CN103627190B - A kind of method solving rubber powder and asphalt performance degradation - Google Patents

A kind of method solving rubber powder and asphalt performance degradation Download PDF

Info

Publication number
CN103627190B
CN103627190B CN201310546641.2A CN201310546641A CN103627190B CN 103627190 B CN103627190 B CN 103627190B CN 201310546641 A CN201310546641 A CN 201310546641A CN 103627190 B CN103627190 B CN 103627190B
Authority
CN
China
Prior art keywords
rubber powder
asphalt
decay
index
underproof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310546641.2A
Other languages
Chinese (zh)
Other versions
CN103627190A (en
Inventor
王国强
于文国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Rente Chemical Industry Group Co., Ltd.
Original Assignee
HEBEI LUNTE PETROLEUM CHEMICAL Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEBEI LUNTE PETROLEUM CHEMICAL Co Ltd filed Critical HEBEI LUNTE PETROLEUM CHEMICAL Co Ltd
Priority to CN201310546641.2A priority Critical patent/CN103627190B/en
Publication of CN103627190A publication Critical patent/CN103627190A/en
Application granted granted Critical
Publication of CN103627190B publication Critical patent/CN103627190B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)
  • Compositions Of Macromolecular Compounds (AREA)

Abstract

The invention discloses a kind of method solving rubber powder and asphalt performance degradation, relate to the technical field of compositions of bituminous material.First the underproof rubber powder and asphalt of index after decay is heated to 180 DEG C ~ 190 DEG C, under agitation add rubber powder and B-450 efficient activator, then first time grinding is carried out with colloidal mill, enter another colloidal mill again and carry out second time grinding, it is 0.1-0.3 millimeter that second time is ground to rubber powder median size; Finally stir 1 ~ 2h, obtain qualified rubber powder and asphalt; In whole process, temperature controls at 180 DEG C ~ 190 DEG C; Percent mass proportioning is: rubber powder 10% ~ 15%, B-450 efficient activator 0.3%, and after decay, the underproof rubber powder and asphalt of index is surplus.The present invention's rubber powder and asphalt indices off quality after can making performance degradation meets quality standard again, and method is easy, cost-saving, can ensure the quality of products and reach requirement of building the road.

Description

A kind of method solving rubber powder and asphalt performance degradation
Technical field
The present invention relates to the technical field of compositions of bituminous material.
Background technology
Rubber powder and asphalt (AsphaltRubber) joins in the middle of pitch by certain production technique by rubber powder, and being formed a kind of take rubber powder as the modifying asphalt of properties-correcting agent, is used for improving the related performance indicators of pitch.According to the definition of U.S. ASTM6144-97 standard, rubber powder content is not less than 15%, and fully must react with pitch under the condition of high temperature more than 180 DEG C.
Impact due to by weather and site construction situation: as situations such as rainy day, snowy day or roadway paving apparatus damages, road construction can not be carried out in time, finished product rubber powder and asphalt depositing through certain hour in stable can, performance index can change, and can not meet requirement of building the road.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of method solving rubber powder and asphalt performance degradation, rubber powder and asphalt indices off quality after can making performance degradation by the method meets quality standard again, method is easy, cost-saving, can ensure the quality of products and reach requirement of building the road.
For solving the problems of the technologies described above, the technical solution used in the present invention is: a kind of method solving rubber powder and asphalt performance degradation: first the underproof rubber powder and asphalt of index after decay is heated to 180 DEG C ~ 190 DEG C, under agitation add rubber powder and B-450 efficient activator, then first time grinding is carried out with colloidal mill, enter another colloidal mill again and carry out second time grinding, it is 0.1-0.3 millimeter that second time is ground to rubber powder median size; Finally stir 1 ~ 2h, obtain qualified rubber powder and asphalt; In whole process, temperature controls at 180 DEG C ~ 190 DEG C; Percent mass proportioning is: rubber powder 10% ~ 15%, B-450 efficient activator 0.3%, and after decay, the underproof rubber powder and asphalt of index is surplus.
The order number of rubber powder is less than, be equal to or greater than the order number of rubber powder used in the rear underproof rubber powder and asphalt of index of decay.
Preferably, the order number of rubber powder is equal to or greater than the order number of rubber powder used in the rear underproof rubber powder and asphalt of index of decay.
The underproof rubber powder and asphalt of index after decay reheats and adds rubber powder by the present invention, the performance such as the penetration degree of rubber powder and asphalt, softening temperature height can be improved, rubber powder and asphalt indices off quality after making performance degradation meets quality standard again, reaches requirement of building the road.
Adding of B-450 efficient activator has immersional wetting to rubber powder, is convenient to grinding and the dissolving of rubber powder.
Twice grinding, accelerates grinding rate continuously, improves production efficiency.
The beneficial effect adopting technique scheme to produce is:
(1) the rubber powder and asphalt indices that the inventive method is off quality after can making performance degradation meets quality standard again, cost-saving, avoids the waste of resource, can ensure the quality of products and reach requirement of building the road.
(2) the inventive method is easy, and production cost is low, easy to implement.
(3) after decay, the front penetration degree of penetration ratio decay of the underproof rubber powder and asphalt of index improves≤15%, and before softening temperature specific damping, softening temperature reduces the rubber powder and asphalt of≤10% by again meeting quality standard after the inventive method process, reaches requirement of building the road.
Embodiment
B-450 efficient activator is that Anhui Jinma Rubber Additives Co., Ltd. produces, and market is on sale.
Embodiment 1
First the underproof rubber powder and asphalt of index after decay is heated to 180 DEG C ~ 190 DEG C, under agitation add rubber powder and B-450 efficient activator, then first time grinding is carried out with colloidal mill, enter another colloidal mill again and carry out second time grinding, it is 0.1-0.3 millimeter that second time is ground to rubber powder median size; Finally stir 1h, obtain qualified rubber powder and asphalt; In whole process, temperature controls at 180 DEG C ~ 190 DEG C.
Percent mass proportioning is: rubber powder 15%, B-450 efficient activator 0.3%, and after decay, the underproof rubber powder and asphalt of index is surplus.
The order number of rubber powder used in the underproof rubber powder and asphalt of index after the order number of rubber powder equals to decay.
After decay, the underproof rubber powder and asphalt of index is: penetration degree (25 DEG C, 100g, 5s) after decay: 69, softening temperature (ring and ball method, DEG C): 56; Penetration degree (25 DEG C, 100g, 5s) before decay: 60, softening temperature (ring and ball method, DEG C): 62.
The key technical indexes of the rubber powder and asphalt before above-mentioned decay to meet in table 1 shown in 2 types, but index is defective after decay, not meet in table 1 shown in 2 types, after the inventive method process, after above-mentioned decay, the underproof rubber powder and asphalt indices of index meets quality standard shown in 2 types in table 1 again, reach requirement of building the road, cost-saving, avoid the waste of resource.
Embodiment 2
First the underproof rubber powder and asphalt of index after decay is heated to 180 DEG C ~ 190 DEG C, under agitation add rubber powder and B-450 efficient activator, then first time grinding is carried out with colloidal mill, enter another colloidal mill again and carry out second time grinding, it is 0.1-0.3 millimeter that second time is ground to rubber powder median size; Finally stir 1.5h, obtain qualified rubber powder and asphalt; In whole process, temperature controls at 180 DEG C ~ 190 DEG C.
Percent mass proportioning is: rubber powder 10%, B-450 efficient activator 0.3%, and after decay, the underproof rubber powder and asphalt of index is surplus.
The order number of rubber powder is less than the order number of rubber powder used in the rear underproof rubber powder and asphalt of index of decay.
After decay, the underproof rubber powder and asphalt of index is: penetration degree (25 DEG C, 100g, 5s) after decay: 62, softening temperature (ring and ball method, DEG C): 53; Penetration degree (25 DEG C, 100g, 5s) before decay: 56, softening temperature (ring and ball method, DEG C): 58.
The key technical indexes of the rubber powder and asphalt before above-mentioned decay to meet in table 1 shown in 3 types, but index is defective after decay, not meet in table 1 shown in 3 types, after the inventive method process, after above-mentioned decay, the underproof rubber powder and asphalt indices of index meets quality standard shown in 3 types in table 1 again, reach requirement of building the road, cost-saving, avoid the waste of resource.
Embodiment 3
First the underproof rubber powder and asphalt of index after decay is heated to 180 DEG C ~ 190 DEG C, under agitation add rubber powder and B-450 efficient activator, then first time grinding is carried out with colloidal mill, enter another colloidal mill again and carry out second time grinding, it is 0.1-0.3 millimeter that second time is ground to rubber powder median size; Finally stir 2h, obtain qualified rubber powder and asphalt; In whole process, temperature controls at 180 DEG C ~ 190 DEG C.
Percent mass proportioning is: rubber powder 12%, B-450 efficient activator 0.3%, and after decay, the underproof rubber powder and asphalt of index is surplus.
The order number of rubber powder is greater than the order number of rubber powder used in the rear underproof rubber powder and asphalt of index of decay.
After decay, the underproof rubber powder and asphalt of index is: penetration degree (25 DEG C, 100g, 5s) after decay: 82, softening temperature (ring and ball method, DEG C): 54; Penetration degree (25 DEG C, 100g, 5s) before decay: 78, softening temperature (ring and ball method, DEG C): 56.
The key technical indexes of the rubber powder and asphalt before above-mentioned decay to meet in table 1 shown in 1 type, but index is defective after decay, not meet in table 1 shown in 1 type, after the inventive method process, after above-mentioned decay, the underproof rubber powder and asphalt indices of index meets quality standard shown in 1 type in table 1 again, reach requirement of building the road, cost-saving, avoid the waste of resource.

Claims (3)

1. solve a method for rubber powder and asphalt performance degradation, it is characterized in that:
First the underproof rubber powder and asphalt of index after decay is heated to 180 DEG C ~ 190 DEG C, under agitation add rubber powder and B-450 efficient activator, then first time grinding is carried out with colloidal mill, enter another colloidal mill again and carry out second time grinding, it is 0.1-0.3 millimeter that second time is ground to rubber powder median size; Finally stir 1 ~ 2h, obtain qualified rubber powder and asphalt; In whole process, temperature controls at 180 DEG C ~ 190 DEG C;
Percent mass proportioning is: rubber powder 10% ~ 15%, B-450 efficient activator 0.3%, and after decay, the underproof rubber powder and asphalt of index is surplus.
2. a kind of method solving rubber powder and asphalt performance degradation according to claim 1, is characterized in that the order number of described rubber powder is less than, is equal to or greater than the order number of rubber powder used in the rear underproof rubber powder and asphalt of index of decay.
3. a kind of method solving rubber powder and asphalt performance degradation according to claim 2, is characterized in that the order number of described rubber powder is equal to or greater than the order number of rubber powder used in the rear underproof rubber powder and asphalt of index of decay.
CN201310546641.2A 2013-11-07 2013-11-07 A kind of method solving rubber powder and asphalt performance degradation Active CN103627190B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310546641.2A CN103627190B (en) 2013-11-07 2013-11-07 A kind of method solving rubber powder and asphalt performance degradation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310546641.2A CN103627190B (en) 2013-11-07 2013-11-07 A kind of method solving rubber powder and asphalt performance degradation

Publications (2)

Publication Number Publication Date
CN103627190A CN103627190A (en) 2014-03-12
CN103627190B true CN103627190B (en) 2016-03-30

Family

ID=50208653

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310546641.2A Active CN103627190B (en) 2013-11-07 2013-11-07 A kind of method solving rubber powder and asphalt performance degradation

Country Status (1)

Country Link
CN (1) CN103627190B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106007490A (en) * 2016-05-25 2016-10-12 王壹帆 Method for processing pavement mixture from unqualified ground tire rubber asphalt

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101113140A (en) * 2006-07-26 2008-01-30 宋同银 Vulcanized rubber regeneration activator and preparation method and uses thereof
CN101985521A (en) * 2010-08-18 2011-03-16 中國禾森石化控股有限公司 Rubber compound modified asphalt and preparation method thereof

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55108457A (en) * 1979-02-15 1980-08-20 Toa Doro Kogyo Kk Particulate asphalt

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101113140A (en) * 2006-07-26 2008-01-30 宋同银 Vulcanized rubber regeneration activator and preparation method and uses thereof
CN101985521A (en) * 2010-08-18 2011-03-16 中國禾森石化控股有限公司 Rubber compound modified asphalt and preparation method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
"橡胶粉改性沥青加工工艺研究";孙建等;《公路》;20080331(第3期);第168-172页 *

Also Published As

Publication number Publication date
CN103627190A (en) 2014-03-12

Similar Documents

Publication Publication Date Title
CN105176107A (en) Modified asphalt particles and preparation method thereof
CN103305014B (en) A kind of SBS modifying asphalt and preparation method thereof
CN103044938B (en) Coal asphalt/SBS (Styrene Butadiene Styrene)/waste colloid powder composite modified asphalt and preparation method thereof
CN102010610B (en) SBS (styrene butadiene styrene) modified asphalt and preparation method thereof
CN105236831A (en) Aged-asphalt regeneration agent, regenerated asphalt mixture and preparation method of two
CN103289420A (en) Admixing type modifier of asphalt mixture
CN102532923A (en) Granular modified asphalt and preparation method thereof
CN103980724A (en) Preparation method of rubber modified asphalt
CN102558886B (en) High-concentration crumb rubber modified asphalt and preparation method thereof
CN103773035B (en) A kind of fibre enhancement epoxy asphalt pavement material and preparation method thereof
CN103232708B (en) Novel asphalt composite modifier, modified asphalt and preparation method of the modified asphalt
CN103627190B (en) A kind of method solving rubber powder and asphalt performance degradation
CN105541181B (en) A kind of rubber powder ground surface material and construction method
CN104558732A (en) High-temperature mixed type waste rubber modified asphalt enhancer composition and preparation method thereof
CN103396669A (en) Microwave desulfurated and cracked waste tyre rubber powder composite modified asphalt and preparation method thereof
CN102604180A (en) High-concentration modifying rubber powder and preparation method thereof
CN103102703B (en) A kind of bituminous composition and preparation method thereof
CN106957534A (en) A kind of low forming temperature high-polymer modified pitch glue and preparation method thereof
CN102020858A (en) Method for improving ductility of No.50 hard petroleum road asphalt after drying oven experiment
CN103468009A (en) Modified road asphalt and production process thereof
CN103602081B (en) A kind of rubber powder and asphalt and preparation method thereof
CN103602083B (en) A kind of asphalt acid-resistant modifier of improvement
CN104877209A (en) Preparation method of SBS and rock asphalt modified scrap rubber composite material and composite material prepared by preparation method
CN103788671B (en) Ground surface material of a kind of stretch-proof Resisting fractre and preparation method thereof
CN104693816B (en) A kind of preparation method and applications of water-fast rubber modified asphalt

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 061100 North Side of Bohai New Area Water Supply Company, Cangzhou City, Hebei Province

Patentee after: Hebei Rente Chemical Industry Group Co., Ltd.

Address before: 061100 North Side of Bohai New Area Water Supply Company, Cangzhou City, Hebei Province

Patentee before: HEBEI LUNTE PETROLEUM CHEMICAL CO., LTD.

CP01 Change in the name or title of a patent holder