CN103609076B - The redundancy running of automation equipment - Google Patents
The redundancy running of automation equipment Download PDFInfo
- Publication number
- CN103609076B CN103609076B CN201180071819.1A CN201180071819A CN103609076B CN 103609076 B CN103609076 B CN 103609076B CN 201180071819 A CN201180071819 A CN 201180071819A CN 103609076 B CN103609076 B CN 103609076B
- Authority
- CN
- China
- Prior art keywords
- communication
- field apparatus
- network
- message
- port com
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000004891 communication Methods 0.000 claims abstract description 140
- 238000000034 method Methods 0.000 claims abstract description 21
- 230000004913 activation Effects 0.000 claims abstract description 16
- 238000012544 monitoring process Methods 0.000 claims abstract description 12
- 230000005540 biological transmission Effects 0.000 claims description 13
- 241000272814 Anser sp. Species 0.000 claims description 5
- 230000003213 activating effect Effects 0.000 claims description 3
- 238000010276 construction Methods 0.000 claims description 2
- 230000009849 deactivation Effects 0.000 claims description 2
- 230000005684 electric field Effects 0.000 description 5
- 230000008569 process Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000005259 measurement Methods 0.000 description 2
- 230000004888 barrier function Effects 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 239000004020 conductor Substances 0.000 description 1
- 230000009977 dual effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 239000000835 fiber Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
- 230000001960 triggered effect Effects 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L12/00—Data switching networks
- H04L12/28—Data switching networks characterised by path configuration, e.g. LAN [Local Area Networks] or WAN [Wide Area Networks]
- H04L12/44—Star or tree networks
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L12/00—Data switching networks
- H04L12/28—Data switching networks characterised by path configuration, e.g. LAN [Local Area Networks] or WAN [Wide Area Networks]
- H04L12/40—Bus networks
- H04L12/40169—Flexible bus arrangements
- H04L12/40176—Flexible bus arrangements involving redundancy
- H04L12/40189—Flexible bus arrangements involving redundancy by using a plurality of bus systems
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/06—Management of faults, events, alarms or notifications
- H04L41/0654—Management of faults, events, alarms or notifications using network fault recovery
- H04L41/0659—Management of faults, events, alarms or notifications using network fault recovery by isolating or reconfiguring faulty entities
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/06—Management of faults, events, alarms or notifications
- H04L41/0654—Management of faults, events, alarms or notifications using network fault recovery
- H04L41/0668—Management of faults, events, alarms or notifications using network fault recovery by dynamic selection of recovery network elements, e.g. replacement by the most appropriate element after failure
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L12/00—Data switching networks
- H04L12/28—Data switching networks characterised by path configuration, e.g. LAN [Local Area Networks] or WAN [Wide Area Networks]
- H04L12/40—Bus networks
- H04L2012/4026—Bus for use in automation systems
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S40/00—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Small-Scale Networks (AREA)
- Data Exchanges In Wide-Area Networks (AREA)
Abstract
The present invention relates to one kind for redundantly running automation equipment(10)Method, wherein field apparatus(11a‑c)With control station(12a‑c)By the communication network constructed with double star structure(13)Carry out exchange data message(D1, D2, D3), wherein in the first star structure(13a)Middle setting first network part(14a), field apparatus(11a‑c)And control station(12a‑c)Respectively by the first communication connection(15a‑f)It is connected with the first network part, and in the second star structure(13b)The second network components of middle setting(14b), field apparatus(11a‑c)And control station(12a‑c)Respectively by the second communication connection(16a‑f)It is connected with second network components.It is a kind of for redundancy running automation equipment in order to provide(10)Simple and inexpensive solution, it is proposed that, field apparatus(11a‑c)There is proper what a medium access control device respectively(18), the medium access control device is with the first PORT COM(19a), first PORT COM and first network part(14a)Be connected and be activation, and the medium access control device have the second PORT COM(19b), second PORT COM and the second network components(14b)It is connected and is inactive, first network part(14a)Monitoring and control station(12a‑c)Each connected the first communication connection(15a‑c)And failure message is produced in case of a failure(A)And send it to field apparatus(11a‑c)And as to failure message(A)Reaction, each field apparatus(11a‑c)Disable its first PORT COM(19a)And activate its second PORT COM(19b).The invention further relates to a kind of corresponding field apparatus(11a‑c)And a kind of automation equipment(10).
Description
Technical field
The present invention relates to a kind of method for redundantly running automation equipment, the wherein electric scene of automation equipment
The electrical control station of equipment and automation equipment by the communication network that is constructed with double star structure come exchange data message, wherein
First network part is set in the first star structure of communication network, field apparatus and control station respectively by the first communication connection with
The first network part is connected, and the second network components is set in the second star structure of communication network, field apparatus and
Control station is connected by the second communication connection with second network components respectively.
The invention further relates to a kind of electric field device, the field apparatus is configured in such automation equipment
Middle redundancy running.
Background technology
Automation equipment is used for the automation of equipment, such as electrical power equipment, such as electrical power net or electric
The automation of switching device, and so-called field apparatus is generally included, the field apparatus is arranged in the master of corresponding equipment
Want near component, that is, be for example arranged near the primary clustering of electrical power net.Such primary clustering is in electrical power
For example can be cable and wire, transformer, generator, motor or current transformer in the case of net.Electric field device is herein
Measured value is generally received, the measured value describes the running status of each primary clustering of electrical power net.The measured value can be with
Stored or be transmitted further to control and the monitoring parts of the higher level of each field apparatus, i.e., so-called automation equipment
Control station.Mass data message must be transmitted between the field apparatus and control station of automation equipment for controlling and supervising
Depending on equipment.The equipment of most automatic operatings also requires reliability high.
The requirement has the strong influence on communication network, and field apparatus and control station are connected to each other using the communication network.Cause
This, generally redundantly designs communication network in automation equipment at present, i.e. a feelings for communication connecting fault in communication network
Reliably data message transmission between equipment and control station at the scene is also ensured that under condition.
Such redundancy structure is that communication network is set particularly in a kind of preferred possibility of the People's Republic of China (PRC)
In so-called double star structure.Here, the first star structure has first network part(Such as interchanger or router), from
Dynamicization equipment(Or at least one associated part of automation equipment)All field apparatus and all control stations by the
One communication connection is connected with the first network part.The second star structure is additionally provided in, second star structure has the
Two network componentses, automation equipment(Or at least one associated part of automation equipment)All field apparatus and all
Control station is connected by the second communication connection with second network components.
Concept " communication connection " should be included with complete between each field apparatus or control station and network components below
Whole transmission line, that is, including existing(It is cable connection or wireless)Transmission medium and its with each field apparatus or
Physics, mechanics of communication and logic the connection of control station(Such as interface, communication device, protocol stack).
Be should be ensured that by the redundancy structure of communication network, between network components and control station a communication connection occurs
Also keep ensuring by communication network data message transmission in the case of failure.Due to all logical in such double star structure
News connection is all dual, and field apparatus generally has to comprising two communication devices, particularly has MAC Address respectively(MAC=
Media Access Control)Two medium access control devices.Include the matchmaker involved by the failure from communication connection
Jie's access control apparatus switch in the control of interior communication herein in osi layer mould to the redundancy of other medium access control device
Type(OSI=Open Systems Interconnection)Application layer(7th layer)On carry out, and there is a requirement that scene sets
Standby calculating power relatively high.Additionally, being relatively expensive using two communication devices and two medium access control devices
And it is troublesome in parametrization because each field apparatus has two MAC Address, the parametrization for example includes determining
The address table of network components.
The content of the invention
Therefore, the technical problem to be solved in the present invention is to provide a kind of less fiber crops for redundancy running automation equipment
Tired and less expensive solution, and a kind of corresponding field apparatus.
In order to solve the above-mentioned technical problem set according to the present invention, field apparatus has proper what a medium access control respectively
Device processed, the medium access control device has the first PORT COM, and first PORT COM is connected with first network part
And it is activation, for having by the first communication linkup transmit and reception data message, and the medium access control device
There is the second PORT COM, second PORT COM is connected with the second network components by the second communication connection and is inactive
's;First network part monitors what each first communication being connected with control station was connected and was broken down in communication connection herein
In the case of produce failure message, the failure message is transferred to field apparatus.As the reaction to receiving failure message, each
Field apparatus disables the first PORT COM of its activation and activates its second inactive PORT COM for by second
Communication linkup transmit and reception data message.
By only needing a medium access control device in the method according to the invention(And thus also only need existing
One MAC Address of field device), opening for the second required in addition medium access control device can be saved on the one hand
Pin, on the other hand reduces the parametrization for communication network as follows(For example for the address table of network components)Expense,
I.e. each field apparatus is based only on a MAC Address and can be implemented in a network, has thus saved each field apparatus pair
The management of multiple MAC Address.
However carried out in the case of still may insure the communication disconnecting between network components and control station
Redundancy switches.In this regard, network components voluntarily monitors the currently active connection with the communication of control station and in communication connection generation
During failure failure message is sent to field apparatus.Used as the reaction to failure message, field apparatus activates it so far
First PORT COM is switched to inactive and activates its second inactive so far PORT COM.Then by this second
PORT COM continues to transmit using the second network components(Send and receive)Data message.Because the second network components is by own
The second communication connection be connected with control station, so it is possible thereby to around being opened between the control station and first network part that are related to
Break down(First)Communication connection.
Because field apparatus can monitor the first communication connection from its directness to first network part in itself,
Network components is monitored(What field apparatus cannot see that)The communication being connected with control station is connected for redundancy monitoring just foot
It is enough, and the monitoring of the communication connection of field apparatus side and redundancy switching if necessary can in itself be carried out by field apparatus.
For completeness herein it should be mentioned that the failure of communication connection is appreciated that it is all damaged(For example
Because the communication device in connection medium mechanical break or control station or network components is damaged)And only partly do not work(Example
Such as frequent mistakenly data message transmission, too poor quality of connection).
According to the preferred embodiment setting of the method for the present invention, as another reaction to receiving failure message,
Each field apparatus sends application report by the second communication connection by its second PORT COM for activating to the second network components
Text, this application message promotes the second network components so to match so that for the biography in the future with field apparatus of data message
It is defeated to use its second PORT COM.Second network components for example can correspondingly with following the form matches, it be used to transmit number for this
According to the address table of message so that make from now on to be carried out data transmission with the MAC Address of involved field apparatus
With its second PORT COM.
Thus can preferably realize that the redundancy for extremely rapidly making the second network components adapt to field apparatus switches, because
Although without waiting for generally regularly but in larger time interval(It is for example every 5 minutes)In the automatic self-check that carries out
The change configuration of the second network components if necessary.
Another preferred embodiment is set, and the data message for being exchanged between equipment and control station at the scene is used to control
And/or monitoring electrical power equipment.
Because must redundantly be designed for the automation equipment of power supply unit based on reliability requirement, exist extremely preferredly
It is such for power supply unit(Such as switchgear or power supply network)Automation equipment in the range of use according to of the invention
Method.
In addition set according to another preferred embodiment of the method for the present invention, by medium access control device
The redundancy control unit of middle setting carries out deactivation and the activation of the second PORT COM of the first PORT COM.
It is possible thereby in the articulamentum of osi layer model(2nd to the 3rd layer)Upper implementation redundancy switches and thus for scene
It is not computation burden for the application of the execution communication of equipment.
In addition can be set according to another preferred embodiment of the method for the present invention, only showing to such selection
Field device transmission fault message, the field apparatus communicates the control station exchange datagrams involved by being connected with first for breaking down
Text.
It is possible thereby to almost carry out the selection of the field apparatus involved by the communication connecting fault with problematic control station
Property redundancy switching, wherein not influenceing not carrying out the field apparatus of data exchange with problematic control station natively.
Specifically can be configured on failure message according to another advantageous implementation method, i.e., using according to
Snmp protocol(SNMP-Simple Network Management Protocol)Trap message as failure message.
Because current most of interchangers use SNMP, it can then be set in the case of corresponding configuration, logical
News connection sends so-called " Trap message " in the case of breaking down to field apparatus.Trap message is specified in SNMP
Brief data message, it is to all or selected recipient's notification event.
Can also alternatively set, using the GOOSE message according to IEC61850 standards as failure message.IEC61850
(IEC-International Electrotechnical Commission)It is the current authority in energy automatic field
Communication standard.Described so-called " GOOSE message " according to the standard(GOOSE-Generic Object Oriented
Substation Event), it allows each equipment rapid communication of automation equipment, so as to particularly effectively directly in energy
Each exchanged between equipment data of automation equipment and order.As long as network components supports GOOSE message communications, it is possible to adopt
With the failure message of the regulation according to IEC61850.
Another advantageous implementation method according to the method for the present invention is, using the power network of electrical power equipment
Power grid control station in control centre is used as control station.
Control station is arranged in the grid control centre of power supply unit in this case, that is, is arranged in automation equipment
Highest ranking layer on, and at the same time field apparatus is arranged near processing position(Namely near primary clustering), also
It is arranged on the lowest class of automation equipment layer.Thus, the double star construct trans automation equipment of communication network is all
Grading layer extend.
Above-mentioned technical problem is come also by the electric field device used in the automation equipment with communication device
Solve, the communication device be configured to the network components of the communication network constructed with double star structure by automation equipment come
Exchange data message.
Set herein according to the present invention, communication device has only one medium access control device, the medium access control
Device processed has the first PORT COM, and first PORT COM is configured to enter with first network part by the first communication connection
Row is communicated and it is activation, and the medium access control device has the second PORT COM, the second PORT COM quilt
It is constructed by the second communication connection and the second network components is communicated and it is inactive, medium access control device
With redundancy control unit, the redundancy control unit is configured to, used as to receiving failure message from first network part(Should
The first communication that failure message description is connected with the control station of automation equipment is connected breaks down)Reaction, disable its swash
First PORT COM living and activate its second inactive PORT COM.
Additionally, above-mentioned technical problem is also by with the multiple electric field devices according to claim 9, multiple electric-controlleds
System is stood and is solved with the automation equipment of the communication network of double star structure construction, wherein in the first star structure of communication network
First network part is set, and field apparatus and control station are connected by the first communication connection with the first network part respectively,
And the second network components is set in the second star structure of communication network, and field apparatus and control station are respectively by the second communication
Connection is connected with second network components, and wherein first network part is configured to what monitoring was connected with control station
Each first communication connect and for control station be connected first communication be connected break down in the case of produce failure
Message and for sending the failure message to field apparatus.
On according to field apparatus of the invention and according to automation equipment of the invention advantage referring to corresponding method
The implementation of claim.
Brief description of the drawings
Below against embodiment, the present invention is further illustrated.In accompanying drawing:
Fig. 1 shows the schematic diagram of the automation equipment with the communication network constructed with double star structure;With
Fig. 2 shows the automation equipment according to Fig. 1, wherein the first communication connecting fault.
Specific embodiment
Fig. 1 shows the schematic diagram of automation equipment 10, and the automation equipment should be for controlling according to the embodiment
And/or not shown in watch circle 1(Such as electrical power net)The energy automation equipment of electrical power equipment.Automation sets
Standby 10 include electric field device 11a, 11b, 11c, and the field apparatus for example can be that protection equipment, measuring apparatus or control set
It is standby.Electrical control station 12a, 12b, 12c are set in automation equipment 10 in addition, and the control station for example can be power supply unit
Control centre's equipment of grid control centre(Such as analytical calculation machine, work station, server).
In order to exchange data message sets communication network 13 between each field apparatus 11a-c and control station 12a-c, should
Communication network is configured to realize the redundancy communication in automation equipment 10 with double star structure.Here, communication network 13
First star structure 13a has first network part 14a, the first network part respectively by first communication connection 15a-f with
Field apparatus 11a-c and control station 12a-c are connected.Second star structure 13b of communication network 13 includes the second Network Dept.
Part 14b, second network components is respectively by the second communication connection 16a-f and field apparatus 11a-c and control station 12a-c phases
Connection.
As already mentioned, concept " communication connection " is appreciated that connection medium and is set with each scene
Physics, logic and mechanics of communication the connection of standby, control station and network components.
The automation equipment shown in Fig. 1 for simplicity relatively clearly keeps each 3 field apparatus consciously
And control station.Actual automation equipment generally includes significantly greater number of field apparatus and control station and network components.
Additionally, communication network is constructed in itself multistagely, that is, the multiple layers including network components.However, what is be illustrated below cuts in redundancy
Process in the case of changing can also be converted to such more complicated communication network.Here, fault monitoring always by
The network components arranged on the layer that field apparatus immediate superior is set is carried out.Network components near such field apparatus with
Therefore communication connection between control station can also include multiple other network componentses, and thus in the multiple of communication network
Extend on layer.
Described in detail by taking field apparatus 11a as an example below the structure of field apparatus 11a-c.Remaining field apparatus 11b and
11c is correspondingly constructed.Field apparatus 11a has application component 17a, and the application component implements field apparatus 11a functions in itself
(Such as measurement electric current and/or voltage, the primary clustering implemented protection algorism, influence power supply unit).Additionally, field apparatus 11a
Also include communication device 17b, the communication device is used for field apparatus 11a and other field apparatus 11b, 11c or control station
12a-c is communicated.Here, application component 17a can access communication device 17b, to receive or sending data.Specifically,
Communication device 1 includes medium access control device 18 herein(MAC-Media Access Control), medium access control
Device has the first PORT COM 19a and the second PORT COM 19b.But medium access control device 18 only includes unique MAC
Address, the MAC Address is used to send and receive data message for field apparatus 11a as device address.Therefore two communication terminals
Mouth 19a identical MAC Address corresponding with 19b.In normal operation, the first PORT COM 19a is used as the PORT COM of activation,
I.e. via PORT COM 19a and field apparatus 11a intactly exchange data message.Second PORT COM 19b is inactive
And it is ready for redundancy switching.Medium access control device 18 has redundancy switch unit 20 in addition, and redundancy switching is single
Redundancy switching of unit's control between two PORT COMs 19a and 19b.
The normal operation of auto-control equipment 10 is described first according to Fig. 1.In order to control and/or monitoring electric supply installation,
Field apparatus 11a-c and control station 12a-c exchange data messages, the data message can for example include measured value, control command
Or event message.Data message is transmitted by communication network 13.Here, the first star structure 13a is configured to activation first
Star structure, its should in normal operation data message transmission.Correspondingly, the first PORT COM 19a activation of field apparatus
Be switched on.
Exemplarily, field apparatus 11a receives the voltage and/or electric current of the measurement position in energy automation equipment
Measured value and the measured value is bundled to data message D1.Data message D1Control station 12b should be transferred to, for example with
Just graphically shown to the operating personnel of energy automation equipment there.Data message D1Via the first communication terminal of activation
The communication connections of mouth 19a and first 15d is sent to the PORT COM of first network part 14a.Network components 14a is from data message
D1Obtain on recipient(Control station 12b)Device address explanation and by corresponding PORT COM and first communication connect
15b is met by data message D1It is sent to control station 12b.Can further process there and such as display data message D1's
Content.
According to corresponding mode can by data message from field apparatus 11a be transferred to other control station 12a, 12c or
Person is transmitted or in opposite directions from control station 12a-c to now from other field apparatus 11b, 11c to control station 12a-c
Field device 11a-c is transmitted.
As long as the communication that 15a-f implements no problem, the second communication connection 16a-f and second can be connected by the first communication
Network components 14b is just not used in data message transmission, but the redundancy for being only ready for needing if necessary switches.
The process in the case where redundancy switches should be explained now according to Fig. 2.Herein it should be assumed that in first network portion
The first communication connection 15b between part 14a and control station 12b breaks down, such as schematically shown by two-wire 21 in Fig. 2 that
Sample.Such failure can be by mechanically connecting the mechanical break of medium(The pull-plug device of extraction, the cable for interrupting, interrupt
Dedicated radio link), damage in communication device(The communication terminal of such as damage in first network part 14a or control station 12a
Mouthful)Or via the too low data transmission quality of communication connection 15a(Because the interference effect of external wireless electric network, electromagnetism are done
The cable conductor disturb, being corroded)Cause.
Network components 14a is continuously monitored by the functional reliability of communication connection 15a-c to control station 12a-c
(Funktionstüchtigkeit).This can for example be carried out by launching test packet to control station 12a-c, control station
12a-c must be replied it in special time.For monitoring that first communicates the functional reliability of connection 15a-c in addition
Possibility be, monitoring connection medium electric parameter(The resistance of such as wire).For example can be by first network part 14a
According to error rate relatively high(The number of data message that is namely imperfect or erroneously being transmitted by the first communication connection
Amount)To recognize too poor transmission quality.
In the embodiment according to Fig. 2, network components 14a identifies that the be connected with control station 12b first communication is connected 15b
Failure.Which create failure message A, the failure message description failure of communication connection 15b and be sent to the message
Field apparatus 11a-c.Failure message A for example can be multi-broadcast message(Multicast-Nachricht)(Simultaneously namely
To the message that multiple recipients send).Specifically, failure message A for example can be so-called according to SNMP(SNMP-Simple
Network Management Protocol, Simple Network Management Protocol)" Trap " message, or according to IEC61850
GOOSE message(GOOSE-Generic Object Oriented Substation Event).Two kinds of message are all to many
The message of the report event that individual recipient sends, quickly and efficiently to announce the event of generation in a network.Should trigger
Each event of corresponding message can be parameterized by user herein.In this case in first network part 14a with
It is the event of triggering failure message A that the failure of the first communication connection 15a-c of control station 12a-c is parameterized.
The medium access control device 18 of field apparatus 11a-c receives failure message A.Known according to failure message A,
One network components 14a and control station(Specifically control station 12b)Between communication connection(Specifically communication connection 15b)Generation event
Barrier.Thus the redundancy triggered by respective medium access control device 18 in field apparatus 11a-c switches.Control is in respective matchmaker
The redundancy switch unit 20 that is included in Jie's access control apparatus 18 and disable(So far it is activation)First PORT COM
19a and activate(So far it is disabling)PORT COM 19b.Because two PORT COMs 19a, 19b and identical medium
Access control apparatus 18 are connected and therefore use identical MAC Address, so the switching can extremely rapidly(At several milliseconds
It is interior)And the articulamentum of the communication device 17b in each field apparatus 11a-c(The layer 2-3 of osi layer model)On carry out, and
The application component 17a of each field apparatus 11a-c is not interfered with.
Because(It is now activation)Second PORT COM 19b is connected with the second network components 14b, then can pass through in the future
The communication connections of second network components 14b and second 16a-c(Herein as a example by communicating connection 16b)Equipment at the scene(Herein for example
Field apparatus 11a)With control station(It is, for example, herein that the first communication broken down connects the control station 12b that 15b is related to)Between
Carry out data message D3Other communication.The the first communication connection 15b for breaking down can be changed or repaired afterwards, so that so
Switch for other redundancy possible in the future afterwards(When the second communication connection 16a-c breaks down)First network is provided again
The communications of part 14a and first connect 15a-c for using.
In order to realize that the second network components 14b is matched with news as quickly as possible, field apparatus 11a-c can be with
Application message T is additionally sent to the second network components 14b after the second PORT COM 19b is successfully activated.By this
Application message promotes the second network components 14b so to match its configuration so that the communication with the future of field apparatus 11a-c is present
Carried out by its second PORT COM 19b.The address table in the second network components 14b can be for example matched for this.
If a part of only existing field apparatus 11a-c can be exchanged with the control station of failure is related in general
Data message, then also optionally only send failure message A, so that only corresponding scene sets to part field equipment 11a-c
Standby to carry out redundancy switching, at the same time remaining field apparatus keeps data transfer with not influenceing.
Claims (9)
1. the method that one kind is used for redundantly operation automation equipment (10), wherein
The field apparatus (11a-c) of-automation equipment (10) is with the control station (12a-c) of automation equipment (10) by with double star
The communication network (13) of shape structure construction carrys out exchange data message (D1, D2, D3), wherein
- first network part (14a), the field apparatus (11a- are set in first star structure (13a) of communication network (13)
C) (15a-f) is connected by the first communication respectively and is connected with the first network part with the control station (12a-c), and
- the second network components (14b), the field apparatus (11a- are set in second star structure (13b) of communication network (13)
C) (16a-f) is connected by the second communication respectively and is connected with second network components with the control station (12a-c),
Characterized in that,
- the field apparatus (11a-c) has proper what a medium access control device (18), medium access control dress respectively
(18) are put only comprising unique MAC Address, the medium access control device has the first PORT COM (19a), first communication
Port be connected with the first network part (14a) and be activation, for by described first communication linkup transmit and
Receive data message (D1, D2, D3), and the medium access control device has the second PORT COM (19b), second communication
Port is connected with second network components (14b) by the described second communication connection and is inactive;
- first network the part (14a) monitors that each first communication connected with the control station (12a-c) is connected (15a-
C) and in the case where such communication connection is broken down failure message (A) is produced;
- failure the message is sent to field apparatus (11a-c);
- as the reaction to receiving the failure message (A), each field apparatus (11a-c) disable its activation first lead to
Interrogate port (19a) and activate its inactive second PORT COM (19b) for being sent out by the described second communication connection
Send and receive data message (D1, D2, D3), and
- as the reaction to receiving the failure message (A), each field apparatus (11a-c) is by the second communication terminal for activating
Mouth (19a) is sent by the second communication connection to the second network components (14b) applies for message (T), and this application message promotes described
Second network components (14b) is so matched so that for data message (D1, D2, D3) with each field apparatus (11a-c)
The transmission in future uses its second PORT COM (19b).
2. method according to claim 1, it is characterised in that
- data message (the D for being exchanged between equipment (11a-c) and control station (12a-c) at the scene1, D2, D3) for control and/or
Monitoring electrical power equipment.
3. method according to claim 1 and 2, it is characterised in that
- the first PORT COM is carried out by the redundancy control unit (20) set in the medium access control device (18)
The activation of the deactivation of (19a) and the second PORT COM (19b).
4. method according to claim 1 and 2, it is characterised in that
- only transmit the failure message (A) to the field apparatus (11a-c) of such selection, the field apparatus with break down
Control station (12a-c) exchange data message (D involved by first communication connection1, D2, D3)。
5. method according to claim 1 and 2, it is characterised in that
- use according to the Trap message of snmp protocol as failure message (A).
6. method according to claim 1 and 2, it is characterised in that
- use according to the GOOSE message of IEC61850 standards as failure message (A).
7. method according to claim 1 and 2, it is characterised in that
Power grid control station in the grid control centre of-use electrical power equipment is used as control station (12a-c).
8. the field apparatus (11a-c) with communication device (17b) that one kind is used in automation equipment (10), communication dress
Put the communication network (13) for being configured to be constructed with double star structure by automation equipment (10) network components (14a,
14b) carry out exchange data message (D1, D2, D3),
Characterized in that,
- the communication device (17b) has unique medium access control device (18), and the medium access control device (18) is only
Comprising unique MAC Address, the medium access control device has the first PORT COM (19a), and first PORT COM is by structure
Make be by first communication connection with first network part (14a) communicated and first PORT COM be activation, and
And the medium access control device has the second PORT COM (19b), second PORT COM is configured to by the second communication
Connection with the second network components (14b) communicated and second PORT COM be it is inactive,
With redundancy control unit (20), the redundancy control unit is configured to the-medium access control device (18), as
Reaction to receiving failure message (A) from the first network part (14a), the failure message description and automation equipment
(10) the first connected communication connection of control station (12a-c) is broken down, and disables the first PORT COM of its activation
(19a) and its inactive second PORT COM (19b) is activated, and
- as the reaction to receiving the failure message (A), each field apparatus (11a-c) is by the second communication terminal for activating
Mouth (19a) is sent by the second communication connection to the second network components (14b) applies for message (T), and this application message promotes described
Second network components (14b) is so matched so that for data message (D1, D2, D3) with each field apparatus (11a-c)
The transmission in future uses its second PORT COM (19b).
9. a kind of automation equipment (10), with the multiple field apparatus (11a-c) according to claim 8, multiple control stations
(12a-c) and the communication network (13) constructed with double star structure, wherein
- first network part (14a), the field apparatus (11a- are set in first star structure (13a) of communication network (13)
C) (15a-f) is connected by the first communication respectively and is connected with the first network part with the control station (12a-c), and
- the second network components (14b), the field apparatus (11a- are set in second star structure (13b) of communication network (13)
C) (16a-f) is connected by the second communication respectively and is connected with second network components with the control station (12a-c), and its
In
- first network the part (14a) be configured to monitoring be connected with the control station (12a-c) each first lead to
News connect (15a-c) and for being connected the situation that (15a-c) breaks down in first communication connected with control station (12a-c)
It is lower to produce failure message (A) and for sending the failure message (A) to the field apparatus (11a-c).
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/EP2011/060545 WO2012175135A1 (en) | 2011-06-23 | 2011-06-23 | Redundant operation of an automation installation |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103609076A CN103609076A (en) | 2014-02-26 |
CN103609076B true CN103609076B (en) | 2017-06-09 |
Family
ID=44627919
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201180071819.1A Expired - Fee Related CN103609076B (en) | 2011-06-23 | 2011-06-23 | The redundancy running of automation equipment |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN103609076B (en) |
WO (1) | WO2012175135A1 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102018203001A1 (en) * | 2018-02-28 | 2019-08-29 | Robert Bosch Gmbh | Electronic data distribution controller and method for operating such |
CN111490936B (en) * | 2020-04-09 | 2022-05-17 | 南京南瑞继保电气有限公司 | IEC61850 redundant device access method and system based on communication link management |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6366557B1 (en) * | 1997-10-31 | 2002-04-02 | Nortel Networks Limited | Method and apparatus for a Gigabit Ethernet MAC (GMAC) |
CN100566277C (en) * | 2005-06-24 | 2009-12-02 | Nxp股份有限公司 | Communications network system and the method that is used to the information that transmits |
US8259593B2 (en) * | 2005-06-29 | 2012-09-04 | Honeywell International Inc. | Apparatus and method for segmenting a communication network |
CN100534048C (en) * | 2007-04-27 | 2009-08-26 | 中控科技集团有限公司 | Distributed Ethernet system and method for inspecting fault based thereon |
DE102010012693A1 (en) * | 2009-09-04 | 2011-03-17 | Hirschmann Automation And Control Gmbh | Arrangement and method for automated detection and subsequent availability calculation of a network structure with active switching nodes for industrial applications |
-
2011
- 2011-06-23 CN CN201180071819.1A patent/CN103609076B/en not_active Expired - Fee Related
- 2011-06-23 WO PCT/EP2011/060545 patent/WO2012175135A1/en active Application Filing
Also Published As
Publication number | Publication date |
---|---|
CN103609076A (en) | 2014-02-26 |
WO2012175135A1 (en) | 2012-12-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101689985B (en) | Identifying improper cabling of devices | |
US20040078463A1 (en) | Method and apparatus for minimally invasive network monitoring | |
CN103684845B (en) | Network stand-by provision and the network system for having the network stand-by provision | |
EP2873200A1 (en) | Bridge-intelligent electronic device of routing messages between sub-networks | |
CN103609076B (en) | The redundancy running of automation equipment | |
KR101020053B1 (en) | Auto-detecting system for optical cable connection in the optical ethernet signal transmitting system having ring network structure | |
CN112286041B (en) | Switching method and switching control system for electrical equipment redundancy monitoring device | |
CN116707142B (en) | Railway signal power supply remote monitoring system based on wireless communication | |
CN104901880B (en) | A kind of method and device of service operation | |
CN104009547B (en) | Breaker remote operation function monitoring arrangement and transformer station's remote operation system | |
KR100690042B1 (en) | The embodiment of ip interface pyh level duplication in ip based using dual active device | |
CN106685087B (en) | A kind of distribution management equipment for electrical power distribution automatization system | |
CN104993571A (en) | Double-machine hot standby method of generating control device | |
CN213484888U (en) | Network detection device | |
CN208937699U (en) | A kind of communication service equipment applied in radar system | |
CN202978442U (en) | Distributed/autonomous-type fault recovery system | |
CN104113436B (en) | Double multipath server monitoring methods, device and system | |
CN217883696U (en) | Power supply control device and system | |
CN107302452A (en) | A kind of control method for PBX business continuances | |
CN108832416A (en) | A kind of intelligent socket system based on bluetooth MESH technology | |
CN104734879B (en) | A kind of network physical link is met an urgent need intelligent switching system | |
CN102290801A (en) | Method and device for realizing fault isolation for distribution terminals | |
CN217307339U (en) | Distributed distribution station terminal based on multiport forwarding communication | |
CN211744141U (en) | Internet energy gateway circuit breaker management system | |
KR102166375B1 (en) | Method and apparatus for monitoring environment using status of communication port |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170609 |