CN103669724B - Concrete filled steel tubular column - Google Patents

Concrete filled steel tubular column Download PDF

Info

Publication number
CN103669724B
CN103669724B CN201210321217.3A CN201210321217A CN103669724B CN 103669724 B CN103669724 B CN 103669724B CN 201210321217 A CN201210321217 A CN 201210321217A CN 103669724 B CN103669724 B CN 103669724B
Authority
CN
China
Prior art keywords
steel pipe
concrete
concrete post
tubular column
interior
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210321217.3A
Other languages
Chinese (zh)
Other versions
CN103669724A (en
Inventor
江忠良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHIFANG TECHNOLOGY CO., LTD.
Original Assignee
ZHEJIANG JIANGXIN STEEL GRID TRUSS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG JIANGXIN STEEL GRID TRUSS Co Ltd filed Critical ZHEJIANG JIANGXIN STEEL GRID TRUSS Co Ltd
Priority to CN201210321217.3A priority Critical patent/CN103669724B/en
Publication of CN103669724A publication Critical patent/CN103669724A/en
Application granted granted Critical
Publication of CN103669724B publication Critical patent/CN103669724B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The invention discloses the concrete filled steel tubular column in a kind of steel construction, form primarily of outer steel pipe (1) and concrete post (2), an interior steel pipe (6) is also had in outer steel pipe (1), concrete post (2) is filled between outer steel pipe (1) and interior steel pipe (6) becomes a hollow concrete post, is a cavity (4) in interior steel pipe (6).The end face of concrete post (2) and bottom surface all exceed end face and the bottom surface of outer steel pipe (1) two hold-carrying indigo plant dish (1a), concrete post (2) end face and bottom surface all have the straight trough of one group of equally distributed break-through hollow concrete post (2), each one group of strip connection strap (3) is embedded in each straight trough above-mentioned and outer steel pipe (1) and interior steel pipe (6) is linked into an integrated entity up and down.The present invention reduces the deadweight of concrete filled steel tubular column, and ensured the concentricity of multilayer concrete filled steel tubular column levels concrete post (2), thus ensure the quality in house.

Description

Concrete filled steel tubular column
Technical field: the present invention relates to the concrete filled steel tubular column in steel construction.
Background technology: steel construction is due to easy construction, and the speed that builds a house is fast, and building waste is few, obtains and applies more and more widely.In steel construction, steel pipe column is one of modal parts.The effect of post is load-bearing, but the anti-pressure ability of steel is less than concrete, and therefore, the steel pipe column of filling concrete in steel pipe comes into one's own., the deadweight of this concrete filled steel tubular column but considerably increases, and for the steel construction of multilayer, this problem is particularly outstanding.
Summary of the invention: the object of this invention is to provide a kind of concrete filled steel tubular column, both make use of the feature that concrete compressive property is good, additionally reduce the deadweight of concrete filled steel tubular column, and the concentricity of multilayer concrete filled steel tubular column levels concrete post can also be ensured, thus ensure the quality of multi-storey steel structure building.
For this reason, the technical solution that the present invention proposes is, a kind of concrete filled steel tubular column, form primarily of steel pipe and the concrete post be filled in steel pipe, described steel pipe is outer steel pipe, also has an interior steel pipe in outer steel pipe, described concrete column filling becomes a hollow concrete post outside between steel pipe and interior steel pipe, the end face of concrete post and bottom surface exceed end face and the bottom surface of outer steel pipe two hold-carrying indigo plant dish, and it also respectively have the straight trough of the break-through hollow concrete post of one group of equally distributed level, are then a cavity in interior steel pipe.In addition, in top and the bottom of concrete filled steel tubular column, between outer steel pipe method indigo plant dish and interior steel pipe, in each straight trough all having one group of strip connection strap to be embedded in described concrete capital face and bottom surface by outer steel pipe and interior fastener for connection integral, and the end face of each connection strap or bottom surface are also all lower than end face and the bottom surface of concrete post.
Therefore concrete post of the present invention plays load-bearing effect, gives full play to the feature that its compressive property is good, be cavity in interior steel pipe, decrease the volume of concrete post, thus alleviate the deadweight of concrete filled steel tubular column.Again because outer and inner tube links into an integrated entity, ensure the concentricity of outer and inner tube, namely ensured the concentricity of concrete post and outer steel pipe.Multilayer concrete filled steel tubular column is interconnected by the method indigo plant dish of outer steel pipe, and this has just ensured the concentricity of multilayer concrete filled steel tubular column levels concrete post, has also just ensured the quality in house.
Below in conjunction with drawings and Examples, the present invention is further illustrated.
Accompanying drawing illustrates: Fig. 1 is the main TV structure schematic diagram of embodiment 1, embodiment 2;
Fig. 2 is the top view of Fig. 1 of embodiment 1;
Fig. 3 is the A-A sectional drawing of Fig. 1 of embodiment 1;
Fig. 4 is the top view of Fig. 1 of embodiment 2;
Fig. 5 is the A-A sectional drawing of Fig. 1 of embodiment 2.
Detailed description of the invention: embodiment 1 as shown in Figure 1 to Figure 3.Also have an interior steel pipe 6 in outer steel pipe 1, outer steel pipe 1 is pipe with interior steel pipe 6.2, concrete post is filled in become a hollow concrete post between outer steel pipe 1 and interior steel pipe 6, be a cavity 4, decrease the volume of concrete post 2, thus alleviate the deadweight of concrete filled steel tubular column in interior steel pipe 6.The two ends up and down of concrete post 2, namely top and bottom all slightly exceed end face and the bottom surface of outer steel pipe 1 liang of hold-carrying indigo plant dish 1a.Like this, during the concrete filled steel tubular column assembly connection of the upper and lower floor in composite steel structure room can not in the middle of to come to nothing disconnection.Certainly, during assembling, the end face of concrete post 2 and bottom surface must through polishings, not only surfacing, and surface and concrete post 2 central axis.In end face and the bottom surface of concrete post 2, respectively there is the radial straight trough of the break-through hollow concrete post 2 of one group of equally distributed level.One group of strip connection strap 3 is embedded in each straight trough above-mentioned, is linked into an integrated entity by interior steel pipe 6 with outer steel pipe 1.This connection, generally be welded to connect bar 3 between steel pipe 1 method indigo plant dish 1a inwall and interior steel pipe 6 outer wall outside, also can be as shown in Figure 1 and Figure 2, outer steel pipe 1 method indigo plant dish 1a has groove, corresponding breach is opened in interior steel pipe 6 top and bottom, connection strap 3 one end is embedded in method indigo plant dish 1a groove, and the other end is embedded on the breach of interior steel pipe 6, is then weldingly connected.Outer and inner tube 6,1 links into an integrated entity, and can ensure the concentricity of outer and inner tube 6,1, has also just ensured the concentricity of multilayer concrete filled steel tubular column levels concrete post 2.Connection strap 3 shown in Fig. 2 is four, certainly can be more, also can reduce, be generally 3-8 bar.In addition, no matter be top or the connection strap of bottom 3, their end face or bottom surface are also lower than end face or the bottom surface of concrete post 2.
Steel pipe 6 external surface in embodiment 1, be welded with more than one deck of contour distribution, every layer has one group of equally distributed spike weldering nail 5 on horizontal section, each weldering nail 5 is vertical with surface, place, namely welding nail 5 decile is distributed on the radius of interior steel pipe 6, the minimum spacing of adjacent two weldering nails 5, namely, steel pipe 6 spacing is circumferentially greater than the diameter of vibrating head; Every assembly welding nail 5 of neighboring layers, not only number is identical, and the position one_to_one corresponding of the horizontal section of each weldering nail 5, and upper and lower overlap does not misplace, so the weldering nail 5 of same level position is distributed on same vertical plane on each layer.As shown in Figure 1, Figure 3, embodiment 1 has weldering nail 5 four layers, and it is one group that the weldering of every layer follows closely 5 eight.Certainly can increase and decrease, the general number of plies is 2-10 layer, and every layer of weldering nail 5 number is 3-24.Each weldering nail 5 all interts in concrete post 2, and thus concrete post 2 is tightr with the connection of interior steel pipe 6.Because interior steel pipe 6 links into an integrated entity with outer steel pipe 1, so in fact concrete post 2 is all tight with the connection of outer and inner tube 6,1.Weldering nail about 5 overlaps of every layer do not misplace, and the spacing of adjacent two weldering nails 5 is greater than the diameter of vibrating head, inserts and extract vibrating head when being conducive to building concrete.
Embodiment 2 as shown in Figure 1, Figure 4, Figure 5.The outer steel pipe 1 of embodiment 2, interior steel pipe 6 are all square tubes.Other guide and embodiment 1 same or similar, no longer repeat.

Claims (2)

1. a concrete filled steel tubular column, form primarily of steel pipe and the concrete post be filled in steel pipe, it is characterized in that: described steel pipe, namely an interior steel pipe (6) is also had in outer steel pipe (1), described concrete post, namely concrete post (2) is filled between outer steel pipe (1) and interior steel pipe (6) becomes a hollow concrete post, is a cavity (4) in interior steel pipe (6), the end face of concrete post (2) and bottom surface all exceed end face and the bottom surface of outer steel pipe (1) two hold-carrying indigo plant dish (1a), concrete post (2) end face and bottom surface all there is the horizontal straight trough of one group of equally distributed break-through hollow concrete post (2), in top and the bottom of concrete filled steel tubular column, between outer steel pipe (1) method indigo plant dish (1a) and interior steel pipe (6), all have one group of strip connection strap (3) to be embedded in each straight trough above-mentioned outer steel pipe (1) and interior steel pipe (6) are linked into an integrated entity, and the surface at concrete filled steel tubular column two ends connection strap (3) is all lower than end face or the bottom surface of concrete post (2).
2. concrete filled steel tubular column according to claim 1, it is characterized in that: on interior steel pipe (6) external surface, layering is welded with multiple spike weldering nail (5), every layer of weldering nail (5) is uniformly distributed on horizontal section, each weldering nail (5) is vertical with surface, place, and the minimum spacing of adjacent two welderings nail (5) is greater than the diameter of vibrating head; (5) not only number is identical for every layer of weldering nail, and the horizontal level of each weldering nail (5) also one_to_one corresponding is identical, namely weldering nail (5) of each layer same level position up and down overlap be distributed on same vertical plane; Each weldering nail (5) is all interted in concrete post (2).
CN201210321217.3A 2012-08-31 2012-08-31 Concrete filled steel tubular column Expired - Fee Related CN103669724B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210321217.3A CN103669724B (en) 2012-08-31 2012-08-31 Concrete filled steel tubular column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210321217.3A CN103669724B (en) 2012-08-31 2012-08-31 Concrete filled steel tubular column

Publications (2)

Publication Number Publication Date
CN103669724A CN103669724A (en) 2014-03-26
CN103669724B true CN103669724B (en) 2015-11-25

Family

ID=50308433

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210321217.3A Expired - Fee Related CN103669724B (en) 2012-08-31 2012-08-31 Concrete filled steel tubular column

Country Status (1)

Country Link
CN (1) CN103669724B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104652704B (en) * 2015-01-28 2017-04-19 查晓雄 Connected installation and calculation methods for inner pipes and outer pipes of pipe-in-pipe concrete-filled steel tube tension members
CN107663927B (en) * 2017-09-19 2019-07-23 温州天泽建设有限公司 A kind of regeneration concrete steel structural upright column and its construction technology

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EA200800968A1 (en) * 2005-09-29 2009-02-27 Бернар Дуэ COMPOUND COLUMN FOR CONNECTIONS OF CONSTRUCTIONS AND FRAMEWORKS OF BUILDINGS
CN101624842A (en) * 2009-08-06 2010-01-13 清华大学 Hollow sandwich filled steel tubular column-steel beam connection adopting one-way fastening bolt
KR20110077713A (en) * 2009-12-30 2011-07-07 재단법인 포항산업과학연구원 Double steel pipe foundation and construction method thereof
CN202787664U (en) * 2012-08-31 2013-03-13 浙江江鑫钢网桁架有限公司 Concrete filled steel tubular column

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EA200800968A1 (en) * 2005-09-29 2009-02-27 Бернар Дуэ COMPOUND COLUMN FOR CONNECTIONS OF CONSTRUCTIONS AND FRAMEWORKS OF BUILDINGS
CN101624842A (en) * 2009-08-06 2010-01-13 清华大学 Hollow sandwich filled steel tubular column-steel beam connection adopting one-way fastening bolt
KR20110077713A (en) * 2009-12-30 2011-07-07 재단법인 포항산업과학연구원 Double steel pipe foundation and construction method thereof
CN202787664U (en) * 2012-08-31 2013-03-13 浙江江鑫钢网桁架有限公司 Concrete filled steel tubular column

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
"圆中空夹层钢管混凝土柱承载力研究";赵均海等;《建筑科学与工程学报》;20050331;第22卷(第1期);第50-54页 *

Also Published As

Publication number Publication date
CN103669724A (en) 2014-03-26

Similar Documents

Publication Publication Date Title
AU2017415961B2 (en) Prefabricated dual-steel-tube concrete shear wall, and assembly method therefor
CN103790265A (en) Method for manufacturing and assembling prefabricated concrete filled steel tube core column stiffening shear wall
CN205242617U (en) Novel steel pipe concrete coincide post - concrete beam connected node
CN102535750A (en) Cylindrical construction part provided with holed stiffening ribs and filled with steel fiber reinforced concrete
CN103615071A (en) Concrete-filled square steel tubular column with built-in spiral stirrup
CN103669724B (en) Concrete filled steel tubular column
JP5785340B1 (en) Manhole construction lining material
CN103603434A (en) Transitional junction from concrete-filled steel tube combination column to reinforced concrete column
CN103953134B (en) Shear wall with energy-consuming strips embedded between border and built-in steel plates and steel braces, and making method
CN202787664U (en) Concrete filled steel tubular column
CN104088375A (en) Buckling restriction steel bar structure
CN203213401U (en) Concrete steel pipe column lining reinforced connecting pipe
CN203808294U (en) Hollow reinforced concrete shear wall with end posts with continuous spiral stirrups
CN210164065U (en) Reinforced concrete column and steel core concrete column coupling assembling
CN103485338B (en) Prestress uplift pile and construction method thereof
CN102220785A (en) Combined joint, precast box house, and construction method for reinforced concrete structure multistory and high-rise building
CN203569700U (en) Transition node from concrete filled steel tube combination column to reinforced concrete column
CN202755362U (en) Prestressed concrete pile
CN102080375A (en) Novel pre-stressed concrete pipe pile
CN202023189U (en) Hollow concrete square pile for foundation
US11566420B2 (en) Assembly-type brick set
CN205000555U (en) Huge post of multicavity guan zhongguan reinforced concrete of space restraint
CN104908150B (en) A kind of piping shaft making template and the method based on factorial praluction piping shaft
CN203008127U (en) Connecting node of steel bar of composite structure
CN210315969U (en) Connection node structure and prefabricated building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 314502 Zhejiang city of Tongxiang province Puyuan town lianyue Road No. 1259

Patentee after: ZHIFANG TECHNOLOGY CO., LTD.

Address before: 314502 Zhejiang city of Tongxiang province Puyuan town lianyue Road No. 1259

Patentee before: ZHEJIANG JIANGXIN STEEL GRID TRUSS CO., LTD

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151125

Termination date: 20180831

CF01 Termination of patent right due to non-payment of annual fee