CN103645368B - The remodeling method of spark gap on-line monitoring type capacitance type potential transformer - Google Patents

The remodeling method of spark gap on-line monitoring type capacitance type potential transformer Download PDF

Info

Publication number
CN103645368B
CN103645368B CN201310537873.1A CN201310537873A CN103645368B CN 103645368 B CN103645368 B CN 103645368B CN 201310537873 A CN201310537873 A CN 201310537873A CN 103645368 B CN103645368 B CN 103645368B
Authority
CN
China
Prior art keywords
spark gap
capacitance type
potential transformer
type potential
line monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310537873.1A
Other languages
Chinese (zh)
Other versions
CN103645368A (en
Inventor
裴继东
蒋延磊
王学礼
张军
银高胜
韩向林
彭磊亚
陈越健
赵志南
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pingdingshan Power Supply Co of State Grid Henan Electric Power Co Ltd
Original Assignee
Pingdingshan Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pingdingshan Power Supply Co of State Grid Henan Electric Power Co Ltd filed Critical Pingdingshan Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority to CN201310537873.1A priority Critical patent/CN103645368B/en
Publication of CN103645368A publication Critical patent/CN103645368A/en
Application granted granted Critical
Publication of CN103645368B publication Critical patent/CN103645368B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses the remodeling method of a kind of spark gap on-line monitoring type capacitance type potential transformer, by the ground connection of spark gap in conventional condenser voltage transformer fuel tank is opened, the earth terminal of spark gap is drawn fuel tank by drawing outward screw rod, and be connected with the spark gap on-line monitoring table being arranged on outside fuel tank, thus have effectively achieved the on-line monitoring to capacitance type potential transformer internal lightning arrester conduction current, and it is very easy to spark gap or transformer carry out test maintenance and failure judgement, the trouble of capacitance type potential transformer all must be taken apart when avoiding maintenance every time and test, reach effect once and for all.

Description

The remodeling method of spark gap on-line monitoring type capacitance type potential transformer
Technical field
The present invention relates to capacitance type potential transformer structure-design technique field, particularly relate to the remodeling method of a kind of spark gap on-line monitoring type capacitance type potential transformer.
Background technology
At present, 550kv, 220kv, 110kv and 35kv capacitance type potential transformer is primary is applied to circuit or busbar voltage monitoring, it is sealed in fuel tank internal after spark gap within conventional condenser voltage transformer is in parallel with electromagnet portion, as shown in Figure 1 and Figure 2, spark gap is connected between transformer high-pressure side and ground all the time, either new clothes, routine test and trouble shoot, all spark gap or transformer cannot be tested, its deterioration cannot be found, damage, there is examination blind area, it is impossible to embody the quality of spark gap performance intuitively.If needing breakdown judge, Defect Search, it is necessary to open spark gap and electromagnetic transformer part line after capacitance type potential transformer is disintegrated, it could be tested.
Summary of the invention
It is an object of the invention to aim to provide the remodeling method of a kind of spark gap on-line monitoring type capacitance type potential transformer, the method will draw capacitance type potential transformer fuel tank outside arrester ground end, and an external spark gap on-line monitoring table, not only it is very easy to spark gap or transformer carry out test maintenance, need not take apart again tank envelope, and have effectively achieved the directly monitoring to capacitance type potential transformer internal lightning arrester conduction current.
Be the technical scheme is that the remodeling method of a kind of spark gap on-line monitoring type capacitance type potential transformer by realizing the purpose of the present invention, comprised the steps:
(1), spark gap lower end ground connection in capacitance type potential transformer is opened, and carry out insulating supporting with insulating part;
(2), selecting appropriate location on the downside of capacitance type potential transformer oil ga(u)ge, hole and arrange the outer bolt that draws, described outer drawing arranges insulated enclosure mechanism between bolt and capacitance type potential transformer fuel tank;
(3), by arrester ground end in capacitance type potential transformer with draw outward bolt and be connected;
(4), spark gap on-line monitoring conduction current table is fixed on capacitance type potential transformer base;
(5), by spark gap on-line monitoring conduction current table one end with draw outward bolt and be connected, other end ground connection.
Described insulating part is epoxy resins insulation part.
Described insulated enclosure mechanism is insulation rubber pad.
The remodeling method of the spark gap on-line monitoring type capacitance type potential transformer of the present invention be we be to realize on-line monitoring to capacitance type potential transformer internal lightning arrester conduction current, propose through test many times and experiment in conjunction with years'experiences, by the ground connection of spark gap in conventional condenser voltage transformer fuel tank is opened, the earth terminal of spark gap is drawn fuel tank by drawing outward screw rod, and be connected with the spark gap on-line monitoring table being arranged on outside fuel tank, thus have effectively achieved the on-line monitoring to capacitance type potential transformer internal lightning arrester conduction current, and it is very easy to spark gap or transformer carry out test maintenance and failure judgement, the trouble of capacitance type potential transformer all must be taken apart when avoiding maintenance every time and test, reach effect once and for all;By arranging insulating part in spark gap lower end, efficiently avoid the spark gap generation at fuel tank internal Grounding, ensure the accuracy of spark gap on-line monitoring conduction current table test;By drawing outside, insulated enclosure mechanism is set between bolt and capacitance type potential transformer fuel tank, being dielectrically separated between bolt and fuel tank is drawn outside not only achieving, ensure spark gap on-line monitoring conduction current table test accuracy, and effectively ensure the generation of fuel tank leakage of oil situation.The present invention is capacitance type potential transformer internal lightning arrester and the regular maintenance of transformer, breakdown judge, and the on-line monitoring of spark gap performance is provided a kind of efficiency easy and simple to handle low cost high, safe and reliable and the remodeling method put things right once and for all, after transformation, monitoring effect is good, and regular maintenance, breakdown judge efficiency are high.
Accompanying drawing explanation
Below in conjunction with the accompanying drawings the present invention is described further
Fig. 1 is the structural representation before the present invention transforms;
Fig. 2 is the electrical schematic diagram before the present invention transforms;
Fig. 3 is the improved structural representation of the present invention;
Fig. 4 is the improved electrical schematic diagram of the present invention.
Detailed description of the invention
As shown in Figure 3, Figure 4: the remodeling method of the spark gap on-line monitoring type capacitance type potential transformer of the present invention, comprise the steps:
(1), spark gap in capacitance type potential transformer 6 lower end ground connection is opened, and carry out insulating supporting with insulating part 7;
(2), selecting appropriate location on the downside of capacitance type potential transformer oil ga(u)ge 5, hole and arrange the outer bolt 3 that draws, described outer drawing arranges insulated enclosure mechanism between bolt 3 and capacitance type potential transformer fuel tank 4;
(3), spark gap in capacitance type potential transformer 6 earth terminal is connected with drawing outward bolt 3;
(4), spark gap on-line monitoring conduction current table 2 is fixed on capacitance type potential transformer base 1;
(5), spark gap on-line monitoring conduction current table 2 one end is connected with drawing outward bolt 3, other end ground connection.
Further, as the preferred version of the present invention: described insulating part 7 is epoxy resins insulation part.Described insulated enclosure mechanism is insulation rubber pad.
The present invention is by drawing capacitance type potential transformer fuel tank outside arrester ground end, and an external spark gap on-line monitoring table, have effectively achieved the directly monitoring to capacitance type potential transformer internal lightning arrester conduction current, and it is very easy to spark gap or transformer carry out test maintenance, need not take apart again tank envelope, reach effect once and for all.Compare time of traditional structure upkeep operation and breakdown judge, needs the work that the time just can complete, after transformation, it is only necessary to half an hour can complete before transformation.
Below in conjunction with embodiment, the present invention is further described:
Embodiment one
On June 20th, 2013, the transformation to certain 35KV transformer substation capacitor formula voltage transformer, comprise the following steps:
(1), spark gap lower end ground connection in capacitance type potential transformer is opened, and carry out insulating supporting with epoxy resins insulation part;
(2), select on the downside of capacitance type potential transformer oil ga(u)ge near tank bottoms position, bore the circular hole of an a diameter of 10mm, bolt is drawn outside insulation rubber ring pad being set in circular hole and installing, inside and outside fuel tank, draw the most sheathed valve rubber, tabletting on bolt the most outside, and it is fixing to carry out compressing sealing by clamp nut;
(3), in capacitance type potential transformer fuel tank, by arrester ground end with draw outward bolt and be connected;
(4), outside capacitance type potential transformer fuel tank, spark gap on-line monitoring conduction current table is fixed on capacitance type potential transformer base;
(5), outside capacitance type potential transformer fuel tank, by spark gap on-line monitoring conduction current table one end with draw outward bolt and be connected, other end ground connection.
Embodiment two
On July 18th, 2013, the transformation to certain 110KV transformer substation capacitor formula voltage transformer, comprise the following steps:
(1), spark gap lower end ground connection in capacitance type potential transformer is opened, and carry out insulating supporting with epoxy resins insulation part;
(2), select on the downside of capacitance type potential transformer oil ga(u)ge near tank bottoms position, bore the through hole of two a diameter of 10mm, between through hole, nearest spacing is 30cm, in two through holes, it is respectively provided with insulation rubber ring pad and draws outward bolt, draw difference the most sheathed valve rubber, tabletting inside and outside bolt fuel tank outside, and be fixed by clamp nut, seal it addition, externally draw between bolt and fuel tank with electric insulating sealant;
(3), in capacitance type potential transformer fuel tank, arrester ground end is drawn bolt outward with one of them and is connected, and carry out ground connection to drawing bolt outside another;
(4), outside capacitance type potential transformer fuel tank, spark gap on-line monitoring conduction current table is fixed on capacitance type potential transformer base;
(5), outside capacitance type potential transformer fuel tank, bolt is drawn outward with two respectively in spark gap on-line monitoring conduction current table two ends and connects one to one.
Embodiment three
On JIUYUE 12nd, 2013, the transformation to certain 110KV transformer substation capacitor formula voltage transformer, comprise the following steps:
(1), spark gap lower end ground connection in capacitance type potential transformer is opened, and carry out insulating supporting by insulating resin plate;
(2), select on the downside of capacitance type potential transformer oil ga(u)ge near tank bottoms position, bore the circular hole of an a diameter of 15mm, bolt is drawn outside insulation rubber ring pad being set in circular hole and installing, draw the most sheathed valve rubber, tabletting inside and outside the fuel tank of bolt the most outside, and it is fixing to carry out compressing sealing by clamp nut;
(3), in capacitance type potential transformer fuel tank, by arrester ground end with draw outward bolt and be connected;
(4), outside capacitance type potential transformer fuel tank, spark gap on-line monitoring conduction current table is fixed on capacitance type potential transformer base;
(5), outside capacitance type potential transformer fuel tank, by spark gap on-line monitoring conduction current table one end with draw outward bolt and be connected, the other end is connected with the earth lead of capacitance type potential transformer.

Claims (3)

1. the remodeling method of a spark gap on-line monitoring type capacitance type potential transformer, it is characterised in that: it comprises the steps:
(1), spark gap lower end ground connection in capacitance type potential transformer is opened, and carry out insulating supporting with insulating part;
(2), selecting appropriate location on the downside of capacitance type potential transformer oil ga(u)ge, hole and arrange the outer bolt that draws, described outer drawing arranges insulated enclosure mechanism between bolt and capacitance type potential transformer fuel tank;
(3), by arrester ground end in capacitance type potential transformer with draw outward bolt and be connected;
(4), spark gap on-line monitoring conduction current table is fixed on capacitance type potential transformer base
(5), by spark gap on-line monitoring conduction current table one end with draw outward bolt and be connected, other end ground connection.
2. the remodeling method of spark gap on-line monitoring type capacitance type potential transformer as claimed in claim 1, it is characterised in that: described insulating part is epoxy resins insulation part.
3. the remodeling method of spark gap on-line monitoring type capacitance type potential transformer as claimed in claim 1, it is characterised in that: described insulated enclosure mechanism is insulation rubber pad.
CN201310537873.1A 2013-11-04 2013-11-04 The remodeling method of spark gap on-line monitoring type capacitance type potential transformer Active CN103645368B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310537873.1A CN103645368B (en) 2013-11-04 2013-11-04 The remodeling method of spark gap on-line monitoring type capacitance type potential transformer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310537873.1A CN103645368B (en) 2013-11-04 2013-11-04 The remodeling method of spark gap on-line monitoring type capacitance type potential transformer

Publications (2)

Publication Number Publication Date
CN103645368A CN103645368A (en) 2014-03-19
CN103645368B true CN103645368B (en) 2016-09-28

Family

ID=50250618

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310537873.1A Active CN103645368B (en) 2013-11-04 2013-11-04 The remodeling method of spark gap on-line monitoring type capacitance type potential transformer

Country Status (1)

Country Link
CN (1) CN103645368B (en)

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2074506U (en) * 1990-09-28 1991-04-03 王国才 Double-functional discharge counter
JPH11202000A (en) * 1998-01-13 1999-07-30 Tokyo Electric Power Co Inc:The Optical vt
CN101680918B (en) * 2007-04-18 2012-08-22 株式会社东芝 Optical VT device
CN102044335A (en) * 2009-10-20 2011-05-04 大连互感器有限公司 Capacitor voltage transformer with external error adjusting structure
DE102010018969A1 (en) * 2010-04-27 2011-10-27 Siemens Aktiengesellschaft Current transformer arrangement
CN201877752U (en) * 2010-12-09 2011-06-22 天津市百利纽泰克电气科技有限公司 Error adjustment connecting box and capacitor voltage transformer with same
CN202421362U (en) * 2011-12-12 2012-09-05 河南省电力公司平顶山供电公司 Arrester online monitoring meter
CN202423952U (en) * 2011-12-13 2012-09-05 河南省电力公司平顶山供电公司 Special wiring equipment for GIS lightning arrester line
CN103018497A (en) * 2012-12-21 2013-04-03 桂林电力电容器有限责任公司 Medium-voltage grounding terminal structure for capacitor voltage transformer test

Also Published As

Publication number Publication date
CN103645368A (en) 2014-03-19

Similar Documents

Publication Publication Date Title
WO2017088307A1 (en) High-voltage dc support insulator test apparatus, test system and test method
CN203519770U (en) Device for high-voltage power cable GIS terminal commissioning test
CN104062526A (en) Oil-oil bushing cable outlet transformer test method without head removing
CN202471902U (en) 10 kv switch cabinet partial discharge detection testing system
CN105067976A (en) Cable GIS terminal integral prefabricated AC withstand voltage testing device
CN102419410B (en) Voltage/current double-applying testing device for electric device
CN203589642U (en) High-voltage conductor dry-type insulating bush
CN106324457B (en) Withstand voltage testing device for insulating part
CN106054044A (en) Insulation test device for gas filled tank
CN102800468B (en) Impregnated paper capacitive oil-SF6 transformer bushing
CN103645368B (en) The remodeling method of spark gap on-line monitoring type capacitance type potential transformer
CN205092826U (en) A frock for solar module high -voltage insulation test and EL test
CN204705696U (en) SF 6discharge Simulation platform
CN203589647U (en) Device capable of dismounting bus
CN206041295U (en) American box -type substation of improved generation 10kV with simple eye through -hole
CN205901152U (en) American case of improved generation 10kV becomes with simple eye through -hole and safety cover
CN209513975U (en) A kind of authentic partial discharge monitoring device of switchgear
CN202788798U (en) Underground pulse neutron generator
CN203178415U (en) Transformer testing apparatus
CN204855624U (en) Harmless sampling device of capacitive equipment end screen electric current
CN203502442U (en) High-voltage test auxiliary device used for 10kV oxide lightning arrester
CN205982524U (en) Aerify insulation test device for cabinet
CN203800349U (en) Novel transformer bushing tap grounding device
CN205211967U (en) Join in marriage electric network line maintenance and use ground connection discharge device
CN103700475A (en) Voltage transformer fuse mounting base

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant