CN103618642A - 基于最大新建速率的防火墙tcp并发连接数测试方法 - Google Patents

基于最大新建速率的防火墙tcp并发连接数测试方法 Download PDF

Info

Publication number
CN103618642A
CN103618642A CN201310610824.6A CN201310610824A CN103618642A CN 103618642 A CN103618642 A CN 103618642A CN 201310610824 A CN201310610824 A CN 201310610824A CN 103618642 A CN103618642 A CN 103618642A
Authority
CN
China
Prior art keywords
tcp
maximum
devices
newly
concurrent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310610824.6A
Other languages
English (en)
Other versions
CN103618642B (zh
Inventor
林丹生
梁智强
梁志宏
胡朝辉
江泽鑫
周强峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of Guangdong Power Grid Co Ltd
Original Assignee
Electric Power Research Institute of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of Guangdong Power Grid Co Ltd filed Critical Electric Power Research Institute of Guangdong Power Grid Co Ltd
Priority to CN201310610824.6A priority Critical patent/CN103618642B/zh
Publication of CN103618642A publication Critical patent/CN103618642A/zh
Application granted granted Critical
Publication of CN103618642B publication Critical patent/CN103618642B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

一种基于最大新建速率的TCP并发连接数测试方法,为包括爬坡阶段的边拆边建方法,其特征是:在爬坡阶段测试中,基于被测设备的TCP最大新建速率,针对不同的被测设备取差异化的Ts值,使得爬坡阶段的TCP新建速率Vs为该设备TCP最大新建速率Vm的固定比例N;结合公式2-1,Ts值可通过公式2-3获得;Ts=Cm/(Vm*N)公式2-3;其中N可由测试单位自行确定。本发明(1)TCP最大并发连接性能测试结果受该设备TCP新建性能的影响较小。此测试过程的维持阶段中,被测设备工作在相同的资源负载比例条件下,更能客观反映出各自的并发性能;(2)能保持所有的待测设备运行在相同的测试条件标准下。

Description

基于最大新建速率的防火墙TCP并发连接数测试方法
技术领域
本发明涉及一种防火墙TCP并发连接数测试方法,尤其是涉及一种基于最大新建速率的防火墙TCP并发连接数测试方法。
背景技术
最大并发测试的主要目标是评价被测设备对TCP连接的管理和保持能力。一般来说,设备的内存越大,session表空间越多,对session的管理能力越强,则设备的TCP并发能力越高。
一般而言,TCP并发连接数有两种测试方法,一种为“只建不拆”法,另一种为“边建边拆”法。“只建不拆”的测试方法是指在建立TCP连接并获取到指定的页面后,连接一直保持,直到测试终了一次性关闭。而“边建边拆”的测试方法是指在测试开始的一段时间内,使设备达到指定的并发数,然后在接下来的一段时间内所有的连接池中一边拆线,一边新建,而总的连接数保持不变。相对而言,“只建不拆”测试方法能够较为快速地测出被测设备所可能达到的TCP并发连接数,但是这样的测试方法不能保证被测设备在测试过程中一直保持TCP连接,而“边建边拆”测试方法能够较为准确地反映被测设备在并发方面的稳定性能,因而应用较为广泛。
“边建边拆”测试方法一般分为4个阶段:
(1)协商阶段:该阶段用于测试链路的协商,一般持续时间在10秒钟以内。
(2)爬坡阶段:在该阶段中,被测设备的TCP并发连接数将在设定的时间Ts内达到设定的最大值Cm,新建速率Vs,设定的时间Ts应考虑被测设备的TCP最大新建速率Vm和Vs之间的关系,Vm、Vs、Ts与Cm之间的关系可用公式2-1、2-2表示:
Cm/Ts=Vs                   公式2-1;
Vs<Vm                     公式2-2;
(3)维持阶段:在该阶段中将不断地拆除旧的TCP连接并建立起新的TCP连接,而总的连接数将维持在第二阶段设定的最大值Cm;一般要求维持阶段的时间不少于60秒;
(4)释放阶段:该阶段拆除已建立的TCP连接,释放压力;释放阶段的时间一般不小于爬坡阶段。
附图展示了基于思博伦Avalanche测试仪的TCP最大并发连接测试中4个阶段的参数配置例子。在该例子中,协商阶段设置为5秒,爬坡时间设置为60秒,最大测试并发数设为60000,维持阶段时间设为60秒,释放阶段时间设为70秒。在此例子中,根据公式2-1,爬坡阶段新建速率为1000连接数/秒。
然而,在“边建边拆”测试过程中,防火墙的TCP并发性能反映在维持阶段,而这一阶段中,防火墙的系统资源不仅是用于TCP连接的维持,同时也用于大量的TCP拆除和新建,而这一阶段的TCP拆除和新建速率,实际上等同于爬坡阶段的TCP新建速率Vs,根据公式2-1,在一定的TCP连接数测试条件下,Vs取决于Ts,因此,如果对所有被测设备采用统一的Ts测试,则可能导致两个方面的问题:
(1)TCP最大并发连接性能测试结果将很大程度上受到该设备TCP新建性能的影响。比如,防火墙A最大TCP新建速率Vma为60000连接/秒,防火墙B最大新建速率Vmb为32000连接/秒。现用最大TCP连接数Cm=1200000对防火墙A和B进行测试,爬坡时间Ts均设置为60秒,根据公式2-1,在爬坡过程中防火墙A和B的新建速率Vsa=Vsb=30000连接/秒,在维持阶段这两者的TCP拆除和新建速率也为30000连接/秒。可以看出,此例子中防火墙B在维持阶段新建速率为其最大新建速率的93.75%,而防火墙A仅为50%。这说明防火墙B在此阶段用于拆除和新建TCP连接的系统资源比例远大于防火墙A,这也很大程度上影响了二者在并发性能的测试对比结果。
(2)难以保证预先设定的Ts值适用于所有待测设备。在被测设备较多且不在统一时间进行测试的情况下,根据公式2-2的要求,可能出现部分被测设备的TCP最大新建速率Vm小于Vs的情况,从而导致出现必须重新确定Ts值而影响已经完成的测试项目的情况。
从上面的分析可以看出,爬坡时间Ts值的设定,是整个TCP并发连接数测试较为重要的一个环节,而固定Ts值的测试方法,则难以解决上述的2个问题。:
发明内容
本发明所要解决的技术问题,就是提供一种基于最大新建速率的TCP并发连接数测试方法,该方法能使被测设备在一种相对“公平”的条件下进行测试比对,TCP并发连接数测试结果不受TCP新建性能影响,又能保证该条件适用于所有被测设备。
解决上述技术问题,本发明采用的技术方案如下:
一种基于最大新建速率的TCP并发连接数测试方法,为包括爬坡阶段的边拆边建方法,其特征是:在爬坡阶段测试中,基于被测设备的TCP最大新建速率,针对不同的被测设备取差异化的Ts值,使得爬坡阶段的TCP新建速率Vs为该设备TCP最大新建速率Vm的固定比例N;结合公式2-1,Ts值可通过公式2-3获得;
Ts=Cm/(Vm*N)           公式2-3;
其中N可由测试单位自行确定。
有益效果:相比于固定Ts值测试方法,基于最大新建速率的TCP并发连接数测试方法有以下两方面的优点:
(1)TCP最大并发连接性能测试结果受该设备TCP新建性能的影响较小。此测试过程的维持阶段中,被测设备工作在相同的资源负载比例条件下,更能客观反映出各自的并发性能。
(2)能保持所有的待测设备运行在相同的测试条件标准下。
附图说明
附图为思博伦Avalanche测试仪TCP最大并发测试配置举例示意图。
具体实施方式
附图为思博伦Avalanche测试仪TCP最大并发测试配置举例示意图。
本发明的基于最大新建速率的TCP并发连接数测试方法实施例,为包括爬坡阶段的边拆边建方法,其在爬坡阶段(只是爬坡阶段,后续阶段相关速率决定于本阶段)测试中,基于被测设备的TCP最大新建速率,针对不同的被测设备取差异化的Ts值,使得爬坡阶段的TCP新建速率Vs为该设备TCP最大新建速率Vm的固定比例N;结合公式2-1,Ts值可通过公式2-3获得;
Ts=Cm/(Vm*N)           公式2-3;
其中N可由测试单位自行确定,不影响测试公平性。

Claims (1)

1.一种基于最大新建速率的TCP并发连接数测试方法,为包括爬坡阶段的边拆边建方法,其特征是:在爬坡阶段测试中,基于被测设备的TCP最大新建速率,针对不同的被测设备取差异化的Ts值,使得爬坡阶段的TCP新建速率Vs为该设备TCP最大新建速率Vm的固定比例N;结合公式2-1,Ts值可通过公式2-3获得;
Ts=Cm/(Vm*N)            公式2-3;
其中N可由测试单位自行确定。
CN201310610824.6A 2013-11-26 2013-11-26 基于最大新建速率的防火墙tcp并发连接数测试方法 Active CN103618642B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310610824.6A CN103618642B (zh) 2013-11-26 2013-11-26 基于最大新建速率的防火墙tcp并发连接数测试方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310610824.6A CN103618642B (zh) 2013-11-26 2013-11-26 基于最大新建速率的防火墙tcp并发连接数测试方法

Publications (2)

Publication Number Publication Date
CN103618642A true CN103618642A (zh) 2014-03-05
CN103618642B CN103618642B (zh) 2016-08-24

Family

ID=50169346

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310610824.6A Active CN103618642B (zh) 2013-11-26 2013-11-26 基于最大新建速率的防火墙tcp并发连接数测试方法

Country Status (1)

Country Link
CN (1) CN103618642B (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104539483A (zh) * 2014-12-31 2015-04-22 中国电子科技集团公司第五十研究所 网络测试系统
CN105141591A (zh) * 2015-08-03 2015-12-09 汉柏科技有限公司 防火墙最大并发连接数量的获取方法及系统
CN107547551A (zh) * 2017-09-06 2018-01-05 新华三信息安全技术有限公司 报文过滤方法、装置、设备及存储介质
CN109120483A (zh) * 2018-10-30 2019-01-01 杭州迪普科技股份有限公司 一种防火墙设备性能测试方法及装置
CN110191023A (zh) * 2019-05-31 2019-08-30 北京金山云网络技术有限公司 新建连接数测试方法、装置、电子设备、存储介质及系统
CN116860657A (zh) * 2023-09-05 2023-10-10 腾讯科技(深圳)有限公司 压测控制处理方法、装置、计算机设备和存储介质

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102082707A (zh) * 2010-12-24 2011-06-01 汉柏科技有限公司 多核防火墙并行处理性能测试方法
CN102546290A (zh) * 2011-11-28 2012-07-04 曙光信息产业(北京)有限公司 一种10Gbps网络流量下测试TCP并发连接的测试装置

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102082707A (zh) * 2010-12-24 2011-06-01 汉柏科技有限公司 多核防火墙并行处理性能测试方法
CN102546290A (zh) * 2011-11-28 2012-07-04 曙光信息产业(北京)有限公司 一种10Gbps网络流量下测试TCP并发连接的测试装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
B. HICKMAN: "《RFC3511:Benchmarking Methodology for Firewall Performance》", 30 April 2003 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104539483A (zh) * 2014-12-31 2015-04-22 中国电子科技集团公司第五十研究所 网络测试系统
CN105141591A (zh) * 2015-08-03 2015-12-09 汉柏科技有限公司 防火墙最大并发连接数量的获取方法及系统
CN107547551A (zh) * 2017-09-06 2018-01-05 新华三信息安全技术有限公司 报文过滤方法、装置、设备及存储介质
CN107547551B (zh) * 2017-09-06 2020-09-25 新华三信息安全技术有限公司 报文过滤方法、装置、设备及存储介质
CN109120483A (zh) * 2018-10-30 2019-01-01 杭州迪普科技股份有限公司 一种防火墙设备性能测试方法及装置
CN109120483B (zh) * 2018-10-30 2020-08-04 杭州迪普科技股份有限公司 一种防火墙设备性能测试方法及装置
CN110191023A (zh) * 2019-05-31 2019-08-30 北京金山云网络技术有限公司 新建连接数测试方法、装置、电子设备、存储介质及系统
CN116860657A (zh) * 2023-09-05 2023-10-10 腾讯科技(深圳)有限公司 压测控制处理方法、装置、计算机设备和存储介质
CN116860657B (zh) * 2023-09-05 2023-11-24 腾讯科技(深圳)有限公司 压测控制处理方法、装置、计算机设备和存储介质

Also Published As

Publication number Publication date
CN103618642B (zh) 2016-08-24

Similar Documents

Publication Publication Date Title
CN103618642A (zh) 基于最大新建速率的防火墙tcp并发连接数测试方法
AU2014220753B9 (en) Method for checking multiple spatially distributed protective devices of an energy supply network, and corresponding checking system
CN101977133B (zh) 一种适用于航天器系统的1553b总线网络仿真系统
CN109116085B (zh) 一种汽车静态电流监测系统及方法
US10317452B2 (en) Testing device, testing method, and program for power system protection control system
CN105071982A (zh) 一种Linux下快速测量网卡性能的方法
CN105974252B (zh) 一种pwm输出故障诊断方法及系统
EP2851700A1 (en) Method and terminal for displaying capacity of battery
WO2015044329A3 (en) Testing of a substation automation system
CN103268286A (zh) 移动终端中应用程序的流量测试方法、系统和测试机
WO2011136959A3 (en) Methods for monitoring processing equipment
CN103049282A (zh) 一种基于Intel Boxboro-EX平台通过BMC收集系统串口信息的方法
CN102890499A (zh) 一种纯电动汽车整车控制器软件在回路测试的方法
CN105486931A (zh) 一种监测母线电容的实际容量的方法及装置
CN107976990A (zh) 一种基于CANoe的整车故障测试方法
US8935116B2 (en) Method and apparatus for testing a wind turbine installation
RU2011103428A (ru) Устройство и способ связи
CN103983955B (zh) 一种收发组件测试中电源监控方法
CN107678959A (zh) 一种控制律软件的集成测试方法
CN109085443B (zh) 一种电源适配器额定寿命测试方法
CN100464192C (zh) 空调器用复位芯片的测试方法
CN102855167A (zh) 可实现100%bit覆盖的双通道计算机ain功能电路
CN102819942B (zh) 一种模拟汽车信号传送检测系统的检测方法
WO2014140384A8 (de) Datenstandardisierung
CN102694698B (zh) 一种快速建立小型网络测试系统的方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 510080 Dongfeng East Road, Dongfeng, Guangdong, Guangzhou, Zhejiang Province, No. 8

Patentee after: ELECTRIC POWER RESEARCH INSTITUTE, GUANGDONG POWER GRID CO., LTD.

Address before: 510080 Dongfeng East Road, Dongfeng, Guangdong, Guangzhou, Zhejiang Province, No. 8

Patentee before: Electrical Power Research Institute of Guangdong Power Grid Corporation

CP01 Change in the name or title of a patent holder