CN103617456A - 一种选矿过程运行指标优化方法 - Google Patents
一种选矿过程运行指标优化方法 Download PDFInfo
- Publication number
- CN103617456A CN103617456A CN201310647027.5A CN201310647027A CN103617456A CN 103617456 A CN103617456 A CN 103617456A CN 201310647027 A CN201310647027 A CN 201310647027A CN 103617456 A CN103617456 A CN 103617456A
- Authority
- CN
- China
- Prior art keywords
- index
- value
- operating
- operating index
- production
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310647027.5A CN103617456B (zh) | 2013-12-04 | 2013-12-04 | 一种选矿过程运行指标优化方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310647027.5A CN103617456B (zh) | 2013-12-04 | 2013-12-04 | 一种选矿过程运行指标优化方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103617456A true CN103617456A (zh) | 2014-03-05 |
CN103617456B CN103617456B (zh) | 2016-08-17 |
Family
ID=50168160
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310647027.5A Active CN103617456B (zh) | 2013-12-04 | 2013-12-04 | 一种选矿过程运行指标优化方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103617456B (zh) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104318313A (zh) * | 2014-09-19 | 2015-01-28 | 东北大学 | 基于案例推理的选矿全流程运行指标智能决策系统及方法 |
CN104503396A (zh) * | 2014-12-03 | 2015-04-08 | 金川集团股份有限公司 | 一种多金属平衡产率的算法 |
CN104732447A (zh) * | 2014-04-23 | 2015-06-24 | 国家电网公司 | 一种电网重要基础设施脆弱性指标体系建立方法 |
CN104267695B (zh) * | 2014-09-23 | 2017-01-04 | 东北大学 | 一种选矿过程工艺指标优化决策系统及方法 |
CN106650997A (zh) * | 2016-10-26 | 2017-05-10 | 北京矿冶研究总院 | 一种选矿生产指标的优化方法 |
EP3244271A4 (en) * | 2015-01-07 | 2018-12-05 | Northeastern University | Ore dressing multi-production-index optimization decision making system and method based on cloud and mobile terminal |
CN111830912A (zh) * | 2019-04-18 | 2020-10-27 | 万洲电气股份有限公司 | 一种工业生产线设备智能优化节能系统和方法 |
CN113792417A (zh) * | 2021-08-23 | 2021-12-14 | 鞍钢集团矿业有限公司 | 一种基于给矿参数与智能算法的强磁机电流优化方法 |
CN115793470A (zh) * | 2023-01-29 | 2023-03-14 | 湖南军芃科技股份有限公司 | 矿石分选机的参数控制方法和矿石分选机 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1603986A (zh) * | 2004-10-29 | 2005-04-06 | 东北大学 | 基于案例推理的磨矿系统智能优化设定方法 |
CN1749891A (zh) * | 2005-10-19 | 2006-03-22 | 东北大学 | 选矿过程综合生产指标智能优化控制方法 |
-
2013
- 2013-12-04 CN CN201310647027.5A patent/CN103617456B/zh active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1603986A (zh) * | 2004-10-29 | 2005-04-06 | 东北大学 | 基于案例推理的磨矿系统智能优化设定方法 |
CN1749891A (zh) * | 2005-10-19 | 2006-03-22 | 东北大学 | 选矿过程综合生产指标智能优化控制方法 |
Non-Patent Citations (2)
Title |
---|
刘长鑫: "面向Web的选矿生产全流程工艺指标决策系统软件平台的设计与开发", 《中国优秀硕士学位论文全文数据库 信息科技辑》 * |
黄肖玲等: "面向生产指标优化的选矿过程调度研究", 《系统工程学报》 * |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104732447A (zh) * | 2014-04-23 | 2015-06-24 | 国家电网公司 | 一种电网重要基础设施脆弱性指标体系建立方法 |
CN104732447B (zh) * | 2014-04-23 | 2019-03-22 | 国家电网公司 | 一种电网重要基础设施脆弱性指标体系建立方法 |
CN104318313A (zh) * | 2014-09-19 | 2015-01-28 | 东北大学 | 基于案例推理的选矿全流程运行指标智能决策系统及方法 |
CN104318313B (zh) * | 2014-09-19 | 2017-05-10 | 东北大学 | 基于案例推理的选矿全流程运行指标智能决策系统及方法 |
CN104267695B (zh) * | 2014-09-23 | 2017-01-04 | 东北大学 | 一种选矿过程工艺指标优化决策系统及方法 |
CN104503396A (zh) * | 2014-12-03 | 2015-04-08 | 金川集团股份有限公司 | 一种多金属平衡产率的算法 |
EP3244271A4 (en) * | 2015-01-07 | 2018-12-05 | Northeastern University | Ore dressing multi-production-index optimization decision making system and method based on cloud and mobile terminal |
CN106650997A (zh) * | 2016-10-26 | 2017-05-10 | 北京矿冶研究总院 | 一种选矿生产指标的优化方法 |
CN111830912A (zh) * | 2019-04-18 | 2020-10-27 | 万洲电气股份有限公司 | 一种工业生产线设备智能优化节能系统和方法 |
CN113792417A (zh) * | 2021-08-23 | 2021-12-14 | 鞍钢集团矿业有限公司 | 一种基于给矿参数与智能算法的强磁机电流优化方法 |
CN113792417B (zh) * | 2021-08-23 | 2023-10-20 | 鞍钢集团矿业有限公司 | 一种基于给矿参数与智能算法的强磁机电流优化方法 |
CN115793470A (zh) * | 2023-01-29 | 2023-03-14 | 湖南军芃科技股份有限公司 | 矿石分选机的参数控制方法和矿石分选机 |
Also Published As
Publication number | Publication date |
---|---|
CN103617456B (zh) | 2016-08-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103617456B (zh) | 一种选矿过程运行指标优化方法 | |
CN101950171B (zh) | 选矿厂磨矿智能分级控制方法及控制设备 | |
Morkun et al. | Automation of iron ore raw materials beneficiation with the operational recognition of its varieties in process streams | |
US11202974B2 (en) | Mineral recovery control | |
Dixit et al. | Application of response surface methodology for modeling and optimization of spiral separator for processing of iron ore slime | |
Morkun et al. | Automation of the ore varieties recognition process in the technological process streams based on the dynamic effects of highenergy ultrasound | |
CN102357395A (zh) | 一种磨矿分级过程的模糊监督控制装置及方法 | |
CN101954309B (zh) | 一种磨矿分级过程的抗扰动控制装置及其方法 | |
Yu et al. | An innovative approach for determining the grinding media system of ball mill based on grinding kinetics and linear superposition principle | |
CN103617470A (zh) | 一种设备能力变化条件下的选矿综合生产指标优化方法 | |
CN103056020A (zh) | 选矿磨矿中的最大可选粒度分级工艺 | |
CN104492615A (zh) | 磨矿分级方法 | |
Bouchard et al. | Plant automation for energy-efficient mineral processing | |
CN104318313B (zh) | 基于案例推理的选矿全流程运行指标智能决策系统及方法 | |
Altun et al. | Estimation of mineral liberation distribution functions to be used in modelling of impact and attrition milling | |
Wang et al. | An improved RNN modeling algorithm for flotation process of copper-silver ore | |
Marynych | Reason for application of intelligent systems for disintegrating complex control | |
Li et al. | Hybrid intelligent optimal control for flotation processes | |
Bingyu et al. | Research on data driven modeling method of grinding process based on RBF neural network | |
Wang et al. | Multi-objective optimization for an industrial grinding and classification process based on PBM and RSM | |
Mukhitdinov et al. | Problems of modeling and control of the technological process of ore grinding | |
Ma et al. | Study on optimization control of fuzzy PID in milling and crushing system | |
US11873238B2 (en) | Mineral recovery control | |
KR102214170B1 (ko) | 고체 광물질의 추출을 위한 부유선광 시스템 | |
Song | Intelligent Control and Energy Conservation of Ball Mill |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20140305 Assignee: Maogong Branch of Fushun Hanwang Aoniu Mining Co., Ltd. Assignor: Northeast University Contract record no.: X2019210000006 Denomination of invention: Operating index optimization method in beneficiation process Granted publication date: 20160817 License type: Common License Record date: 20190916 |
|
EE01 | Entry into force of recordation of patent licensing contract | ||
EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20140305 Assignee: SHOUGANG LUANNAN MACHENG MINING Co.,Ltd. Assignor: Northeastern University Contract record no.: X2020210000013 Denomination of invention: An optimization method for operation index of mineral processing process Granted publication date: 20160817 License type: Common License Record date: 20200910 |
|
EE01 | Entry into force of recordation of patent licensing contract | ||
EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20140305 Assignee: Longi Magnet Co.,Ltd. Assignor: Northeastern University Contract record no.: X2020210000025 Denomination of invention: An optimization method for operation index of mineral processing process Granted publication date: 20160817 License type: Common License Record date: 20201124 |
|
EE01 | Entry into force of recordation of patent licensing contract |