lengths, and the surface of described anchoring piece is brushed with water proofing asphalt.
7. water-cooled partition wall in a kind of stove that can install online according to claim 1, it is characterized in that: described anchor (6) is partition wall amorphous refractory supporting plate, described partition wall amorphous refractory pallets level is arranged on the outer wall of water cooled pipeline (2), and the surface of described partition wall amorphous refractory supporting plate is brushed with water proofing asphalt.
8. water-cooled partition wall in a kind of stove that can install online according to claim 1, it is characterized in that: described hanging girder steel (3) is made up of the channel-section steel of two parallel placements, two channel-section steels are by connecting at welding edges Interal fixation, the lower surface of two channel-section steels is welded with two pieces of locating parts (12), when hanging girder steel (3) hanging when two furnace roof crossbeams (11) are upper, two pieces of locating parts (12) are positioned at the inner side of two furnace roof crossbeams (11) simultaneously and contact with it.
9. water-cooled partition wall in a kind of stove that can install online according to claim 8, it is characterized in that: described hanging water tank (1) upper with hang girder steel (3) fixed connection place and weld by one block of steel plate with bolt hole, the lower surface of the channel-section steel of described hanging girder steel (3) offers bolt hole corresponding with it, hanging girder steel (3) is bolted to connection on this steel plate.
10. a preparation method for water-cooled partition wall in the stove can installed online, is characterized in that comprising the following steps:
The first step, makes partition wall steel construction:
1) a hanging water tank (1) is made according to the width of body of heater (10), one or more steel plate is welded at hanging water tank (1) inner watertight, be divided into multiple water tank room, on the upper wall of each water tank room, offer a water outlet of water tank (4) again, this water outlet of water tank (4) watertight is welded with flanged fitting; Weld lifting earrings (5) respectively at the two ends of hanging water tank (1) upper wall, then be fixedly connected with multiple hanging girder steel (3) on the upper wall of hanging water tank (1);
2) according to the water cooled pipeline (2) of the dimensioned dimension size of water tank room, water cooled pipeline (2) is mountain font, and cooling water is entered by the middle mouth of pipe, flows out from the both sides mouth of pipe; Water cooled pipeline (2) intervalve saliva is close is welded with flanged fitting; At the middle part of water cooled pipeline (2) and several anchoring pieces differed in length of lower weld;
3) about one circular hole run through is offered at the middle part of water tank room, then by the middle mouth of pipe of water cooled pipeline (2) through this circular hole, simultaneously with lower wall and the upper wall airtight welding of water tank room; On the lower wall at two ends, water tank room, offer a through hole respectively, then by the mouth of pipe of water cooled pipeline (2) both sides respectively watertight be welded on through hole; Water tank room and water cooled pipeline (2) form a water-cooled pipe-line system, and cooling water is entered by the middle mouth of pipe, flows out to water tank indoor from the both sides mouth of pipe, then discharges from water outlet of water tank (4);
Second step, carries out bulge test to water-cooled pipe-line system:
After partition wall structure steel fabrication completes, by water outlet of water tank (4) blind plate sealing, then mouth of pipe water flowing pressurization in the middle of water cooled pipeline (2), carry out bulge test to water-cooled pipe-line system, test pressure gets the 1.25-1.5 of design pressure doubly;
3rd step, build preparation before amorphous refractory:
1) after bulge test completes, then water cooled pipeline (2) middle part and the coated one deck refractory fiber blanket (9) of lower surface, and with adhesive tape refractory fiber blanket (9) twined tie up fixing;
2) at anchoring piece external coating one deck water proofing asphalt;
4th step, build amorphous refractory (7):
1) according to need the specification of rectangular wall body, the method adopting formwork to build builds amorphous refractory (7);
2) rectangular wall body built up is watered to amorphous refractory (7) and carry out maintenance aftershaping, reach mounting condition.
The preparation method of water-cooled partition wall in 11. a kind of stoves that can install online according to claim 10, it is characterized in that: the rectangular wall body in shown 4th step is divided into three formworks to build from top to bottom, first build lower floor's amorphous refractory (7), after its maintenance is shaping, builds middle level amorphous refractory (7) again, builds upper, middle and lower three layers of amorphous refractory (7) by that analogy.
In 12. 1 kinds of stoves that can install online, the installation method of water-cooled partition wall, is characterized in that comprising the steps:
1) installing hole that body of heater (10) top is reserved is opened, by clean for the cleaning of periphery amorphous refractory surface; Fix a circle refractory fiber blanket (9) on the surface of installing hole, this refractory fiber blanket (9) wraps with plastic sheeting in advance;
2) this water-cooled partition wall is entered body of heater (10) installing hole by hoisting machine tool integral hoisting, hanging girder steel (3) hanging is on furnace roof crossbeam, closely knit by clogging between this water-cooled partition wall and body of heater (10) with the refractory fiber blanket fixed in step 1) (9);
3) two-layer refractory brick is added a cover at the sealing surface of body of heater (10) installing hole and this water-cooled partition wall;
4) first outer to water outlet of water tank (4) and stove drainpipe is connected, outer to the mouth of pipe in the middle of water cooled pipeline (2) and stove water inlet pipe is connected, and water flowing; So far, partition wall enters running status.
CN201310619608.8A 2013-11-29 2013-11-29 Furnace water-cooling partition wall capable of being installed on line and manufacturing and installing method thereof Expired - Fee Related CN103673617B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310619608.8A CN103673617B (en) 2013-11-29 2013-11-29 Furnace water-cooling partition wall capable of being installed on line and manufacturing and installing method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310619608.8A CN103673617B (en) 2013-11-29 2013-11-29 Furnace water-cooling partition wall capable of being installed on line and manufacturing and installing method thereof

Publications (2)

Publication Number Publication Date
CN103673617A CN103673617A (en) 2014-03-26
CN103673617B true CN103673617B (en) 2015-05-20

Family

ID=50311917

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310619608.8A Expired - Fee Related CN103673617B (en) 2013-11-29 2013-11-29 Furnace water-cooling partition wall capable of being installed on line and manufacturing and installing method thereof

Country Status (1)

Country Link
CN (1) CN103673617B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103913067B (en) * 2014-04-23 2015-08-12 洛阳市洛华粉体工程特种耐火材料有限公司 A kind of for the whole pipe-type water-cooling device watering furnace roof furnace lining
CN106766924A (en) * 2017-01-05 2017-05-31 中冶华天南京工程技术有限公司 The streamlined air-cooled partition wall of heating furnace furnace roof
CN110643377B (en) * 2019-09-24 2021-04-06 济钢集团国际工程技术有限公司 Preparation method of maintenance-free dry quenching coke tank

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1070259A (en) * 1992-09-29 1993-03-24 薛鸿雁 Integratal isolating wall for ring heating stove
CN2729060Y (en) * 2004-09-28 2005-09-28 中国凯盛国际工程有限公司 Partition device of tin groove outlet of float glass making device
CN201242349Y (en) * 2008-04-30 2009-05-20 山东泰威冶金材料制造有限公司 Water cooling type chain-grating machine flame dyke
CN201607126U (en) * 2010-03-05 2010-10-13 长沙有色冶金设计研究院 Partition water jacket used for oxygen side-blown converter
CN202013100U (en) * 2011-03-11 2011-10-19 重庆赛迪工业炉有限公司 High temperature partition wall
CN103363806A (en) * 2013-07-23 2013-10-23 鞍钢集团工程技术有限公司 Heating furnace wall cooling device and use method thereof
CN203572226U (en) * 2013-11-29 2014-04-30 中冶南方(武汉)威仕工业炉有限公司 Water-cooling partition wall in furnace capable of being installed on line

Also Published As

Publication number Publication date
CN103673617A (en) 2014-03-26

Similar Documents

Publication Publication Date Title
CN103673617B (en) Furnace water-cooling partition wall capable of being installed on line and manufacturing and installing method thereof
CN106246209B (en) A kind of tunnel inner lining concrete insulated curing constructing device and its construction method
JP2009235808A (en) Concrete slab and construction method therefor
AU2016240086A1 (en) Curtain wall brick external wall
CN203572226U (en) Water-cooling partition wall in furnace capable of being installed on line
CN104596288B (en) A kind of connection quirk of carbon element anode roasting furnace
CN207569425U (en) Concrete heat-insulating transmission pipeline
CN205502387U (en) Concrete supporting member for building
CN210321236U (en) Semi-covering type reinforced copper cooling wall
CN216360497U (en) Combined fluid stirring and purifying element
CN105002317A (en) Heat accumulating type burner for heating furnace
CN211921657U (en) Novel low formula is prevented segregation and is imitated high-efficient desorption column
CN212129234U (en) Utility tunnel
CN203807500U (en) Hot blast stove scale weld cracking preventing structure
CN210798087U (en) A profiled steel plate composite board with rainwater drainage device
CN210826224U (en) Longitudinal bending type copper cooling wall
CN203489667U (en) Top structure of communication flame path of open type annular roasting furnace
CN203613237U (en) Furnace head beam structure for steel rolling heating furnace
CN204916752U (en) Thermostatic control slurry tank
CN204495065U (en) Heating furnace furnace roof anchored brick breaking part prevents the erecting by overhang of collapse of furnace's roof
CN206847458U (en) A kind of heat-exchanger rig
CN221907710U (en) Maintenance cooling integrated pipe of large-section beam
CN104946835B (en) Blast furnace hot-blast valve maintenance platform
CN109185598A (en) Plugging device for rhone quick blocking discharge outlet
CN219411239U (en) Beam column node structure of steel reinforced concrete frame and pouring exhaust structure thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150520

Termination date: 20151129

CF01 Termination of patent right due to non-payment of annual fee