CN103603505B - A kind of shale sintering heat insulation building block bi-directional expansion assembled tile card - Google Patents
A kind of shale sintering heat insulation building block bi-directional expansion assembled tile card Download PDFInfo
- Publication number
- CN103603505B CN103603505B CN201310606438.XA CN201310606438A CN103603505B CN 103603505 B CN103603505 B CN 103603505B CN 201310606438 A CN201310606438 A CN 201310606438A CN 103603505 B CN103603505 B CN 103603505B
- Authority
- CN
- China
- Prior art keywords
- clamping bar
- building block
- brick clamp
- sleeve
- handle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Finishing Walls (AREA)
Abstract
The invention discloses a kind of shale sintering heat insulation building block bi-directional expansion assembled tile card, comprise afterburning clamping bar, positive silk clamping bar, sleeve and anti-silk clamping bar; Afterburning clamping bar, positive silk clamping bar and anti-silk clamping bar are L-type rod member; Described afterburning clamping bar comprises the first brick clamp and the handle perpendicular with the first brick clamp, and the middle part of handle is provided with circular hole; Positive silk clamping bar comprises clamping bar connecting rod and the sleeve connection screw rod perpendicular with clamping bar connecting rod; The end of clamping bar connecting rod is provided with circular hole, and clamping bar connecting rod is connected on the handle of afterburning clamping bar by rotating shaft; Anti-silk clamping bar comprises screw rod and second brick clamp perpendicular with screw rod; One end of sleeve connects positive silk clamping bar, and the other end connects anti-silk clamping bar; Grasping part is formed, in order to the building block of clamping to be put in the inner between first brick clamp and the second brick clamp.This brick card solve different model shale sintering heat insulation building block due to size different, the difficult problem that single fixed dimension brick clamp cannot be adopted to carry, make building block carrying and building construction more convenient.
Description
Technical field
The invention belongs to construction tool technical field, be specifically related to a kind of shale sintering heat insulation building block bi-directional expansion assembled tile card.
Background technology
Actively carry out in the process of wall reform in China, have insulation, lightweight, large scale, high hole rate shale sintering heat insulation building block arise at the historic moment.In cold district, housing construction is also promoted shale sintering heat insulation building block gradually.In work progress, for clamp and the brick card carrying shale sintering heat insulation building block is larger for the efficiency of construction impact of building workman by laying bricks or stones.Because shale sintering heat insulation building block is different from common building building block, its size, weight are all larger relative to common building block, simultaneously, the shape and size of shale sintering heat insulation building block have multiple different size, common brick card is used for shale sintering heat insulation building block not too suitable, therefore, it is necessary for studying a kind of brick card for shale sintering heat insulation building block.
Summary of the invention
For the defect existed in above-mentioned prior art or deficiency, the object of the invention is, provides a kind of brick card adapting to different size shale sintering heat insulation building block, solves the problem that cannot be suitable for when existing common brick is stuck in carrying shale sintering heat insulation building block.
In order to complete above-mentioned task, the present invention adopts following technical scheme to be solved:
A kind of shale sintering heat insulation building block bi-directional expansion assembled tile card, comprises afterburning clamping bar, positive silk clamping bar, sleeve and anti-silk clamping bar; Wherein, described afterburning clamping bar, positive silk clamping bar and anti-silk clamping bar are L-type rod member; Described afterburning clamping bar comprises the first brick clamp and the handle perpendicular with the first brick clamp, and the middle part of handle is provided with circular hole; Described positive silk clamping bar comprises clamping bar connecting rod and the sleeve connection screw rod perpendicular with clamping bar connecting rod; The end of clamping bar connecting rod is provided with circular hole, and clamping bar connecting rod is connected on the handle of afterburning clamping bar by rotating shaft, and rotating shaft is through the circular hole of handle and the circular hole of clamping bar connecting rod, and positive silk clamping bar can be that axis of rotation rotates with rotating shaft; Anti-silk clamping bar comprises screw rod and second brick clamp perpendicular with screw rod; One end of sleeve connects positive silk clamping bar, and the other end connects anti-silk clamping bar; Grasping part is formed, in order to the building block of clamping to be put in the inner between first brick clamp and the second brick clamp.
The present invention also comprises following other technologies feature:
Described positive silk clamping bar is circular pin.
Described sleeve is a circular cylinder, and one end of sleeve connection screw rod is processed with external screw thread; One end of screw rod is processed with external screw thread; Inside, sleeve two ends is processed with internal thread; Sleeve connection screw rod, screw rod and sleeve are all threaded connection.
The end of described first brick clamp and the second brick clamp is flat intermediate plate.
The clip surface of described first brick clamp is provided with rubber sheet gasket; The clip surface of the second brick clamp is provided with rubber sheet gasket.
The end of described handle is set with rubber handle;
Described adjusting rod is circular pin, and the circular aperture on positive and negative silk braid cylinder is inserted in one end of adjusting rod, and adjusting rod rotates and positive and negative silk braid cylinder can be driven to rotate around its center line in vertical plane, thus regulates the relative position of positive silk clamping bar and anti-silk clamping bar.
Rubber handle is set with outside described adjusting rod one end.
Drawknot one reaction spring between the corner of described afterburning clamping bar corner and positive silk clamping bar.
The length of the screw thread that described sleeve connection screw rod and screw rod are arranged is 10cm; Sleeve wall thickness is 5mm, and internal diameter is 15mm, and the Circularhole diameter in the middle part of sleeve is 12mm; The diameter of the circular hole of the circular hole on handle and clamping bar connecting rod is 8mm, and the diameter of rotating shaft is 7.5mm; The size of the rubber sheet gasket on the rubber sheet gasket on the first brick clamp and the second brick clamp: length is 80mm, and width is 30mm, and thickness is 5mm; First brick clamp and the second brick clamp length are 100mm width and are 30mm; Rubber handle length on handle is 150mm; Adjusting rod long 250mm diameter 10mm, the length of its rubber handle be equipped with is 100mm.
Compared with existing common brick card, the present invention, according to different clamp distance, regulates the relative distance of two brick clamps, solves the carrying of different model shale sintering heat insulation building block with the positive and negative silk braid cylinder that middle part is provided with circular aperture.Reaction spring between afterburning clamping bar and positive silk clamping bar makes the distance between it shrink freely, and is conducive to the operation of workman.Anti-skid rubber cushion on brick clamp, can increase the reliability of clamping, make handling process safer, and reduces the infringement to building block itself.
Accompanying drawing explanation
Fig. 1 is the structural representation of shale sintering heat insulation building block bi-directional expansion assembled tile card of the present invention.
Fig. 2 is the structural representation of afterburning clamping bar.
Fig. 3 is the structural representation of positive silk clamping bar.
Fig. 4 is the structural representation of circular sleeve.
Fig. 5 is the structural representation of anti-silk clamping bar.
Fig. 6 is the structural representation of adjusting rod.
Fig. 7 is the structural representation of brick clamp.
Each label implication in figure: 1, afterburning clamping bar, 2, positive silk clamping bar, 3, sleeve, 4, anti-silk clamping bar, 5, reaction spring, 6, rotating shaft, 7, adjusting rod, 11, handle, 12, the first brick clamp, 13, circular hole, 14, rubber sheet gasket, 15, rubber handle, 21, sleeve connection screw rod, 22, circular hole, 23, clamping bar connecting rod, 31, circular hole, 41, screw rod, 42, the second brick clamp, 43, rubber sheet gasket, 71, rubber handle.
Below in conjunction with the drawings and specific embodiments, the present invention is described in detail.
Detailed description of the invention
The present embodiment follows technical scheme of the present invention, and main body circular steel used is Q235, and diameter is 15mm.The length of the screw thread that sleeve connection screw rod 21 and screw rod 41 are arranged is 10cm.Sleeve 3 wall thickness is 5mm, and internal diameter is 15mm, and circular hole 31 diameter in the middle part of sleeve 3 is 12mm.Circular hole 13 on handle 11 is 8mm with the diameter of the circular hole 22 of clamping bar connecting rod 23, and the diameter of rotating shaft 6 is 7.5mm.The stiffness factor of reaction spring 5 is k=1 ~ 5N/mm.The size of the rubber sheet gasket 14 on the first brick clamp 12 and the rubber sheet gasket 43 on the second brick clamp 42: length is 80mm, and width is 30mm, and thickness is 5mm.First brick clamp 12 and the second brick clamp 42 are circular pin forging and form, and length is 100mm, and width is 30mm.Rubber handle 15 length on handle 11 is 150mm.Adjusting rod 7 length 250mm, diameter is 10mm, and the length of the rubber handle 71 of its suit is 100mm.The brick card of the present embodiment the shale sintering heat insulation building block gauge size that is suitable in table 1.
Table 1 shale sintering heat insulation building block specification (unit: mm)
Specification | Long | Wide | High |
I type | 248 | 365 | 249 |
II type | 248 | 490 | 249 |
III type | 359 | 240 | 249 |
IV type | 359 | 200 | 249 |
V type | 359 | 150 | 249 |
VI type | 359 | 115 | 249 |
In use procedure, regulate the relative distance between two brick clamps by sleeve, realize the clamping carrying of different model shale sintering heat insulation building block and build by laying bricks or stones.
Be connected with positive silk clamping bar 2 corner reaction spring 5 in the corner of afterburning clamping bar 1, the distance after having clamped shale sintering heat insulation building block between two brick clamps can be made to automatically restore to home position, be convenient to continue clipping operation, improve efficiency of construction.
Brick clamp end arranges rubber sheet gasket 14 and 43, and afterburning clamping bar 1 arranges rubber handle 15, clamping can be made reliable, prevent the infringement to building block hand grasping holes wall.
When using shale sintering heat insulation building block bi-directional expansion assembled tile card of the present invention to carry building block, user is first according to the distance adjustment that the specification of the building block of required carrying regulates positive and negative silk braid cylinder 3 to realize between the first brick clamp 12 and the second brick clamp 42.Positive silk clamping bar 2 determines its relative distance with anti-silk clamping bar 4 by screw thread.Then the handle 11 of hand-held afterburning clamping bar 2 one end, in the hand grasping holes making the first brick clamp 12 and the second brick clamp 42 lay respectively at shale sintering heat insulation building block or on edge, be pulled upwardly handle 11 afterwards, handle 11 6 to rotate relative to clamping bar connecting rod 23 around the shaft, Distance Shortened between the lower end of the first brick clamp 12 and the lower end of the second brick clamp 42, thus shale sintering heat insulation building block is clamped, then building block can be mentioned; When needing the shale sintering heat insulation building block carrying other model, only adjusting rod 7 need be inserted the circular aperture 31 in the middle part of sleeve 3, make it at vertical rotation in surface by clockwise (counterclockwise) rotation adjusting lever 7, positive and negative silk braid cylinder (3) is driven to rotate around its center line, tune up (little) positive relative position between silk clamping bar 2 and anti-silk clamping bar 4, then proceed carrying work.
Claims (8)
1. a shale sintering heat insulation building block bi-directional expansion assembled tile card, is characterized in that, comprises afterburning clamping bar (1), positive silk clamping bar (2), sleeve (3), anti-silk clamping bar (4) and adjusting rod (7); Wherein, described afterburning clamping bar (1), positive silk clamping bar (2) and anti-silk clamping bar (4) are L-type rod member; Described afterburning clamping bar (1) comprises the first brick clamp (12) and the handle (11) perpendicular with the first brick clamp (12), and the middle part of handle (11) is provided with circular hole two (13); Described positive silk clamping bar (2) comprises clamping bar connecting rod (23) and the sleeve connection screw rod (21) perpendicular with clamping bar connecting rod (23); The end of clamping bar connecting rod (23) is provided with circular hole one (22), clamping bar connecting rod (23) is connected on the handle (11) of afterburning clamping bar (1) by rotating shaft (6), the circular hole two (13) of rotating shaft (6) through handle (11) and the circular hole one (22) of clamping bar connecting rod (23), positive silk clamping bar (2) can with rotating shaft (6) for axis of rotation rotates; Anti-silk clamping bar (4) comprises screw rod (41) and second brick clamp (42) perpendicular with screw rod (41); One end of sleeve (3) connects positive silk clamping bar (2), and the other end connects anti-silk clamping bar (4); Grasping part is formed, in order to put in the inner by the building block of clamping between first brick clamp (12) and the second brick clamp (42);
Drawknot one reaction spring (5) between described afterburning clamping bar (1) corner and the corner of positive silk clamping bar (2);
Described adjusting rod (7) is circular pin, the circular hole three (31) on sleeve (3) is inserted in one end of adjusting rod (7), adjusting rod (7) rotates and sleeve (3) can be driven to rotate around its center line in vertical plane, thus regulates the relative position of positive silk clamping bar (2) and anti-silk clamping bar (4).
2. shale sintering heat insulation building block bi-directional expansion assembled tile card as claimed in claim 1, it is characterized in that, described positive silk clamping bar (2) is circular pin.
3. shale sintering heat insulation building block bi-directional expansion assembled tile card as claimed in claim 1 or 2, it is characterized in that, described sleeve (3) is a circular cylinder, and one end of sleeve connection screw rod (21) is processed with external screw thread; One end of screw rod (41) is processed with external screw thread; Sleeve (3) inside, two ends is processed with internal thread; Sleeve connection screw rod (21), screw rod (41) and sleeve (3) are all threaded connection.
4. shale sintering heat insulation building block bi-directional expansion assembled tile card as claimed in claim 1, it is characterized in that, the end of described first brick clamp (12) and the second brick clamp (42) is flat intermediate plate.
5. shale sintering heat insulation building block bi-directional expansion assembled tile card as claimed in claim 4, it is characterized in that, the clip surface of described first brick clamp (12) is provided with rubber sheet gasket; The clip surface of the second brick clamp (42) is provided with rubber sheet gasket.
6. shale sintering heat insulation building block bi-directional expansion assembled tile card as claimed in claim 5, it is characterized in that, the end of described handle (11) is set with rubber handle.
7. shale sintering heat insulation building block bi-directional expansion assembled tile card as claimed in claim 6, is characterized in that, be set with rubber handle outside described adjusting rod (7) one end.
8. shale sintering heat insulation building block bi-directional expansion assembled tile card as claimed in claim 7, is characterized in that, the length of described sleeve connection screw rod (21) and the upper screw thread arranged of screw rod (41) is 10cm; Sleeve (3) wall thickness is 5mm, and internal diameter is 15mm, and circular hole three (31) diameter at sleeve (3) middle part is 12mm; Circular hole two (13) on handle (11) is 8mm with the diameter of the circular hole one (22) of clamping bar connecting rod (23), and the diameter of rotating shaft (6) is 7.5mm; The size of the rubber sheet gasket on the rubber sheet gasket on the first brick clamp (12) and the second brick clamp (42): length is 80mm, and width is 30mm, and thickness is 5mm; First brick clamp (12) and the second brick clamp (42) length are 100mm, and width is 30mm; Rubber handle length on handle (11) is 150mm; Adjusting rod (7) long 250mm, diameter 10mm, the length of its rubber handle be equipped with is 100mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310606438.XA CN103603505B (en) | 2013-11-22 | 2013-11-22 | A kind of shale sintering heat insulation building block bi-directional expansion assembled tile card |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310606438.XA CN103603505B (en) | 2013-11-22 | 2013-11-22 | A kind of shale sintering heat insulation building block bi-directional expansion assembled tile card |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103603505A CN103603505A (en) | 2014-02-26 |
CN103603505B true CN103603505B (en) | 2016-01-13 |
Family
ID=50121760
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310606438.XA Active CN103603505B (en) | 2013-11-22 | 2013-11-22 | A kind of shale sintering heat insulation building block bi-directional expansion assembled tile card |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103603505B (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104878677A (en) * | 2015-06-01 | 2015-09-02 | 马宏 | Rotary fine-tuning tool for construction blocks |
CN104912341B (en) * | 2015-06-18 | 2017-03-22 | 三峡大学 | Labor-saving brick clamp |
CN108149934B (en) * | 2017-12-20 | 2024-01-26 | 孙清鹏 | Road brick clamping and laying device and using method thereof |
CN111894287A (en) * | 2018-07-02 | 2020-11-06 | 杭州富阳鼎杰石材有限公司 | Labor-saving brick clamping equipment capable of clamping bricks with different quantities for constructional engineering |
CN111997386A (en) * | 2018-07-02 | 2020-11-27 | 杭州富阳鼎杰石材有限公司 | Laborsaving brick that building engineering used clamps puts |
CN110847507A (en) * | 2019-12-04 | 2020-02-28 | 徐州融创达电子科技有限公司 | Color steel tile structure convenient to transport and move |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4055364A (en) * | 1976-09-23 | 1977-10-25 | Max Breite | Lifting device for batteries and the like |
US6481767B2 (en) * | 2001-02-15 | 2002-11-19 | Lisle Corporation | Battery carrier device |
CN201350602Y (en) * | 2009-02-16 | 2009-11-25 | 哈依尔别克·胡尔曼哈力 | Brick lifter |
CN201460243U (en) * | 2009-05-31 | 2010-05-12 | 中冶实久建设有限公司 | Fine tuning and aligning machine for roof truss interval |
CN201574588U (en) * | 2009-12-25 | 2010-09-08 | 金苹果(宁波)汽车部件有限公司 | Brick clamping device |
CN202100017U (en) * | 2011-06-05 | 2012-01-04 | 荆长东 | Brick clamp |
CN202138790U (en) * | 2011-07-18 | 2012-02-08 | 王秀林 | Adjustable brick clip |
CN203684704U (en) * | 2013-11-22 | 2014-07-02 | 西安建筑科技大学 | Bidirectional-expanding/contracting assembled brick clamp for shale sintered heat-reserving building blocks |
-
2013
- 2013-11-22 CN CN201310606438.XA patent/CN103603505B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4055364A (en) * | 1976-09-23 | 1977-10-25 | Max Breite | Lifting device for batteries and the like |
US6481767B2 (en) * | 2001-02-15 | 2002-11-19 | Lisle Corporation | Battery carrier device |
CN201350602Y (en) * | 2009-02-16 | 2009-11-25 | 哈依尔别克·胡尔曼哈力 | Brick lifter |
CN201460243U (en) * | 2009-05-31 | 2010-05-12 | 中冶实久建设有限公司 | Fine tuning and aligning machine for roof truss interval |
CN201574588U (en) * | 2009-12-25 | 2010-09-08 | 金苹果(宁波)汽车部件有限公司 | Brick clamping device |
CN202100017U (en) * | 2011-06-05 | 2012-01-04 | 荆长东 | Brick clamp |
CN202138790U (en) * | 2011-07-18 | 2012-02-08 | 王秀林 | Adjustable brick clip |
CN203684704U (en) * | 2013-11-22 | 2014-07-02 | 西安建筑科技大学 | Bidirectional-expanding/contracting assembled brick clamp for shale sintered heat-reserving building blocks |
Also Published As
Publication number | Publication date |
---|---|
CN103603505A (en) | 2014-02-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103603505B (en) | A kind of shale sintering heat insulation building block bi-directional expansion assembled tile card | |
CN202921945U (en) | Sector clamping claw device for processing thin-walled workpiece | |
CN204602932U (en) | Multi-radian bending machine | |
MX2019005601A (en) | Pipe element having shoulder, groove and bead and methods and apparatus for manufacture thereof. | |
CN203817784U (en) | Exhaust manifold surface milling clamp for double milling machine | |
CN202336731U (en) | Jig for drilling holes on excircle | |
CN203129563U (en) | Universal adjustable scaffold wall connecting member | |
CN203684704U (en) | Bidirectional-expanding/contracting assembled brick clamp for shale sintered heat-reserving building blocks | |
CN102658311A (en) | Shaping clamp for shaft | |
CN204711957U (en) | The large-scale extracting tool to wheel, impeller | |
CN203268832U (en) | Multipurpose brick clamp | |
CN202138790U (en) | Adjustable brick clip | |
CN201291429Y (en) | Special-purpose wrench for water blanking adapter | |
CN204022086U (en) | The adjustable handgrip auxiliary structure of a kind of clamping length | |
CN208775590U (en) | A kind of scalable brick clamp | |
CN203578811U (en) | Annular clamp for machining center | |
CN202952241U (en) | Novel fixing device | |
CN202117298U (en) | Floor tile leveling device | |
CN202137716U (en) | Multifunctional ratchet wrench | |
CN206169098U (en) | Pipe expander | |
CN205343008U (en) | Hammer that can dismantle and change arm of force length | |
CN203412307U (en) | Multifunctional construction building blade | |
CN204727029U (en) | Building block mobile device | |
CN203808476U (en) | Mounting tool for clamping surface mounted stone | |
CN204040484U (en) | A kind of pull-type gradually open form pipe crimping tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |