CN103630844B - Environment test device - Google Patents

Environment test device Download PDF

Info

Publication number
CN103630844B
CN103630844B CN201310373399.3A CN201310373399A CN103630844B CN 103630844 B CN103630844 B CN 103630844B CN 201310373399 A CN201310373399 A CN 201310373399A CN 103630844 B CN103630844 B CN 103630844B
Authority
CN
China
Prior art keywords
air
wall
laboratory
conduit
discharge duct
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310373399.3A
Other languages
Chinese (zh)
Other versions
CN103630844A (en
Inventor
中西优贵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Espec Corp
Original Assignee
Espec Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Espec Corp filed Critical Espec Corp
Publication of CN103630844A publication Critical patent/CN103630844A/en
Application granted granted Critical
Publication of CN103630844B publication Critical patent/CN103630844B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N17/00Investigating resistance of materials to the weather, to corrosion, or to light

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Ecology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Environmental Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)
  • Automatic Analysis And Handling Materials Therefor (AREA)

Abstract

The present invention relates to a kind of environment test device, the environment test device(1)Comprising being formed with air purge hole(41)And air suction hole(42)Partition wall(15);By partition wall(15)The laboratory of separation(10)And air conditioning chamber(11);Discharge duct(21);With will come from air purge hole(41)Air to discharge duct(21)The conduit of guiding(22).Discharge duct(21)And conduit(22)Constitute and delimit laboratory(10)The wall of more than 6 in, divide wall(15)The outer wall adjoined each other.In addition, discharge duct(21)With the air purge hole that air is discharged to the orthogonal direction of the orientation with sample(21a).

Description

Environment test device
Technical field
The present invention relates to the environment test device that environmental test is carried out to sample.
Background technology
In the environmental test of the operational reliability for confirming the product under various environmental aspect, using for example special The environment test device with laboratory and air conditioning chamber shown in sharp document 1, the laboratory and air conditioning chamber separated by partition wall and It is interconnected via the opening at up and down two.In the environment test device, in air conditioning chamber, by humidification device, cooling device etc. Air is adjusted to defined humiture, using the pressure fan for the top for being arranged on air conditioning chamber by the air after adjusting, warp Supplied from upper opening to laboratory, thus, the air in laboratory is remained into defined humiture.
Patent document 1:Japanese Patent Laid-Open 2002-349914 publications
But, in the environment test device that above-mentioned patent document 1 is related to, the sky of laboratory is only flowed into via upper opening Gas, turns into the air-flow flowed from the top down in laboratory, is attracted by lower openings.Thus, for example, vertically being set in laboratory The shelf of multistage level is equipped with, in the case of loading sample on each shelf(I.e., multiple samples are arranged along vertical When), air stream is difficult to the sample for touching the hypomere for being positioned in shelf, in the sample and the hypomere in shelf of the epimere of shelf Environmental condition residing for sample is different.Furthermore, if the sample heating of shelf epimere, its heating can influence to be in shelf hypomere Sample, the temperature conditionss of these samples are also different.
In addition, in following environment test devices, i.e., in laboratory, multiple samples are arranged in the horizontal direction, In the way of the orientation along these samples produces air stream, the environmental test dress of air is supplied from air conditioning chamber to laboratory Put, in the upstream and downstream of air-flow, the environmental condition of sample is also different.If for example, the sample heating in upstream, is in down The sample of trip can be influenceed by its heating, so that the environmental condition of these samples is different.So, if the environment of multiple samples Condition is different, then can the precision of generation environment experiment the problem of reduce.
The content of the invention
Therefore, it is an object of the invention to provide the different environmental test dresses that can reduce the environmental condition for sample Put.
The environment test device of the present invention has the separation for being formed with the first air purge hole and the first air suction hole The laboratory of wall separation and another room, the environment test device possess:Discharge duct, it constitutes 6 that delimit above-mentioned laboratory More than wall in, the first wall in addition to above-mentioned partition wall, with along with configuring multiple samples in above-mentioned laboratory Discharge the second air purge hole of air in the orthogonal direction of orientation;And conduit, it, which is constituted, delimit the 6 of above-mentioned laboratory At least a portion in wall more than individual, with the second wall of the above-mentioned first wall adjoining in addition to above-mentioned partition wall, will The air discharged by above-mentioned another room from above-mentioned first air purge hole is guided to above-mentioned discharge duct.
Accordingly, the air of laboratory is discharged to from the second air purge hole, it is orthogonal in the orientation with multiple samples Side is flowed up.Therefore, it is possible to reduce the difference of the environmental condition for sample.
In the present invention, be also equipped with attraction pipeline, it is constituted in the wall of more than 6 for delimiting above-mentioned laboratory, with it is above-mentioned A part for second wall or the 3rd relative wall of above-mentioned second wall, with more multiple than above-mentioned on above-mentioned orthogonal direction The second air suction hole that sample is formed further from the position of above-mentioned second air purge hole.So, preferably above-mentioned attraction pipeline The air attracted from above-mentioned second air suction hole is guided to above-mentioned first air suction hole.Thus, discharged from the second air Hole is discharged to the air of laboratory, is reliably flowed up in the orthogonal side of the orientation with multiple samples.Therefore, it is possible to enter One step reduces the difference of the environmental condition for sample.
In addition, in the present invention, preferably above-mentioned second wall is adjacent to above-mentioned partition wall and above-mentioned first wall this two side, on Stating conduit has:The plate-shaped member of above-mentioned second wall is constituted in a face;Intercommunicating pore, it is formed in above-mentioned plate-shaped member Above-mentioned orthogonal direction one end, connect the space relative with the another side of above-mentioned plate-shaped member and above-mentioned discharge duct It is logical;And demarcation strip, it is protruded from the above-mentioned another side of above-mentioned plate-shaped member, and is prolonged along the direction intersected with above-mentioned orthogonal direction Stretch, being separated out the formation of above-mentioned plate-shaped member has the first area of above-mentioned intercommunicating pore and do not form the secondth area of above-mentioned intercommunicating pore Domain, above-mentioned first air purge hole is communicated in the space relative with above-mentioned first area.Thus, discharged from the first air purge hole Air, by the space relative with first area and intercommunicating pore, flow to discharge duct.
In addition, in the present invention, the above-mentioned first area preferably in above-mentioned plate-shaped member is protruded parallel with above-mentioned demarcation strip The deflecting plate of more than 1.Thereby, it is possible to effectively make to flow to discharge duct from the air that the first air purge hole is discharged.
In addition, in the present invention, preferably in above-mentioned another room, being provided with from above-mentioned first air purge hole to above-mentioned guiding tube Discharge the pressure fan of air in road.Thereby, it is possible to effectively make air flow to conduit from another room.
In addition, in the present invention, the test flume with inner space is preferably also equipped with, by being set in above-mentioned inner space State discharge duct and above-mentioned conduit to delimit above-mentioned laboratory, above-mentioned discharge duct and above-mentioned conduit, which can be installed, to be torn open It is arranged at above-mentioned test flume with unloading.Thus, even if for example, because heating or blast by sample cause the wall of composition laboratory Discharge duct and the conduit damage of the part in face, also only need to change the wall that they are just capable of easily repairing test room Face.
In addition, in the present invention, preferably around above-mentioned test flume, being formed with thermal insulation layer.Thus, the environment bar of sample is made Part is difficult to change, and test accuracy is improved.
According to the present invention environment test device, the air of laboratory is discharged to from the second air purge hole, with it is multiple The side that the orientation of sample is orthogonal is flowed up.Thereby, it is possible to reduce the difference of the environmental condition for sample.
Brief description of the drawings
Fig. 1 is the front view of the environment test device of one embodiment of the present invention.
Fig. 2 is the pie graph of the state after the unloading door of the environment test device shown in Fig. 1.
Fig. 3 is the sectional view of the III-III lines shown in Fig. 1.
Fig. 4(a)Figure when being the conduit shown in Fig. 3 from right,(b)It is the suction from left shown in Fig. 3 Figure during skirt road.
Fig. 5 is the general perspective view of the test flume shown in Fig. 2(Schematic isometric), it is the explanation for the flowing for representing air Figure.
Fig. 6 be the 1st variation of the test flume for representing the environment test device in one embodiment of the present invention substantially Stereogram.
Fig. 7 be the 2nd variation of the test flume for representing the environment test device in one embodiment of the present invention substantially Stereogram.
Fig. 8 be the 3rd variation of the test flume for representing the environment test device in one embodiment of the present invention substantially Stereogram.
Symbol description:
1:Environment test device
3:Test flume
3a:Inner space
3b:Thermal insulation layer
10,210:Laboratory
11:Air conditioning chamber(Another room)
15:Partition wall
21:Discharge duct
21a:Air purge hole(Second air purge hole)
22,222:Conduit
22a, 222a:Intercommunicating pore
23,223:Attraction pipeline
23a, 223a:Air suction hole(Second air suction hole)
25:Plate-shaped member
25a:First area
25b:Second area
26:Demarcation strip
27:Deflecting plate
31:Pressure fan
41:Air purge hole(First air purge hole)
42:Air suction hole(First air suction hole)
Embodiment
Below, it is described with reference to the preferred embodiment of the present invention.
The environment test device 1 that one embodiment of the present invention is related to, as shown in FIG. 1 to 3, for various rings Border is tested, and the framework 2 with approximately parallelepiped body shape, is arranged in framework 2 and the test flume 3 with inner space 3a and is covered The door 4 of the thermal insulation of the opening of lid test flume 3.
As shown in Figures 2 and 3, test flume 3 is configured in the way of being open forwards in the front of framework 2(Paper in Fig. 2 Nearby side, lower section in Fig. 3)Part.As shown in figure 3, the rear portion of framework 2, is received as the power supply for storing supply unit 5 Receive space.As shown in Figures 1 and 2, the position in the door 4 than framework 2 on the right side, is provided with display part 8 and operating portion 9.Display Portion 8 shows warm and humid degrees of data in the laboratory 10 of test flume 3 etc..Operating portion 9 is for carrying out the humiture in laboratory 10 Setting operating portion.
Test flume 3 in addition to the opening in the front for being opened, being closed by door 4 around wall, by thermal insulation layer 3b Surround.Thus, inner space 3a temperature and humidity is difficult to change.Therefore, the environmental condition of sample becomes to be difficult to change, experiment Precision is improved.In the back of test flume 3 and the thermal insulation layer 3b of the back portion, 4 through holes 6 are formed with.It is used as power supply The connector 5a of the connecting portion of device 5, from these through holes 6, respectively forwardly side is prominent.In addition, in through hole 6 and connector 5a Between filling sealing agent, keep laboratory 10 air-tightness.
In present embodiment, the flat sample tray 91 that double dot dash line is represented in Fig. 2 and Fig. 3 is accommodated in laboratory 10 It is interior.Sample tray 91 has the multiple sockets that can be for example connected with the secondary cell as sample 90, to laboratory 10 Direction of insertion(Relative to laboratory 10 from the direction at front direction rear)Front end formed terminal and connect these sockets and end Multiple distributions of son.So, sample tray 91 is accommodated in laboratory 10, thus, terminal and the connector 5a of sample tray 91 Connection, can will be connected to multiple samples 90 of socket(Secondary cell)Electrically connected with supply unit 5.Thereby, it is possible to various Under environment, the charge and discharge electric test of secondary cell is completed.
Furthermore, in laboratory 10, it is provided with guide rail(It is not shown).On sample tray 91, with to laboratory 10 insert Enter on the orthogonal direction in direction, arrange three samples 90.At this moment, multiple samples 90 are lined up along the direction orthogonal with direction of insertion One row, but do not arranged along direction of insertion.Slided by making such sample tray 91 along guide rail by the direction of insertion of level Dynamic to be inserted, terminal is connected to connector 5a, and multiple samples 90 are electrically connected with supply unit 5.In addition, by by sample tray 91 press horizontal direction along guide rail(The direction opposite with direction of insertion)Pull out, terminal is exited from connector 5a, can make sample 90 No longer electrically connected with supply unit 5.So, it is only necessary to which sample tray 91 is put into laboratory 10 or is taken out, it becomes possible to Electrical connection is cancelled in the simple electrical connection for carrying out sample 90 and supply unit 5.In present embodiment, in laboratory 10, edge Vertical, four sample trays 91 for being arranged with 3 samples 90 can be stored.
In test flume 3, it is provided with and the inner space 3a of rectangular shape is divided into lower space 11 and upper space 16 Partition wall 15,3 pipelines 21~23.As shown in Figures 2 and 3, on partition wall 15,2 air rows are formed with right-hand end Portal(First air purge hole)41, it is formed with 1 air suction hole in left end(First air suction hole)42.Such as Fig. 3 Shown, 2 air purge holes 41 are configured along fore-and-aft direction.Air suction hole 42 extends along the longitudinal direction.
Lower space 11 is air conditioning chamber(Another room), in Fig. 2,2 pressure fan 31 are set gradually since the right, by example Air heater 32, cooling device 33 and the utilization internal heater that such as sheathed heater electrothermal heater is constituted are heated and held The humidification device 34 that water in device is humidified.2 pressure fan 31 are arranged along the longitudinal direction, respectively with air purge hole 41 Relatively.I.e., 1 pressure fan 31 is provided with to 1 air purge hole 41.So, can be by by sky by being provided with pressure fan 31 The air after the adjustment of room 11 is adjusted to effective flow into conduit 22(As described later).Air conditioning chamber 11 is flowed into from air suction hole 42 Air, adjusts its temperature and humidity, while to the right using humidification device 34, cooling device 33 and air heater 32 successively Flowing, in the state of as defined humiture, is discharged upward using 2 pressure fan 31 from each air purge hole 41.
3 pipelines 21~23 are arranged on upper space 16, and each pipeline 21~23 constitutes the laboratory of approximately parallelepiped body shape A mutually different wall in 10 6 walls.In addition, partition wall 15 constitutes the wall of side below laboratory 10.3 pipes In road 21~23, have to be formed into laboratory 10 discharge air air purge hole 21a discharge duct 21, will be from 2 skies The air that gas tap 41 is discharged is directed to the conduit 22 and attraction pipeline 23 of discharge duct 21, the shape of attraction pipeline 23 Into the air suction hole 23a for having the air in attraction laboratory 10, and the air of attraction is directed to air suction hole 42.
As shown in Fig. 2 discharge duct 21 possesses the plate-shaped member with oblong plan shape.The plate-shaped member its 4 In the state of side is abutted with the top board, pipeline 22,23 and partition wall 15 of test flume 3, test flume 3 is screwed on.I.e., by unloading Lower screw, discharge duct 21 just can the progress installing/dismounting of relative test groove 3.In addition, plate-shaped member and the experiment of discharge duct 21 The back isolation configuration of groove 3, it constitutes the stream 21b of air flow between the back of test flume 3.In addition, discharge duct 21 With air purge hole(Second air purge hole)21a, the air from stream 21b is discharged towards front horizontal.In addition, exhaust The face relative with door 4 of pipeline 21 constitutes one in 6 walls for delimiting laboratory 10(First wall).
As shown in Figures 2 and 3, conduit 22 possesses the plate-shaped member 25 with oblong plan shape, in plate-like portion In the state of 3 sides of part 25 are abutted with the top board of test flume 3, back and partition wall 15, test flume 3 is screwed on.I.e., pass through Screw is unloaded, conduit 22 just can the progress installing/dismounting of relative test groove 3.In addition, the plate-shaped member 25 of conduit 22 with The right wall portion isolation configuration of test flume 3, is configured to connect with 2 air purge holes 41 at it between the right wall portion of test flume 3 Logical stream 22b.In addition, conduit 22(Plate-shaped member 25)A face(The face relative with attraction pipeline 23), it is to delimit One in 6 walls of laboratory 10, constitute the wall of the wall adjoining constituted with discharge duct 21(Second wall).
On plate-shaped member 25, such as Fig. 4(a)It is shown, the right part in figure(Rearward end), it is formed with 2 intercommunicating pore 22a.This A little intercommunicating pore 22a extend along vertical, and arrange in the direction.In addition, these intercommunicating pores 22a formation is in plate-shaped member 25 With discharge duct 21(Stream 21b)Relative part, makes stream 22b be connected with stream 21b.Although in addition, intercommunicating pore 22a edges Vertical lines up multiple row, but can also be in the right part of plate-shaped member 25(One end), 2 intercommunicating pore 22a are formed in The intercommunicating pore of continuous 1 strip of vertical.
Conduit 22 also has the demarcation strip 26 and deflecting plate 27 protruded from the another side of plate-shaped member 25.Such as Fig. 4(a) It is shown, demarcation strip 26 with horizontal direction(Fore-and-aft direction)The side of intersection is upwardly extended, and plate-shaped member 25 is divided into the firstth area Domain 25a and second area 25b.Generally ramped 45 ° of the relatively horizontal orientation of demarcation strip 26.In the first area 25a of plate-shaped member 25 It is formed with 2 intercommunicating pore 22a.Deflecting plate 27 is extended in parallel with demarcation strip 26, is configured in first area 25a.In addition, demarcation strip 26 And the both ends of deflecting plate 27, vertical or extend horizontally to plate-shaped member 25 adjoining side.Demarcation strip 26 and deflecting plate 27 Overhang from plate-shaped member 25 is identical.The both ends of deflecting plate 27 configure between air purge hole 41 and intercommunicating pore 22a it Between.
Such conduit 22 is matched somebody with somebody in the state of demarcation strip 26 and deflecting plate 27 are abutted with the right wall portion of test flume 3 Put.Thus, stream 22b is formed in the space relative with first area 25a.In addition, at this moment, stream 22b is biased 27 points of plate and is Two.I.e., the air purge hole 41 in front is connected with the intercommunicating pore 22a of upside, the air purge hole 41 at rear and the company of downside Through hole 22a is connected.Thus, the air discharged from air purge hole 41 can effectively flow to discharge duct 21.Because suppression The air from 2 pressure fan 31 has been made while the situation of the intercommunicating pore 22a on the upside of flowing to.Pressure fan 31 from front side Air is oriented to the intercommunicating pore 22a of upside by demarcation strip 26, and the air for coming from behind the pressure fan 31 of side is oriented to down by deflecting plate 27 The intercommunicating pore 22a of side, the air after channeled pipeline 22 is pressed is supplied to the stream 21b of discharge duct 21.Therefore, from blast pipe The air of the air purge hole 21a discharges in road 21, in laboratory 10, towards front horizontal flowing, the air-flow turns into laminar flow shape State.
As shown in Figures 2 and 3, attraction pipeline 23 possesses the plate-shaped member 35 with oblong plan shape, in plate-like portion In the state of 3 sides of part 35 are abutted with the top board of test flume 3, back and partition wall 15, test flume 3 is screwed on.I.e., pass through Screw is unloaded, attraction pipeline 23 just can the progress installing/dismounting of relative test groove 3.In addition, the plate-shaped member 35 of attraction pipeline 23 with The left wall isolation configuration of test flume 3, is configured to the stream connected with air suction hole 42 between the left wall of test flume 3 23b.In addition, attraction pipeline 23(Plate-shaped member 35)A face(The face relative with conduit 22)It is to delimit laboratory 10 One in 6 walls, constitute the wall relative with the wall that conduit 22 is constituted(3rd wall).
Such as Fig. 4(b)It is shown, the right part in figure of plate-shaped member 35(Leading section)It is formed with 3 air suction holes(Second is empty Gas suction hole)23a.Thus, attraction pipeline 23 attracts the air of laboratory 10 from air suction hole 23a, via air suction hole 42 guide the air to air conditioning chamber 11.These air suction holes 23a extends along vertical, and arranges in the direction.Separately Outside, as shown in figure 3, these air suction holes 23a formation in plate-shaped member 35 farthest away from discharge duct 21(Stream 21b)End Portion.More specifically, in the longitudinal direction, air suction hole 23a formation than sample 90 further from air purge hole 21a position Put.Thus, the air discharged from air purge hole 21a, from the rear to the front, i.e., along the orientation with multiple samples 90 just Reliably flow in the direction of friendship.Therefore, it is possible to further irregular difference of the reduction environmental condition for sample 90.In addition, although empty Gas suction hole 23a lines up multiple row along vertical, but in the one end of plate-shaped member 35,3 air suction hole 23a also may be used To be formed in the air suction hole of continuous 1 strip in vertical.
Attraction pipeline 23 also has the demarcation strip 36 and 2 deflecting plates 37,38 protruded from the another side of plate-shaped member 35.Such as Fig. 4(b)It is shown, demarcation strip 36 along with horizontal direction(Fore-and-aft direction)The direction extension of intersection, the is divided into by plate-shaped member 35 One region 35a and second area 35b.Generally ramped 45 ° of the relatively horizontal orientation of demarcation strip 36.In the first area of plate-shaped member 35 35a is formed with 3 air suction hole 23a.Deflecting plate 37,38 is extended in parallel with demarcation strip 36, is configured in first area 35a.Separately Outside, the both ends vertical of demarcation strip 36 and deflecting plate 37,38 or extend horizontally to plate-shaped member 35 adjoining side.Demarcation strip 36 and deflecting plate 37,38 from plate-shaped member 35 overhang it is identical.The one end of deflecting plate 37,38 is configured in air suction hole Between 23a, the other end configuration is by the position of 3 deciles along the longitudinal direction of air suction hole 42.
Such attraction pipeline 23 is in the state of demarcation strip 36 and deflecting plate 37,38 are abutted with the left wall of test flume 3 Configuration.Thus, stream 23b is formed in the space relative with first area 35a.In addition, at this moment, stream 23b is biased plate 37,38 It is divided into three.I.e., 3 air suction hole 23a are individually connected with air suction hole 42 respectively, are produced in each air suction hole 23a Impartial attraction.Therefore, the air discharged from air purge hole 21a to laboratory 10 is easy to flatly flow forwards.Knot Really, in laboratory 10, laminar condition can effectively be kept.
Then, reference picture 3 and Fig. 5, illustrate the air-flow in the test flume 3 of environment test device 1.Ring in present embodiment Border experimental rig 1 has 3 pipelines 21~23.Therefore, adjusted through air conditioning chamber 11, using pressure fan 31 from the row of air purge hole 41 The air gone out temporarily accumulates in stream 22b(The space relative with first area 25a).Then, air is pressed in stream 22b Change, the stream 21b of discharge duct 21 is supplied from 2 intercommunicating pore 22a.I.e., as shown in figure 5, being arranged upward from air purge hole 41 The air gone out is advanced obliquely upward by stream 22b, and stream 21b is flowed to via intercommunicating pore 22a.In stream 21b, air is also Temporarily accumulate, the air after pressing is discharged in laboratory 10 from the air purge hole 21a of discharge duct 21.
Be discharged to the air in laboratory 10 from air purge hole 21a, be accommodated in laboratory 10 sample tray 91 it Between, between the top board of the sample tray 91 in the top and test flume 3 and bottom sample tray 91 and partition wall 15 it Between, bottom horizontal flow sheet from the rear to the front.At this moment, as shown in figure 3, multiple samples 90 in left-right direction(It is orthogonal with fore-and-aft direction Direction)Arrangement, is not arranged, so the environmental condition for each sample 90 is identical along the longitudinal direction.So, to laboratory The air of discharge is attracted in attraction pipeline 23 from the air suction hole 23a in front in 10.Afterwards, air from stream 23b via Air suction hole 42 flows into air conditioning chamber 11.
As described above, according to the environment test device 1 of present embodiment, conduit 22 will be discharged from air purge hole 41 Air guided to discharge duct 21, from discharge duct 21 discharge air, in laboratory 10, along and sample 90 arrangement side To orthogonal direction(Direction from the rear to the front)Flowing.Therefore, the difference of the environmental condition for sample 90 is reduced.Separately Outside, because each 21~23, pipeline is screwed, so the easy installing/dismounting of pipeline 21~23.Thus, for example, carrying out Secondary cell(Sample 90)Charge and discharge electric test when, even if due to the heating or blast of sample 90 cause constitute laboratory 10 wall The pipeline 21~23 of the part in face is damaged, and also only needing to just being capable of easily repairing test room 10 by changing them.
Environment test device 1 in present embodiment, air conditioning chamber 11 is set in the lower space of test flume 3, empty on top Between laboratory 10 is set so that the air discharged from the air purge hole 41 of the right-hand end of air conditioning chamber 11, from laboratory 10 The mode of flowing, is provided with discharge duct 21 and conduit 22 in front of rear direction.But, air conditioning chamber 11, laboratory 10, exhaust The position of pipeline 21 and the grade of conduit 22 is not limited to this.
Can also be as shown in fig. 6, air conditioning chamber 11 be set in the upper space of test flume 3, in lower space setting laboratory 10, so that the air discharged from the air purge hole 41 of the right-hand end of air conditioning chamber 11, flows in front of the rear direction of laboratory 10 Dynamic mode, sets discharge duct 21 and conduit 22(1st variation).Specifically, discharge duct 21 and conduit 22 are arranged on and above-mentioned embodiment identical position.At this moment, conduit 22 can also be constituted in the following manner, will be separated It is on the contrary, the air from air purge hole 41 is oliquely downward guided with above-mentioned embodiment that plate 26 is tilted with deflecting plate 27. Even if so can also obtaining and above-mentioned embodiment identical effect.At this moment, attraction pipeline 23 can also be arranged on it is above-mentioned Embodiment identical position, by demarcation strip 36 and deflecting plate 37,38 reversed dips, by the air from air suction hole 23a Guide obliquely upward.So, it can also obtain and above-mentioned embodiment identical effect.
Alternatively, it is also possible to as shown in fig. 7, in the right side space setting air conditioning chamber 11 of test flume 3, being set in left side space Laboratory 10 is put, so that the air discharged from the air purge hole 41 of the upper side end of air conditioning chamber 11, from the rear of laboratory 10 The mode flowed forwards, sets discharge duct 21 and conduit 22(2nd variation).Specifically, it is configured to and makes State embodiment test flume 3 be rotated by 90 ° after state essentially identical configuration.Even if so can also obtaining and above-mentioned reality Apply mode identical effect.Furthermore, in the variation, sample tray 91 can also be holded up, it is horizontal arranged multiple.At this moment, Although the orientation of sample 90 turns into vertical, the flowing of air turns into fore-and-aft direction, therefore orthogonal with orientation. If in addition, attraction pipeline 23 is configured in the left of test flume 3, can also be obtained still in horizontal level even if sample tray 91 Same effect.In this case, can also be by for making the sky that attraction pipeline 23 of the configuration in left is connected with air conditioning chamber 11 Between be arranged on the section below of test flume 3.
Alternatively, it is also possible to as shown in figure 8, setting air conditioning chamber in the bottom rightward space of test flume 3(Another room)211, Upper left-hand space sets laboratory 210, so that the air discharged from the air purge hole 241 of air conditioning chamber 211, from laboratory The mode of flowing in front of 210 rear direction, sets discharge duct 21 and conduit 222(3rd variation).In this variation Air conditioning chamber 211 is the space by forming partition wall 211a in above-mentioned air conditioning chamber 11 and marking off.Then, set in the space Put pressure fan, air heater, cooling device and humidification device etc..In addition, air suction hole can also be set in air conditioning chamber 211 242.Air purge hole 241 is arranged on rear, and air suction hole 242 is arranged on front.Conduit 222 constitutes laboratory 210 Right side wall rear half portion, attraction pipeline 223 constitute laboratory 210 right side wall front half portion.These guiding tubes Road 222 and attraction pipeline 223 are not provided with deflecting plate, are made up of plate-shaped member 225,235 and demarcation strip 226,236.So, exist The rear end of conduit 222 is formed with intercommunicating pore 222a, and air suction hole is formed with the front ends of attraction pipeline 223 223a.So, air is discharged in front of the rear direction of laboratory 210, can be obtained and above-mentioned embodiment identical effect.Should In structure, partition wall 211a left does not have the space can also.At least one party of partition wall 211a and plate-shaped member 225,235 into Being integrated can also.In addition, in the variation, sample 90 and sample tray 91 also according to above-mentioned embodiment identical mode Stored.And then, in the variation, it would however also be possible to employ the substitution air conditioning chamber 211 of air conditioning chamber 11 of partition wall is provided with, in the sky Adjust in room 11, partition wall extends in left-right direction, be separated into the front space connected with air suction hole 242 and discharged with air The rear space that hole 241 is connected, and this two space is connected in the left part of air conditioning chamber 11.In this case, air attracts The air that hole 242 attracts flows to the left in front space, thereafter, is flowed to the right in rear space, from air purge hole 241 Discharge.Even if so, can also obtain and above-mentioned embodiment identical effect.
Above, the preferred embodiment of the present invention is illustrated, but the present invention is not limited to above-mentioned embodiment party Formula, as long as various changes can be carried out in the range of this patent is claimed.For example, around test flume 3, can not also shape Into thermal insulation layer 3b.In addition, each pipeline 21~23, which can also be not provided with into, to carry out installing/dismounting relative to test flume 3.In addition, On conduit 22 and attraction pipeline 23, deflecting plate 27,37,38 can also be not provided with.In addition, pressure fan 31 can also set 1 Or more than 3.Attraction pipeline 23,223 can also be not provided with.In this case, it is preferably orthogonal in the orientation with sample On direction, air suction hole 42 is being configured further from the air purge hole 21a of discharge duct 21 position than sample 90.Thus, The flowing of the air of laboratory is discharged to from air purge hole 21a, as the direction that the orientation with sample is orthogonal, can be obtained To effect similar to the above.In addition, laboratory 10,210 can also be cubic shaped.And then, laboratory can also be by 7 The polyhedron that wall more than individual delimited.
In addition, in above-mentioned embodiment and the 1st~the 3rd variation, discharge duct 21 to be arranged on to the rear of test flume 3 Part(Back side), left, right, top, the optional position of section below can also be disposed at.I.e., can also be according to The mode that air can be discharged to the orthogonal direction in the direction with arranging sample 90 sets discharge duct 21.In such manner, it is possible to obtain Effect similar to the above.
The position of conduit 22 and attraction pipeline 23 can also be exchanged.In addition, conduit 222 and attraction pipeline 223 Position can also exchange.In this case, discharge duct is made to be moved to conduit side.In addition, the equipment of idle call(Example Such as, pressure fan, air heater, cooling device and humidification device etc.)Air conditioning chamber 11 can also be not arranged in, and is provided in and draws Conduit road 22,222 or attraction pipeline 23,223, conduit 22,222 or attraction pipeline 23,223 have the effect of air conditioning chamber concurrently. At this moment, air conditioning chamber 11 is only another room.
Attraction pipeline 23 can not also be configured in the position relative with conduit 22.For example, substitution partition wall 15, configuration Attraction pipeline 23, the equipment for configuring idle call in stream 23b, attraction pipeline 23 has air conditioning chamber concurrently(Another room)Effect also may be used With.In this case, the plate-shaped member 35 of attraction pipeline 23 turns into the partition wall of compartment test room 10 and air conditioning chamber.In addition, this When, air suction hole 23a is preferably configured in front.So, it can also obtain and above-mentioned embodiment identical effect.And then, It can also be used the dorsal part of door 4 as conduit 22 or attraction pipeline 23.

Claims (10)

1. a kind of environment test device, is separated with the partition wall for being formed with the first air purge hole and the first air suction hole Laboratory and another room, the environment test device is characterised by possessing:
Discharge duct, the discharge duct is constituted in the wall of more than 6 for delimiting the laboratory, in addition to the partition wall First wall, be expelled to institute by air along with configuring in the orthogonal direction of the orientation of multiple samples of the laboratory State the second air purge hole in laboratory;With
Conduit, the conduit is constituted in the wall of more than 6 for delimiting the laboratory and in addition to the partition wall First wall adjoining the second wall at least a portion, will be by another room from first air purge hole The air of discharge is guided to the discharge duct, wherein,
Second wall is adjacent to the partition wall and the first wall both sides,
The conduit has:
The plate-shaped member of second wall is constituted in a face;With
Demarcation strip, is protruded, and the plate-shaped member is divided into first area and the secondth area from the another side of the plate-shaped member Domain,
Wherein, the space relative with the first area is communicated in the discharge duct and first air purge hole.
2. environment test device according to claim 1, it is characterised in that be also equipped with attraction pipeline, the attraction pipeline structure Into in the wall of more than 6 for delimiting the laboratory, the part with second wall or second wall it is relative 3rd wall, with the orthogonal direction than the multiple sample further from second air purge hole position shape Into the second air suction hole,
The attraction pipeline is guided the air attracted from the second air suction hole to the first air suction hole.
3. environment test device according to claim 1 or 2, it is characterised in that:
In the first area of the plate-shaped member, connect the space relative with the first area and the discharge duct Logical intercommunicating pore forms the one end in the orthogonal direction of the plate-shaped member,
The demarcation strip extends along with the direction that the orthogonal direction intersects.
4. environment test device according to claim 1, it is characterised in that:
In the first area of the plate-shaped member, the deflecting plate of more than 1 parallel with the demarcation strip is protruded.
5. environment test device according to claim 1 or 2, it is characterised in that:
In another room, the pressure fan that air is discharged from first air purge hole to the conduit is provided with.
6. environment test device according to claim 3, it is characterised in that:
In another room, the pressure fan that air is discharged from first air purge hole to the conduit is provided with.
7. environment test device according to claim 1 or 2, it is characterised in that:
The test flume with inner space is also equipped with,
By setting the discharge duct and the conduit to delimit the laboratory in the inner space,
The discharge duct and the conduit can be arranged at the test flume installing/dismounting.
8. environment test device according to claim 3, it is characterised in that:
The test flume with inner space is also equipped with,
By setting the discharge duct and the conduit to delimit the laboratory in the inner space,
The discharge duct and the conduit can be arranged at the test flume installing/dismounting.
9. environment test device according to claim 7, it is characterised in that:
Thermal insulation layer is formed with around the test flume.
10. environment test device according to claim 8, it is characterised in that:
Thermal insulation layer is formed with around the test flume.
CN201310373399.3A 2012-08-24 2013-08-23 Environment test device Active CN103630844B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2012185759A JP5655040B2 (en) 2012-08-24 2012-08-24 Environmental test equipment
JP2012-185759 2012-08-24

Publications (2)

Publication Number Publication Date
CN103630844A CN103630844A (en) 2014-03-12
CN103630844B true CN103630844B (en) 2017-07-18

Family

ID=50212096

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310373399.3A Active CN103630844B (en) 2012-08-24 2013-08-23 Environment test device

Country Status (4)

Country Link
JP (1) JP5655040B2 (en)
KR (1) KR101631473B1 (en)
CN (1) CN103630844B (en)
TW (1) TWI555955B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105738721A (en) * 2014-12-12 2016-07-06 富泰华工业(深圳)有限公司 Test box
CN106442283B (en) * 2016-08-31 2019-01-01 中国石油大学(华东) A kind of analogy method of atmospheric corrosion
JP6842156B2 (en) * 2016-10-25 2021-03-17 株式会社システック Explosion-proof constant temperature bath
JP6780602B2 (en) 2017-07-31 2020-11-04 信越化学工業株式会社 Resist composition and pattern forming method
JP7145129B2 (en) * 2019-08-20 2022-09-30 エスペック株式会社 Environmental test equipment
FR3127811B1 (en) * 2021-10-05 2023-10-27 Centre Scient Et Technique Du Batiment Climatic chamber

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5932728A (en) * 1982-08-19 1984-02-22 Takezo Koyanagi Room cooling/heating, greenhouse-cultivating and snow-sawing device utilizing underground heat
JPH1154248A (en) * 1997-08-06 1999-02-26 Chuo Riken:Kk Double-sided plate heater and double heating constant temperature oven
JP2006275326A (en) * 2005-03-28 2006-10-12 Sanyo Electric Co Ltd Constant-temperature storage
JP2007071457A (en) * 2005-09-07 2007-03-22 Ishikawajima Inspection & Instrumentation Co Air conditioning device for environmental test

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3223816A1 (en) * 1982-06-25 1983-12-29 Maschinenfabrik Georg Kiefer Gmbh, 7000 Stuttgart AIR DISTRIBUTORS FOR ROOM VENTILATION
JP3717804B2 (en) 2001-05-24 2005-11-16 エスペック株式会社 Humidifier
CN1177188C (en) * 2001-08-31 2004-11-24 Lg电子株式会社 Cooling air circulating device in refrigerator
KR100688606B1 (en) * 2006-06-12 2007-03-02 이재천 Integrated ventilation system for using heat exchanger
JP5096505B2 (en) * 2010-01-15 2012-12-12 エスペック株式会社 Duct unit and environmental test apparatus having the same
JP5456536B2 (en) * 2010-03-29 2014-04-02 エスペック株式会社 Thermostatic device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5932728A (en) * 1982-08-19 1984-02-22 Takezo Koyanagi Room cooling/heating, greenhouse-cultivating and snow-sawing device utilizing underground heat
JPH1154248A (en) * 1997-08-06 1999-02-26 Chuo Riken:Kk Double-sided plate heater and double heating constant temperature oven
JP2006275326A (en) * 2005-03-28 2006-10-12 Sanyo Electric Co Ltd Constant-temperature storage
JP2007071457A (en) * 2005-09-07 2007-03-22 Ishikawajima Inspection & Instrumentation Co Air conditioning device for environmental test

Also Published As

Publication number Publication date
JP5655040B2 (en) 2015-01-14
TW201408962A (en) 2014-03-01
CN103630844A (en) 2014-03-12
KR101631473B1 (en) 2016-06-17
KR20140026260A (en) 2014-03-05
JP2014044089A (en) 2014-03-13
TWI555955B (en) 2016-11-01

Similar Documents

Publication Publication Date Title
CN103630844B (en) Environment test device
CN107726708B (en) Refrigerator and air duct thereof
CN106471643B (en) For accommodating the shell of multiple battery cells with the cooling device being integrated in shell
CN105799481B (en) Vehicle battery
CN101548787B (en) Flow equalizing apparatus used in heated air circulation sterilization dryer for heating cavity
US20180331401A1 (en) Energy storage device
CN105722374A (en) Cold Plate, In Particular Forming The Structural Portion Of A Device With Heat-Generating Components
EP1884733A3 (en) Heat exchanger assembly with partitioned manifolds
JP2012218510A (en) Exhaust device for fuel cell vehicle
CN105024021B (en) A kind of parallel air-cooled battery case
CN104567195A (en) Refrigerator
SE0950029A1 (en) Induction apparatus for combining air flows
JP6299551B2 (en) Heating device cooling device
EP2105305A3 (en) Liquid container and method of manufacturing the same
CN107110555A (en) The indoor set of air-conditioning device
CN110057155A (en) Manufacturing method for the modular universal air supply device of refrigerator, refrigerator and refrigerator
US20190281727A1 (en) Cooling apparatus
JP5929864B2 (en) Air conditioner outdoor unit
CN202135635U (en) Intermediate-temperature high-humidity proofing chamber
CN104619151B (en) Electronic component cooling system and method
CN105895937A (en) Humidifier, for example, for fuel cell
CN206488561U (en) A kind of oily electrical heating baking oven of smooth feed type crude lube stock
JP6057826B2 (en) Power storage device
CN104807101A (en) Indoor unit and air conditioner with same
CN219435971U (en) Cooling pipeline for energy storage container and energy storage container cooling system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant