CN103645047A - 超大排量安全阀用性能试验系统 - Google Patents

超大排量安全阀用性能试验系统 Download PDF

Info

Publication number
CN103645047A
CN103645047A CN201310734841.0A CN201310734841A CN103645047A CN 103645047 A CN103645047 A CN 103645047A CN 201310734841 A CN201310734841 A CN 201310734841A CN 103645047 A CN103645047 A CN 103645047A
Authority
CN
China
Prior art keywords
safety valve
thermofor
steam
testing
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310734841.0A
Other languages
English (en)
Inventor
刘庆江
唐卉
张明宝
张福君
孙同英
国金莲
杨军
邓剑虹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Boiler Co Ltd
Original Assignee
Harbin Boiler Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Boiler Co Ltd filed Critical Harbin Boiler Co Ltd
Priority to CN201310734841.0A priority Critical patent/CN103645047A/zh
Publication of CN103645047A publication Critical patent/CN103645047A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Safety Valves (AREA)

Abstract

超大排量安全阀用性能试验系统。现有的安全阀试验系统均采用一台蓄热器与试验安全阀直接螺栓相连的型式。由锅炉向蓄热器内通入蒸汽,使蓄热器内压力逐步升高,达到试验安全阀开启压力后,试验安全阀开启。利用上述试验系统,试验安全阀的排量一般不超过300t/h,并且没有排放时间的要求,试验安全阀达到全行程就可以满足试验要求。本发明的组成包括:锅炉(1)、蓄热器(2)、试验罐(4)、调节阀(6)、管路A(3)、管路B(5),所述的锅炉与所述的蓄热器通过所述的管路A连接,所述的蓄热器与所述的试验罐通过所述的管路B连接,所述的管路B上安装有所述的调节阀。本发明用于超大排量安全阀用性能试验。

Description

超大排量安全阀用性能试验系统
技术领域:
本发明涉及一种超大排量安全阀用性能试验系统。
背景技术:
现有的安全阀试验系统均采用一台蓄热器与试验安全阀直接螺栓相连的型式。由锅炉向蓄热器内通入蒸汽,使蓄热器内压力逐步升高,达到试验安全阀开启压力后,试验安全阀开启。利用上述试验系统,试验安全阀的排量一般不超过300t/h,并且没有排放时间的要求,试验安全阀达到全行程就可以满足试验要求。
发明内容:
本发明的目的是提供一种超大排量安全阀用性能试验系统。
上述的目的通过以下的技术方案实现:
一种超大排量安全阀用性能试验系统,其组成包括:锅炉、蓄热器、试验罐、调节阀、管路A、管路B,所述的锅炉与所述的蓄热器通过所述的管路A连接,所述的蓄热器与所述的试验罐通过所述的管路B连接,所述的管路B上安装有所述的调节阀。
所述的超大排量安全阀用性能试验系统,所述的蓄热器包括壳体,所述的壳体上具有2个汽水分离器A,所述的供气接管安装在所述的壳体上,所述的壳体上具有锅炉进气接管。
所述的超大排量安全阀用性能试验系统,所述的蓄热器用于将锅炉产生的蒸汽以高压饱和水的形式储存于所述的蓄热器中,同时所述的蓄热器设置了汽水分离器,提高了外供汽的干度。
所述的超大排量安全阀用性能试验系统,所述的试验罐包括外壳,所述的外壳上具有试验安全阀接管、蒸汽进口接管。
所述的超大排量安全阀用性能试验系统,所述的试验罐用于接收蓄热器产生并经过调节阀减压的饱和蒸汽,所述的试验罐内部设置所述的汽水分离器B,提高了蒸汽内的干度,减小了汽水对试验安全阀的冲击。
所述的超大排量安全阀用性能试验系统,所述的调节阀具有快开快关功能,对所述的蓄热器产生蒸汽的参数具有调节功能,使得试验罐内部压力始终保持在规定的范围内,使得试验安全阀持续地以全启状态排出蒸汽,保证试验顺利地进行,同时,所述的调节阀的快开快关无用功能降低了能量的损耗。
有益效果:
1. 本发明通过高压的蓄热器储存能量,调节阀调节定量释放储存的能量和试验罐接收能量并连接试验安全阀的完整系统设置,为超大排量安全阀性能试验提供了支撑,促进了国产大流量核电主蒸汽用安全阀的研制工作。
2. 本发明中锅炉用于提供试验所需的蒸汽。
3.本发明中蓄热器用于将锅炉产生的蒸汽以高压饱和水的形式储存于蓄热器中。在试验过程中,通过降低蓄热器内部压力,使蓄热器内储存的饱和水“闪蒸”,从而产生相对低压力的饱和蒸汽向外供汽,蓄热器内部设置了汽水分离器,此汽水分离器提高了向外供汽的干度。
4. 本发明的试验罐用于接收蓄热器产生并经过调节阀减压的饱和蒸汽,试验罐内部设置的汽水分离器,此汽水分离器又进一步提高了蒸汽内的干度,减小了汽水对试验安全阀的冲击。试验罐与试验安全阀采用螺栓连接,当试验安全阀开启时试验罐用于承受安全阀反力。
附图说明:
附图1是本发明的结构示意图。
附图2是附图1中蓄热器的结构示意图。
附图3是附图1中试验罐的结构示意图。
具体实施方式:
实施例1:
一种超大排量安全阀用性能试验系统,其组成包括:锅炉1、蓄热器2、试验罐4、调节阀6、管路A,件号:3、管路B,件号:5,所述的锅炉与所述的蓄热器通过所述的管路A连接,所述的蓄热器与所述的试验罐通过所述的管路B连接,所述的管路B上安装有所述的调节阀。
实施例2:
根据实施例1所述的超大排量安全阀用性能试验系统,所述的蓄热器包括壳体7,所述的壳体上具有2个汽水分离器A,件号:8,所述的汽水分离器A与供气接管9连接,所述的供气接管安装在所述的壳体上,所述的壳体上具有锅炉进气接管10。
实施例3:
根据实施例1或2所述的超大排量安全阀用性能试验系统,所述的蓄热器用于将锅炉产生的蒸汽以高压饱和水的形式储存于所述的蓄热器中,同时所述的蓄热器设置了汽水分离器,提高了外供汽的干度。
实施例4:
根据实施例1或2或3所述的超大排量安全阀用性能试验系统,所述的试验罐包括外壳11,所述的外壳上具有试验安全阀接管12、蒸汽进口接管13,所述的试验安全阀接管与汽水分离器B,件号:14连接。
实施例5:
根据实施例4所述的超大排量安全阀用性能试验系统,所述的试验罐用于接收蓄热器产生并经过调节阀减压的饱和蒸汽,所述的试验罐内部设置所述的汽水分离器B,提高了蒸汽内的干度,减小了汽水对试验安全阀的冲击。
实施例6:
根据实施例1或2或3或4所述的超大排量安全阀用性能试验系统,所述的调节阀具有快开快关功能,对所述的蓄热器产生蒸汽的参数具有调节功能,使得试验罐内部压力始终保持在规定的范围内,使得试验安全阀持续地以全启状态排出蒸汽,保证试验顺利地进行,同时,所述的调节阀的快开快关无用功能降低了能量的损耗。

Claims (6)

1.一种超大排量安全阀用性能试验系统,其组成包括:锅炉、蓄热器、试验罐、调节阀、管路A、管路B,其特征是:所述的锅炉与所述的蓄热器通过所述的管路A连接,所述的蓄热器与所述的试验罐通过所述的管路B连接,所述的管路B上安装有所述的调节阀。
2.根据权利要求1所述的超大排量安全阀用性能试验系统,其特征是:所述的蓄热器包括壳体,所述的壳体上具有2个汽水分离器A,所述的供气接管安装在所述的壳体上,所述的壳体上具有锅炉进气接管。
3.根据权利要求1或2所述的超大排量安全阀用性能试验系统,其特征是:所述的蓄热器用于将锅炉产生的蒸汽以高压饱和水的形式储存于所述的蓄热器中,同时所述的蓄热器设置了汽水分离器,提高了外供汽的干度。
4.根据权利要求1或2或3所述的超大排量安全阀用性能试验系统,其特征是:所述的试验罐包括外壳,所述的外壳上具有试验安全阀接管、蒸汽进口接管。
5.根据权利要求4或5所述的超大排量安全阀用性能试验系统,其特征是:所述的试验罐用于接收蓄热器产生并经过调节阀减压的饱和蒸汽,所述的试验罐内部设置所述的汽水分离器B,提高了蒸汽内的干度,减小了汽水对试验安全阀的冲击。
6.根据权利要求1或2或3或4或5所述的超大排量安全阀用性能试验系统,其特征是:所述的调节阀具有快开快关功能,对所述的蓄热器产生蒸汽的参数具有调节功能,使得试验罐内部压力始终保持在规定的范围内,使得试验安全阀持续地以全启状态排出蒸汽,保证试验顺利地进行,同时,所述的调节阀的快开快关无用功能降低了能量的损耗。
CN201310734841.0A 2013-12-27 2013-12-27 超大排量安全阀用性能试验系统 Pending CN103645047A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310734841.0A CN103645047A (zh) 2013-12-27 2013-12-27 超大排量安全阀用性能试验系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310734841.0A CN103645047A (zh) 2013-12-27 2013-12-27 超大排量安全阀用性能试验系统

Publications (1)

Publication Number Publication Date
CN103645047A true CN103645047A (zh) 2014-03-19

Family

ID=50250299

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310734841.0A Pending CN103645047A (zh) 2013-12-27 2013-12-27 超大排量安全阀用性能试验系统

Country Status (1)

Country Link
CN (1) CN103645047A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104359669A (zh) * 2014-11-27 2015-02-18 哈尔滨锅炉厂有限责任公司 具备超大排量安全阀和常规安全阀双用蓄热器及蓄热方法
CN104568402A (zh) * 2014-12-15 2015-04-29 华东理工大学 一种测试核电稳压器安全阀排量的试验装置和试验方法
CN108760271A (zh) * 2018-06-19 2018-11-06 中国船舶重工集团公司第七〇九研究所 一种模拟实际工况的安全阀启闭压力测试装置及方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2175374A (en) * 1985-05-15 1986-11-26 Westinghouse Electric Corp Check valve test method using truncated accumulator blowdown
CN2793547Y (zh) * 2004-11-26 2006-07-05 北京迪威尔石油天然气技术开发有限公司 过热蒸汽炉
CN202072661U (zh) * 2011-04-29 2011-12-14 中冶焦耐(大连)工程技术有限公司 干熄焦锅炉调压放散蒸汽回收利用装置
CN202735073U (zh) * 2012-06-26 2013-02-13 深圳市特种设备安全检验研究院 安全阀热态型式试验装置
CN103852245A (zh) * 2012-12-04 2014-06-11 华东理工大学 一种测试安全阀热态机械性能的试验装置及试验方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2175374A (en) * 1985-05-15 1986-11-26 Westinghouse Electric Corp Check valve test method using truncated accumulator blowdown
CN2793547Y (zh) * 2004-11-26 2006-07-05 北京迪威尔石油天然气技术开发有限公司 过热蒸汽炉
CN202072661U (zh) * 2011-04-29 2011-12-14 中冶焦耐(大连)工程技术有限公司 干熄焦锅炉调压放散蒸汽回收利用装置
CN202735073U (zh) * 2012-06-26 2013-02-13 深圳市特种设备安全检验研究院 安全阀热态型式试验装置
CN103852245A (zh) * 2012-12-04 2014-06-11 华东理工大学 一种测试安全阀热态机械性能的试验装置及试验方法

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104359669A (zh) * 2014-11-27 2015-02-18 哈尔滨锅炉厂有限责任公司 具备超大排量安全阀和常规安全阀双用蓄热器及蓄热方法
CN104359669B (zh) * 2014-11-27 2017-05-03 哈尔滨锅炉厂有限责任公司 具备超大排量安全阀和常规安全阀双用蓄热器及蓄热方法
CN104568402A (zh) * 2014-12-15 2015-04-29 华东理工大学 一种测试核电稳压器安全阀排量的试验装置和试验方法
CN104568402B (zh) * 2014-12-15 2017-02-22 华东理工大学 一种测试核电稳压器安全阀排量试验装置的试验方法
CN108760271A (zh) * 2018-06-19 2018-11-06 中国船舶重工集团公司第七〇九研究所 一种模拟实际工况的安全阀启闭压力测试装置及方法
CN108760271B (zh) * 2018-06-19 2020-05-05 中国船舶重工集团公司第七一九研究所 一种模拟实际工况的安全阀启闭压力测试装置及方法

Similar Documents

Publication Publication Date Title
CN204493974U (zh) 无负压泵站中消减管道内水锤波装置
CN103645047A (zh) 超大排量安全阀用性能试验系统
CN202493240U (zh) 防冻型定压放气采油组合装置
CN101776077B (zh) 多功能水泵阀门
CN203882632U (zh) 一种核电厂主给水流量调节系统
CN205655277U (zh) 一种小型电站锅炉启动上水系统
CN103742894A (zh) 适用于船用余热锅炉的模块化换热箱体
CN204285436U (zh) 一种亚临界机组无电泵给水流量控制系统
CN104359669A (zh) 具备超大排量安全阀和常规安全阀双用蓄热器及蓄热方法
CN202707245U (zh) 清除汽车发动机积碳专用的自动控制氢氧除碳机
CN202253582U (zh) 锅炉除氧器
JOP20190309A1 (ar) طريقة ونظام الانتقال بمحطة الطاقة النووية إلى الحالة الآمنة بعد الإجهاد المفرط
CN104616707A (zh) 一种用于研究堆第二停堆系统的注硼系统
CN203559939U (zh) 降低超超临界机组汽水两相流的再循环管道
CN203633486U (zh) 烤房高压蒸汽烟叶回潮装置
CN103375324B (zh) 一种防止调相压水气罐及安全阀误动的方法
CN204348342U (zh) 一种高温气冷堆事故冷却除湿系统
CN203024124U (zh) 一种蒸汽发生器
CN103196227A (zh) 防炉管内导热油结焦的导热油炉及使用方法
CN203671579U (zh) 余热承压停电补水装置
CN201964392U (zh) 一种过热蒸汽减温射流装置
CN204512585U (zh) 一种水轮机加长型进水蝶阀
CN204328466U (zh) 一种液态氨气化并储存的集成装置
CN103486726A (zh) 一种节能锅炉
CN203382532U (zh) 新型卧塔喷射式除氧器

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140319