CN103639248B CN201310524843.7A CN201310524843A CN103639248B CN 103639248 B CN103639248 B CN 103639248B CN 201310524843 A CN201310524843 A CN 201310524843A CN 103639248 B CN103639248 B CN 103639248B
Authority
CN
China
Prior art keywords
ring parts
heating
thermal insulation
struts
heat treatment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310524843.7A
Other languages
Chinese (zh)
Other versions
CN103639248A (en
Inventor
于慎君
石如星
席志永
陶凯
郎庆斌
代博杰
雷晓娟
张�杰
刘晓恩
张念周
刘志刚
聂新林
张航宇
潘志生
王桂霞
姚朝晖
张帆
殷立涛
林乙丑
马正峰
刘同欣
崔丽丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CITIC Heavy Industries Co Ltd
Original Assignee
CITIC Heavy Industries Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CITIC Heavy Industries Co Ltd filed Critical CITIC Heavy Industries Co Ltd
Priority to CN201310524843.7A priority Critical patent/CN103639248B/en
Publication of CN103639248A publication Critical patent/CN103639248A/en
Application granted granted Critical
Publication of CN103639248B publication Critical patent/CN103639248B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Heat Treatment Of Articles (AREA)

Abstract

The bearing calibration of ovalizing deflection after a kind of large-scale ring parts heat treatment, relate to metal material heat treatment technics field, described method indicates the direction of minor axis B after the ovalizing deflection amount of measuring ring parts, put into car type furnace heating and thermal insulation, then take out the middle part that two struts is vertically fixed on to ring-shaped work pieces inner circle, again after heating and thermal insulation, carry out coolingly to the ring-shaped work pieces taking out, remove strut, to obtain the ring parts of realistic requirement; The present invention utilizes that under the condition of high temperature, to be out of shape the intensity of part lower, proofreaies and correct by the swell increment under the heated condition of two struts, simple to operate, save the energy, and safe and reliable.

Description

The bearing calibration of ovalizing deflection after a kind of large-scale ring parts heat treatment
[technical field]
The invention belongs to metal material heat treatment technics field, especially relate to a kind of bearing calibration of measuring ovalizing deflection after large-scale ring parts heat treatment.
[background technology]
Known, wheel band, the large-scale ring parts such as rolling ring is the vital part on kiln large-scale mill series products, this ring parts external diameter is larger, wall thickness is also thicker, in the time of heat treatment, conventionally adopt car type furnace heating, very easily there is ovalizing deflection in ring parts in heat treated process, once there is distortion and will bring very large difficulty to the machining in later stage in ring parts, operator is conventionally in order to process the product of drawing requirement, just have in the process of making blank, the thickness surplus of blank is amplified, make it be greater than deflection, so not only cause the serious waste of material, more crucial is, the heat treatment ovalizing deflection of part can cause the each portion of follow-up inside and outside circle processing capacity difference, thereby affect the uniformity of part outer working face hardness, the final serviceability that affects product, once and the ovalizing deflection of heat treatment process is greater than institute's made allowance, will causes again product to carry out machining and scrap, become those skilled in the art's basic demand and find out the bearing calibration of ovalizing deflection after a kind of large-scale ring parts heat treatment.
[summary of the invention]
In order to overcome the deficiency in background technology, the invention discloses the bearing calibration of ovalizing deflection after a kind of large-scale ring parts heat treatment, described method indicates the direction of minor axis B after the ovalizing deflection amount of measuring ring parts, put into car type furnace heating and thermal insulation, then take out the middle part that two struts is vertically fixed on to ring-shaped work pieces inner circle, again after heating and thermal insulation, carry out coolingly to the ring-shaped work pieces taking out, remove strut, to obtain the ring parts of realistic requirement; The present invention utilizes that under the condition of high temperature, to be out of shape the intensity of part lower, proofreaies and correct by the swell increment under the heated condition of two struts, simple to operate, save the energy, and safe and reliable.
In order to realize the object of foregoing invention, the present invention adopts following technical scheme:
The bearing calibration of ovalizing deflection after a kind of large-scale ring parts heat treatment, described method comprises the ovalizing deflection amount, heating and thermal insulation, placement strut of ring parts of measuring, heating and thermal insulation, cooling and to the cooling ring parts that obtains realistic requirement of strut again, and concrete operation step is as follows:
1) the ovalizing deflection amount of measurement ring parts:
First measure the ovalizing deflection amount of ring parts, measure inner circle long axis length A and inner circle minor axis length B;
2) heating and thermal insulation:
Connect previous step, the ring parts pad of measuring deflection, on car type furnace, is taken out after the direction of the minor axis B of ring parts periphery makes a mark, the ring parts marking is put into car type furnace heating and thermal insulation;
3) place strut 2:
Connect previous step, the strut that is (A+B)/2 by two length is vertically placed on the middle part of the ring parts inner circle after heating and thermal insulation mutually, and horizontal pad is firm, and wherein the two ends of the arbitrary strut in two struts are consistent with the direction of minor axis B;
4) heating and thermal insulation again:
Connect previous step, take out after the ring parts with two struts good pad is put into car type furnace heating and thermal insulation;
5) cooling
Connect previous step, the ring parts with two struts after coming out of the stove carried out to air cooling, air cooling to the surface temperature of ring parts lower than 300 degree after, ring parts is hung to car type furnace;
6) cooling to strut
Connect previous step, ring parts is hung and two struts carried out after car type furnace coolingly, make two struts depart from ring parts, to obtain the ring parts of realistic requirement.
The bearing calibration of ovalizing deflection after described large-scale ring parts heat treatment, the material making marks in described step 2 is adeciduate marker at high temperature, and described marker is lead oil.
The bearing calibration of ovalizing deflection after described large-scale ring parts heat treatment, the heating-up temperature in described step 2 and step 4 is 580 degree-620 degree, and temperature retention time is 6-8.5 hour.
The bearing calibration of ovalizing deflection after described large-scale ring parts heat treatment is water cooling to the type of cooling of two struts in described step 6.
Owing to adopting technique scheme, the present invention has following beneficial effect:
The bearing calibration of ovalizing deflection after large-scale ring parts heat treatment of the present invention, described method indicates the direction of minor axis B after the ovalizing deflection amount of measuring ring parts, put into car type furnace heating and thermal insulation, then take out the middle part that two struts is vertically fixed on to ring-shaped work pieces inner circle, again after heating and thermal insulation, carry out cooling to the ring-shaped work pieces taking out, remove strut, to obtain the ring parts of realistic requirement; The present invention utilizes that under the condition of high temperature, to be out of shape the intensity of part lower, proofreaies and correct by the swell increment under the heated condition of two struts, simple to operate, save the energy, and safe and reliable.
[brief description of the drawings]
Fig. 1 is the schematic diagram before the present invention proofreaies and correct;
Fig. 2 is the schematic diagram after the present invention heats;
Fig. 3 is the schematic diagram of timing of the present invention;
Fig. 4 is the schematic diagram after the present invention proofreaies and correct;
In the drawings: 1, ring parts; 2, strut.
[detailed description of the invention]
With reference to the following examples, can explain in more detail the present invention; But the present invention is not limited to these embodiment.
The bearing calibration of ovalizing deflection after a kind of large-scale ring parts heat treatment described in 1-4 by reference to the accompanying drawings, described method comprises the ovalizing deflection amount, heating and thermal insulation, placement strut 2 of ring parts 1 of measuring, heating and thermal insulation, cooling and to the cooling ring parts that obtains realistic requirement of strut 2 again, and concrete operation step is as follows:
1) the ovalizing deflection amount of measurement ring parts:
First measure the ovalizing deflection amount of ring parts 1, measure inner circle long axis length A and inner circle minor axis length B;
2) heating and thermal insulation:
Connect previous step, ring parts 1 pad of measuring deflection, on car type furnace, is made a mark in the direction of the minor axis B of ring parts 1 periphery, the material making marks is lead oil; After being put into car type furnace heating and thermal insulation, takes out the ring parts marking 1; Heating-up temperature is 580 degree-620 degree, and temperature retention time is 6-8.5 hour;
3) place strut:
Connect previous step, the strut that is (A+B)/2 by two length 2 is vertically placed on the middle part of ring parts 1 inner circle after heating and thermal insulation mutually, and horizontal pad is firm, and wherein the two ends of the arbitrary strut 2 in two struts 2 are consistent with the direction of minor axis B;
4) heating and thermal insulation again:
Connect previous step, take out after the ring parts 1 with two struts 2 good pad is put into car type furnace heating and thermal insulation; Heating-up temperature is 580 degree-620 degree, and temperature retention time is 6-8.5 hour;
5) cooling
Connect previous step, the ring parts 1 with two struts 2 after coming out of the stove carried out to air cooling, air cooling to the surface temperature of ring parts 1 lower than 300 degree after, ring parts 1 is hung to car type furnace;
6) cooling to strut 2
Connect previous step, ring parts 1 is hung and two struts 2 carried out after car type furnace coolingly, the type of cooling of described two struts 2 is water cooling; Make two struts 2 depart from ring parts 1, to obtain the ring parts 1 of realistic requirement.
Embodiment 1:
Rolling ring material is 35, height h=900mm, and design external diameter is 4120mm, and radially allowance is 30mm, and modified front outside diameter is 4150, and interior circular diameter is 3600mm, and radially allowance is 30mm, and modified front interior circular diameter is 3570mm. Adopt hardening and tempering process heat treatment, after quenching there is ovalizing deflection in (water-cooled), inner circle minor axis is 3549mm, major axis is 3568mm, minor axis dwindles 21mm, causes periphery half finish turning to occur a large amount of casting skins, and the monolateral allowance of only having 4mm, bring difficulty to subsequent assembly, need carry out ellipse to it and proofread and correct.
First by rolling ring pad on chassis boiler face, minor axis is vertical with chassis boiler face, measures good height, carries out fulcrum at rolling ring inner utilization parallels and refractory brick, fulcrum height and rolling ring center is highly close. Enter stove and be heated to 600 DEG C, insulation 7h, puts on the fulcrum setting for two struts of 3559mm are orthogonal long after coming out of the stove, and wherein a strut overlaps with short-axis direction. Back into stove heating and thermal insulation, heating-up temperature is 600 DEG C, and temperature retention time is 7h. Air cooling after coming out of the stove, after being chilled to surface temperature and being 300 DEG C, is winched under stove, utilizes cooling water pipe to the disposal of spraying water of two struts, remove strut after part cool down, carry out dimensional measurement, inner circle minor axis is that 3558mm, major axis are 3560mm. Be that short-axis direction corrects 9mm amount. Make short-axis direction cylindrical allowance be increased to 13mm, dimension correction success; The present invention utilizes that under the condition of high temperature, to be out of shape the intensity of part lower, proofreaies and correct by the swell increment under the heated condition of two struts, simple to operate, save the energy, and safe and reliable.
The embodiment selecting in this article for open object of the present invention, current think suitable, but will be appreciated that, the present invention is intended to comprise that all belong to all changes and the improvement of the embodiment in this design and the scope of the invention.

Claims (4)

1. the bearing calibration of ovalizing deflection after one kind large-scale ring parts heat treatment, described method comprises the ovalizing deflection amount, heating and thermal insulation, placement strut (2) of ring parts (1) of measuring, heating and thermal insulation, cooling and to the cooling ring parts that obtains realistic requirement of strut (2) again, it is characterized in that: concrete operation step is as follows:
1) the ovalizing deflection amount of measurement ring parts:
First measure the ovalizing deflection amount of ring parts (1), measure inner circle long axis length A and inner circle minor axis length B;
2) heating and thermal insulation:
Connect previous step, ring parts (1) pad of measuring deflection, on car type furnace, is taken out after the direction of the minor axis of ring parts (1) periphery makes a mark, the ring parts marking (1) is put into car type furnace heating and thermal insulation;
3) place strut (2):
Connect previous step, the strut (2) that is (A+B)/2 by two length is vertically placed on the middle part of ring parts (1) inner circle after heating and thermal insulation mutually, and horizontal pad is firm, wherein the two ends of the arbitrary strut (2) in two struts (2) are consistent with the direction of minor axis;
4) heating and thermal insulation again:
Connect previous step, take out after the ring parts (1) with two struts (2) good pad is put into car type furnace heating and thermal insulation;
5) cooling
Connect previous step, the ring parts (1) with two struts (2) after coming out of the stove carried out to air cooling, air cooling to the surface temperature of ring parts (1) lower than 300 degree after, ring parts (1) is hung to car type furnace;
6) cooling to strut (2)
Connect previous step, ring parts (1) is hung and two struts (2) carried out after car type furnace coolingly, make two struts (2) depart from ring parts (1), to obtain the ring parts (1) of realistic requirement.
2. the bearing calibration of ovalizing deflection after large-scale ring parts heat treatment according to claim 1, is characterized in that: described step 2) in the material that makes marks be adeciduate marker under high temperature, described marker is lead oil.
3. the bearing calibration of ovalizing deflection after large-scale ring parts heat treatment according to claim 1, is characterized in that: described step 2) and step 4) in heating-up temperature be 580 degree-620 degree, temperature retention time is 6-8.5 hour.
4. the bearing calibration of ovalizing deflection after large-scale ring parts heat treatment according to claim 1, is characterized in that: in described step 6), be water cooling to the type of cooling of two struts (2).
CN201310524843.7A 2013-10-31 2013-10-31 The bearing calibration of ovalizing deflection after a kind of large-scale ring parts heat treatment Active CN103639248B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310524843.7A CN103639248B (en) 2013-10-31 2013-10-31 The bearing calibration of ovalizing deflection after a kind of large-scale ring parts heat treatment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310524843.7A CN103639248B (en) 2013-10-31 2013-10-31 The bearing calibration of ovalizing deflection after a kind of large-scale ring parts heat treatment

Publications (2)

Publication Number Publication Date
CN103639248A CN103639248A (en) 2014-03-19
CN103639248B true CN103639248B (en) 2016-05-11

Family

ID=50244606

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310524843.7A Active CN103639248B (en) 2013-10-31 2013-10-31 The bearing calibration of ovalizing deflection after a kind of large-scale ring parts heat treatment

Country Status (1)

Country Link
CN (1) CN103639248B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106929658A (en) * 2016-12-14 2017-07-07 常州天山重工机械有限公司 A kind of tempering correction process of the quenched ring gear of thin-walled
CN107186007A (en) * 2017-05-12 2017-09-22 中信重工机械股份有限公司 A kind of bearing calibration under the cold conditions of large-size cylinder body class part heat treatment ovalizing deflection
CN115198064B (en) * 2022-07-28 2023-06-20 江苏科技大学 Elliptical deformation shape correction tool and shape correction method for large metal ring

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1621540A (en) * 2004-12-03 2005-06-01 瓦房店轴承集团有限责任公司 Heat treating trimming method for large-scale bearing ring
CN101643832A (en) * 2009-09-02 2010-02-10 大连华锐股份有限公司 Method for preventing circularity over tolerance of large gear ring after heat treatment
CN101684519A (en) * 2009-06-29 2010-03-31 洛阳Lyc轴承有限公司 Method for improving heat treatment deformation of thin-wall light narrow series bearing ring
CN101838731A (en) * 2010-03-23 2010-09-22 中信重工机械股份有限公司 Correcting quenching method for elliptical or conical deformation generated by carburized thin-wall ring gear
CN101838730A (en) * 2010-03-23 2010-09-22 中信重工机械股份有限公司 Reversible deformation correcting method for elliptical gear ring subjected to deformation after carburization
CN102794334A (en) * 2012-07-17 2012-11-28 湖北三江航天江北机械工程有限公司 Diameter and shape precision control method of thin-walled cylinder and special tool thereof

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61123435A (en) * 1984-11-19 1986-06-11 Suzuume Seisakusho:Kk Production of mascot bell made of unified metal
JP4360721B2 (en) * 1999-11-22 2009-11-11 第一高周波工業株式会社 Ring material straightening method
JP2008231451A (en) * 2007-03-16 2008-10-02 Nsk Ltd Heat treatment method for annular body, and annular body sizing tool

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1621540A (en) * 2004-12-03 2005-06-01 瓦房店轴承集团有限责任公司 Heat treating trimming method for large-scale bearing ring
CN101684519A (en) * 2009-06-29 2010-03-31 洛阳Lyc轴承有限公司 Method for improving heat treatment deformation of thin-wall light narrow series bearing ring
CN101643832A (en) * 2009-09-02 2010-02-10 大连华锐股份有限公司 Method for preventing circularity over tolerance of large gear ring after heat treatment
CN101838731A (en) * 2010-03-23 2010-09-22 中信重工机械股份有限公司 Correcting quenching method for elliptical or conical deformation generated by carburized thin-wall ring gear
CN101838730A (en) * 2010-03-23 2010-09-22 中信重工机械股份有限公司 Reversible deformation correcting method for elliptical gear ring subjected to deformation after carburization
CN102794334A (en) * 2012-07-17 2012-11-28 湖北三江航天江北机械工程有限公司 Diameter and shape precision control method of thin-walled cylinder and special tool thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
大型铸钢件的变形与校正;方英照;《大型铸锻件》;19810228(第02期);35-38 *

Also Published As

Publication number Publication date
CN103639248A (en) 2014-03-19

Similar Documents

Publication Publication Date Title
CN104827245B (en) A kind of forging technology of bearing ring
CN101643832B (en) Method for preventing circularity over tolerance of large gear ring after heat treatment
CN103639248B (en) The bearing calibration of ovalizing deflection after a kind of large-scale ring parts heat treatment
CN104805276B (en) Whole induction heating temperature control method for support rollers
CN104313278A (en) Method for controlling content of delta ferrite in martensite thermal-resisting steel
CN104475495A (en) Reshaping method for barrel with diameter greater than 1 meter
CN104328267A (en) Heat treatment process of large-diameter stainless steel bearing ring
CN105312367A (en) Orthopedic device and orthopedic method for high-strength steel thin-wall annular forging piece
CN104625627B (en) A kind of preparation method of plasma rotating electrode titanium alloy electrode rod
CN209363326U (en) A kind of hot elongated orthopedic appliance of centrifugal ductile cast iron pipes
CN103567337B (en) Dual-phase steel hot processing method
CN104032115B (en) A kind of secondary gear circle that reduces nitrogenizes the heat treatment method of deformation
WO2009067961A1 (en) Method of manufacturing of ball bearing's rings by rolling-out of the blanks from bearing's steel using a roll-out machine
CN106064221A (en) A kind of Forging Technology of GCr15 roller shell
CN106222392A (en) A kind of integral quenching method of forging steel cold roll
CN106399651B (en) A kind of thin-walled major diameter mould overall vacuum quenching technical
CN105063286A (en) Minor-diameter cold roll hardening and tempering technology
CN104017976A (en) Process for heat treatment of 12Cr1MoVG high pressure tubes after forging
CN103143886B (en) A kind of novel processing method of ball bearing
CN206069951U (en) A kind of roll head and neck makes annealing treatment separate type heater
CN107983853B (en) A kind of production method of the leveling apparatus and its smoothing wheel of station boiler band steel band
CN103290179B (en) Thermal treatment method for medium carbon structural alloy steel with low hardenability
CN105296715B (en) A kind of heat treatment method for lifting Casting Roller set uniformity of hardness
CN203382799U (en) Roller rod composite normalizing and annealing furnace
CN107641705A (en) A kind of Technology for Heating Processing of steel rolling ring forging

Legal Events

Date Code Title Description